RFA - SD 028 RevB 11kV 400V Substation Single Line Diagram
RFA - SD 028 RevB 11kV 400V Substation Single Line Diagram
G G
Main Station (External)
89R 89R
DS
36kV 600A
DS
36kV 600A
52S2
VCB
52S2
VCB
52S2
VCB
Earth Terminal Board
11kV 600A 11kV 600A 11kV 600A
RC 25kA RC 25kA RC 25kA
From
V,A,W,Wh,PF Energy Center 1F
Tr
CTT Multi Transformer Room
HV N/P 1F Generator Room DB-2 DB-2
52R 52R CTx3 Meter
LV ⑩
70sq
VCB VCB
36kV 600A 36kV 600A V,A,W,Wh,PF V,A,W,Wh,PF
RC 25kA RC 25kA CTT CTT Multi
CTT Multi
OCGR
CTx3
23 CTx3 Meter
24 CTx3 Meter
CTT CTT
CTx3 OVGR CTx3 OVGR
CT×3 CT×3
(Temp Alarm)
TIE TR
Cable size???
200sq
5000kVA
6sq
6sq
11kV/11kV 5 52G1 52G2
Inter Lock
12000/110V 0-15000V
U U
UVR-A1 OVR-A1
6
52R2
VCB
DB-1
11kV 630A
RC 25kA
Inter Lock
DB-1 DB-1 DB-1 DB-1 DB-1 DB-2 DB-2 DB-2 DB-2 DB-2 DB-2
B 52BG
21 22
Additional Bus Bar 7 8 9 10 14 15 16 17 18 20 VCB
52B 52FG1 52FG2 52FG3 52FG4 11kV 630A
for Future Extension 52F1
VCB
52F2
VCB
52F3
VCB
52F4
VCB
52FG6
RC 25kA
VCB VCB VCB VCB VCB VCB
11kV 630A 11kV 630A 11kV 630A 11kV 630A 11kV 630A 11kV 630A 11kV 630A 11kV 630A 11kV 630A 11kV 630A
RC 25kA RC 25kA RC 25kA RC 25kA RC 25kA RC 25kA RC 25kA RC 25kA RC 25kA RC 25kA
EVT×3
(OFF with Fire Signal) (OFF with Fire Signal) (OFF with Fire Signal) (OFF with Fire Signal)
11000 110 190
V,A,W,Wh,PF V,A V,A,W,Wh,PF V,A,W,Wh,PF V,A,W,Wh,PF V,A,W,Wh,PF V,A,W,Wh,PF V,A,W,Wh,PF V,A,W,Wh,PF 3 3 3
CTT CTT CTT CTT CTT CTT CTT CTT CTT PF×3
Multi Multi Multi Multi Multi Multi Multi Multi Multi
CTx2 Meter CTx2 Meter CTx3 Meter CTx3 Meter CTx3 Meter CTx3 Meter CTx3 Meter CTx3 Meter CTx2 Meter
Project:
100sq
Hlaing Township ,Yangon ,Myanmar
PF C 7.5A PF C 7.5A PF C 7.5A PF C 7.5A Tel: (95)1 654838 , 514862 , 527103
kVA
kVA
kVA
kVA
kVA
kVA
40kA 40kA 40kA 40kA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
30.0
11.0
Sub Contractor:
50.0
3.25
3.7
2.9
VMC 400A VMC 400A VMC 400A VMC 400A
118
8.1
130
130
130
130
130
130
-
-
SR SR SR SR Yurtec Corporation
225 AF 125 AT
100 AF 75 AT
50 AF 30 AT
50 AF 20 AT
50 AF 30 AT
400 AF 300 AT
400 AF 300 AT
400 AF 300 AT
400 AF 300 AT
400 AF 300 AT
400 AF 300 AT
225 AF 125 AT
50 AF 30 AT
100sq
Jockey Pump
14sq
35sq
35sq
6sq
6sq
SC
Fire Pump
Fire Pump
SC SC SC
500kvar 500kvar 300kvar 200kvar
GEP1
GEP2
GEP3
GL31
<2Ω <10Ω <2Ω <2Ω <2Ω
Drawing title:
EP1
EP2
EP3
EP4
EP5
EP6
EP7
EP8
EP9
L31
B
EB has been omitted.
11kV 400V Substation
Single Line Diagram (1)
Scale Drawn Checked Approved Size
N/S A1
N/S Date: 08 Feb 2020 Date: Date:
A3
Drawing Number Rev
TC-NYSH-SD-E-SL-001 B
52F3 52FG1
131.8
37.37
35.70
26.47
20.78
20.12
32.55
10.98
37.28
12.08
12.08
12.08
12.08
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
633.477
KW
KW
KW
KW
KW
KW
KW
KW
KW
KW
KW
37.1
37.1
51.2
63.0
63.0
10.2
741.48
7.4
6.0
6.0
1.4
1.9
9.6
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
100
100
100
5.2
1.5
1.5
1.5
50
50
75
75
75
AT
AT
AT
AT
AT
400AF 300 AT
225AF 125 AT
225AF 125 AT
225AF 175 AT
225AF 200 AT
225AF 200 AT
225AF 150 AT
225AF 150 AT
AT
100AF 100 AT
100AF 100 AT
100AF 100 AT
225AF 125 AT
AT
AT
AT
AT
AT
AT
AT
AT
AT
50 AF 50 AT
50 AF 50 AT
225AF 150 AT
50 AF 30 AT
100AF 75 AT
100AF 75 AT
100AF 75 AT
100AF 75 AT
50 AF 20 AT
EGL10 50 AF 20 AT
EGL11 50 AF 20 AT
50 AF 30
50 AF 30
50 AF 30
50 AF 20
50 AF 20
50 AF 50
50 AF 30
50 AF 30
50 AF 30
50 AF 30
50 AF 30
50 AF 30
50 AF 30
50 AF 30
50 AF 30
TOTAL
TOTAL
1P10
1P11
EGL1
EGL2
EGL3
EGL4
EGL5
EGL6
EGL7
EGL8
EGL9
1P1
1P2
1P3
1P4
1P5
1P6
1P7
1P8
1P9
L11
L12
L13
L14
L15
L16
L17
L18
L19
L20
L21
L22
L23
L24
L25
L26
52FG2 52FG3
DB-4 DB-5 B
37 RFI 212 Question No.94 39
(Temp Alarm) (Temp Alarm) Change Transformer Capacity
from 300kVA to 750kVA
3φ4WTR 3φ4WTR
750kVA 750kVA
R11000V/415V/240V R11000V/415V/240V
Manual Tap Changer Manual Tap Changer
Dry Type Dry Type
EFx3 EFx3
CTT CTT To
(5A) 38 (5A) 40 RF Electrical Earth Terminal Board
ZCT Multi V,A,W,Wh ZCT Multi V,A,W,Wh Room
Meter Meter MCB4P From 1F Tr 1F Tr 1F Tr 1F Tr 1F Tr RF Tr RF Tr
MCCB3P1250/1000AT
CTx2 CTx2 50/20AT
x9set Energy Center HV
NO. DESCRIPTION OF REVISION REV DATE
To ET Panel To ET Panel N/P N/P N/P N/P N/P N/P N/P
④ 1500A/5A 1500A/5A LV SPD
Common Alarm ⑤ Common Alarm
SPDx4
1F Transformer Room ① ② ③ ④ ⑤ ⑥ ⑦ 1 For Approval A 11.Dec.2019
Over Demand Over Demand
100sq
100sq
Breaker Trip Breaker Trip AVR Line has been changed from Panel No.40 to No.36
Leakage Leakage due to mistake.
2 B 08.Feb.2020
Change Transformer Capacity of No. 25 and 39.
Omit HV Feeder Panel of No. 11, 13 and 19.
SPD
14sq
35sq
35sq
35sq
35sq
35sq
35sq
35sq
6sq
6sq
19.03
30.61
21.39
26.31
33.43
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
220.36
75.0
75.0
15.0
15.0
15.0
15.0
15.0
15.0
60.0
48.0
48.0
48.0
48.0
17.1
KW
KW
KW
KW
KW
KW
KW
10.0
KW
4.29
16.3
150
7.5
7.5
7.5
7.5
7.5
7.5
387
2.3
2.3
7.4
5.2
6.7
3.0
5.0
5.0
5.0
E(LA) E(TrN) E(TrN) E(TrN) E(TrN) E(TrN) E(TrN) E(TrN) E tp E tc
225 AF 175 AT
225 AF 175 AT
AT
AT
AT
AT
AT
AT
AT
AT
AT
AT
AT
AT
225 AF 225 AT
225 AF 175 AT
225 AF 175 AT
225 AF 175 AT
225 AF 175 AT
50 AF 50 AT
50 AF 20 AT
50 AF 20 AT
50 AF 30 AT
50 AF 30 AT
50 AF 30 AT
50 AF 20 AT
50 AF 30 AT
100AF 75 AT
225AF 125 AT
50 AF 30 AT
100AF 75 AT
100AF 75 AT
100AF 75 AT
225AF 125 AT
50 AF 30 AT
50 AF 30 AT
50 AF 30 AT
<10Ω <2Ω <2Ω <2Ω <2Ω <2Ω <2Ω <2Ω
50 AF 30
50 AF 30
50 AF 30
2HGP10 50 AF 30
2HGP11 50 AF 30
100 AF 75
100 AF 75
100 AF 75
100 AF 75
100 AF 75
100 AF 75
50 AF 30
B
AVR EB has been omitted.
2HGP4
2HGP5
TOTAL
2HGP6
2HGP7
2HGP8
2HGP9
EGL21
EGL22
EGL23
EGL24
EGL25
EGL26
EGL27
EGL28
EGL29
EGL30
EGL31
TOTAL
TOTAL
1GP1
1GP2
1GP3
1GP4
1GP5
1GP6
1GP7
1GP8
GL10
GL1
GL2
GL3
GL4
GL5
GL6
GL7
GL8
GL9
AVR
750kVA
C
Project:
Please let us know whether fault alarm to BMS
is necessary or not
New Yangon Specialist Hospital
C
The Corner of Min Ye' Kyaw Swar Road And
RFI 198 Question 61
Pyay Road,Yangon Division
Main Feeder for ANGIO 1~3 have been omitted.
52F4 52FG4
Consultant:
GF Electrical Room RF Electrical Room
DB-6 DB-6
41 43
(Temp Alarm) (Temp Alarm) YAMASHITA SEKKEI INC.
3φ4WTR 3φ4WTR ARCHITECTS, ENGINEERS & CONSULTANTS
500kVA 300kVA
R11000V/415V/240V R11000V/415V/240V
Manual Tap Changer Manual Tap Changer
Dry Type Dry Type
CTT
Common Alarm
CTT
Common Alarm
Contractor:
ZCT EFx3
Over Demand 42 ZCT EFx3
Over Demand 44
Breaker Trip Breaker Trip
Leakage Leakage
To 1F ET Panel (5A) To 1F ET Panel (5A)
⑥ ⑦
CTx2
Multi V,A,W,Wh Multi V,A,W,Wh The Tokyo Enterprise Building,
Meter Meter
750A/5A 400A/5A No.32 , Pyay Road, 6 1/2 miles,
MCCB4P800/700ATx4 Hlaing Township ,Yangon ,Myanmar
Tel: (95)1 654838 , 514862 , 527103
Sub Contractor:
Battery Yurtec Corporation
UPS Myanmar Office
Bank
170.5
108.7
46.17
kVA
17.07
kVA
46.17
kVA
17.07
kVA
46.17
kVA
17.07
kVA
46.17
kVA
17.07
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
kVA
578.737
KW
14.8
KW
14.8
KW
14.8
KW
KW
2.20
KW
KW
KW
KW
KW
KW
7.45
7.58
7.45
7.58
7.45
7.58
7.45
7.58
3.7
5.0
5.0
5.0
5.0
5.0
0.1
88.92
AVR
MCCB2P 1250/1000AT UPS
400 AF 400 AT
50 AF 50 AT
50 AF 50 AT
50 AF 50 AT
400 AF 250 AT
225 AF 175 AT
100 AF 75 AT
225 AF 175 AT
100 AF 75 AT
225 AF 175 AT
100 AF 75 AT
225 AF 175 AT
100 AF 75 AT
50 AF 20 AT
50 AF 20 AT
50 AF 50 AT
50 AF 50 AT
50 AF 50 AT
50 AF 50 AT
50 AF 50 AT
50 AF 30 AT
50 AF 30 AT
50 AF 30 AT
50 AF 30 AT
50 AF 30 AT
50 AF 30 AT
50 AF 30 AT
50 AF 30 AT
50 AF 20 AT
400kVA
AVR Drawing title:
750kVA
TOTAL
2GP1
2GP2
2GP3
2GP4
2GP5
2GP6
GL21
GL22
GL23
GL24
GL25
GL26
GL27
GL28
GL29
Please let us know whether fault alarm to BMS is necessary or not
2P1
2P2
2P3
2P4
2P5
L21
L22
L23
L24
L25
L26
L27
L28
L29