PMP Outline

Uploaded by

maha.abuelsaud
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views8 pages

PMP Outline

Uploaded by

maha.abuelsaud
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

P R O F E S S I O N A L P R OJ E C T M A N A G E ME N T

PROJECTS in the center of PMI +50 years heading PMBOK applies to any PROJECT PROFESSIONALS
Enterprise Management Professional Project Management Project (predictive or agile) use common TERMINOLOGY

▶ Turn ideas into reality ▶ Certification ▶ 5 Process Groups ▶ Project Management: create a product,
▶ "Change the Business" ▶ Project Management ▶ Initiating service or result (and get it transitioned)
more appreciated than Professional (PMP®) ▶ Planning ▶ Program Mgt.: Benefit realization
“Run the Business" ▶ Executing ▶ Portfolio Mgt.: Do the right thing
▶ Knowledge ▶ Controlling ▶ Stakeholders: those who affect or are
▶ Managers know how to ▶ Project Management Body ▶ Closing affected by the project
manage operations, but of Knowledge (PMBOK®) ▶ Constraint: “I’m not free to manage my
they need professionals: ▶ 10 Knowledge Areas way, so I’m constrained”
o Who manage projects 4. Integration ▶ Assumption: “I don’t know that yet, but
o Who are accountable 5. Scope I can take assumptions”
6. Schedule ▶ Good practice: Progressive Elaboration
▶ Everything a project 7. Cost = Rolling Wave Planning
professional should know 8. Quality ▶ PMO: Project Management Office
is already invented 9. Resources ▶ PMIS: Project Mgt. Information System
10. Communications ▶ OPA: Organizational Process Assets
11. Risk ▶ EEF: Enterprise Environmental Factors
12. Procurement ▶ Lifecycle: Predictive (req. clear) vs. Agile
13. Stakeholders (discover requirements from feedback)
▶ Types of organizations:
▶ 49 Processes o Functional
▶ Inputs o Weak Matrix
▶ Tools & Techniques o Balanced Matrix
▶ Outputs o Strong Matrix
▶ Document templates o Projectized
S C OP E M A N A G E ME N T

PROFESSIONAL
PLANNING MONITORING / CONTROL TERMINOLOGY
PROJECT MANAGERS

▶ They manage the Product Scope ▶ 5.1 Plan Scope Management ▶ 5.5 Validate Scope ▶ Scope creep
▶ to satisfy needs ▶ Scope Management Plan ▶ Verified Deliverables → ▶ Product = Σ requirements
▶ from collecting requirements ▶ Requirement Mgt. Plan Validated Deliverables ▶ Project = Σ work
▶ until customer accepts ▶ Data: “The door delivered ▶ Verified = as designed
deliverables ▶ 5.2 Collect Requirements is painted red” ▶ Validated = as required
▶ Requirements ▶ Info: “The client wants the ▶ Scope Baseline:
▶ and the Project Scope Documentation door painted brown” o Project Scope
▶ What work to do? Statement
▶ This work is “in” or “out”? ▶ 5.3 Define Scope ▶ 5.6 Control Scope o Work Breakdown
▶ 100% work complete: ▶ Scope Statement ▶ No “scope creep” Structure
o deliverables o Work approach ▶ No work out of scope o WBS Dictionary
o other work o Exclusions ▶ Facilitate positive changes ▶ Work Packages
▶ Communicate on WBS ▶ Planning Packages
▶ 5.4 Create WBS ▶ Data: “Team is working on ▶ Good practice:
▶ 100% rule: product XYZ” Progressive Elaboration =
o WBS = Σ work packages ▶ Info: “Product XYZ is not Rolling Wave Planning
o WBS = Σ control accounts included in any work
▶ WBS Dictionary package, so this is a scope
▶ Scope Baseline variance”
S C H E D U L E M A N A G E ME N T

PROFESSIONAL
MANAGE ACTIVITIES MANAGE BASELINE TERMINOLOGY
PROJECT MANAGERS
▶ They visualize what to do ▶ 6.1 Plan Schedule Management ▶ 6.6 Develop Schedule ▶ Activity Attributes
▶ Today? This week? This ▶ Schedule Management Plan ▶ Model Schedule: ▶ Milestones
month? At the end? o Critical Path Method ▶ Dependencies: Hard/Soft Logic
▶ 6.2 Define Activities o Critical Chain Method ▶ Project Network Diagram
▶ to finish on time ▶ Activity = Start-Finish ▶ Meet Constraints: ▶ Duration Estimates
▶ Decompose into ACTIVITIES o Fast-tracking (risk) ▶ 3-point dates: Optimistic
▶ Set a schedule baseline ▶ 6.3 Sequence Activities o Crashing (cost) /Pessimistic/Most Likely
▶ 3 couple of dates: ▶ Logical dependencies: FS, SS, FF o Levelling (time) ▶ Committed dates: Baseline
o Baseline Start-Finish o Hard logic (mandatory) ▶ Set Schedule Baseline Start/Finish
o Start-Finish o Soft logic (preferred) ▶ Represent Gantt Chart ▶ Real dates: Actual Start/Finish
o Actual Start-Finish ▶ Project Network Diagram ▶ My best estimate: Start/Finish
▶ %Complete = ▶ 6.6 Control Schedule ▶ Critical/Near-Critical Path
Actual Duration / Duration ▶ 6.4 Estimate Activity Durations ▶ Status Dates ▶ Free/Total Slack, Float
▶ On each project review: ▶ Estimation techniques: ▶ Status Reports ▶ Schedule Constraint
o Measure & Adjust o Analogous: order of ▶ Measure & Adjust ▶ Project/Resource Calendars
o Ask Steering Committee: magnitude ▶ Data: “Activity completion ▶ Scheduling Methods: CPM /
What do we do? o Parametric: formula date April the 3rd” Critical Chain / PERT
o 3-point estimate: quantify risk ▶ Info: “2-week delay ▶ Schedule
o Bottom up: knowledge forecast” ▶ Gantt Chart
CO S T MA N A G E M E N T

PROFESSIONAL
ACTIVITY MANAGEMENT BASELINE MANAGEMENT TERMINOLOGY
PROJECT MANAGERS
▶ They are accountable on ▶ 7.1 Plan Cost Management ▶ 7.3 Determine Budget ▶ BAC: Budget At Completion
▶ Cost Variance ▶ Cost Management Plan ▶ Basis of Estimates ▶ Project Budget
actual vs. forecast ▶ EV Measurement Methods: ▶ Cost aggregation ▶ Contingency Reserve
▶ Financial Benefit o Percent Complete ▶ Funding limit reconciliation ▶ Management Reserve
actual vs. forecast o Fixed Formula (0/100-25/75- ▶ Contingency Reserve ▶ PV: Planned Value = BCWS
▶ Financial WIP 50/50) ▶ Management Reserve ▶ EV: Earned Value = BCWP
actual vs. forecast o Weighted Milestones ▶ Cost Baseline ▶ AC: Actual Cost = ACWP
o Physical Measurement ▶ Funding Requirements ▶ CV: Cost Variance
▶ to finish on budget o Apportioned Effort ▶ CPI: Cost Performance Index
▶ Control work packages o Level Of Effort ▶ 7.4 Control Costs ▶ ETC: Estimate To Complete
performance: ▶ Earned Value Management ▶ EAC: Estimate At Completion
o Budget ▶ 7.2 Estimate Cost ▶ Earned Schedule ▶ VAC: Variance At Completion
o Cost Baseline ▶ Uncertainty Cone ▶ TCPI: To-Complete ▶ TCPI: To Complete Performance Index
o PV, EV, AC ▶ People: Direct vs. indirect costs Performance Index ▶ WIP: Work In Progress
o Funding, expenses, ▶ Physical: equipment, materials, ▶ Cash Flow / Financial Margin ▶ SV: Schedule Variance
reserves, costs installations, infrastructure ▶ WIP: Work In Progress ▶ SPI: Schedule Performance Index
▶ On each review: ▶ Estimation techniques: ▶ Status Dates, Status Reports ▶ TEAC: Time Estimate At Completion
o Measure & Adjust o Analogous: expert judgement ▶ Measure & Adjust ▶ ES: Earned Schedule
o Ask Steering o Parametric: historical data ▶ Data: “submitted hours” ▶ SV(t): Schedule Variance time
Committee: What o 3-point estimate: quantify risk ▶ Info: “bad news: variance at ▶ SPI(t): Schedule Performance Index time
do we do? o Bottom up: detailed knowledge completion & positive WIP” ▶ DSO: Days Sales Outstanding
Q U A L I T Y A N D P RO CU RE M E N T MA N A G E M E N T

PLANNING EXECUTION CONTROL TERMINOLOGY

▶ 8.1 Plan Quality ▶ 8.2 Manage Quality ▶ 8.3 Control Quality ▶ Quality ≠ Grade
▶ Quality as user perceives ▶ Audit Processes ▶ Inspect Products (sampling) ▶ Precise ≠ Accurate
▶ Planning over Inspection ▶ Continuous Improvement ▶ Verified deliverables ▶ Standard ≠ Regulation
▶ Cost Benefit analysis ▶ Find root causes (Ishikawa, ▶ Control Charts ▶ Control Chart
▶ Cost of Quality 5 Whys) o Track Special Causes o UCL: Upper Control Limit
o Conformance: (outliers, rule of 7, etc.) o LCL: Lower Control Limit
Prevention + Appraisal ▶ 8.2 Conduct Procurement o Not Common Causes o Special (assignable) cause
o Non-Conformance: ▶ Proposal evaluations ▶ Pareto (identify major causes) o Common cause
Internal + External ▶ Bidder conferences ▶ Data: High number of escaped ▶ Process is under control if:
▶ Seven Basic Tools of Quality ▶ Contracts (⊂ agreements) defects o 99% outcomes within limits
o Cause & Effect Diagram o FP, FPEPA, FPIF ▶ Info: Trend chart shows low o 𝐿𝐶𝐿, 𝑈𝐶𝐿 ⊂
o Flowchart o T&M performance of Testing Team o 𝜇 − 3𝜎, 𝜇 + 3𝜎
o Check Sheet o CPFF, CPAF, CPIF
o Pareto Diagram ▶ FPIF ▶ 13.4 Control Procurement ▶ SOW: Statement Of Work
o Histogram o Target Cost, Target Fee, ▶ Accept deliverables ▶ RFP: Request for Proposal
o Control Chart Sharing Ratio, Ceiling Price, ▶ Inspections, audits ▶ RFQ: Request for Quotation
o Scatter Diagram PTA ▶ Procurement documentation ▶ RFI: Request for Information
o Actual Cost, Actual Fee, ▶ Claims and contract ▶ IFB: Invitation for Bid
▶ 12.1 Plan Procurement Actual Price administration ▶ FFP: Firm Fixed Price
▶ Make or buy decisions ▶ CPIF ▶ Directed vs. constructive ▶ FPIF: Fixed Price Plus Incentive
▶ Procurement SOWs o Target Cost, Target-Min- changes Fee
▶ Procurement documents Max Fee, Sharing Ratio ▶ Contract Terminations ▶ PTA: Point of Total Assumption
(RFP, RFQ, RFI, IFB) o Actual Cost, Actual Fee, o Mutual Agreement ▶ T&M: Time and Material
▶ Is scope clear? Actual Price o Cause or Defect ▶ CPFF: Cost Reimbursable Plus
o Yes: Fixed Price contract ▶ Agile Contracts o Convenience Fixed Fee
o No: Cost Reimbursable o Small Proc. SOWs ▶ Dispute resolutions ▶ CPAF: Cost Reimbursable Plus
▶ Is performance measurable? o Alistair Cockburn o Negotiated agreement Award Fee
o Yes: Incentive Fee contract o Money for Nothing & o Escalation, Mediation, ▶ CPIF: Cost Reimbursable Plus
o No: Fixed Fee contract Change for Free Arbitration, Litigation Incentive Fee
R ES OU RC E M A N A G E ME N T

PROFESSIONAL
PLANNING EXECUTION TERMINOLOGY
PROJECT MANAGERS

▶ They manage People ▶ 9.1 Plan Resource ▶ 9.3 Acquire Resources ▶ Interpersonal Skills
▶ Recruit team members Management ▶ Expert Judgement ▶ Resource Management Plan
▶ Leading & Team Building ▶ Project needs ▶ Assignations ▶ Team Charter
▶ Performance Appraisals ▶ Availability ▶ Resource Calendars ▶ RBS (Resource Breakdown
▶ Motivation Theories Structure)
▶ and Physical Resources ▶ Staffing Management ▶ 9.4 Develop Team (~ ”carrot”) ▶ RAM (Responsibility
▶ Equipment Plan ▶ Individual Performance Assignation Matrix):
▶ Materials ▶ Training o RACI (Responsible,
▶ Installations ▶ 9.2 Estimate Activity ▶ Virtual / Remote Accountable, Consulted,
▶ Infrastructure Resources ▶ Team building (Tuckman ladder) Informed)
▶ Work Packages / ▶ Situational Adapted Leadership ▶ OBS (Organizational
Activities / Assignments Breakdown Structure)
▶ Resource Constraints ▶ 9.5 Manage Team (~ “stick”) ▶ PMIS (Project Management
▶ Resource Requirements: ▶ Performance Reports Information System)
o 2 plumbers at 50% ▶ Change Requests ▶ FTE (Full Time Equivalent)
o 3 electricians full-time ▶ Team Performance
o 250 programmer
hours
o 3 software licenses CONTROL
o 4 laptops
o 100 meters of wire ▶ 9.6 Control Resources
o 4 train tickets ▶ Problem solving
▶ Change Requests
▶ Data: “didn’t attend the meeting”
▶ Info: “no longer works as a team”
CO M MU N I C ATI O N S A N D S TA K E H O LD E R M A N A G E M EN T

INITIATING / PLANNING EXECUTION MONITORING TERMINOLOGY

▶ 13.1 Identify Stakeholders ▶ 10.2 Manage ▶ 10.3 Monitor ▶ Interpersonal skills


▶ Who to engage? Communications Communications ▶ Communication model
▶ Meet their expectations ▶ Elaborate documents, ▶ Is communication (sender, receiver, message)
present, inform, report, effective? ▶ Communication method
▶ 10.1 Plan Communications receive feedback ▶ Corrective / preventive (pull, push, interactive)
▶ Communication actions ▶ Communication channels
requirements ▶ 13.3 Manage Stakeholder ▶ Data: “She hasn’t read ▶ Communications Plan
Engagement this report”
▶ 13.2 Plan Stakeholder ▶ Manage expectations, ▶ Info: “She ignores the ▶ Stakeholder
Engagement conflicts, issues project status” ▶ Power/Interest grid
▶ Engagement Levels: ▶ Win-win negotiation ▶ Stakeholder Engagement
o Unaware ▶ 13.4 Monitor Stakeholder Assessment Matrix
o Resistant Engagement ▶ Stakeholder Engagement
o Neutral ▶ Is engagement effective? Plan
o Supportive ▶ Corrective / preventive ▶ Stakeholder register
o Leading actions ▶ Issue log
▶ Data: “She no longer
answers emails”
▶ Info: “She has moved
from leading to neutral”
R ISKS , IS SUE S, AS SUM PT IO NS

PROFESSIONAL
PLANNING EXECUTION / CONTROL TERMINOLOGY
PROJECT MANAGERS

▶ Do I have the right to believe? ▶ 11.1 Plan Risk Management ▶ 11.6 Implement Risk ▶ Uncertainty
▶ Yes → Estimate ▶ Risk Management Plan Responses o Threat/Opportunity
▶ No → Manage Uncertainty ▶ Risk Breakdown Structure ▶ Update Issue log o Business/Pure Risk
▶ Attitude of a Project ▶ Update Risk Register o Secondary/Residual
Professional ▶ 11.2 Identify Risks o Update status: ▶ Project Documents
▶ Create Risk Register o Watch list o Risk register
▶ Issue ≠ Risk o OPA & Expert Judgement o Open o Assumption log
▶ Risk = Materialized Issue o Causal analysis o Closed o Issue log
▶ Manage with Issue Log o Risk Owners o Update: ▶ Qualitative Risk Analysis
o Fix when it happens o Dates o Severity
o Definitive solution ▶ 11.3 Qualitative Analysis o Comments o Probability and Impact
o Temporary solution ▶ Prioritize Risk Register o Conclusions Matrix
(workaround) o Qualify = high, medium, low ▶ Quantitative Risk Analysis
o Severity = Importance = ▶ 11.7 Monitor Risks o Contingency Reserve
▶ Assumption ≠ Risk o Probability x Impact ▶ Update Assumption log o Management Reserve
▶ Not under control of PM ▶ Update Risk Register o Probability Function
▶ Manage with Assumption Log ▶ 11.4 Quantitative Analysis o New threats and o Monte Carlo Simulation
o If they don’t know then ▶ Size of uncertainty window opportunities o Expected Monetary Value
take assumptions ▶ Probability and reserves o Residual risks o Decision Tree
o Are they still valid? o Secondary risks ▶ Respond Threats: Accept,
▶ 11.5 Plan Risk Responses o Update: Avoid, Contain, Mitigate,
▶ Manage Risks ▶ Threats: Accept, Avoid, Contain, o Responses Transfer, Escalate
▶ Obliged to respond to them Mitigate, Transfer o Mitigation actions ▶ Respond Opportunities:
▶ Manage with Risk Register ▶ Opportunities: Accept, Exploit, o Contingency Accept, Exploit, Enhance,
o Threats and Opportunities Enhance, Share actions Share, Escalate