PAN: AAJCR7493N www.agriagro.
in
CIN: U52399UP2019PTC119977 Phone no: - 8534050666, 9520099666
SIDDHI VINAYAK TRADE CENTER JEONI MANDI AGRA-282004
FARMER NAME - Vikash Kumar Choudhary Purchase Dept.SGT University
Gurgaon Haryana
Fan and Pad
Technical Standard of Hi Tech Fan and Pan cooling system Green House: With Fan
Pad/Fogging System:
Sr.No Item Departmental Description
01 Size : (AREA – 2000 SQ meter) (Dimensions - 28m x 36m)
02 Shape :dome - Aero Dynamic along all four sides with curvature shaped hockey
pipes of 48.0 mm OD G.I Pipes with a view to reduce the impact of
wing and consequent damage of Poly House Structure.
- Gutter Orientation –North South and may change according to wing
direction.
- PAD should be in Wind direction and must have covered elevated
Balcony for shade.
03. Structure: Hot Dip Galvanized Tubular Structure of BIS standards. Galvanization of
the structural members should not be less than 300 GSM (germs per
square meter).
Withstand to Structure should withstand to minimum wind velocity of 80.6 miles
wind velocity per/hr. or 130 Km/hr. or 36 Meter per Second.
Note : In case of high wind velocity zones, structure should withstand
wind velocity up to 94 miles per/hr or 150 Km/hr or 42 Meter per
second.
Size of the Members Name Outside Thickn Wt.per
Structural Diameter( ess meter
members mm) (mm) length (kg)
Columns 76 2 3.75
Top Purlins 48 (Ridge) 2 2.30
Gutter Purlins 42/43(cent 2 2.10
er)
Top Arches of the truss 42 2 2.10
Bottom Chord of the truss 60 2 2.85
Horizontal (GI pipe)
Top chords and trussed 48/43 2 2.30/2.10
member
Internal Bracings of the 33 2 1.60
truss-Pipe structural
members to be fitted in
planted nuts, bolts and
washers without welding
Coridors/Balconies 60 2 2.85
Curtain Runner 42 2 2.10
Flap control pipe 21 2 1
Curtain Shaft 27 2 1.30
Cross bracing 33 2 1.60
Note: Welded pipes should not be used for structure erection
expect bottom pipe of 8 m length.
Columns 76 OD,2mm thick
Purlin 48mm OD/2 .0 mm thick at ridge and 42/43 mm OD/2 mm thick
for center
Trusses Bottom horizontal 60mm OD/2 mm thick G.I. Pipe, top chords
and truss members 48mm OD/and 43mm OD 2.0mm thick
Bracing 32 mm OD/1.8mm thick G.I. Pipe structural members to
be fitted in plated nuts, bolts and washers without welding .
Clamps and
Nut Bolts
4 Grid Size -8 m x 4 m (ideal size),
- Size can be less depending upon space availability but not more
8m x 4m grid size.
5 Balcony and 2 meter wide, vertical/curved pipe – 60 mm OD/2 mm thick G.I
Corridor Pipe with 32 mm OD/1.8 mm thick horizontal GI pipe as
supporting pipe. Area covered by corridors should not be
included while calculating the area under POLY HOUSE.
6 Foundation Telescopic type, The column size to be 45 cm x 45 cm x 90
cm depth of CC1:2:4 ratios properly compacted over 10
cm layer of 1:8:16. Two hold fasteners to be used in
perpendicular direction at 20 cm apart in concrete starting
from 20cm from base. 2mm thick pipe
7 Gutter Should be made of Galvanized sheet of 1.5mm thickness in
trapezoidal shape having 500mm wide perimeter (preferably of
single length without joint) Coil having 120 GSM Galvanization. It
should be leak proof.Min.1% slope required for the gutter,
Assure uniform slope to gutter to avoid stagnant water in gutter
to achieve maximum life of gutter.
Gutter Orientation – North –South and may change according to
wind direction.
(a) Gutter Height 4 Meter
(b) Gutter Slope 1 to 1.5 % to be provided in civil structural work
Ridge Height 6. meter,
/Centre Height
9 Poly Film Technical Specifications of polythene should be as per
Indian standard (Iso 15827 :2009)
To select the proper film for poly-house is very
important and which have direct relation with quality
of the crop as well quantity of the produce polythene
should be properly UV stabilized at least three years.
Thickness of polythene should be minimum 200
micron (0.2mm).
Options in green house film
Compulsory Properties:
* UV Stabilization
* Diffusion /Clear (Light Transmission)
Optional Properties:
* UV Blocking /Antivirus
* Sulphur Resistant
* Thermic
* Anti Drip
* Anti Mist
*Anti Dust
Carnation: 200 micron thick, UV Stabilized, anti dust,
with cooling effect, where altitude is high polythene
should be with IR protection.
10 Thermal Net 30 to 50%, alluminate /thermal net as per
requirement.
- Minimum 100 GSM
- Power operated crank mechanism should be
provided for expanding and retracting the shade
net.
11 Poly fixing C type profile made from GI should have- High
strength with light weight –(approx 220-250
gm/rmtrs),smooth edges, curve bottom proper for
1.25” to 3”pipes,proer channel for spring and suitable
for double spring locking 0.9mm thick. Self Drilling
Screw should be fixed on profile every 40 cm along the
full length of the profile.
12 Spring Insert GI wire spring of 2.2mm diameter, having good
elasticity should be used for longer life the
transferring less heat to the cladding materials as
plastic films or shade net.
If we are using GI wire spring it is better to use a two
inch strip of new poly film to be placed over the main
plastic in the profile and then lock it with GI profile.
This will help in longer life of the plastic as the rusted
spring will not directly come in contact with the main
plastic.
All spring must end inside the profile. Any spring
outside profile must be either fixed inside or should be
cut so that it does not damage the plastic in strong
wind as it will initiate all the plastic being pulled out of
profile.
13 Entrance Double door entry, Doors should be made of form FRP
sheets or polycarbonate sheets. Opening and closing is
either hinged or sliding. in, width of door should be 1M and
Min height 2M.The door area should have 50mm PCC
Flooring over 75mm thick sub base.
14 Civil Work Wall on fan side will be 35mm thick and 70 cm high and
wall on pad side will be 23 cm thick & 80 cm high from
ground level in cm 1:6 with required foundation, All the
walls will be plastered in cm 1:4 on top and sides.
80cm to 1m wide and 10 cm thick footpaths made of
cement concrete ratio of 1:2:4 Should be provided as per
the requirements.
15 Electrical Conduit and wiring as required for connecting light, fan,
fittings : motor and pumping to main electrical supplies.
Preferably use copper wire to withstand the load of the
electrical appliances of Indian standards.
16 Climate Control System
A
5 FAN 2 AIR center fan
- Exhaust Fans-50”however it depends upon size of fan-
pad house with louvers, 1.5 HP-3phase ISI standard
electric motor.
Fan-Pad System - Cellulose cooling pads of 1.8 meter height with 150mm
thickness covering the area properly, PVC water
distribution system, and screen/disc filter, valve and
pumps etc.
- Control panel with manual operation, temp, and
humidity sensors.
B Fogging System Hi tech Four Way anti leak Foggers 28 lph, 16mm
Laterals,, rust proof, TDS PROOF
Water storage tank per poly house 2000+2000 liter tow tank,,,
(AREA – 2000 SQ meter) (Dimensions – 28m x36)
Sr.
No Total Final
. ITEMS Cost / Price Quantity Price
1. Include
(1) Galvanized steel
structure
(2) Double door room
(3) Cladding
(4) COVERING MATERIAL UV-
Stabilized Polycarbonate
sheet 6mm. Multi wall
(5) Drip irrigation and Fogger
system Hi tech Four
Way anti leak Foggers
28 lph, 16mm
Laterals,, rust proof,
TDS PROOF
(6)Cooling system Fans &
Cellulose Cooling Pad
(7)Elect. Control Panel
Climate Control
System: Fan pad
system (1.5HP/50’’)
Fogging system
(Four way anti- leak)
(8) all Civil work foundation,
wall
(9) Humidity and
Temperature will be
controlled with Auto
sensors.
Cost of FPCSPH Structure
2000 SQ MTR,
,
2. Plantation 0 0 0
Include Include Include
2000*1530 ,,
PER SQMTR
TOTAL 3060000/
Gst extra 18% Grand total 3898800
Extra Services benefit Description By RN AGRI AGRO SOULITIONS
HI – TECH AGRONOMY CONSULTANCY
We, AGRI AGRO has a qualified Agriculture Agronomist who provides proper knowledge to
the Customer for maintaining and realizing the full potential of Greenhouse Project so that
they get well equipped and are able to avail maximum profit out of it. We provide agronomy
4 services in a month for 1 Years, so Our Customer can get the right solution of the Crop
disease & other Problems.
Hi tech Fogging System,,
Hi tech Four Way anti leak Foggers 28 lph, 16mm Laterals,, rust proof, TDS PROOF
Foundations,,
Telescopic type, The column size to be 45 cm x 45 cm x 90 cm depth of CC1:2:4 ratios
properly compacted over 10 cm layer of 1:8:16. Two hold fasteners to be used in
perpendicular direction at 20 cm apart in concrete starting from 20cm from base.
Entry chamber with anti-leak proof double doors.
No extra cost Water harvesting system save water save earth
Soil Preparation and Fertigation in Polyhouse Cultivation
Term & condition
1. 50% Amount as an advance along with order.
2. 25% WORK COMPLETE , 25% AFTER FINAL WORK
3. GST tax extra ,18% according to product,,
4. Total Material Including Polycarbonate sheet will be
delivered at your site within 15 Days Receipt of
Payment.
5. Installation will be completely done at your site within 60 Days for
the Receipt of payment.
6. The Delivery of the material may be delayed due to unforeseen
factor and force major.
Our Bank
Catholic Syrian Bank (CSB BANK) AGRA.
Account name; RNAGRI AGRO SOLUTIONS PVT. LTD
Account no;038604061915195001
Ifsc code: CSBKOOOO386
GSTIN: 09AAJCR7493N1ZC
7. Electricity and Water supply is to be provided by the Farmer/ Party.
8. Land leveling is compulsory, if hard rock is present foundation
pit will be done by farmer/ PARTY.
9. It is compulsory that, Party will give the shelter to our Polyhouse construction
labors.
We hope you will find our offer in line with your requirement.
Thanking you once again,
Sincerely yours,
RNAGRI AGRO SOLUTIONS PVT.LTD
Authorized Signatory
MOHD HABIB – 9520099666 ,, 8534050666,
MAIL- [email protected]