0% found this document useful (0 votes)
135 views2 pages

Clearance For Hydro Test

Uploaded by

Shobhik Mazumder
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
135 views2 pages

Clearance For Hydro Test

Uploaded by

Shobhik Mazumder
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

FABTECH PROJECTS AND ENGINEERS LTD

RECORD OF CLEARENCE FOR HYDROTESTING


Report No.:FPEL/CFH/R-02 Date.:
Name of Project.: BIO REFINERY PROJECT
Client.: M/s ASSAM BIO REFINERY PVT LTD.
Consultant.: M/s ARYA ENGINEERS AND CONTRACTORS PVT.LTD.
Contractor.: M/s FABTECH PROJECTS AND ENGINEERS LTD
TANK NO: FERMENTER-125-RB-0001-B TEST PACKAGE NO:
SIGNATURE
S No ACTIVITY DESCRIPTION CHECKS REMARKS
FABTECH TPI/AECPL
A MECHANICAL CLEARENCE
Completeness of Drawing(FPRO-535-DR-125-W-
1 0001-B-0001,REV-7 )
COMPLETED

2 Fit-up OK
3 Installation as per Drawing OK
4 Correctness of installation of Shell OK
a Valves NA
b Strainer NA
c Flange joints COMPLETED
d Level guages NA
5 Supports OK
6 Vents/Drains NA
7 Tapping for instruments OK
8 Expension bellows NA
9 Earthing OK
10 Rf Pad Pneumatic Test OK
11 seal welding of screwed connection OK
12 Cold pull,if any NA
13 Flange box-up OK
14 Liquidation of checklist point OK
15 Pre-hydro test punch list DONE
B WELDING/NDT CLEARENCE
1 Weld Visual OK
2 PWHT/Hardness NA
3 DPT/MPT OK
4 Radiography OK
5 Positive Material Identification OK
6 Tank joint History sheet OK
C WATER FILLING CLEARENCE
1 Liquidation of Pre hydrotest point OK
Removal of NRV/CV/Instrument/ Rupture
2 OK
disc/Strainer mess
3 Location of Test Pump OK
4 Post hydrotest punch list(note-1) NA
FABTECH TPI/AECPL
Sign: Sign:
Date: Date:
Name: Name: