CXT90 - Service Manual
CXT90 - Service Manual
· 01· · 02·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use
Working environment
2 ≤ 95%(45℃ )
humidity
Repeatability error of
6 ≤ ±0.5%
weighing sensor
Monitor Mainframe
· 03· · 04·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use
· 05· · 06·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use
· 07· · 08·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use
幅度和高度限制器 反 顺 down.
Amplitude & Height Limiter Anti-clockwise Clockwise
电位器
调节螺钉
POT turning
screw
回转传感器
Slewing sensor
1 2
3
1 2
3
原回转限位器
Original Slewing Sensor
空白处
顺时针转动 反时针转动 Blank
Clockwise roatation Anti-Clockwise roatation
· 09· · 10·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use
▲▲ Remark: The slewing angle sensor utilizes the transmission ◆◆ Control port instruction:It has two types of
function of slewing travel limiter .It does not change the control port:15 port control and 24 port control
connection of slewing travel limiter.
15 control port
Load moment indicator Tower Crane Anti-collision
▲▲ 3.5. Installation of Wind Sensor and Other inverse ejecting Liebherr
park when trolley runs outwards
Equipment 1
(or maximum angle)
1 when left slewing is restricted
Liebherr
Fasten wind sensor on the top of tower crane, lead the inverse ejecting Liebherr when
park when trolley runs inwards
signal cable to operator cabin and connect it to the wind 2 2 right slewing is restricted
(or minimum angle)
Liebherr
sensor port of the controller. After all the other devices have
3 moment limitation point 1 3 slewing braking
been installed, connect the signal cable to driver’s cabin.
park when trolley runs outwards
All the interfaces are unique so there will not by any wrong 4 moment limitation point 2 4
(or maximum angle)
connection. park when trolley runs inwards
5 moment limitation point 3 5
(or minimum angle)
6 weight limitation point 1 6 moment limitation point 1
7 weight limitation point 2 7 moment limitation point 2
▲▲ 3.6. Connection of Power Line high speed limitation of trolley
8 weight limitation point 3 8 running outwards(or maximum
Requirements on power connection: Don't connect to
angle)
the same phase line as power supply of tower crane control high speed limitation of trolley
circuit; try to minimize power interference (it is better to 9 weight limitation point 4 9 running inwards(or minimum
connect power directly from tower crane power control angle)
10 Installation mode Bypass 10 Installation mode Bypass
cabinet).Requirements on grounding: Choose the appropriate
high speed limitation of left
ground point for reliable grounding, ground resistance should 11 Left slewing limitation 11
slewing
not more than 4Ω, so as to ensure that the system work high speed limitation of right
12 right slewing limitation 12
properly. slewing
13 maximum height limitation 13 left slewing stop
14 minimum height limitation 14 Right slewing stop
15 moment limitation point 4 15 Moment limitation 4
· 11· · 12·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use
24 control port
park when trolley runs outwards high speed limitation of right
Ⅳ > Function and Setting (Load Moment Indicator)
1 13
(or maximum angle) slewing
park when trolley runs inwards high speed limitation of left
2
(or minimum angle)
14
slewing
The system has the following functions, load moment
3 moment limitation point 1 15 high speed lifting
indicator, record display and remote online monitoring.
Preparation: Confirm the tower crane type and
4 moment limitation point 2 16 lifting limit
manufacturer (e.g. Yongmao STL293-18T), dimension of
5 moment limitation point 3 17 high speed lifting down weighing sensor, amplitude and ratio of height limiter.
6 weight limitation point 1 18 lifting down limit
high speed limitation of trolley
7 weight limitation point 2 19 running outwards(or maximum
▲▲ 4.1. Start the system and enter working
angle) interface
high speed limitation of trolley
8 weight limitation point 3 20 running inwards(or minimum ◆◆ 4.1.1. Level-jib Tower Crane
angle)
Moment Language
9 weight limitation point 3 21 moment limitation point 4
10 Installation mode bypass 22 Slewing braking Rated
inverse ejecting Liebherr when load
11 left slewing stop 23
left slewing is restricted
Wind
inverse ejecting Liebherr when speed rate
12 right slewing stop 24
right slewing is restricted load
▲▲ NOTE: The relay is closed(ON)when the power in on. The relay slewing
height
is off(OFF) when it is on the state of alarm.The above contacts amplitude
can be used as normally closed contacts.
Traveling Alarm
status bar
· 13· · 14·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use
Moment Language Setting procedure: Make sure the displayed tower crane
type the same as the tower crane installed → Installation of
Rated Load hardware → Set general parameter → calibrate parameter
Rate
Wind speed
Load
▲▲ 4.2 General Parameter (Protected by
Slewing password)
Height
It has been set by tower crane manufacturer according to
Amplitude
the features of tower crane and can not be changed.
Traveling Alarm
Status
Bar
· 15· · 16·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use
· 17· · 18·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use
· 19· · 20·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use
▲▲ 4.5. Records
· 21· · 22·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use
◆◆ 4.5.5.Wind speed:
When the speed of the wind exceeds the pre-set data, it ◆◆ 4.5.7. External control relay on/off record
· 23· · 24·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use
1# Obstacle Coordinates:(30、95)
(70、95)
(70、115)(30、
115) 高度 Height(H):50
2# Obstacle Coordinates:(80、58)
(92、58)
(92、95)(155、
95)(155、125)(80、125)高度 Height(H):30
· 25· · 26·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use
3# Obstacle Coordinates:(30、22)(138、22)(138、
44)(30、44)高度 Height(H):80
1# Tower Crane(Level-jib)Coordinates:(70、65) 大 臂 长
度 main jib length:50M 平衡臂 Counter jib length:11M H:
60M
2# Tower Crane(Luffing)Coordinates:(120、65)大臂长度
main jib length:40M 平衡臂 Counter jib length:8M H:80M
Point A coordinate(145、85)B 点坐标 Point B coordinate(80、
10)
2.When the coordinates have been confirmed, give each
mainframe number (eg.1#is 10021,2#is 10011,3#is 10035)
and connect each system online on the ground. Input the site
coordinate and tower crane parameter into each mainframe
and check the correctness of the parameter.(3 ways of data
input 1.Input the data manually on the system.2.Set up file by
using PC software supplied by manufacturer, and upload to Click menu icon on the bottom right of screen, input
mainframe by USB.3.Upload the data to mainframe wirelessly by password 8211 and enter menu setting.
using the PC software supplied by manufacturer).
· 27· · 28·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use
Setting procedure :Zone setup → Setup on tower Instead of inputting points,the customer can also
crane → Setup on site → General parameter → Load automatically get the zone coordinates by the angle of tower
chart → Parameter setup crane and the trolley position.
The system can set up to 10 zones. The coordinates need to
▲▲ 4.6. Zone Setup be calculated according to the construction site drawing.
· 29· · 30·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use
· 31· · 32·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use
Slewing coordinate Point A and B need to be calibrated tower crane main jib to point A ,click “point A” and ‘Yes’,
according to the site drawing. Point A and B are the reference Then move the tower crane jib anticlockwise to point B and
points of slewing coordinates which are set by the operator. click “point B” and “Yes”. The system will calculate the
Check the setting of site drawing Point A and B slewing angle automatically.
Then set alarm distance and pre-alarm distance.
Inertia angle indicates the angle when system stays alarm.
Brake and inverse ejecting are used exclusively for
LIBHERR
The calibration of coordinate of anti-collision has been
done.
· 33· · 34·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use
Ⅴ > Operation Order Access Module Specification (Optional) Ⅵ > System Malfunction Analysis
This module is used to record tower crane gear operation
or gear voltage ,tower crane mechanical limit signal No. Fault Code Solution
collection, automatic type switching and rate switching (only
supports two kinds of types and rates) Restart the system, touch 20 times continuously
with in 5 seconds on the start interface to enter
1 Touch-Screen Invalid
the tuning program,calibrate according to the
instruction
Check if the display and mainframes have been
Tower Crane Operation Order Access Line No. Extended Module Line No. Data errors or no
2 connected to cables and restart.Make sure they
response after boot
are well connected and restart.
The corresponding sensor breaks down.Check
the connection of cable and enter the parameters
Weight, amplitude, calibration interface to view all sensor
height, parameters.
3 slewing displayed Weight varies between 0.5~4.8, amplitude
exclamation point and varies between 0.2~4.8,
alarm height varies between 0.2~4.8, slewing between
0~16800
· 35· · 36·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use
▲▲ Cautions
Ⅶ > Technical Support and Maintenance Service
Often check monitor fix holder. Keep it firm, stable and
free of loose status.
Regularly check whether the power supply cable is broken
▲▲ 7.1 CXT-90 Ⅱ Installation and Commissioning
or the shell is damaged or not. Check if the connection
We will delegate personnel to provide our users
is firm and stable on the grounding. with training and instructions during the installation and
Check if the lead-out cable, plugs and sockets are loose commissioning. To carry out installation and commissioning,
the site should meet the following requirements.
or not. Do not insert or pull o the cable improperly, or it
◎ The crane works properly;
may cause poor contact. ◎ Prepare standard weights or article with known weights
Do not clean the panel with chemical solvent. Wipe it with for calibration to facilitate the calibration process.
Weight of article for calibration shall be close to
semi-wet towel.
40%~50% of the maximum rated load capacity;
Keep the main board from rain and avoid exposing to ◎ Prepare an angle ruler to calibrate the length accurately.
sunlight directly. ◎ Assistance will be needed for on-site installation and
commissioning from hoister, crane maintenance electrician,
Do not open the rear cover of case randomly.
crane operator, and locksmith etc.
Check whether the direction of weighing sensor shaft stays
the same. ▲▲ 7.2 Maintenance Service
Make sure to install the height and amplitude limiter
◎ Lifetime maintenance;
tightly ◎ 1 year Quality warranty period from date of purchase;
◎ Provide free Maintenance service within warranty
period; beyond the warranty period, only cost will be charged.
◎ We exclude warranty for:
① Damage from collision and extrusion;
② Damage from improper dismantle;
③ Damage from other abnormal operation.
· 37· · 38·