0% found this document useful (0 votes)
7 views

2 M1 Lab 1 Data Table Sheet

Uploaded by

itzelrauda
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views

2 M1 Lab 1 Data Table Sheet

Uploaded by

itzelrauda
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

L5U

College of Engineering Bert S. Turner Department of Construction Management

Lab 1- Site Assessment & Planning


Objective
This lab exercise will involve the location of eight control points. Data has been gathered from a Google
map file. The instructions below are for how the procedure is to be completed if you were physically out
in the field. For this exercise, use the provided materials to populate the table. Once you have populated
the table, save your assignment with the following naming convention [TigerMike_M1SitePlan] before
uploading. Your assignment is due by 11:59 p.m. on Sunday.

Basic Steps
This exercise is to be performed individually.

Distance
1. Evaluate the site noting location and description of points.
2. Layout 100 ft fiberglass tape and determine your number of steps /100ft.
3. Pace off distance between points noting each line-specific number. Calculate distance by
multiplying paces x length of your pace, recording the calculated distance in the table.
Direction
1. Directions will be recorded (estimate to the nearest degree using an e-compass (Phone app))

Part 1 Part 2
Line Distance (feet) Line Direction (Degrees)

1-2 1-2
2-3 2-3
3-4 3-4
4-5 4-5
5-6 5-6
6-7 6-7
7-8 7-8
8-1 8-1
1-8 1-8
8-7 8-7
7-6 7-6
6-5 6-5
5-4 5-4
4-3 4-3
3-2 3-2
2-1 2-1

You might also like