0% found this document useful (0 votes)
17 views10 pages

Assignment Format

Uploaded by

vaibhav poman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views10 pages

Assignment Format

Uploaded by

vaibhav poman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

KJEI’s

TRINITY POLYTECHNI
Sr. No. 25 &27, Near Bopdeo Ghat, Kondhawa Sas

Name of Subject & Code:Design of steel and RCC Structures

ASSIGNMENT NO-

Unit NO-1.Fundamental of steel structures.

Assignment Declaration Date: 22/07/2024


Assignment Submission Date (on or before) - 26/08/2024
Assignment assessment declaration Date by faculty (on or before): - 27/07/2024
Maximum marks for Assignment: 16

Question No. Question Statement

Q1. Enlist the four steel structures with their functions.

Q2. Write four advantages & disadvantages of steel as construction material.


State any loads to be considered while designing steel structures along with their
Q3.
respective code.

Q4. Explain the limit state of serviceability applicable to steel structure

Q5. Enlist the components and corresponding function of steel water tank.

Q6. Enlist four load to be considered per IS 8751987 while designing steel structures.

Course coordinator
KJEI’s

NITY POLYTECHNIC, PUNE


27, Near Bopdeo Ghat, Kondhawa Saswad Road , Dist. Pune.

ures

ASSIGNMENT NO- 1

24

Mapping Number
ement Blooms Level Marks
CO PO PSO
s. a PO1 PSO1 R1 2

construction material. a PO2 PSO1 A3 4


teel structures along with their
a PO3 PSO1 U2 2

to steel structure a PO1 PSO1 R1 2

of steel water tank. a PO1 PSO1 R1 4

while designing steel structures. a PO3 PSO1 R1 2

HOD
KJEI’s

TRINITY POLYTECHN
Sr. No. 25 &27, Near Bopdeo Ghat, Kondhawa S

Name of Subject & Code:Design of steel and RCC Structures

ASSIGNMENT NO

Unit NO-1.Design of steel connection

Assignment Declaration Date: 08/08/2024


Assignment Submission Date (on or before) - 13/08/2024
Assignment assessment declaration Date by faculty (on or before): - 16/08/2024
Maximum marks for Assignment: 26

Question No. Question Statement

Q1. State the relation between throat thickness & size of fillet weld with diagram.

Q2. State any four types of steel section along with sketches.

Q3. Write four advantages of bolted connection over welded connection.

Design the lap joint for plates 100X10 mm & 80 X 10 mm thick connected to transmit
Q4. 120KN factored load uding sigle row of 18 mm diameter bolts of 4.6 grade & plates of
415 grades.

Design suitable fillet weled connection for ISA 80X50X8 mm with its longed leg
connected to gusset plateof thickenss 8 mm. The angle is subjected to a factored load of
Q5.
275 KN .Take Cxx = 27.3 mm . Assume welding is applied to two edged and shop
welding .Gy 250 Mpa.Fu = 410 MPa.

Determine the efficiency of Lap joint used to conncet two plates of 10 mm thickness,Use
Q6. Fe 410 grade gor plate material & 4.6 grade for bolts.Take the end distance equal to
30mm & bolt diameter 20 mm with 50mm pitch .
Course coordinator
KJEI’s

INITY POLYTECHNIC, PUNE


&27, Near Bopdeo Ghat, Kondhawa Saswad Road , Dist. Pune.

ures

ASSIGNMENT NO- 2

24

Mapping Number
ement Blooms Level
CO PO PSO
of fillet weld with diagram. b PO1 PSO1 U2

tches. b PO2 PSO1 U2

elded connection. b PO3 PSO1 U2

X 10 mm thick connected to transmit


ameter bolts of 4.6 grade & plates of b PO1 PSO1 A3

X50X8 mm with its longed leg


ngle is subjected to a factored load of
s applied to two edged and shop b PO1 PSO1 A3

cet two plates of 10 mm thickness,Use


lts.Take the end distance equal to b PO3 PSO1 A4
HOD
Marks

6
HOD