Dokumen - Tips - Atp Huawei 3g Rev1 Jan 2015docx

Uploaded by

zzzzkamalzzzz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
68 views50 pages

Dokumen - Tips - Atp Huawei 3g Rev1 Jan 2015docx

Uploaded by

zzzzkamalzzzz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 50

Site ID : .....

Site Name : .....


PO Number : .....
Item Number : .....
Area : .....

Check List GR
BTS ACCEPTANCE TEST DOCUMENT

Check List Check List


No Item
Vendor PMO
I Cover Check List GR
II Cover Doc ATP ( Foto Bangunan )
III Doc. Acceptance Test Document ( ATP )
IV Doc. RFI Notice ( asli )
V BOQ Actual Measurement ( ttd Manager FOC PT.HS )
VI Doc. PO
VII Doc. Berita Acara Serah Terima Site
VIII VSWR REPORT
IX WALK TEST REPORT
X FOTO DOCUMENTATION
XI Doc. As Plan Drawing & As built Drawing

Jakarta, ……………………...2014

PT. Huawei Tech Investment PMO


SITE ACCEPTANCE DOCUMENT CHECKLIST
SITE ID / NAME : ..... / .....
REGION / AREA : ..... / .....
SITE TYPE : .....

Hereby stated description and item below refer to the documents attached have been
approved for construction:

Checked
No. Table of Contents Remarks
HTI HS
1 BOQ
NodeB BOQ
2.1 NodeB ATP
Acceptance test
3.1 Installation Checklist
Indoor Installation Checklist
Outdoor Installation Checklist
4.1 Installation Checklist
Feeder System List
Fiber Optic list
4.2 BTS Commissioning Record
Network Parameter Checklist
4.3 Integration Test
Basic Service Checklist
4.4 Handover Test
4.5 24 Hours Stability Test
4.6 Alarm Query Test
4.7 Punch List Summary
5 VSWR Measurement
6 Site Documentation
7 Capture LMT
8 SIR Approve

PT. Huawei Services PT. Huawei Tech Investment


1 BOQ FOR NodeB

Project Name : .....


Customer : .....
Site ID : .....
Site Name : .....
Site Type : .....
Site Description : .....
Date : .....

Type BTS 3900 BoQ


BOQ
Material No. Code Description As As Remark
Plan Built
>> A1/1 BTS3900A WCDMA S1/1/1 (Band 1 2100M, CE U:128 D:128, DC -48V)
BTS3900A 02113169 BTS3900 Cabinet (DC -48V) 0 0 Existing
BBU 02315848 BBU Box 0 0 Existing
MARP RFU V100R102,WD5MWFUB81,Multi-Carrier
WRFU 02319231 Transceiver Unit(EDHT 80W,Band1,RX1920-1980/TX2110- 3 3 New
2170MHz),9U
WBBP 03020GSA WCDMA Base Band Processing & Interface Unit 1 1 New

WMPT 03020JQE WCDMA Main Processing & Transmission Unit (4E1 + 2FE), 1*1 1 1 New

UBRI 03052995 Universal Broadband Radio Interface 0 0 NA

04012542 Internal Cable Set, BTS3900, Single Cabinet Internal Cable Set 0 0 NA

>> B1/1 BTS3900A WCDMA S1/1/1 (Band 1 2100M, CE U:128 D:128, DC -48V)
Auxiliary Kit 02239275 3900 Series BTS Macro, Site Auxiliary Material Kit (G/U/L) 0 0 Existing
Single Cable, Shielding Straight Through Cable, 10m, MP8-IV,
Auxiliary 04046100 0 0 NA
CC4P0.5P430U (S), MP8-IV, LSZH
Signal Cable, Shielded Straight Through Cable, 10m, MP8-II,
Auxiliary 04070012 0 0 NA
CC4P0.5GY(S), MP8-II, FTP
Blank Label, DB0699, Huawei D Blank Cable Label, 40 Groups
Auxiliary 29040316 0 0 NA
40 Pcs, 4 Colum*10 Rows
Auxiliary 29041060 Signal Cable Label 1 1 New
Auxiliary 29041061 Power Cable Label 1 1 New

>> >> BTS3900A WCDMA S1/1/1 (Band 1 2100M, CE U:128 D:128, DC -48V)
Trunkcable,20m,120ohm,4E1,0.4mm,D26M(3ROW),120CC8P0.
Trunk Cable 04120119 0 0 Existing
4P430U(S)
Jumper
04130029 RF Cable,4.0m,7/16DIN50AM,COAX50-8.7/3.55B,DIN50SM-II 0 0 Existing
Cable
Outsourcing Cable,SFP High Speed Transmission
CPRI 2M 04050098 3 3 New
Cable,2.0m,SFP20M,CC2P0.32B,SFP20M,For Indoor
7/8" Aluminium Feeder Kit,Antenna Jumper Included,General
Feeder Kit 02236760 0 0 Existing
Area
Coaxial Cable,Smooth Copper
Feeder 7/8” 25070134 Tube,50ohm,27.8mm,21.5mm,9.3mm,Black, 7/8" Aluminium 0 0 Existing
Cable,With a package exempted from fumigating
Semi Rigid Semi Rigid Cable 6 6 New
Grounding
21120291 Grounding Unit 0 0 Existing
Unit
Base Frame 21150604 HERT Cabinet Base 0 0 Existing
Blue 16mm 25030533 Wire, 450/750V, 227 IEC 02 (RV) 16mm^2, black, 85A 10 10 New

Black 16mm 25030535 Wire, 450/750V, 227 IEC 02 (RV) 16mm^2, blue, 85A 10 10 New
Grounding
25030429 Wire,450/750V,60227 IEC 02(RV)16mm^2,yellow green,85A 10 10 New
Cable

*Site BOQ will base on the actual materials that installed.


PT. Huawei Services PT. Huawei Tech Investment
PT. Huawei Services PT. Huawei Tech Investment
NodeB ATP

REGION / AREA : ..... / .....

SITE ID : .....

SITE NAME : .....

SITE TYPE : .....

PT. Huawei Services PT. Huawei Tech Investment


2.1 Acceptance test

Test category Test item Test sub-item Test result

T01-0101
□Pass □Fail □NA
Power-on Check of the BBU

T01-0102
□Pass □Fail □NA
Power-on Check of the RRU

T01-0103
Power-on Check of Boards- □Pass □Fail □NA
BTS3900A

T01-0104
Power-on Check of Boards- □Pass □Fail □NA
BTS3900

T01-0105
Power-on Check of Heat □Pass □Fail □NA
T01-01 Exchanger
T01
Hardware Status T01-0106
Hardware
Check □Pass □Fail □NA
Status Check of Boards

T01-0107
Status Check of E1/T1 Ports □Pass □Fail □NA
of IuB Interface

T01-0108
Status Check of Optical □Pass □Fail □NA
Modules of CPRI Interface

T01-0109
Status Check of Local □Pass □Fail □NA
Ethernet Port

T01-0110
Status Check of Ethernet □Pass □Fail □NA
Ports of IuB interface

T02 T02-01 T01-0101 □Pass □Fail □NA


Fiber Optic Feeder Fiber Optic Check Check Fiber optic feeder
length and overall insertion
loss compliance to design
using OTDR. Create PDF
certification report for
handover pack and .SOR file
for reference.
T01-0102
Check insertion loss and
reflectance of each network
component/event using □Pass □Fail □NA
OTDR. Create PDF
certification report for
handover pack and .SOR file
for reference.
T01-0103
Check all LC feeder
connectors are clean and
free from dust, moisture,
contamination and scratches □Pass □Fail □NA
and meet IEC-61300-3-35.
Create consolidated
certificate report of
connector for handover
pack.
T01-0104
Check BBU, RRU TX ports
are clean and free from dust,
moisture, contamination and
scratches and meet IEC- □Pass □Fail □NA
61300-3-35. Create
consolidated certificate report
of connector for handover
pack.
PT. Huawei Services PT. Huawei Tech Investment
T02-0101
□Pass □Fail □NA
Login Management

T02-01 T02-0102
User Permission Locking Local Maintenance □Pass □Fail □NA
Management Terminal

T02-0103
□Pass □Fail □NA
Configuration Privilege

T02-0201
Querying NodeB Software □Pass □Fail □NA
Version

T02-0202
Querying Active NodeB □Pass □Fail □NA
Versions

T02-0203
□Pass □Fail □NA
Querying Board Version

T02-0204
Downloading NodeB □Pass □Fail □NA
Software Package

T02 T02-02 T02-0205


Operation and Software Version Downloading BootRom □Pass □Fail □NA
Maintenance Management Package

T02-0206
Synchronizing Software □Pass □Fail □NA
Version

T02-0207
□Pass □Fail □NA
Activating NodeB Software

T02-0208
Activating BootRom □Pass □Fail □NA
Package

T02-0209
Upgrading the NodeB □Pass □Fail □NA
Through the M2000

T02-03 T02-0301
License File Distributing a License File □Pass □Fail □NA
Management to the NodeB

T02-0401
T02-04 □Pass □Fail □NA
System Restart
Equipment
Management T02-0402
□Pass □Fail □NA
Querying NodeB Type

PT. Huawei Services PT. Huawei Tech Investment


T02-0403
□Pass □Fail □NA
RFU Reset

T02-0404
Board Blocking and □Pass □Fail □NA
Unblocking

T02-0405
□Pass □Fail □NA
NodeB Time Management

T02-0406
NodeB Time Zone □Pass □Fail □NA
Management

T02-0407
□Pass □Fail □NA
NodeB SNTP Management

T02-0408
RFU TX Switch □Pass □Fail □NA
Management

T02-0409
□Pass □Fail □NA
Hot Plugin on CPRI Port

T02-0410
Maintenance of the Power □Pass □Fail □NA
Supply System

T02-0411
Maintenance of the RRU □Pass □Fail □NA
Power System

T02-0412
Maintenance of the NodeB □Pass □Fail □NA
Clock

T02-0413
Querying NodeB Abnormal □Pass □Fail □NA
Status

T02-0501
□Pass □Fail □NA
E1/T1 Link Management
T02-05
T02-0502
IuB Interface □Pass □Fail □NA
IMA Group Management
Management
T02-0503
□Pass □Fail □NA
Ethernet Link Management

PT. Huawei Services PT. Huawei Tech Investment


PT. Huawei Services PT. Huawei Tech Investment
T02-0504
IP Transmission Layer Link □Pass □Fail □NA
Management

T02-0505
Standard Protocol Tracing □Pass □Fail □NA
at IuB Interface

T02-0206
□Pass □Fail □NA
Sector Management

T02-0507
□Pass □Fail □NA
Local Cell Management

T02-0508
□Pass □Fail □NA
Local Cell Operations

T02-0509
CE Consumption of R99 □Pass □Fail □NA
AMR12.2K Service

T02-0510
CE Consumption of R99 □Pass □Fail □NA
VP Service

T02-0511
CE Consumption of R99 □Pass □Fail □NA
PS384K Service

T02-0512
CE Consumption of □Pass □Fail □NA
HSDPA Service

T02-0601
Local Maintenance through □Pass □Fail □NA
Local Ethernet Port
T02-06
T02-0602
Maintenance Channel □Pass □Fail □NA
Remote Maintenance
Management
through Omch Channel

T02-0603
□Pass □Fail □NA
BootP Funcion

T02-0701
Uploading Data □Pass □Fail □NA
T02-07 configuration File
File management T02-0702
Dowloading Data □Pass □Fail □NA
Configuration File
PT. Huawei Services PT. Huawei Tech Investment
T02-0801
Checking NodeB Data □Pass □Fail □NA
Consistency

T02-0802
RTWP Measurement □Pass □Fail □NA
Monitoring

T02-0803
CPU/DSP Usage □Pass □Fail □NA
Monitoring

T02-08 T02-0804
Configuration RFU Temperature □Pass □Fail □NA
Management Monitoring

T02-0805
Cell Service Resource □Pass □Fail □NA
Query

T02-0806
RFU Output Power □Pass □Fail □NA
Monitoring

T02-0807
Board Service Resource □Pass □Fail □NA
Query

T02-09 T02-0901
□Pass □Fail □NA
Alarm Management Alarm Query

T02-1001
□Pass □Fail □NA
NE Startup

T02-1002
□Pass □Fail □NA
NE Shutdown

T02-1003
NodeB Software Download □Pass □Fail □NA
Start / Finish

T02-10 T02-1004
□Pass □Fail □NA
Typical Alarms Board Startup

T02-1005
□Pass □Fail □NA
Board Fault Alarm

T02-1006
□Pass □Fail □NA
E1/T1 Loss of Signal

T02-1007
E1/T1 Remote Alarm □Pass □Fail □NA
Indication
3.1 Installation Checklist

Indoor Installation Checklist

SITE: ….. SITE CONFIG: _/_/_ DATE: DD/MM/YYYY


Equipment overall condition
Procedure Pass Fail N/A Remark Audit
1 Visually inspect the cabinets for any damage.
2 Check that the cabinet doors and locks operate
correctly. (applicable for outdoor Equipment)

Remarks
Site Documentation

Procedure Pass Fail N/A Remark Audit

Check that the equipment is installed according to


3 the as plan site design package.

4 Check that the indoor cable ladder is installed


according to the as plan side design package
(applicable for Indoor Equipment)

Civil Works Check


Procedure Pass Fail N/A Remark Audit

Check that the cabinets have been securely


5
fastened and are leveled correctly.

Check that indoor cable ladder above the cabinet


6 has been installed correctly (applicable for Indoor
Equipment).

Check that the DDF are grounded to the main


7
grounding bus bar.

Remarks
Equipment Specific Checks
Procedure Pass Fail N/A Remark Audit

Check that all equipment internal cables are


8
correctly installed and labeled.

Check that the cabinet blanking panels have been


9
installed.

PT. Huawei Services PT. Huawei Tech Investment


Cabinet External Cabling Check
Procedure Pass Fail N/A Remark Audit

Check each the equipment rack is grounded to the


10
main grounding bus bar and labeled.

Check that the A-Bis and A PCM cables are


11
connected to the correct position of DDF.

Check that the alarm cabling has been connected


12
from the BTS to the DDF

Check that the extension cabinet cables are


13
correctly connected and labeled.
Check fiber optic link length and qualify overall
14 loss (dB) and individual loss of each network
component/event using OTDR. Create PDF
certification report for handover pack and .SOR file
for reference.
Check All fiber optic connectors are clean and free
15 from dust, moisture, contamination and scratches.
Create consolidated certificate report of connector
endface standard IEC-61300-3-35 for handover
pack.

Check power level BBU Transmitter (TX) port


16
before connection of feeder jumpers.

Check that the feeder jumper cables are tightened


16
all the NodeB.
Check that the external cabinet cabling has been
17 cable tied to the cable ladder.

18 Check that the indoor feeder cable labeling is


correct.

Check that the DC power cable is the correct size


19
and is terminated correctly.

20 Check the transmission cables, DC Cables and


feeder jumpers are be correctly labeled

21 Check that accessory equipment is installed


correctly.

Remarks

Final Checks
Procedure Pass Fail N/A Remark Audit

20 Check that all installation and packing materials


have been removed from the site.

Remarks

PT. Huawei Services PT. Huawei Tech Investment


Outdoor Installation Checklist

SITE: ….. SITE CONFIG: _/_/_ DATE: DD/MM/YYYY

PT. Huawei Services PT. Huawei Tech Investment


Antennas

Procedure Pass Fail N/A Remark

Visually inspect the antennas and feeders for any


21
installation damage.

Check that the correct type of antenna has been


22
installed.

Remarks

Feeders
Procedure Pass Fail N/A Remark

Check that the bending radius of all feeders is


23
greater than 20 x Ǿ.

Check that outdoor feeder labeling is correct at


24
the top and the bottom of the tower.

Check that the top feeder grounding is correctly


25
terminated.

Remarks

Connectors
Procedure Pass Fail N/A Remark

26 Check that all top feeder connectors are tight.

Check that all top feeders to jumper connections


27
are tight.

Check that all top jumpers to antenna


28
connections are tight.

Remarks

Weather sealing
Procedure Pass Fail N/A Remark

Check all top grounding kits are weather-sealed


29
correctly.

Check all feeders to jumper connections are


30
weather-sealed correctly.

Check all jumpers to antenna connections are


31
weather-sealed correctly.

Antenna Steelwork

PT. Huawei Services PT. Huawei Tech Investment


Procedure Pass Fail N/A Remark

Check that the antenna supporting steelwork is


32
correctly installed.

33 Check all antenna mounting clamps and


brackets have been tightened.

Remarks

Antenna Installation Check

Procedure Pass Fail N/A Remark

Check that the antennas are mounted at the


34
correct height.

Check that the direction of all antennas in all


35
sectors is correct.

Remarks

Antenna Installation Date


Antenna Sector 1 Sector 2 Sector 3
Height RXD12
Direction
Down tilt
M/E

Remarks

Outdoor Site Documentation


Procedure Pass Fail N/A Remark
Check that the antenna layout is according to
36 the site drawing.

Check that the feeder cable ladder is installed


37 as per the site drawing.

Check that the feeder gland plate is installed as


38 per the site drawing (applicable for Indoor
Equipment)

Remarks

SITE: ….. SITE CONFIG: _/_/_ DATE: DD/MM/YYYY

Civil Works Inspection


Procedure Pass Fail N/A Remark
39 Check that the feeder cable ladder is correctly
installed

PT. Huawei Services PT. Huawei Tech Investment


Check that the feeder grand plate has been
40 correctly installed (applicable for Indoor
Equipment).

Remarks

Feeder Grounding
Procedure Pass Fail N/A Remark

41 Check number/location of feeder grounding kits.

42 Check all bottom grounding are correctly


terminated

43 Check all bottom grounding kits are weather


sealed correctly.

Concluding Checks
Procedure Pass Fail N/A Remark

Check that all installation and packing materials


44
have been removed from the site.

T02-1008
IMA/UNI Link Loss of Cell □Pass □Fail □NA
Delineation

T02-1009
□Pass □Fail □NA
CCP Fault

T02-1010
Tx Branch Switch off □Pass □Fail □NA
Manually

T02-1011
□Pass □Fail □NA
RFU VSWR Abnormal

T02-1012
NodeB Clock Source □Pass □Fail □NA
Abnormal

T02-1013
□Pass □Fail □NA
FE Interface Fault Alarm

T02-1014
□Pass □Fail □NA
External Alarm

T03 T03-01 T03-0101


Synchronization Extracting Clock Extracting Clock Signal □Pass □Fail □NA
Signal from IuB from E1/T1 IuB Interface
Interface
T03-0102 □Pass □Fail □NA
Extracting Clock Signal
from IP IuB Interface

PT. Huawei Services PT. Huawei Tech Investment


T03-02 T03-0201
□Pass □Fail □NA
Free-Run Free-Run

T04-01
T04 T04-0101
AISG ALD □Pass □Fail □NA
Antenna System TMA Maintenance
Management

Conclusion: Totally 64 items included for acceptance test, in which ____passed, ____ failed, and ____ were
not applicable.

PT. Huawei Services Representative PT. Huawei Tech Investment Representative

Signature:__________________ Signature:__________________

Date:______________________ Date:______________________

PT. Huawei Services PT. Huawei Tech Investment


4.1 Installation Checklist

Feeder System List

SITE: ….. SITE CONFIG: _/_/_ DATE: DD/MM/YYYY


VSWR TE S T

RRU Feeder
No. RRU Panel N port VSWR Distance To Fault (DTF) Audit
Board Length(m)

RFU _TXM
1 RFU 0
RFU _TXD
RFU _TXM
2 RFU 2
RFU _TXD
RFU _TXM
3 RFU 4
RFU _TXD

Notes:

1. VSWR value shall be referring to the specification manual from the supplier.
2. Setting at site master for cable 7/8" (VF and cable loss shall refer to the specification manual from the supplier).
3. Setting at site master for cable 1-5/8" (VF and cable loss shall refer to the specification manual from the
supplier).
4. VSWR ≤ 1.3
5. DTF test will be carried out according to the test procedure and test result included in the test documentation.

PT. Huawei Services PT. Huawei Tech Investment


4.2 BTS Commissioning Record

Network Parameter Checklist

SITE: ….. SITE CONFIG: _/_/_ DATE: DD/MM/YYYY


Cell parameter Plan Actual Remark
CI
Antenna direction
Sector 1 (Azimuth)
Antenna Tilt (M+E)
(Degree)

CI
Antenna
Sector 2 direction(Azimuth)
Antenna Tilt (M+E)
(Degree)

CI

Antenna
Sector 3 direction(Azimuth)
Antenna Tilt (M+E)
(Degree)

PT. Huawei Services PT. Huawei Tech Investment


4.3 Integration Test

Basic Service Checklist

SITE: ….. SITE CONFIG: _/_/_ DATE: DD/MM/YYYY

Basic Service Test


Cell No. Test Item Pass Fail Remark
Incoming Call (3G-3G)
Incoming Call (2G-3G)
Incoming Call (PSTN-3G)
Outgoing Call (3G-3G)
Outgoing Call (3G-2G)
Cell 1
Outgoing Call (3G-PSTN)
SMS Incoming
SMS Outgoing
HSDPA Browsing
HSDPA Downlink
Incoming Call (3G-3G)
Incoming Call (2G-3G)
Incoming Call (PSTN-3G)
Outgoing Call (3G-3G)
Outgoing Call (3G-2G)
Cell 2
Outgoing Call (3G-PSTN)
SMS Incoming
SMS Outgoing
HSDPA Browsing
HSDPA Downlink
Incoming Call (3G-3G)
Incoming Call (2G-3G)
Incoming Call (PSTN-3G)
Outgoing Call (3G-3G)
Outgoing Call (3G-2G)
Cell 3
Outgoing Call (3G-PSTN)
SMS Incoming
SMS Outgoing
HSDPA Browsing
HSDPA Downlink

PT. Huawei Services PT. Huawei Tech Investment


4.4 Handover Test

SITE: ….. SITE CONFIG: _/_/_ DATE: DD/MM/YYYY


Call Test

Origin Target Target Cell


Cell Cell Pass Fail Remark Audit
ARFCN/BCCH S-code/BSIC

CELL2
CELL3
CELL(2G)A
CELL1
CELL3
CELL(2G)B
CELL1
CELL2

CELL3 CELL(2G)C
CELL(2G)A CELL 1
CELL(2G)B CELL 2
CELL(2G)C CELL 3

Notes:

1. In the Target cell column, the parameter ARFCN &S-code is for 3G cell, the parameter BCCH &BSIC is for
2G cell.
2. Verify with the TOC if inter site neighbor relationship has been defined before test.
3. GSM 2G cell mush add corresponding 3G neighbor cell.

PT. Huawei Services PT. Huawei Tech Investment


4.5 24 Hours Stability Test

Site Name: …..


Check Result:

OK
--
This is to be confirmed that the BTS 3G has been running at least 24 hours without any
related self fault.

Remarks

Notes: The 24 hours is to be done in TOC/NOC, which will be passed if NODEB is normal operation and no alarm.

PT. Huawei Services PT. Huawei Tech Investment


4.6 Alarm Query Test
Site Name: …..
Check Result:

OK
--

1. This test will be done from OMC (Region TOC).


2. This is to be confirmed that the BTS alarm is visible and there are no active alarms.

Remarks

Notes: if the site is no active alarms then write “OK, no active alarm”, otherwise record the alarm information in detail

PT. Huawei Services PT. Huawei Tech Investment


4.7 Punch List Summary

Site Name: …..


Check Result:

Note:
Please record in detailed for testing items that unable to complete.

Rectified By
No. Items Description Remark
HTI HS

PT. Huawei Services PT. Huawei Tech Investment


NodeB Site Binder
XL Rollout Project 2014

Site ID : …..
Site Name : …..
Site Type : …..
BTS Type : …..
Site Description: …..
Proj Def : …..

CERTIFICATE
of
Preliminary Acceptance
It is agreed that, from to , the acceptance test
for site has been successfully held by both the PT. Huawei
Services and Huawei Tech Investment engineer.
It also had been proved by both parties that Huawei’s NodeB
equipments can fully satisfy the need of PT . XL AXIATA under the contract
and can be rightly put into full service.

PT. HUAWEI SERVICES PT. Huawei Tech Investment

Date Date
5 VSWR Measurement

V SW R
3G_NGINGAS_SIDOA RJO SECTOR 1 A

M1: 1.226 @ 1985.116 MHz


1.5

1.4
V S W R

Limit : 1.3
1.3

1.2

1.1

M1
1.0
1975 2000 2025 2050 2075 2100 2125 2150
Frequency (1970.0 - 2170.0 MHz)

Resolution: 517 CAL:ON(COAX) CW : ON


Std: UMTS IV Uplink(Gener (_) Channel: N/A
Date: 04/27/2010 Time: 12:49:06
Model: S331D Serial #: 00914148

D ista n c e -to -fa u lt


3G_NGINGAS_SIDOA RJO SECTOR 1 A

M1: 1.009 @ .000 Meter M2: 1.016 @ 3.401 Meter M3: 1.04 @ 32.616 Meter M4: 1.09 @ 34.797 Meter
1.30

1.25

1.20
V S W R

1.15

1.10

Limit : 1.05
1.05

M1 M2 M3 M4
1.00
0 5 10 15 20 25 30 35 40 45
Distance (0.0 - 45.0 Meter)

Resolution: 517 CAL:ON(COAX) CW : ON


Std: UMTS IV Uplink(Gener (_) Channel: N/A
Date: 04/27/2010 Time: 12:49:28 Ins.Loss:0.080dB/m
Model: S331D Serial #: 00914148 Prop.Vel:0.890
V SW R
3G_NGINGAS_SIDOA RJO SECTOR 1 B

M1: 1.286 @ 1991.318 MHz


1.5

1.4
V S W R

Limit : 1.3
1.3

1.2

1.1

M1
1.0
1975 2000 2025 2050 2075 2100 2125 2150
Frequency (1970.0 - 2170.0 MHz)

Resolution: 517 CAL:ON(COAX) CW : ON


Std: UMTS IV Uplink(Gener (_) Channel: N/A
Date: 04/27/2010 Time: 12:51:07
Model: S331D Serial #: 00914148

D ista n c e -to -fa u lt


3G_NGINGAS_SIDOA RJO SECTOR 1 B

M1: 1.034 @ .000 Meter M2: 1.026 @ 3.314 Meter

M3: 1.026 @ 32.355 Meter M4: 1.07 @ 34.797 Meter


1.30

1.25

1.20
V S W R

1.15

1.10

Limit : 1.05
1.05
M1 M2 M3 M4
1.00
0 5 10 15 20 25 30 35 40 45
Distance (0.0 - 45.0 Meter)

Resolution: 517 CAL:ON(COAX) CW : ON


Std: UMTS IV Uplink(Gener (_) Channel: N/A
Date: 04/27/2010 Time: 12:51:23 Ins.Loss:0.080dB/m
Model: S331D Serial #: 00914148 Prop.Vel:0.890
V SW R
3G_NGINGAS_SIDOA RJO SECTOR 2 A

M1: 1.23 @ 1976.589 MHz


1.5

1.4
V S W R

Limit : 1.3
1.3

1.2

1.1

M1
1.0
1975 2000 2025 2050 2075 2100 2125 2150
Frequency (1970.0 - 2170.0 MHz)

Resolution: 517 CAL:ON(COAX) CW : ON


Std: UMTS IV Uplink(Gener (_) Channel: N/A
Date: Apr/27/2010 Time: 12:33:14
Model: S331D Serial #: 00914148

D ista n c e -to -fa u lt


3G_NGINGAS_SIDOA RJO SECTOR 2 A

M1: 1.011 @ .000 Meter M2: 1.041 @ 3.314 Meter

M3: 1.025 @ 32.529 Meter M4: 1.083 @ 34.797 Meter


1.30

1.25

1.20
V S W R

1.15

1.10

Limit : 1.05
1.05
M1 M2 M3 M4
1.00
0 5 10 15 20 25 30 35 40 45
Distance (0.0 - 45.0 Meter)

Resolution: 517 CAL:ON(COAX) CW : ON


Std: UMTS IV Uplink(Gener (_) Channel: N/A
Date: 04/27/2010 Time: 12:33:58 Ins.Loss:0.080dB/m
Model: S331D Serial #: 00914148 Prop.Vel:0.890
V SW R
3G_NGINGAS_SIDOA RJO SECTOR 2 B

M1: 1.236 @ 2117.674 MHz


1.5

1.4
V S W R

Limit : 1.3
1.3

1.2

1.1

M1
1.0
1975 2000 2025 2050 2075 2100 2125 2150
Frequency (1970.0 - 2170.0 MHz)

Resolution: 517 CAL:ON(COAX) CW : ON


Std: UMTS IV Uplink(Gener (_) Channel: N/A
Date: Apr/27/2010 Time: 12:36:15
Model: S331D Serial #: 00914148

D ista n c e -to -fa u lt


3G_NGINGAS_SIDOA RJO SECTOR 2 B

M1: 1.048 @ .000 Meter M2: 1.024 @ 3.401 Meter

M3: 1.046 @ 32.355 Meter M4: 1.056 @ 34.797 Meter


1.30

1.25

1.20
V S W R

1.15

1.10

Limit : 1.05
1.05
M1 M2 M3 M4
1.00
0 5 10 15 20 25 30 35 40 45
Distance (0.0 - 45.0 Meter)

Resolution: 517 CAL:ON(COAX) CW : ON


Std: UMTS IV Uplink(Gener (_) Channel: N/A
Date: 04/27/2010 Time: 12:35:45 Ins.Loss:0.080dB/m
Model: S331D Serial #: 00914148 Prop.Vel:0.890
V SW R
3G_NGINGAS_SIDOA RJO SECTOR 3 A

M1: 1.21 @ 2052.658 MHz


1.5

1.4
V S W R

Limit : 1.3
1.3

1.2

1.1

M1
1.0
1975 2000 2025 2050 2075 2100 2125 2150
Frequency (1970.0 - 2170.0 MHz)

Resolution: 517 CAL:ON(COAX) CW : ON


Std: UMTS IV Uplink(Gener (_) Channel: N/A
Date: 04/28/2010 Time: 12:51:16
Model: S331D Serial #: 00914148

D ista n c e -to -fa u lt


3G_NGINGAS_SIDOA RJO SECTOR 3 A

M1: 1.044 @ .000 Meter M2: 1.04 @ 3.401 Meter

M3: 1.022 @ 32.703 Meter M4: 1.062 @ 34.884 Meter


1.30

1.25

1.20
V S W R

1.15

1.10

Limit : 1.05
1.05
M1 M2 M3 M4
1.00
0 5 10 15 20 25 30 35 40 45
Distance (0.0 - 45.0 Meter)

Resolution: 517 CAL:ON(COAX) CW : ON


Std: UMTS IV Uplink(Gener (_) Channel: N/A
Date: 04/28/2010 Time: 12:50:51 Ins.Loss:0.080dB/m
Model: S331D Serial #: 00914148 Prop.Vel:0.890
V SW R
3G_NGINGAS_SIDOA RJO SECTOR 3 B

M1: 1.255 @ 1989.092 MHz


1.5

1.4
V S W R

Limit : 1.3
1.3

1.2

1.1

M1
1.0
1975 2000 2025 2050 2075 2100 2125 2150
Frequency (1970.0 - 2170.0 MHz)

Resolution: 517 CAL:ON(COAX) CW : ON


Std: UMTS IV Uplink(Gener (_) Channel: N/A
Date: 04/27/2010 Time: 12:30:30
Model: S331D Serial #: 00914148

D ista n c e -to -fa u lt


3G_NGINGAS_SIDOA RJO SECTOR 3 B

M1: 1.02 @ .000 Meter M2: 1.018 @ 3.314 Meter

M3: 1.055 @ 32.529 Meter M4: 1.058 @ 34.884 Meter


1.30

1.25

1.20
V S W R

1.15

1.10

Limit : 1.05
1.05
M1 M2 M3 M4
1.00
0 5 10 15 20 25 30 35 40 45
Distance (0.0 - 45.0 Meter)

Resolution: 517 CAL:ON(COAX) CW : ON


Std: UMTS IV Uplink(Gener (_) Channel: N/A
Date: 04/27/2010 Time: 12:30:06 Ins.Loss:0.080dB/m
Model: S331D Serial #: 00914148 Prop.Vel:0.890
6 Site Documentation
REFER TO FILE List site picture ATP
DATA CAPTURE

1. RRU Physical Topology

2. Main Cabinet
3. Display VSWR

4. List Alarm
5. Display Locell

6. Display RRU Traffic Capability


7. Display Board Status

8. List NodeB Type


9. Display Cell Config

10. Display Software Version


11. Display License

12. Traffic