0% found this document useful (0 votes)
1K views21 pages

CXT90 - Service Manual

Uploaded by

baraa alkhabbaz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views21 pages

CXT90 - Service Manual

Uploaded by

baraa alkhabbaz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 21

目录 CXT/90 Ⅱ Multi-function Inidocator for Tower Crane

Instructions for Installation and Use

Ⅰ > System Overview


Ⅰ > System Overview.................................................... 02

▲▲ 1.1. Product Features


Ⅱ > System Composition (Load Moment Indicator) CXT-90 Ⅱ Multi-function Indicator for Tower Crane
integrated load moment indicator with anti-collision & zone
....................................................................................... 04 protection system and remote online monitoring system. It
indicates real time working states of tower crane and tower
crane group both in operator cabin and online.In the meantime
Ⅲ > Hardware Installation.............................................. 06 it combines functions including black box, anti-collision &
zone protection.The system is applicable to various types
of level-jib and luffing tower cranes. It adopted the most
advanced embedded intelligent microprocessor technology,
Ⅳ > Function and Setting (Load Moment Indicator) high precision digital azimuth sensor, weighing sensor, angle
....................................................................................... 14 sensor.which greatly enhanced data processing capability with
higher precision and higher stability. In addition,the system
adopts 8 inch sized touch screen and display in Chinese/
English/Russian language,which help operators install and
Ⅴ > Operation Order Access Module Specification (Optional) use the system more easily. When the operator runs the tower
crane, the system can show the comprehensive working states
....................................................................................... 35
of tower crane which help him run the tower crane safe and
effectively.

Ⅵ > System Malfunction Analysis.................................. 36


▲▲ Note: Users can choose part or all of the system’s functions according
to their needs.We will prepare different spare parts based on the order.
The function and the supplied spare parts are subject to the contract.
Ⅶ > Technical Support and Maintenance Service......... 38

· 01· · 02·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use

Ⅱ > System Composition (Load Moment Indicator)


Composition of the system is shown as follows, including
▲▲ 1.2. Parameter monitor, mainframe, amplitude sensor, height sensor,
weighing sensor, wind speed sensor, signal access module
and etc.(prepare based on customer’s requirement)
Working environment
1 -20℃~ 60℃
temperature

Working environment
2 ≤ 95%(45℃ )
humidity

~ 48V ~ 220V ~ 380V


3 Power Supply voltage
(customizable)

4 Mode of operation continuous

5 Combined error ≤ ±3%

Repeatability error of
6 ≤ ±0.5%
weighing sensor

Linearity error of weighing


7 ≤ ±0.5%
sensor

Monitor Mainframe

· 03· · 04·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use

Ⅲ > Hardware Installation

▲▲ 3.1. Installation of Driver Cabin’s Control


Box and Monitor
It’s recommend that you install the control box to the
proper left side of driver’s cabin. (The users can deal with the
Wind Speed Sensor Slewing sensor
installation according to the specific circumstance.)

▲▲ 3.2. Installation of Weighing Sensor Shaft


First way of installation: Take the original weighing
wheel shaft down; replace it with the shear force weighing
sensor shaft according to the original assembling structure.
Try to avoid strong force striking. It’s better to use a wooden
Height、Amplitude Sensor hammer. During assembling, attention shall be paid to prevent
the lead-out cable or cable joint at the ends of the shear shaft
from impacting or punchy bending in case of damage. After
installation of shear force weighing sensor shaft, lay the signal
cable and connect it to the controller the 4 cored port and
tighten the screws.

Function can be selected according to the requirement.

· 05· · 06·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use

▲▲ 3.3. Installation of Trolley Travel Limiter


此处折弯
Bend here
(DXZ-W with Potentiometer)
防转卡板
Anti-rotary
clamp Clamp ◆◆ 3.3.1. Installation of Height Travel Limiter
Take down the original height travel limiter without
(剪力)传感器轴
(shear) weighing
potentiometer and replace it with the one with potentiometer
sensor shaft
and larger drive ratio (for example, replacing 1:78 with 1: 96).
After fixing the limiter cable well, connect it to the controller
the 3 cored signal cable port and tighten the screws.
两孔中心连线
Line of two holes
crossing the center
测力环
Dynamometer
滑轮
Sliding wheel ◆◆ 3.3.2. Installation of Amplitude Travel Limiter
Take down the original amplitude travel limiter without
▲▲ Note: If the tower crane doesn't have Dynamometer and potentiometer and replace it with the one with potentiometer
the way of the installation is different form the above,please and larger drive ratio (for example, replacing 1:78 with 1: 96).
contact with the manufacture. What’s more, please ensure After laying the limiter cable, connect it to the controller the 5
the arrow mark of the load cell points to the direction of steel
cored signal cable port and tighten the screws.
wire ropes’ resultant force. !
Second way of installation: Tension sensor:The blue ◆◆ 3.3.3. Adjustment of Travel Limiter
part on the below picture is the installation position of tension
▲▲ Note: The height travel limiter and amplitude travel limiter
sensor. Pay attention to the wiring during the installation.
need to be adjusted after installation. The way of adjustment of
both devices is the same.
Find out the rotary direction of the limiter shaft when the
hook is rising or traveling outwards. See the Figure below. You
can find out the rotary direction of POT (same as limiter shaft).

· 07· · 08·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use

幅度和高度限制器 反 顺 down.
Amplitude & Height Limiter Anti-clockwise Clockwise

电位器
调节螺钉
POT turning
screw
回转传感器
Slewing sensor

1 2
3

1 2
3
原回转限位器
Original Slewing Sensor

空白处
顺时针转动 反时针转动 Blank
Clockwise roatation Anti-Clockwise roatation

▲▲ Note: Take down POT cover to observe the sliding contact


point of POT, and then find out the traveling range of POT
according to the rotary direction of hook when it is rising or of
trolley when traveling outwards. Moving the sliding contact
point to the place where the POT begins to work and voltage is
0.2V or 0.5V when the hook height is zero or the trolley moves
to min amplitude.

▲▲ 3.4. Slewing Sensor Installation (Optional)


Take down the two screws of original slewing travel
limiter and mount the azimuth (slewing angle) sensor between
the tower crane and slewing travel limiter, and then fasten the
bigger and smaller gear to slewing travel limiter and slewing
angle sensor separately, make sure the two gears are properly
joined. Lay and lead the signal cable of slewing angle sensor
into the cabin, then connect the 7-cored plug to the controller
the slewing angle signal socket marked and then screw it

· 09· · 10·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use

▲▲ Remark: The slewing angle sensor utilizes the transmission ◆◆ Control port instruction:It has two types of
function of slewing travel limiter .It does not change the control port:15 port control and 24 port control
connection of slewing travel limiter.
15 control port
Load moment indicator Tower Crane Anti-collision
▲▲ 3.5. Installation of Wind Sensor and Other inverse ejecting Liebherr
park when trolley runs outwards
Equipment 1
(or maximum angle)
1 when left slewing is restricted
Liebherr
Fasten wind sensor on the top of tower crane, lead the inverse ejecting Liebherr when
park when trolley runs inwards
signal cable to operator cabin and connect it to the wind 2 2 right slewing is restricted
(or minimum angle)
Liebherr
sensor port of the controller. After all the other devices have
3 moment limitation point 1 3 slewing braking
been installed, connect the signal cable to driver’s cabin.
park when trolley runs outwards
All the interfaces are unique so there will not by any wrong 4 moment limitation point 2 4
(or maximum angle)
connection. park when trolley runs inwards
5 moment limitation point 3 5
(or minimum angle)
6 weight limitation point 1 6 moment limitation point 1
7 weight limitation point 2 7 moment limitation point 2
▲▲ 3.6. Connection of Power Line high speed limitation of trolley
8 weight limitation point 3 8 running outwards(or maximum
Requirements on power connection: Don't connect to
angle)
the same phase line as power supply of tower crane control high speed limitation of trolley
circuit; try to minimize power interference (it is better to 9 weight limitation point 4 9 running inwards(or minimum
connect power directly from tower crane power control angle)
10 Installation mode Bypass 10 Installation mode Bypass
cabinet).Requirements on grounding: Choose the appropriate
high speed limitation of left
ground point for reliable grounding, ground resistance should 11 Left slewing limitation 11
slewing
not more than 4Ω, so as to ensure that the system work high speed limitation of right
12 right slewing limitation 12
properly. slewing
13 maximum height limitation 13 left slewing stop
14 minimum height limitation 14 Right slewing stop
15 moment limitation point 4 15 Moment limitation 4

· 11· · 12·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use

24 control port
park when trolley runs outwards high speed limitation of right
Ⅳ > Function and Setting (Load Moment Indicator)
1 13
(or maximum angle) slewing
park when trolley runs inwards high speed limitation of left
2
(or minimum angle)
14
slewing
The system has the following functions, load moment
3 moment limitation point 1 15 high speed lifting
indicator, record display and remote online monitoring.
Preparation: Confirm the tower crane type and
4 moment limitation point 2 16 lifting limit
manufacturer (e.g. Yongmao STL293-18T), dimension of
5 moment limitation point 3 17 high speed lifting down weighing sensor, amplitude and ratio of height limiter.
6 weight limitation point 1 18 lifting down limit
high speed limitation of trolley
7 weight limitation point 2 19 running outwards(or maximum
▲▲ 4.1. Start the system and enter working
angle) interface
high speed limitation of trolley
8 weight limitation point 3 20 running inwards(or minimum ◆◆ 4.1.1. Level-jib Tower Crane
angle)
Moment Language
9 weight limitation point 3 21 moment limitation point 4
10 Installation mode bypass 22 Slewing braking Rated
inverse ejecting Liebherr when load
11 left slewing stop 23
left slewing is restricted
Wind
inverse ejecting Liebherr when speed rate
12 right slewing stop 24
right slewing is restricted load

▲▲ NOTE: The relay is closed(ON)when the power in on. The relay slewing
height
is off(OFF) when it is on the state of alarm.The above contacts amplitude
can be used as normally closed contacts.
Traveling Alarm
status bar

Zone protection Type Time Menu

◆◆ 4.1.2. Luffing tower crane

· 13· · 14·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use

Moment Language Setting procedure: Make sure the displayed tower crane
type the same as the tower crane installed → Installation of
Rated Load hardware → Set general parameter → calibrate parameter
Rate
Wind speed
Load
▲▲ 4.2 General Parameter (Protected by
Slewing password)
Height
It has been set by tower crane manufacturer according to
Amplitude
the features of tower crane and can not be changed.
Traveling Alarm
Status
Bar

Zone protection Type Time Menu

Press menu icon on right bottom of screen .Input password


8334 and enter menu interface:

Input different password and enter the metric/inch and


wind speed unit conversion interface.

· 15· · 16·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use

Input the load chart of tower crane by PC software and set


up the file. Upload the file by USB disk to change the type of
tower crane.
It has been set by tower crane manufacturer according to
the features of tower crane and can not be changed.

▲▲ 4.4. Parameter Setting


real time working parameter of tower cranes, e.g.
amplitude, height, weight, slewing,traveling.

▲▲ 4.3. Load chart(Protected by password , not


available to the terminal customer)

V1 and V2 indicate double sensor voltage. User needs to


connect double output sensor voltage. Both V1 and V2 need to
be selected. If V1 has problems, user can switch to V2 (cross
V1).If the sensor is single output. User can only select V1.This
will be set before delivery from factory.

· 17· · 18·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use

◆◆ 4.4.1. Slewing Calibration: amplitude” and input the data.


Point A and B need to be set up properly.(see construction ◆◆ 4.4.3. Weight Calibration
site settings for details)Move the tower crane main jib to point
When the hook is empty, click “weight clearing”;
A ,click “point A” and ‘Yes’, Then move the tower crane
If only calibrate weight once, lift a certain weight and
jib anticlockwise to point B and click “point B” and “Yes”.
calibrated as weight 1
The system will calculate the slewing angle automatically.
If calibrate twice, first lift one goods and calibrated as
weight 1, then lift another goods heavier than first goods and
calibrated 2.
If calibrate thrice, first lift one goods and calibrated as
weight 1,and then lift goods heavier than first goods and
calibrated 2. Lift goods heavier than second one and calibrate 3.
The weight can be displayed more accurate by calibrating
3 phase weights.

▲▲ Note: The rated load should be calibrated on the middle of


Eg:If the tower crane coordinate is (100、100),point A is(110、100),point B is main jib. The calibrated weight should be up to 2T.
(90、100).Move the main jib to point A and click point A, and move the main jib
in anticlockwise direction to point B. If the tower crane coordinate became(150、
100),then point A should be (160、100) ,point B should be (140、100).
◆◆ 4.4.4. Height Calibration
◆◆ 4.4.2. Amplitude Calibration (angle calibration for Move the hook to the ground (normally 0M), click
luffing tower crane) “minimum height”. Move the hook to the maximum height,
Jib’s elevation calibration for luffing tower cranes: click “maximum height” and input the data( eg.100M)
Move the main jib to the minimum elevation and stop it, click Note:The height of luffing tower crane should be
“minimum elevation”, input the data (usually 15 ° )Move calibrated when the angle of main jib is 15°
the main jib the maximum elevation and stop it, input the
◆◆ 4.4.5. Groups of jib length and rate
data(usually 86° )
Amplitude calibration for level-jib tower cranes: Move The jib length and the rates should be in line with the
the trolley to the minimum amplitude (normally 2M), click current working states of tower cranes. Otherwise the load
“minimum amplitude” and input the data. Move the trolley chart of load indicator can’t protect the tower crane.
to the maximum amplitude and stop it, click “maximum When choose to control by outside automatic rates, users

· 19· · 20·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use

need to click S/D.( -1means invalid option) ◆◆ 4.5.1. Record include :


Anti-collision record: alarm record of Anti-collision and
zone protection of tower cranes e.g. slewing, amplitude alarm

Indicate tower crane relevant parameter input(zone


parameter、tower crane parameter、switch between moment
and anti-collision,switch for some function)

▲▲ 4.5. Records

◆◆ 4.5.2 .Working record:


weight record of every lift(When the number of the records
is up to 90% of the total amount of records number, the system
will alarm to download the records. If it reaches 100% without
downloading, the system will stop working ).

· 21· · 22·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use

will keep record of real time wind speed.

◆◆ 4.5.6. Calibration record:


◆◆ 4.5.3. Real time record:
Keep record of every calibration of amplitude, height,
Record working states in every 2 seconds after starting
weight or slewing. In case of any careless calibration.
the system.(When the number of the records is up to 90% of
the total amount of records number, the system will alert to
download the records. If it reaches 100% without downloading,
the system will stop working.)

◆◆ 4.5.4 .BYPASS record:


Record working states in every 2 seconds when bypass
(When the number of the records is up to 90% of the total
amount of records number, the system will alert to download
the records. If it reaches 100% without downloading, the
system will stop working.)

◆◆ 4.5.5.Wind speed:
When the speed of the wind exceeds the pre-set data, it ◆◆ 4.5.7. External control relay on/off record

· 23· · 24·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use

24-channel Relay Configuration) ▲▲ Note:Anti-collision and Zone Protection(Optional)

The system can connect up to 30 sets within the


same network:
Preparation Each tower crane needs to be equipped with
one mainframe
1.Confirm the corresponding distance between each
tower crane, the distance between tower crane and structure
according to the detailed drawing of construction site. In this
way the corresponding coordinates can be calculated.
Construction site drawing.

Download by USB disk:


Records can be downloaded based on actual needs: See
below figure
It can also be downloaded by USB disk. The document is in
excel format. See the snap shot of screen.

1# Obstacle Coordinates:(30、95)
(70、95)
(70、115)(30、
115) 高度 Height(H):50
2# Obstacle Coordinates:(80、58)
(92、58)
(92、95)(155、
95)(155、125)(80、125)高度 Height(H):30

· 25· · 26·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use

3# Obstacle Coordinates:(30、22)(138、22)(138、
44)(30、44)高度 Height(H):80
1# Tower Crane(Level-jib)Coordinates:(70、65) 大 臂 长
度 main jib length:50M 平衡臂 Counter jib length:11M H:
60M
2# Tower Crane(Luffing)Coordinates:(120、65)大臂长度
main jib length:40M 平衡臂 Counter jib length:8M H:80M
Point A coordinate(145、85)B 点坐标 Point B coordinate(80、
10)
2.When the coordinates have been confirmed, give each
mainframe number (eg.1#is 10021,2#is 10011,3#is 10035)
and connect each system online on the ground. Input the site
coordinate and tower crane parameter into each mainframe
and check the correctness of the parameter.(3 ways of data
input 1.Input the data manually on the system.2.Set up file by
using PC software supplied by manufacturer, and upload to Click menu icon on the bottom right of screen, input
mainframe by USB.3.Upload the data to mainframe wirelessly by password 8211 and enter menu setting.
using the PC software supplied by manufacturer).

Multi-device display Interface, luffing and level-


jib tower crane can be used in one system.

· 27· · 28·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use

Setting procedure :Zone setup → Setup on tower Instead of inputting points,the customer can also
crane → Setup on site → General parameter → Load automatically get the zone coordinates by the angle of tower
chart → Parameter setup crane and the trolley position.
The system can set up to 10 zones. The coordinates need to
▲▲ 4.6. Zone Setup be calculated according to the construction site drawing.

▲▲ Note: the parameter “height” is height value of zone. A


smaller value (e.g. 5 meter) can be input in the protected zones
while a bigger value is needed to input in the obstacles (bigger
than the height of tower crane).
After setting the zone, return to menu and prepare for 4.6
Setup on Tower Crane

▲▲ 4.7 Tower Crane Setup

X1 and Y1 is the tower crane’s corresponding axis. You


need to input 3-6 points on zone position axis.

Please refer to the site drawing, for example, on the above


picture, the coordinates are 1#()2#()3#()

· 29· · 30·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use

Arrange and record the information on which the tower


crane numbers are in line with mainframe serial number, input
data one by one
Number of the tower crane: Tower crane group system
number
Device Name:This system number is 10003.Each
System’s number is unique.It has already been settled
before delivery.The device name needs to be in line with the
number of the tower crane.For example,we now have 3 system
100003,100004,10005,so we can set up 1#,3#,2#tower crane.
X1 coordinate,Y1 coordinate:system installation position
on the tower crane. Need to input if it is traveling tower crane It can choose 30 sets of tower cranes. You can click number
X2、Y2 coordinates position: Normally the end position of and enter to edit and save automatically. This parameter can
the rail(All the tower cranes which have been online connected also be uploaded wireless by using PC software.
must in the same axis system).
Tower crane’s height:often refer to as height of counter ▲▲ 4.8 Setup on Site
jib
Main jib length,short jib length,minimum distance,means
the group of jib length,length of counter-jib and minimum
amplitude.

▲▲ Note: luffing tower crane, maximum elevation of jib,minimum


elevation of jib, structural parameter (distance between the root
of jib and the slewing center)

· 31· · 32·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use

Slewing coordinate Point A and B need to be calibrated tower crane main jib to point A ,click “point A” and ‘Yes’,
according to the site drawing. Point A and B are the reference Then move the tower crane jib anticlockwise to point B and
points of slewing coordinates which are set by the operator. click “point B” and “Yes”. The system will calculate the
Check the setting of site drawing Point A and B slewing angle automatically.
Then set alarm distance and pre-alarm distance.
Inertia angle indicates the angle when system stays alarm.
Brake and inverse ejecting are used exclusively for
LIBHERR
The calibration of coordinate of anti-collision has been
done.

Next enter the actual parameter setting interface(Same as


load moment indicator)

Eg:If the tower crane coordinate is (100、100),point A


is(110、100),point B is (90、100).Move the main jib to point
A and click point A, and move the main jib in anticlockwise
direction to point B. If the tower crane coordinate became(150、
100),then point A should be (160、100) ,point B should be (140、
100).

Slewing Calibration: Point A and B need to be set up


properly.(see construction site settings for details)Move the

· 33· · 34·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use

Ⅴ > Operation Order Access Module Specification (Optional) Ⅵ > System Malfunction Analysis
This module is used to record tower crane gear operation
or gear voltage ,tower crane mechanical limit signal No. Fault Code Solution
collection, automatic type switching and rate switching (only
supports two kinds of types and rates) Restart the system, touch 20 times continuously
with in 5 seconds on the start interface to enter
1 Touch-Screen Invalid
the tuning program,calibrate according to the
instruction
Check if the display and mainframes have been
Tower Crane Operation Order Access Line No. Extended Module Line No. Data errors or no
2 connected to cables and restart.Make sure they
response after boot
are well connected and restart.
The corresponding sensor breaks down.Check
the connection of cable and enter the parameters
Weight, amplitude, calibration interface to view all sensor
height, parameters.
3 slewing displayed Weight varies between 0.5~4.8, amplitude
exclamation point and varies between 0.2~4.8,
alarm height varies between 0.2~4.8, slewing between
0~16800

Monitor always show Check the connection between cable and


4
the boot interface mainframe.

Zone Protection doesn’t


Check if the corresponding number of the
5 display tower crane
monitor have been set
interface

Check if the power supply or internal power


6 No display on monitor
supply has been damaged

7 White screen Change display

· 35· · 36·
CXT/90 Ⅱ Multi-function Inidocator for Tower Crane
Instructions for Installation and Use

▲▲ Cautions
Ⅶ > Technical Support and Maintenance Service
Often check monitor fix holder. Keep it firm, stable and
free of loose status.
Regularly check whether the power supply cable is broken
▲▲ 7.1 CXT-90 Ⅱ Installation and Commissioning
or the shell is damaged or not. Check if the connection
We will delegate personnel to provide our users
is firm and stable on the grounding. with training and instructions during the installation and
Check if the lead-out cable, plugs and sockets are loose commissioning. To carry out installation and commissioning,
the site should meet the following requirements.
or not. Do not insert or pull o the cable improperly, or it
◎ The crane works properly;
may cause poor contact. ◎ Prepare standard weights or article with known weights
Do not clean the panel with chemical solvent. Wipe it with for calibration to facilitate the calibration process.
Weight of article for calibration shall be close to
semi-wet towel.
40%~50% of the maximum rated load capacity;
Keep the main board from rain and avoid exposing to ◎ Prepare an angle ruler to calibrate the length accurately.
sunlight directly. ◎ Assistance will be needed for on-site installation and
commissioning from hoister, crane maintenance electrician,
Do not open the rear cover of case randomly.
crane operator, and locksmith etc.
Check whether the direction of weighing sensor shaft stays
the same. ▲▲ 7.2 Maintenance Service
Make sure to install the height and amplitude limiter
◎ Lifetime maintenance;
tightly ◎ 1 year Quality warranty period from date of purchase;
◎ Provide free Maintenance service within warranty
period; beyond the warranty period, only cost will be charged.
◎ We exclude warranty for:
① Damage from collision and extrusion;
② Damage from improper dismantle;
③ Damage from other abnormal operation.

▲▲ Note: The system is a auxiliary safety system only.It cannot


replace the tower crane’s safety device.