BK 1
BK 1
This report includes the mobilisation and calibrations operations carried out by Enzen Global
Solutions Pvt Ltd., on the survey boat MB MAHALAXMI in preparation for commencement
of Multi Beam Bathymetry survey at Bakreswar Reservoir, Birbhum, West Bengal.
The mobilisation of the survey boat, installation and interfacing of the survey equipment was
started on 29th May 2023 and completed on 30th May at Bakreshwar Dam. The Multi-beam
echo sounder patch test calibration survey was conducted on 30th May.
Back deck procedures were explained and followed with no single-man operations and all
non-essential personnel keeping clear of operations. Personnel Protection Equipment
included safety boots, personnel floatation device/ life jackets and cover-all’s for all personnel
involved in back deck operations.
2
Floating Solar Pre-Feasibility Study - Bakreswar Reservoir Bathymetry Study
Proposed grid size: Study lines will be spaced accordingly to the depth of water at
proposed study area to have a minimum overlap of 25% and 100% coverage of
underwater topography to obtain the contours output with the line interval of 10m X
10m.
1 x 3D Motion Sensor
3
Floating Solar Pre-Feasibility Study - Bakreswar Reservoir Bathymetry Study
The survey works will be conducted in accordance with the specifications and scope of work
specified by WBPDCL, and the standard survey procedure recommended by the equipment
manufacturer and Enzen Global Solutions Private Limited.
B. Geodesy
Surveys will be conducted in WGS 84 spheroid, Indian Datum, Grid co-ordinates are in terms
of Universal Transverse Mercator (UTM) Projection. Details of Spheroid and Grid systems
are as follows: