Engr Drawing
Engr Drawing
BRACINGS L IRON
65X65X6MM THK
GL GL
PCC(1:2:4) 300x300x600
-200X200X6MM TH
MS SHOE PLATE
STAGING
NOTES:
WATER TANKSTAGING
0 ALL DIMENSIONS ARE IN MILLIMETERSUNLESS DRA WN BY :
OTHERWISE SPECIFIED
Smt Sh Kumarj Roy ENGRS BRANCH
02- FIGURE DIMENSIONS SHALL BE FOLLOWED HÌ 9 SECTOR
CHKD BY : ASSAM RIFLES
03- CONTRACTOR TO CHECK AND VERIFY ALL
DIMENSIONS BEFORE EXECUTION OF THE WORK DRG No:-MPR/ENGR/ 207 SHEET No :- 1/1
SCALE - 1:100
OVER
FLOW
FOR
PIPE
clc ENGRS
BRANCH
SECTOR
9HÌRIFLES
ASSAM
150
clc 150
GI @
TH
100mm
1:3:6
PCC RCC AR
Dia FACES
BOTH 1/12 )WKSSECTOR
BARS@BARS
-160 GIHOOmm
PIPE
200mm
GL B/WaysDIST
OUT
LET SECTION
&
PLAN
CAPACITY :- (
No SO1
150 80 600 TANK
WATER 9
-250 SHEET HÌ
200
MAN
HOLE
COVER]
900
RCC SECTION
AT'A-A'
600x600 000
LTRS Roy No:-MPR/ENGR/203
Kumari SEP
2013
SLOP
50000 1SCALE
-:100
COVER 3500 Sh
WPC
WITH
SLAB LEVEL
WATER IN WPC
:DRAWNBY
Smt CHKD
:BY
PLASTER CORNER
BARS
c160 1:2:4
RCC 150
(EXTRA)@
clc
3% PCC
TH WITH DRG DATE
100mm THWITH
WPC
TH
1:3 100mm
Smm -900
CM
250 BETWEEN
CEMENT
15mmTH COVER
IN PERIOD
FILLED
BE
-600 GRADE A SHALL HOLE
ALLOWED BE OF
LEAKAGE.
FACES BE DEPTH COATS
GL SHALL
GIDia
200mm clc OF TO MAN
PIPE
LET
IN WALLS
150BOTH
@ 250100 MIX WATER METRE
BE FORG/L TWO OF FIXING.
BARS& FILLINGS.
SUCCESSIVES
EACH
CONCRETE WILL SIDE HANDLES
B/Ways ABOVE
WITH
TANK
ONE TESTING
PIPEFLOW
OVER
FOR 120 FROM BEFORE
BOTTOM
TH
250mm DURATION
EXCEEDING PLASTER FINISHED
GI OF
& AND
Dia TOP TAPER
WALL Dia OUT
GI LET
PIPE
L100mm STRUCTURAL
TESTING SOIL AFTER
200mm PAINTED
TH RUNG
). DAY EXCAVATED BASE
PAINT
200mim 1:1:2 EXTERNAL
AND
REPLACED
NOT
DURING
50 ( ONE 1:3 MS BE
r200 50 ALL'M25' LIFT CM ALL TO
OF
t30e 09-
-6004 (REF
DETAIL) 07 -08 10
- 1].
SUMP
PIT
TANK.
OUT 1:3
WORK. AT SHALL
PLAN MILLIMETERS
UNLESS WITH
WATER
WALL
TH
-b09 FOLLOWED. 5mm
3500 ALL TREAD
THE NO RCC
THE ARE
VERIFY
OF COVER(1
IN ANDBENDS&
WALLS
230x230
BEAM OF EMBEDDED
EXECUTION VWPC.
BE
SLOP AND TOP
SHALL WITH
ON SIDE.SIDECONTAINING@3%
IN CHECK
re00 ARESPECIFIED,
OTHERWISE HOLE PROVIDED INNER
BEFORE BE CASTING
DIMENSIONS OUT
50 NOTES:
DIMENSIONS TO TO
MAN AT 06-
PLASTERING
OF
CONTRACTORARE
DIMENSIONS PROVIDED
TIME
THE
OF
BE
NUMBERS
A -50 FIGURED PIPES
RUNG)TO WITH
GI
200mm
Dia PIPE
LET 50
IN
ALL ALL
BE CM
200 2
200 -00SE 01- 02- 04-
03 05
DETAILS
ENGRS
BRANCH
ASSAM
RIFLES
SECTOR
9HÌ
UNLESS WORK
RCC AR
212
)SO1
(WKS
SECTOR
FOLLOWED.
ALL
THE
MILLIMETERS CAPACITY
OTHER :-
VERIFY
OF
WATER
TANK No
9HQ
EXECUTION SHEET
BE
SHALL
AND
IN CHECK
OTHERWISE
SPECIFIED.
SECTION
ARE DIMENSIONS
BEFORE LTRS Roy DRG
No:-MPR/ENGR/203
DIMENSIONSTO Kumari SEP
2013
NOTES CONTRACTOR
DIMENSTONS 50000 Sh 1:100
SCALE-
FIGURED
PLAN
DRAWN
BY
- Smt
ALL
CHKD
BY
DATE
D1 02 03
OF
FLOOR
BEAM
160
r4
NOS DETAILS FIXING
DETAILS
Ls0
BOTTOM
SLAB OF
MSRUNG
ps0 EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ 250
230
00
80
STR
@
150
c/c
-RCC
WALL
OF
MS
RUNG
DETAILS
200,
UP UP
BEND Dia
BEND LONG
8mm
150
C/C
BARS@ 150
C/C
BARS@
(GALVANISED ALT ATL/S
ALT BARS
RUNG
MS Dia
16mm
Dia Dia
12mm EXTRA
C/C
8mm
200
1:2:4
PCC
VAVLE
OUT THWPC
WITH REINFORCEMENT
DETAILS
- GATE 100mm SLAB
G|WASH SECTION
'B-B'
AT
WTH
COVER
50Dia \600 LONG
SPAN
PIPE
1
TH
250mm
BOTTOM
&
TOP TH
TAPER
WAL
TH
100
200mm FACES
c/e OF
1S0BOTH
VERTICAL
MAIN
BARS
B/Ways @
BARS
&
B/Ways
&
BOTH
FACES
clc 120
150
@ SPAN SHORT
160
RAN
OTHERWISE :
No SHALL
OPENING ENGRS
BRANCH
RIFLES
ASSAM
BEFORE
PVC SH FOURTH SECTOR
9HQ
:-CESZ/TD/6,
AR
Dia
/2.
150PROVIDED.
TOILETS.
ACCESSORIES
WINDOWS/DOORS WALL
ROOM /3 (WKS
)SO1SECTOR
UNLESS DIMENSIONS EVERY
Nos 1/2
& 1
NOMINAL
EXCEPT :-
4 :-
AND No N No
MILLIMETERS No ALL PROVIDED
FOLLOWED. BE SH DRG SHEET 9HQ
ALL
GUTTER CESZ/TD/1,
SHALL
REFER
WINDOWS
WITH THAN WITH TH
GUARD
VERIFY
ACCESSORIESMARK LONGERBE
WATER
1:4 PLAN
115mm
DETAIL CM
DOORS& SHALL
IN BE :-
AND No ISI N
GIVENSHALL
RAIN DRG DOOR 150mmMASONRY
WORK. VENTILATOR ALL BAR) SINGH 198
CHECK
ARE DIMENSIONS PVC ALL
REFER
PVC ROD TO Dia
Mtr ENGR/
DIMENSIONS
TO
THE
ROUND
WITH
DETAIL (750x2100)
(2-6
BRICK
PROVIDED
DRAPERY
WITH RUPENDER
NOTES
:
OF
CONTRACTOR WINDOW/
EXECUTION
HALFPIPE TH
REINFORCEMENT 9x6 /
MPR
JUL
2013
SPECIFIED. IDED.
PROV
BE 1:
100
FIGURED D00R
WATER 1/3 3/3. PD1
TO BE 115mm :-
Dia DIA
ALL DOOR20mmSHALL LAYER. BY - No:-
200 FORFOR FOR CHKD
BY -
DRAWN
01
02-
08-
DRG SCALE DATE
03 06. 09-
D4 5 07
COL
BRICK
-250x25Omm
ALROUND
W3 PROTECTION
ALROUND
PCCDRAIN
150x150
W3 PROJECTION
3000 PLINTH
W3 ROOF
W3
WIDE WIDE
GUARD
ROOM -600 600
6655x4570
VERANDAH
9000 3000 PLAN
W3
W3
D7
PDI
-3000 D9
12000x2
00
TOILET 2000x2
150
WEPONRY
V2 2000
W3
W3
-4800
0THER ENGRS
RIFLES
ASSAM
BRANCH
WORK OF OVERA
SECTOR
9HÌ AR
OTHERWVISE OXIDESURFACES
BEFOREFRAME
ALL SOi
)WKS
SECTOR
OVER 2/3
EXTRA TO RED PAINT WALL
ROOM
UNLESS DIMENSIONS
WOODEN
BASE PLASTER
USING F INTERNAL
AND -
SUB COAT BASE No
9
1:48 1:4 CEMENT SHEET HÌ
MtrTH SECTION
FINISH A
MILLIMETERS ON
FOLLOWED.PROVIDED PCC &
CM OVER ALL
SURFACES. 9x6
GUARD DETAILS
ALL SMOOTHINTERNAL TO
VERIFY :
FINISHES
TH PAINT OF
DISTEMPZR
COAT 15mm
75m
SINGH
IN WITH SYNTHETICENAMEL
EXTERNAL
BE BE WAL
AND TO ON ALL THREE 198
ENGR
MPR/
GIVEN SHALL
1WITHELEVATION,
WORKCEILING PROVIDED
FLOORrNG O THE BOUND RUPENDER
CHECK AND 2013
JUL
1200r OF
ARE DIMENSIONS SPACING
1200mm PLASTER
OF MEMBERS.ALL
LADLAT.
THE ACES OILCELING
DIMENSIONS
TO BOARD SCHEDULE
SHALL
CEMENT
BE
1:2:4
TO
OF OF PRIMER
CONTRACTOR I:6 SURFOF STEEL
NOTESSSPECIPIEDPXECUTION PCC THCM TO ALL COATS
&
-
PIGURED
CBP BRICK
BED EXTERNALCOATS WALL BY BY:
CHKD
TH TH OF
THREECOAT DRAWN DRG
No
ALi Gmm Smm 1Smm TWO THE SCALE DATE
02- 03-
2 4 4
250x250
BRICK
COL ROOF
BAND
LINTEL
BAR ce
l50 INTEL
BAND
CHAJJA
RCC
&
12mm cc
@
Bars
RCC
14:8
PCC 150 500
NOS 80
120
NOS @ OF
PB 4 OF Bars
G
BRICK
COL
DETAIL
FDN PLINTH115
BEAM DETAILS
BAND,
100
50 -80
250x250 500x500 BAND Bar
ROOF
120
F230
NOS
4 PROTECTIONDETA
GL SOLLING
OVER
SMOOTH
FINISH WALL
WITH
150, 150 BATS
OD 136
BRICK
88.9 PCC
BOLT
NOS -250x250 BAR
POST
RCC
DWARF
POST STIRRUPS
O
&mm TH TH
4& O 65 75
NUT
LONG 12mm
TUBULAR
150
cc 1:4:8
PCC
O
300mm NOS
450x450
16mm &
@
OF POST
DETAIL
FDN FDN
PLINTH
WITH
4
GIL -WALL OVER MASONRY
BRICK
450x450
TUBULAR ONE
OF
LAYER
PLINTH
BEAM
BITUMINUS WALL
TH 1:4:8
PCC
1:6
CM
IN
115mm
GI
JGL
TIE
WIND
WATER
RAIN
FI
GUTTER
ROOFING
TH
mm
40x
SHEET
RIDGE
TIE THCGI S00
SHEFT
WIND
1200mm
x
40
BRANCH
9HÌRIFLES
ASSAM
SECTOR AR
WALL
ROOM )(WKS
shr
SECcYOR
DIMENSIONS
MILLIMETERS
UNLESS 3/3
DETAILS
TRUSS
ENGRS :-
FOLLOWED.
TH
GUARD No
9HÌ
ALL
SHEET
VERIFY 115mm
WORK.
IN BE
GIVEN SHALLAND
SINGH MPR/ENGR/198
THE
CHECK MtrWITH RUPENDER 2013
JUN
SPECIFIED.
OTHERWISE OF
ARE DIMENSIONS
EXECUTION 1:
100
DIMENSIONSTO
NOTES
:
9x6
CONTRACTOR
DRAWN
BY :BY
CHKD :-
FIGURED
BEFORE No
ALL SCALE
DRG DATE
02-
01 03
PCC
BOLT JOINING
PLATE
WELDED 300mm
IN
O/D STIFFENER
-6mm
TH EMBEDDED
TO
RAFTER
RIGHT 21.3mm PLATE
MS
BASE BOLT
PLATEDia COL
16mm JOINING
PLATE D'AT
DETAIL O/D KSmm
POST Dia
MS
FOR OF
DETAIL mm LONG
l6mm 'E"
AT
DETAIL
TH -KING 88.9
HOLE
O-6mm
50,
60mm
LONG
WELDED
TO
RAFTER
LEFT
JOINING
PLATE
16mm
BOLT
Dia
RAFTER
WELDED
'E'
AT
DETAIL
-STRUT
O/D
26.9mm
O/D 3000,
3000
PLATE
21.Jmm TIE
RIGHT
TO BOTTOM
RUNNER
oJoNING
'C"
DETAIL
AT 150 250
KEY
PLAN
OST 33.7mn1
O/D
0
KING 3000
4COL
TUBULAR
TRUSS
TUBULAR
9
CLEAT
PURLIN
PURLIN
TIE
16mm
BOLT
Din LEFT
LONG
60mm oINING
PLATE
TO
WELDED
TIE
33.7mm
O/D
KNEE
BOLT WELDED 3)
IN
1
Din (SLOP
12mm -200x100xómm O/D
PLATE
MS
CLEAT
PURLN
TO
TIE
B'DETAIL
AT 3575mm 33.7mm
FOR
-HOLE
O/D
PURLIN
48.3mm
RUNNER
ELEVATION
SECTIONAL
O/D
21.3mm
KING
POST
BOTTOM
-RAFTER
-FPL
WELDED
PLATE
MS
BOLT
Dia
l6mm 6000
LONG
60mmn
RAFTER
200x100xómm CLEAT.
PURLIN
TIE
TO
OOL JOINING
PLATE. 150rS0x6mm
150x50x6mm
CLEAT
PURLIN
-BITUMIN
WASHER 0D
26.9mm
STRUT LONG
OD 25Ox250x8amm
PLATE
-BASE
SHEET
CGI AT'A
DETAL -TIE100x6mm
OD
424mm 88.9mm 300nm
WASHER
GI
CLEAT
PURLIN
NUT
PURLIN
600
1000 3009
DIMENSIONS
BLOCK BRANCH
ENGRS
RIFLES
ASSAM
UNLESS COMPLETE SECTOR
9HÌ SECTOR
AR
HÌ9
1/3 (WKS
)SO1
ALL &
ELEVATION
PLAN
MILLIMETERS WITH
FOLLOWED. WITH :-
ALL BATH No
MARK
VERIFY FRAME 195SHEET
WORK.
ISIPR0VIDED.
IN BE AND
GIVEN SHALL DOORSTEEL
AND
THE PROVIDED.
SINGH
RUPENDER
CHECKPVC VENTILATOR:-V(600x450) ENGR/
OTHERWISEOF
SPECIFIED.
ARE DIMENSIONSBE
SHALL
EXECUTION
(7S012100)
TOILET JUL
2013
DIMENSIONS
TO BE
SHALL
MPR/ 100
L:
CONTRACTOR
ACCESSIORIES
NOTES
: PDI
FIGURED :DRAWN
BY
BEFORE FITTING
DOOR:- RCC CHKD
BY
No:-
ALL
SCALE
DRG DATE
01 02 03 05
04
ELEVATION
Ce30
ALROUND
DRAIN
PROTECTION
1500x2000 PROJECTION
500 BATH WATER
VI
2345
PLAN
RAINPLINTH
PDI ROOF
PCC
TOILET
985%1000 WIDE WIDE
PDI 50
1000 VI
I50x1
L450 600
A
WORK.
NON-SKID ALROUND. BLOCK
MILLIMETERS
FOLLOWED. 1:2:4
OF OF A
OVER
COAT 9HÌRIFLES
ASSAM
BRANCH
SECTOR
FACES FACES AR
ALL EXTERNAL /MEMBERS. 2/3 (WKS
) SECTOR
THE PCC OVERA
CERAMIC INTERNAL PANT
VERIFY COLOURED BED
INTERNAL
EXTERNAL :-
OF TH
SCREED
BATH ENGRS No
BE EXECUTION
IN UNLESS
SHALL SCHEDULE
OF
FINISHES:
25mmn PAINT
ALL ENAMEL
SO1
OTHERWISE
SPECIFIED. STEEL SHEET 9HQ
GIVEN AND GLAZED IN
ANDPLAN
OVER TO
TH 1:4 TO TO DISTEMPER
BASE
CHECK DADO. PRIMER ALL
SYNTHETIC
ARE FIGURED TILES CM PLASTER
FLOORING:-300x300x7mm
SPACIFIED. PLASTER
DIMENSIONS TH WALL.
CEMENT
BEFORE TH EXCEPT TO SINGH
RUPENDER 195
DIMENSIONSTO DADO:-200x300x7mm
FLOOR 15mm RESISTANTOXIDE TOILET /
1:6 OB THE ENGR
CONTRACTOR 14 OF OF JUL
2013
DIMENSIONS AS OVERCM CM OF WALL OF RED
NOTES CERAMIC COAT COATS COATS /
BASE TH TH
SURFACES MPR l:
l00
ALKALI OF
ALL
SUB
TILES
15mm
WALL .WALL THE
15mm TWO TWO TWO COAT RCC -CHKD
BY
DRAWN
BY
OF :DRG
No -
01- 03- 01- 02- 03- 04- 05-
02 O6- 07- SCALE
DATE
\115
clc 2270
150 CIFI)
@
STIRRUPS 115
COLUMN
PLAN
LAYOUT
FOOTING
16
Ø
2- 16
02-
8Ø
1558
AND
PB PB
-L230
'PB' BEAM
1058 PLINTH
PB
115
CEI
SPANDistribution
Bars
c/c
300
LONG 115 1042
@
80
ALONG
TH
PCC
H00
GL
REINFORCEMENT
(Altematly
Cranked)
c'c 450
Bars S0
Main @1 1:2:4
OVER
10o
SLAB FILLING
SPECIFIED. AT'A-A'
SECTION
REQD
AS
FILLING
CORE
SPANBars V
TYPE AS I48
HARD
cc FINISH
Distribution PCC
SHORT 300
RSI PB
TH TH
@ FLOOR 100mm
75mm SAND
So
FORALONG
Lir FINISH
REINFORCEMENT
TABLE 250 V
Cranked)
(AlternatBy WATER
cc
150 SINTEX FAIR
Bars
Main
100mm
FOR
TREATMENT
PROOFING
@
100 PVC WITH
OVER
SLAB
(1:3)
PC GL
M RCCROOF
Thickness THC
W
Slab 120 3% 300 450
25mm
WITH
TH 4450
600
SlabName RS
THE THE SURFACES ENGRS
BRANCH
OVER COLOURED
ALROUND.
OF BLOCK RIFLES
ASSAM
SECTOR
9HÌ AR
WORK. OF A COAT
MILLIMETERS NON-SKID
1:2:4
OF OVER 2/3 SOI
(WKS
) SECTOR
FOLLOWED. FACESFACES
EXTERNALMEMBERS
ALL PCC A
INTERNAL :-
THE OVER PAINT
CERAMIC
BED EXTERNAL BATH No
VERIFY COLOURED
TH INTERNAL
OF SHEET 9HÌ
SCREED PAINT
ALL ENAMEL
IN UNLESS EXECUTION SCHEDULE
FINISHES:
OF
25mm STEEL
ANDPLAN
BE
OTHERWISE
SPECIFIED. IN
GLAZED TO
AND
GIVENSHALL OVER BASE
DISTEMPER
TH 1:4 TO TO DADO. PRIMER ALL
SYNTHETIC
CHECK CM PLASTER
PLASTER WALL. TO RUPENDER 195
SINGH ENGR/
MPR/
FL0ORING:-300x300x7mm
SPACIFIED.
TILES CEMENT
ARE DIMENSIONS TH EXCEPT TOILET
BEFORE TH OXIDE
DADO-200x300x7mm
15mm RESISTANT
THE 2013
JUL
DIMENSIONS
TO FLOOR OB
1:6 I4 OF OF
CONTRACTOR
OF WALL OF RED l:
l00
NOTES
- DIMENSIONS AS OVERM M
COAT COATS COATS
CERAMIC C C SURFACES
BASE OF
FIGURED TH
TILES
TH
WALL. WALL.THE ALKALI
COAT
RCC BY
DRAWN
15mm 15mm TWO TWO TWO CHKD
BY
ALL SUB DRG
No
OF SCALE
02- 03.- 04- 05- 06- 07- DATE
01- 02- - 01
03
2270
cle CIF)
150
@ COLUMN
STIRRUPS
PLAN
LAYOUT
FOOTING
PB
16
-2-
Ø
16
2-
8Ø 1558 AND
PB
BEAM
'PB'
-230
PLINTH
1058 PB
115
CIEI)
SPANDistribution
Bars
cc
300 042
1e28
LONG
@
&o
ALONG
H00
TH
PCC GL
REINFORCEMENI
(Altematly
Cranked) 450
c'c
Man
Bars 1:2:4
S0 FILLING
OVER
1
@
100
SPECIFIED SECTION
AT'A-A'
SLAB
TYPE REOD
HARD
CORE
V AS
SPANDistribution AS 48
Bars I
FINISH FILLING
PCC
c 100mm
TH
SHORT 300 PB TH
TABLE
RSI
FOR @
FLOOR
75mm
SAND
8o
ALONG
Ltr FINISH
FAIR
WITH V
REINFORCEMENT
(Alternatly
Cranked) 250
WATER
c'c SINTEX
Main
Bars
150 100mm
FOR
@ PVC TREATMENT
PROOFING
10o
WPCOVER
SLAB
(1:3)
THRCCROOF GL
M
Thickness C
Slab 120 TH3% 300 450
2300
WITH
25mm
450
SlabNameRS
VERIFY
DIMENSIONS
ALL
AND
BATH BRANCH
9HÌRIFLES
ASSAM
SECTOR
UNLESS
'M20'
GRADE OTHER AR
FOLLOWED. 3/3 )WKSSECTOR
MILLIMETERS ENGRS :-
No
(
SO1
MIX
OF
WORK. AND
BLOCK
DETAILS SHEET
9
HÌ
BE
AND CONCRETE
SHALL
THE TOILE
RCC COL
IN
ARE
CHECK
OF
OTHERWISE
SPECIFIED
DIMENSIONS
SINGH
NOTES: EXECUTION No:-MPR/ENGR/|9
DIMENSIONS
TO STRUCTURAL
RB, RUPENDER 2013
JUL
CONTRACTOR
1SCALE
- :100
FIGURED
BEFORE(1:1.5:3).
LB, CHKD
:BY
DRAWNBY
ALL 04-
ALL
02-03- DRG DATE
D1
cle SPECIFIED
150 STONE
BALLAST
FILLING
REQD
/
BATS
@
STRRUPS AS
1:4:8
BRICKAS AND
PROTECTION
PLINTH
FILLING
10
Ø
2- FINISH PCC
10
Ø
2-
TH
DETAIL
FDN
WALL
TH
FLOOR 100mmSAND
80 7Smm GL
115, 'LB' -
230-50
FI0
115 PB 4
'D2'
140cle 1:6| TYPE
50+
(0.3L) WITH CM
LVL
50+ o
@ IN 600 1l:4:8
1-120 STIRRUPS
SUPPORTS
AT REST
@
160c/c 'BO PLINTH
MASONRY
DPC
1:2:4 PLASTER
CEMENT
WITH
NEAT PCC
+ EXTRA PCC
FOR
UPTO 150
160 160
2- BRICK SOLLING
1:4
8O THWPC FINISHING
2- CM WITH
oVER
FINISH
SMOOTH
40mm TH
TH BATS
'RB'
-2304
3% 230
15 1:3:6
S0 PCCBRICK
TH TH
65 75
300
B/W
de
FOOTING
COLUMN
RCC
80
STIRRUPS 1:A8
-TYPE
'D2'
100
rPCC J00a
200
Nos
-4 150cc
@
335
'Ci'
COL 'F1'
AT
900x900
230 900 230
335
OG
LVT
-
35 1500
BATH ENGRS
BRANCH
UNLESS
DMENSIONS
FOLLOWED.
'M20' OTHER
9HÌASSAM
RIFLES
SECTOR
(. AR
) SECTOR
GRADE 3/3 WKS
ALL
MILLIMETERS
VERIFY
AND :-
No
(
SO1
OF
WORK
MIX
BLOCK
AND
DETAILS SHEET
9
HÌ
BE
IN
AND
SHALL CONCRETE
THE TOILE
COL
CHECK
SPECIFIED.
OTHERWISE
OF
ARE DIMENSIONS SINGH
RUPENDER
DRG
No:-MPRENGR/
|95
NOTES: EXECUTION
DIMENSIONS
TO STRUCTURAL RB, 2013
JUL
CONTRACTOR
RCC 1:100
SCALE
FIGURED
BEFORE LB, DRAWN
:BY
(1:1.5:3).
ALL ALL CHKD
BY
02-03- 04-
DATE
01
cle SPECIFIED
150 STONE
FILLING
BALLAST
BATSIREQD
@
STRRUPS AS
1:4:8
BRICKAS PLINTH
PROTECTION
AND
FINISH PCC FILLING
Ø
2-10 10
Ø
2-
TH WALL
FDN
DETAIL
FLOOR TH 100mmSAND
80 75mm GL
I15, 'LB'
-50
H50
115 T
3050+ 4
P
'D2'
140c/c 1:6|
WITH TYPE
(0.3L) CM
LVL
600
@SUPPORTS 'BO'
IN 1:4:8
REST
160c/e
@
1-120 STIRRUPS MASONRYPLINTH
T50
DPC
1:2:4 PLASTER
CEMENT
WITH
NEAT PCC
+ EXTRA
2-160 1- 60 PCC
FOR
UPTO 150
BRICK SOLLING
PC 1:4
80AT TH FINISHING
2 CM
W
40mm
3%
TH
230
TH 50 WITH
OVER
INISH
BATS
2304"RB' 15 1:3:6
40
PCCBRICK
GL
SMOOTH
TH TH
65 75
-300
B/W
STIRRUPS 'D2'
TYPE
-PCC
1:4% dc
COLUMN
RCC
FOOTING
00
200
Nos
4 150cc
@
Oa
80 'CI'
COL 335
'FI
AT
230 900x900
900 230
230
335
EOGLVL
35
00 1500
WORK DETAILS
ENGRS
BRANCH
GIVEN
IN
MILLIMETERS 9HÌ RIFLES
ASSAM
SECTOR AR
FOLLOWED. BWays Soi
(WKS
) SECTOR
ALLTHE
CHAJJA /2
SHEET
No
VERIFY
OF CC CHAJJA
RCC
DETAIL
EXECUTION 150 9HÌ
BE
UNLESS
OTHERWISE
SPECIFIED. BARS
AND
SHALL STIRRUPS
Bmm 500 RCC
CHECK
12mm
-8mm SENTRY
(D/S
POST
DIMENSIONS CC
130
2 &
DIMENSIONS
BEFORE SINGH
RUPENDER
FOUNDATION 189
NOS ENGR/ 2013
22
APR
NS TO
01-ALL
DIMENSI -CONTRACTOR 4 230
/
MMPR
FIGURED
NOTES DRAWN
BY
CHND
aY
PLAN, :DRG
No
SCALL
DATE
-
02 03
2560
C/C
180
REMARKSTEMP
BARS
REINFORCEMENT
OF 400,400,400,
FOOTINGSB/WAYs
BARS
@
Ø
MM Ø @1S0
C/C BEAM
PLINTH
r PLAN
FOUNDATION
MM
10 8
SPAN
LONG CIC
MM
300 FOOTINGS
END THICKNESS
-2 200
SLAB
AT
BAR OF D 00
SHORT
SPAN CIC
R.C.CEXTRA L
FOOTINGSB
SIZE
OF I000
MM
COL |000
300
OF R.C.CSTIRRUPSBELOW
DEPTH 1200
GL
SCHEDULE BARS
SPAN
LONG
BENT
Up 150
cc
RE-INFORCEMENT
O OF 50
GI
CIC
MM
@ SCHEDULE 1200
400,400,400,
10
SPAN BARS
SHORT CEMENT
REINFOR 16
MMO
BENT
UP 150
clc NOS
O 4
MM
12
@
COL 400x400
OF
SIZE
400, e160
HICKNESS 400
SLAB
OF
100 OF
NAME
RCCCOL
COL
750 PLAN
'B-B
AT-
AB
SLANO
FLOOR
SLAB J 2500x2500
NO
SER
2960
ROOM
2160
REST
TYPE
OF
STRRIUPS bar 2-12
top
Extra
400 400,
MM
OBARS BARS BARS MMO
BARS
SUPPORT
OF 150
CKC 150
CC CC
1S0
@
FROM
FACE 150
C
O O
MM MM
a
BRICK
TH
230MASONRY
IN
8 S 16
CM
BEAM
TOP 2-12
REINFORCEMENT
2-12 2-12 2-12
R.C.C
400,
OF BOTTOM
2-12
SCHEDULE 2-12 2-12 2-12
D7
'A-A'
PLAN
AT-
2500x2500
SIZE
OF
BEAM 2960 ROOM
D
300 300 250 W4 2160
NAME
OF PLINTH BEAMFLOOR
BEAM BEAMROOF BEAMLINTEL
BAND 400, L
400,
SERNO 400
1. 2. 3. 4.
2160 400,
WORK. SHUTTER.
DOOR. FINISH
LAID
TOP COATS A STEEL
9HÌRIFLES
BRANCH
ENGRS ASSAM
MILLIMETERS 456-1978) OF PRIMEROVER
GRADE
FOLLOWED. AT PROVIDED
ONBED FACESALL SECTOR AR
ALL
THE SMOOTH SO1
(WKS
)
PANELLED ALL CASE SECTOR
50mm
WINDOW BRICK TOTWO PAINT
VERIFY EXTERNAL OF
OF OF IS DISTEMPER T0 2
/ & & COATENAMEL STAIR 2
BE MIX (AS
EXECUTION BOTTOM WITHOVER WALL PRIMER -
No
IN UNLESS
OTHERWISE
SPEÇIFIED.
AND WDODEN
1200x1200-GLAZED BE OVERA 9HÌ
GIVENSHALL :-
CONCRETE SHEET
REINFORCEMENT :OPENINGS SHALL
FLOORING THE SURFACES.
SCHEDULE
OF
FINISHES: TO
CHECK AT
BASE
BOUND SYNTHETICPINK POST&
(D/S)
SENTRY
ELEVATION
ARE DIMENSIONS 40mm 15mm
PLASTER OF PAINT
25mmn
BEFORE 75mm 1000x2100
SUB
CEMENT
/
SURFACESOXIDE SINGH
RUPENDER189
DIMENSIONS TO STRUCTURAL OL WOODEN
MEMBERS. 1:50 2013
22APR
i-
- - - 1:2:4 1:4:8 EXTERNAL ENGR/
FOUNDATION OF 1:4 BASE
-CONTRACTOR PCC OF OF 1- :100,
'M20'
(1:1.5:3).COLUMN
DIMENSIONS PCCEXTRA RED
-COVER
T0 SCHEDULE
- CM COATS COATS /
WINDOW(W-4) CEMENT SECTIONAL MPR
NOTES
- -FIGURED ii)
BEAM TH TH WALLINTERNAL
THE
SLAB
Ív) TH OF -DRAWN
BY
DETAILS -CHKD
BY
DOOR(D-7) USING
100mm
01-40mm ALL
COAT :-
01-ALL 04-ALL -15mnm-TWO0
FLAT. 04-TWO No
i) ii) OF TO SCALE DATE
DRG
02 03 |05 02 03
D2)
IRON
20x20x4mm
ANGLE
SIDE)
RAILING(BOTH (TYPE
1:4:8
-PCC
ANGLE
OF
DETAILS
CASE
STAIR
IRON
WITH
BOLT
FIXED
LONG 1500
PLANK IRON
100mm WOODEN
STEPS
OF
ANGLE-75x75x6mm
550x250 ANGLE 500
WDN &
NUT
DETAILS
TH -25x25x4mm
-25mm Dia
16mm
IRON
ANGLE
75x75x6mm
ON
TIEPURLIN BARS
WIND STIRRUPS
RAFTER EACH Ø
FL 150
CIC
@
12mm J:J.S:3
-RCC
OD
PURLIN
48.30mm
40x6mm
OF
8mm NOS
PIPE TOP
1
ELEVA
SECTIO
S
M
OD
T60.30mm
ON
WOODEN
NET -FLOOR
BEAM -8MM
STIRRUPS
Ø SPECIFIED
AS
FLOOR B/WAYS
CIC
@150
BARSBEAM
Ø PLINTH
-16MM Ø
-12MM
BARS
FRAME
WORK 150
CIC
14
@
RIDGE
ROOF
PGI SHEET
TH. FRAME
WOODEN
WORK 1000
WITH
mm CGI
0.63 TH. 6mm
CEILING
TH
0.63mm
le00
1p0300,30 500 L00
2700
LML.
G
SPECIFIED
LIMITED)
ENGRS
BRANCH
BEFORE LIGHT SECTOR
9HÌRIFLES
ASSAM AR
SHAPE UNLESSOTHERWISE SECTOR
SÓ1(WKs)
(1:1.5:3).
320. 2200 DIMENSIONS
100 900 ELECTRICALS
MAST
BAR
BENDING
SCHEDULE2075 'M20' 9
HÌ
00
GRADEHIGH
FOLLOWED.
ALL
MILLIMETERS
00 VERIFY
OF MTR
LENGTH
MIX BAJAJ No-h.
2495 2400 3792 BE AND FOR16
CONCRETE
SHALLWORK. SHT
IN CHECK BY SINGH
SIZE ARE 18,
120 103 DIMENSIONS
THE
DRG
(SUBMITTED
DIMENSIONS
TO STRUCTURAL RUPENDER MPR/ENGR/
2011
OF FDN
CONTRACTOR
QTY EXECUTION SEP
24 40 12 SCALE
-1:50
FIGURE
NOTES: 23
ALL ALL :- BY: No:-
CKD -
MK BY
T2 T3 TCD DRG DATE
01-- 03- 04-
02
BOLT
NOS
BOLT BOLT
8
WITH
OF
LONG LONG
TOWER FIXING (T2)
PLATE (T3) (T3)
850mm BOTHWAYS
c/c 850mm cde
MAST TOWER
BASE
PLATE FOR 190
ANCHOR 190
Dia WASHER HOLE@
NUT
& (T1) Dia @
HIGH30mm STIRRUPS108
120 30mm STIRRUPS
32mm
Dia PCC
1:4:8
MTR NOS TH NOSNOS
GL 8mm NOS
16 8 82 24 20 82
8
SECTIONAL
ELEVATION
PLAN
SECTIONAL
59
-2300 2300 1000
900
5mm 1000
CABLE
ENTRY.
Dia
100
7
FOR 30
l600
PIPE 2300
PVC
GL
SECTOR
AR HO9
WKS ) 801( 2011 JUN 25 DATE
1:30 SCALE :
FLAT MS POST& IRON
1/1 No- SHEET ENGR/I79 MPR No
DRG ANGLE PRIMER
ON OXIDE RED OF
COAT OVER
A
PAINT ENAMELSYNTHETIC COATS
OF TWO 04
FLES ASSAM CHKD MILLIMETERS. GIVEN
IN DIMENSIONS
ARE ALL 03-
ECTOR 9HÌ
ANCH ENGR SINGHRUPENDER ;- DRN FOLLWED. SHALL
BEDIMENSIONS FIGURED 02
WORK.
S OTHER SECTIOON
AND THE EXECUTION
OF BEFOREDIMENSIONS
NG LINK CHAIN ALL VERIFY AND CHECK CONTRACTOR
TO
NOTES:
01
GL GL GL GL GL
250
2000
IRON FLAT
mm
40x6
x6 75 x75 x6 75 x75
IRON -ANGLE IRON ANGLE
MILLIMETERS.
ALL GATE BRANCH
STEEL
PAINT
THE WED. 9HÌASSAM
RIFLES
SECTOR HÓYSECTOR
AR
VERIFY )WKS
OF FOLL ALL 1/|
ENAMEL
ENGINEER
TYPICAL
DETAIL
EXECUTION
AND BE
IN ON STEEL :- so
GIVEN OXIDE No
SHALL SYNTHETIC SHEET
CHECK
BEFORE ARE RED
TO
DIMENSIONS WIDE SINGH :MPR/ENGR/I78
DIMENSIONS
OF
CONTRACTOR OF COAT JUN
2011
23
DIMENSIONS -RäPENDER
COATS
NOTES
: MEMBERS.
FIGURE A
WORK.
1500 1:50
OVER
ALL TWO
No SCALE
:CHKD
02- 03- - DRN DRG DATE
01 04
50x50xómm
BOLT
POST
IRON DOOR
-ANGLE
IRON
FRAME 150c/c
ANGLE SLIDING
@
BAR
65x65x6mm
EXISTING LONG MS
Dia
300 16
GL
STEEL
GATE
1500
HINGE
PINTOL
1350
1500
NSECTOR
AR PLAN
SO1WKS ) 2011 APR 30 - DATE c/e STIRRUPS
150 @ 8O
e504
WALL. BRICK -FULL.
1:100 SCALE
H350
:-1/2 SHEET
No ENGR/174 MPR/ No:- DRG 120 NOS 4 COA 3000c/c
OF
FLES ASSAM
CTOR HÌ
9
:BY
CHKD ELEVATION SECTIONAL
CH ENGRS SINGH
RUPEE0ER
BYWN
DRA
ON ELEVATION& PLAN, GL GL
ALL
BOUNDARY BEAM -PLINTH 4350
150
COL -RCC
-2150
1650
500
MEMBERS.
STEEL ALL PRIMER
TO OXIDE RED OF
COAT
SYNTHETICENAMEL
OVERA PAINT OFCOAT TWO 04-
WORK. THEEXECUTION
OF BEFOREDIMENSIONS 750
ALLVERIFY AND CHECKCONTRACTOR
TO 03-
FOLLOWED DIMENSIONS
SHALL
BE FIGURE 02-
SPECIFIED. OTHERWISE IRON ANGLESOx50x6mm
MILLIMETERS
UNLESS DIMENSIONS
ARE
IN ALL 01-
NOTES: STAPLES WIRE WITH FIXING
@l50c/c WIRE BARBED
UNLESS DIME
GRADE)
FOLLOWED. 456-1978 BOUNDARY
WALL ENGRS
BRANCH
9HÌRIFLES
ASSAM
OTHER SECTOR /2
WORK. TOP
AR
ALL :-2 S9Y
)WKSSECTOR
MILLIMETERS AT :
OF
VERIFY IS SOmm
LENGTH No
THE /
MIX (AS AND SHEET
BE OF & 9HQ
:- BOTTOM DEVELOPMENT
AND CONCRETE BAR
SHALL REINFORCEMENT
EXECUTION DETAILS
FDN
NOTES:
IN CHECK
SPECIFIED.
OTHERWISE
OF
ARE DIMENSIONS AT COL
DIA SINGH ENGR/174
RUPANDER
75mm 15mm
25mm
40mm
DIMENSIONS STRUCTURAL
TOBEFORE x FDN,
57
FOUNDATION- SCALE
l:100,
1:50 201|
03-CONTRACTOR
- TENSION
LENGTH/
'M20
(1:2:4). MPR/ APR
FIGURED T0 COLUMN WALL
-NSIONS BEAM 30
COVER SLAB iv)
FOR
ALL DRA
WN
BY No:- :
ALL 06-LAP CHKD
BY
DETAILS
COMBINED
OF
GL COL
FO0TING
250x350
/250x350
25 1250x1000
950x750
PB
PB
-
clc
150 B/W
COPING
TH
75mm
120
NOS @ COL
RCC 1:2:4
RCC PCC
1:4:8
TYPE-D2
STIRRUPS cle
150
@
4 100
80 DETAILS
OF
COL
FDN
700 1000x1000
700x
250x350
PB
Hi50
2000
1:6WITH
INT/EXT
PLASTER
clc CM 1:4:8
TYPE-D2
PCC
75mm
TH 150
COPING
BARS IN
a WORK
80
STIRRUPS STIRRUPS
120
4NOS 100
150
c
BRICK
NOS
a
PLINTH
BEAM 80 DETAILS
OF WALLFDN
2
250
250 -F375750
PB
50
350
GL
2000
RETAINING
LEXISTING
WALL
ELEVATION
PLAN ROOF
WIDE
600
4000
PROJECTION
4n00
2500 1500
FI B0ARD
75x50
HIGH
FLOOR F2/C3 Fi/C1 WOODENFALSE
SECTION
AT'A-A' MS
RAILING CEILINO
LAYOUT
PLAN 5250FRAMING RIDGE
-3750c/c
BEAM OF
BEAM
TB/FB
& 100mm
SPECIFIED
-FLOORAS
88.90mm
POSTOD 48-70mm ODOD
48.30mm
FOOTING
TH
FLOOR TUBULAR
TRUSS
OVER
ROOFING
SHEET
PPG
F2/C4 F1/C2
FB SLAB enm OD
RAFTERTIE &
les WINDTIE 40
x
Imnm PURLIN
Ts0x25mm
WEATHER
BOARD
FIXED
25xGmmWITH
FI
4000 TH
PI
DATE SCALE
|:00 DRG |DRAWNBY
CHKD BY 04- 03- 02- 01-
No:-
PLAN, CONTRACTOR TO
BEFOREFIGURED
TWO OTHERWISE
SPECIFIED
OF ALL
PRIMER
2010Nov 08
MPR/ RUPENDPER
SINGH
COAT DIMENSIONS
NOTES:
EXECUTION
DIMENSIONS
ENGR/ELEVATION & TO OF
GAZEBO SYNTHETIC
ALL
CHECK
AND
l67 WOODEN/STEEL ARE
OF
SHALL
THE IN
SHEET
:-1/2 BRANCE
No ENGRS ENAMEL MILLIMETERS
RIFLES
ASSAM
SECTORHQ
9 WORK.
DIMENSIONS
VERIFY
ALL BE
HÌ
FOLLOWED
S01(WKS9 ) PAINT
MEMBERS.
SECTOR
SECTION
OVER UNLESS
AR
A
COAT
NOTE:- Col-1 & Col-2 HEIGHT 2500mmBETWEEN
G. LVL TO FLOOR BEAM 0.3LI
DRAIN PCC DRAIN -XPM 3. DO NOT SCALE OUT ANY DIMENSIONS FROM THE DRG.
FOLL OWWRITTEN DIMENSIONS ONLY
10x3 mm flat iron
handle
75mm dia hings 5mm dia hingey N150 DETAILS OF DOOR,DRAIN
handle 750
300 DRN BYi ENGR BRANCH
600 iron 50x50x6 frarme P CC 610 Rupender Singh
ELEVATION ELEVATION SECTION AT K-K HQ 9 SECTOR
CKD BY ASSAM RIFLES
L150x60x6mm frame 12 mm cement plaster
600
6mmMS plate y Bmm MS plate DRG NO:- MPRI ENGR/STD /09SHNO. :- 2/2
shllow Y R
fueCC
Slope
150hm
drain
2805 shallow SECTIONC-AT
D
pit
Drying 600
plateform
-75mmRCC
PLAN platorm mnsh
slope
Parking
hole
holAier
parkihghoe
2805 -Drain
|rampEarh
slope Concrete
K 75mmRCC
lintel 3
pointed
cement NosxPM
Gmm being
75 cement Reinforcement
barsverticals
bars
mm Supports
morter Reinforcement
carried dia@100
6mm carried to
BB pointing prevent
holAier work
brick
Into dia@150 away 50x6
mm loose
B 535 mm
CRS 20x3x3xcm
CRS particals
flat/iron
parkinghole helical
INCINERATOR
PLAN OF -Air 20mmdia
bars
fire
SECTIONG-HON hole 120c/cBW
@
450x230
eCCBupports
flu-R rivetedto
10
mm mmGIiron
circular
sheetcover
75mmRCC
lintel dla
opening
600x600mm Feed bolt
of steps
Gmmplate Al rammed
form
earth
300x290mm
ironmmmade
50x50X6
hole
75mmpceplat
& 1425 2130
on hre
angle door
H
NO::MPR/ENGR/STD
: 24
INCINERATOR
Rupender
Singh WRITTEN
NOT
DIMENSIONS
SCALE
NOTES
1:100,
JAN SECTION
PLAN, BEFORE
TO
DIMENSIONS OUT
2011 ARE CHECK
1:20 ANY EXECUTION
GIVEN
DIMENSIONS AND
ASSAM
RIFLES
SECTOR HQ
BRANCH9
ENGR ONLY IN
MILLIMETRES, VERIFY
OF
HQ
/09SH THE
soi(KS)9
SECTOR FROM WORK. ALL
THE
NO. THE UNLES
AR
DRG.
:-1/2
NOTES
-65X65X6 MM ANGLE IRON
1. CONTRACTOR TO CHECK AND VERIFY ALL THE
-40X6 MM FISUP OF BARBED WIRE DIMENSIONSBEFORE EXECUTION OF THE WORK.
-MS SCREW BOLT 2. ALL DIMENSIONS GIVEN ARE IN MILLIMETRES, UNLESS
OTHERWISE MENTIONED
BARBED WIRE @ 150 C/C
3. DO NOT SCALE OUT ANY DIMENSIONS FROM THE DRG.
WRITTEN DIMENSIONS ONLY WILL BE FOLLOWED.
4. TWO COAT OF ALUMINIUM PAINT OVER ONE COAT OF
RED OXIDE ON ANGLE IRON POST ONLY
PCC 1:3:6
300 75X75X6
ANGLE INI BARBED WIRE SECURITY
POST
3000 CIC 3000 C/C FENCING
PLAN, ELEVATION & TYPICAL SECTION
ELEVATION
DRN: ENGR BRANCH
RUPENDER SINGH HO 9 SECTOR
300 GL GL
CKD: ASSAM RIFLES
DRG NO :-MPR/ENGR/ STD/04 SHT NO. 11
-PCC 1:3:6
1200
ool100
PCC 1:4:8
GL
3000
100 th hard core filling
34. DETAILS OF PCC
1400
STEPS
DETAILS OF PCC FOOTPATH
GARBAGE PIT
1525
1525
7552 olo
9984 o/o 13281224 2448 1224 1328
2559 o/c 2433c/c 2433c/c 2559 clo 230 1590
1974
1590
5154
olo PLINTH DETAIL FOR SHELTERS
5199
olo C/L OF TRUSS
PLINTH PLAN OF
CL OF TRUSS DRG NOs. 110, 111, 114 &115
DRN:
PCC 1:2:4, 230x230x300 RUPENDERSINGH ENGR BRANCH
(WILL CAST AFTER HQ 9 SECTOR
ALIGNING THE HD BOLT)
CKD: ASSAM RIFLES
1328 1224 1224 1224 1224 1328 DRG NO.:- MPR/ENGR/STDI13 SHT NO. :- 1/1