Gad & Ret - Wall of PS (Marwar) DFC-22200 - (Sheet 3 of 3)
Gad & Ret - Wall of PS (Marwar) DFC-22200 - (Sheet 3 of 3)
This drawing is the property of SOJITZ-L&T CONSORTIUM and must not be passed on to
any person or body not authorised by us to receive it nor be copied or otherwise made use
either in full or in part by such person or body without our prior permission in writing.
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETRES, LEVELS &
M CHAINAGES ARE IN METRES UNLESS OTHERWISE M
e2 * SPECIFIED.
3. DESIGN CRITERIA.
i) IRS BRIDGE RULES INCORPORATING A&C SLIP NO.42
4d
4. BACK FILL MATERIAL CONSIST OF GRANULAR
MATERIAL OF GW, GP, SW GROUPS AS PER IS:
4d
2000
1498-1970.
L L
5. SUBWAY SHALL BE DESIGNED AS PER DFCCIL
2000
LOADING (32.5T AXLE LOAD) AS PER BRIDGE RULES
ISSUED BY RDSO (WITH LATEST CORRECTION SLIP).
Ld
Ld
L2 L1 9. TOLERANCE SHALL BE FOLLOWED AS PER IRS
K K
CONCRETE BRIDGE CODE.
h1
10.
DESIGN DOCUMENT NO:DOC/CTP1&2/DGN/BR/0351.
Ld
PER GIR DOC NO. DOC/CTP2/DGN/GB/0203 PART 1c .
SPT N VALUE OF THE BORE LOG HAS TO BE
VERIFIED AT THE BOTTOM LEVEL OF EXCAVATION
ON THE NATURAL GROUND . IF NOT ACHIEVED,
FURTHER EXCAVATION SHOULD BE DONE TO GET
THE REQUIRED SPT N VALUE.
100 a
(TYP.)
11 10
ABBREVATIONS
G C
L - CENTER LINE INVERT LEVEL OF G
REV - REVISION MANHOLES
* TYP - TYPICAL
THK. - THICKNESS MH1 - 264.724
** MH2 - 264.582
BH - BORE HOLE
F F
VARIES
VARIES
E E
D D
VARIES
VARIES
ISSUED FOR CONSTRUCTION
0
DESIGN PACKAGE JAY 23.12.17 SKV 23.12.17 JAY 23.12.17 VR 23.12.17
REV.NO. DESCRIPTION DESIGNED DRAWN CHECKED APPROVED
C REVISIONS C
PROJECT :
WESTERN DEDICATED FREIGHT CORRIDOR
PACKAGE CT P1 & P2 – Rewari to Iqbalgadh
ORGANIZATION SEAL & SIGN.
EMPLOYER :
DEDICATED FREIGHT
CORRIDOR CORPORATION OF
INDIA LTD.
CONTRACTOR :
SOJITZ-L&T CONSORTIUM
B DESIGNER: B
L&T INFRASTRUCTURE
ENGINEERING LIMITED
VARIES
2 P S 1 3 - 0 0 1 0 6 7 6 0
SHEET NO.: 3 OF 3
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1