Tube Coping Calculation Schedule

Sample apartment construction schedule

Uploaded by

Abhishek Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
109 views4 pages

Tube Coping Calculation Schedule

Sample apartment construction schedule

Uploaded by

Abhishek Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Godrej Nest - Sample Flat

Sr. No. Activity Start Date End Date


Master Toilet 23/06/2021 02:00 PM 26/06/2021 05:00 PM
1 Electrical Wiring 24/06/2021 09:00 AM 24/06/2021 07:00 PM
2 Counter Angle fixing 23/06/2021 04:00 PM 23/06/2021 09:00 PM
3 Window coping 23/06/2021 02:00 PM 23/06/2021 05:00 PM
4 Toilet Ventilator fixing 24/06/2021 09:00 AM 24/06/2021 10:00 AM
5 Ledge Wall Coping 23/06/2021 02:00 PM 23/06/2021 05:00 PM
6 Counter Top Fixing 24/06/2021 09:00 AM 24/06/2021 01:00 PM
7 Toliet Door Fixing
8 Wall tile Repair/ Grouting 24/06/2021 01:00 PM 24/06/2021 03:00 PM
9 Switch Plate fixing 25/06/2021 09:00 AM 25/06/2021 12:00 PM
10 Grid tile fixing 25/06/2021 01:00 PM 25/06/2021 03:00 PM
11 Light fixures fixing 25/06/2021 03:00 PM 25/06/2021 05:00 PM
12 CP & Sanitory fixtures fixing 26/06/2021 09:00 AM 26/06/2021 01:00 PM
13 Floor tile Repair/ Grouting 26/06/2021 03:00 PM 26/06/2021 05:00 PM

Master Bedroom 23/06/2021 09:00 AM 26/06/2021 09:00 PM


14 Alumininum Sliding Door & Window fixing With Glass 23/06/2021 09:00 AM 25/06/2021 05:00 PM
15 Electrical Wiring 24/06/2021 09:00 AM 24/06/2021 07:00 PM
16 Bedroom Door Fixing
17 Ceiling Paint 23/06/2021 09:00 AM 23/06/2021 05:00 PM
18 Wall Paint 1st coat 23/06/2021 02:00 PM 23/06/2021 09:00 PM
19 Switch Plate fixing 24/06/2021 09:00 AM 24/06/2021 10:00 PM
20 AC Indoor unit Fixing & Commisioning 24/06/2021 09:00 AM 24/06/2021 10:00 PM
21 Electrical Light Fixtures fitting 24/06/2021 09:00 AM 24/06/2021 10:00 PM
22 Ceiling Fan Fixing 24/06/2021 09:00 AM 24/06/2021 10:00 PM
23 Wall Paint 2nd Coat 25/06/2021 09:00 AM 25/06/2021 01:00 PM
24 Wooden Flooring & Skirting 26/06/2021 02:00 PM 26/06/2021 08:00 PM
25 Final Touchup & Cleaning 26/06/2021 03:00 PM 26/06/2021 09:00 PM

Master Bedroom Balcony 23/06/2021 09:00 AM 26/06/2021 09:00 PM


26 External Glazing 23/06/2021 09:00 AM 25/06/2021 05:00 PM
27 Electrical wiring 24/06/2021 09:00 AM 24/06/2021 07:00 PM
28 Ceiling Painting 23/06/2021 09:00 AM 23/06/2021 05:00 PM
29 Ceiling Light fixures fixing 24/06/2021 09:00 AM 24/06/2021 10:00 PM
30 Wall painting 25/06/2021 09:00 AM 25/06/2021 01:00 PM
31 Wall Electrical fixtures fixing 25/06/2021 01:00 PM 25/06/2021 09:00 PM
32 Shaft Covering WPC Jali 25/06/2021 01:00 PM 25/06/2021 09:00 PM
33 Floor tile Repair/ Grouting 26/06/2021 02:00 PM 26/06/2021 08:00 PM
34 Final Touchup & Cleaning 26/06/2021 03:00 PM 26/06/2021 09:00 PM

Toilet 1,2 23/06/2021 02:00 PM 26/06/2021 05:00 PM


35 Electrical Wiring 24/06/2021 09:00 AM 24/06/2021 07:00 PM
36 Counter Angle fixing 23/06/2021 04:00 PM 23/06/2021 09:00 PM
37 Window coping 23/06/2021 02:00 PM 23/06/2021 05:00 PM
38 Toilet Ventilator fixing 24/06/2021 09:00 AM 24/06/2021 10:00 AM
39 Ledge Wall Coping 23/06/2021 02:00 PM 23/06/2021 05:00 PM
40 Counter Top Fixing 24/06/2021 09:00 AM 24/06/2021 01:00 PM
41 Toliet Door Fixing
42 Wall tile Repair/ Grouting 24/06/2021 01:00 PM 24/06/2021 03:00 PM
43 Switch Plate fixing 25/06/2021 09:00 AM 25/06/2021 12:00 PM
44 Grid tile fixing 25/06/2021 01:00 PM 25/06/2021 03:00 PM
45 Light fixures fixing 25/06/2021 03:00 PM 25/06/2021 05:00 PM
46 CP & Sanitory fixtures fixing 26/06/2021 09:00 AM 26/06/2021 01:00 PM
47 Floor tile Repair/ Grouting 26/06/2021 03:00 PM 26/06/2021 05:00 PM

Page 1 of 4
Godrej Nest - Sample Flat
Sr. No. Activity Start Date End Date
Bedroom 1,2 23/06/2021 09:00 AM 26/06/2021 09:00 PM
48 Alumininum Sliding Door & Window fixing With Glass 23/06/2021 09:00 AM 25/06/2021 05:00 PM
49 Electrical Wiring 24/06/2021 09:00 AM 24/06/2021 07:00 PM
50 Bedroom Door Fixing
51 Ceiling Paint 23/06/2021 09:00 AM 23/06/2021 05:00 PM
52 Wall Paint 1st coat 23/06/2021 02:00 PM 23/06/2021 09:00 PM
53 Switch Plate fixing 24/06/2021 09:00 AM 24/06/2021 10:00 PM
54 AC Indoor unit Fixing & Commisioning 24/06/2021 09:00 AM 24/06/2021 10:00 PM
55 Electrical Light Fixtures fitting 24/06/2021 09:00 AM 24/06/2021 10:00 PM
56 Ceiling Fan Fixing 24/06/2021 09:00 AM 24/06/2021 10:00 PM
57 Wall Paint 2nd Coat 25/06/2021 09:00 AM 25/06/2021 01:00 PM
58 Wooden Flooring & Skirting 26/06/2021 02:00 PM 26/06/2021 08:00 PM
59 Final Touchup & Cleaning 26/06/2021 03:00 PM 26/06/2021 09:00 PM

Bedroom 1,2 Balcony 23/06/2021 09:00 AM 26/06/2021 09:00 PM


60 External Glazing 23/06/2021 09:00 AM 25/06/2021 05:00 PM
61 Electrical wiring 24/06/2021 09:00 AM 24/06/2021 07:00 PM
62 Ceiling Painting 23/06/2021 09:00 AM 23/06/2021 05:00 PM
63 Ceiling Light fixures fixing 24/06/2021 09:00 AM 24/06/2021 10:00 PM
64 Wall painting 25/06/2021 09:00 AM 25/06/2021 01:00 PM
65 Wall Electrical fixtures fixing 25/06/2021 01:00 PM 25/06/2021 09:00 PM
66 Floor tile Repair/ Grouting 26/06/2021 02:00 PM 26/06/2021 08:00 PM
67 Final Touchup & Cleaning 26/06/2021 03:00 PM 26/06/2021 09:00 PM

Living Room 23/06/2021 09:00 AM 26/06/2021 09:00 PM


68 Alumininum Sliding Door & Window fixing With Glass 23/06/2021 09:00 AM 25/06/2021 05:00 PM
69 Electrical Wiring 24/06/2021 09:00 AM 24/06/2021 07:00 PM
70 Bedroom Door Fixing
71 Ceiling Paint 23/06/2021 09:00 AM 23/06/2021 05:00 PM
72 Wall Paint 1st coat 23/06/2021 02:00 PM 23/06/2021 09:00 PM
73 Switch Plate fixing 24/06/2021 09:00 AM 24/06/2021 10:00 PM
74 AC Indoor unit Fixing & Commisioning 24/06/2021 09:00 AM 24/06/2021 10:00 PM
75 Electrical Light Fixtures fitting 24/06/2021 09:00 AM 24/06/2021 10:00 PM
76 Ceiling Fan Fixing 24/06/2021 09:00 AM 24/06/2021 10:00 PM
77 Floor Tile Repair 24/06/2021 05:00 PM 24/06/2021 10:00 PM
78 Wall Paint 2nd Coat 25/06/2021 09:00 AM 25/06/2021 01:00 PM
79 Floor Tile Grouting 26/06/2021 02:00 PM 26/06/2021 08:00 PM
80 Final Touchup & Cleaning 26/06/2021 03:00 PM 26/06/2021 09:00 PM

Living Room Balcony 23/06/2021 09:00 AM 26/06/2021 09:00 PM


81 External Glazing 23/06/2021 09:00 AM 25/06/2021 05:00 PM
82 Electrical wiring 24/06/2021 09:00 AM 24/06/2021 07:00 PM
83 Ceiling Painting 23/06/2021 09:00 AM 23/06/2021 05:00 PM
84 Ceiling Light fixures fixing 24/06/2021 09:00 AM 24/06/2021 05:00 PM
85 Wall painting 25/06/2021 09:00 AM 25/06/2021 01:00 PM
86 Wall Electrical fixtures fixing 25/06/2021 01:00 PM 25/06/2021 09:00 PM
87 Floor tile Repair/ Grouting 26/06/2021 02:00 PM 26/06/2021 08:00 PM
88 Final Touchup & Cleaning 26/06/2021 03:00 PM 26/06/2021 09:00 PM

Kitchen 23/06/2021 09:00 AM 26/06/2021 09:00 PM


89 Alumininum Door & Window fixing With Glass 23/06/2021 09:00 AM 25/06/2021 05:00 PM
90 Electrical Wiring 24/06/2021 09:00 AM 24/06/2021 07:00 PM
91 Ceiling Paint 23/06/2021 09:00 AM 23/06/2021 05:00 PM
92 Wall Painting 1st coat 23/06/2021 02:00 PM 23/06/2021 09:00 PM
93 Wall Tile Grouting 24/06/2021 01:00 PM 24/06/2021 03:00 PM
94 Electrical Light Fixtures fitting 25/06/2021 09:00 AM 25/06/2021 12:00 PM
95 Wall Painting 2nd Coat 25/06/2021 12:00 PM 25/06/2021 01:00 PM
96 Floor tile Repair/ Grouting 26/06/2021 02:00 PM 26/06/2021 08:00 PM
97 Final Touchup & Cleaning 26/06/2021 03:00 PM 26/06/2021 09:00 PM

Page 2 of 4
Godrej Nest - Sample Flat
Sr. No. Activity Start Date End Date
DH Toilet 23/06/2021 02:00 PM 26/06/2021 05:00 PM
98 Electrical Wiring 24/06/2021 09:00 AM 24/06/2021 07:00 PM
99 Window coping 23/06/2021 02:00 PM 23/06/2021 05:00 PM
100 Toilet Ventilator fixing 24/06/2021 09:00 AM 24/06/2021 10:00 AM
101 Ledge Wall Coping 23/06/2021 02:00 PM 23/06/2021 05:00 PM
102 Toliet Door Fixing
103 Wall tile Repair/ Grouting 24/06/2021 01:00 PM 24/06/2021 03:00 PM
104 Switch Plate fixing 25/06/2021 09:00 AM 25/06/2021 12:00 PM
105 Grid tile fixing 25/06/2021 01:00 PM 25/06/2021 03:00 PM
106 Light fixures fixing 25/06/2021 03:00 PM 25/06/2021 05:00 PM
107 CP & Sanitory fixtures fixing 26/06/2021 09:00 AM 26/06/2021 01:00 PM
108 Floor tile Repair/ Grouting 26/06/2021 03:00 PM 26/06/2021 05:00 PM

DH Room 23/06/2021 09:00 AM 26/06/2021 09:00 PM


109 Alumininum Door & Window fixing With Glass 23/06/2021 09:00 AM 25/06/2021 05:00 PM
110 Electrical Wiring 24/06/2021 09:00 AM 24/06/2021 07:00 PM
111 Bedroom Door Fixing
112 Ceiling Paint 23/06/2021 09:00 AM 23/06/2021 05:00 PM
113 Wall Paint 1st coat 23/06/2021 02:00 PM 23/06/2021 09:00 PM
114 Switch Plate fixing 24/06/2021 09:00 AM 24/06/2021 10:00 PM
115 Electrical Light Fixtures fitting 24/06/2021 09:00 AM 24/06/2021 10:00 PM
116 Ceiling Fan Fixing 24/06/2021 09:00 AM 24/06/2021 10:00 PM
117 Floor Tile Repair 24/06/2021 09:00 AM 24/06/2021 05:00 PM
118 Wall Paint 2nd Coat 25/06/2021 09:00 AM 25/06/2021 01:00 PM
119 Floor Tile Grouting 26/06/2021 02:00 PM 26/06/2021 08:00 PM
120 Final Touchup & Cleaning 26/06/2021 03:00 PM 26/06/2021 09:00 PM

Page 3 of 4
Godrej Nest - Marketing Office
Sr. No. Activity Start Date End Date
Handicap Toilet 23/06/2021 01:00 PM 29/06/2021 05:00 PM
1 Waterproofing Works 23/06/2021 01:00 PM 24/06/2021 01:00 PM
2 Toliet Door Frame Fixing 25/06/2021 03:00 PM 25/06/2021 09:00 PM
3 Wall tile 26/06/2021 01:00 PM 26/06/2021 09:00 PM
4 Floor Tiling 27/06/2021 09:00 AM 27/06/2021 01:00 PM
5 Electrical Wiring 27/06/2021 03:00 PM 27/06/2021 07:00 PM
6 Counter Angle fixing 26/06/2021 04:00 PM 26/06/2021 09:00 PM
7 Window coping 26/06/2021 02:00 PM 26/06/2021 05:00 PM
8 Toilet Ventilator fixing 27/06/2021 09:00 AM 27/06/2021 10:00 AM
9 Ledge Wall Coping 26/06/2021 02:00 PM 26/06/2021 05:00 PM
10 Counter Top Fixing 27/06/2021 09:00 AM 27/06/2021 01:00 PM
11 Toliet Door Shutter Fixing 27/06/2021 01:00 PM 27/06/2021 03:00 PM
12 Wall tile Repair/ Grouting 27/06/2021 01:00 PM 27/06/2021 03:00 PM
13 Switch Plate fixing 28/06/2021 09:00 AM 28/06/2021 12:00 PM
14 Grid tile fixing 28/06/2021 01:00 PM 28/06/2021 03:00 PM
15 Light fixures fixing 28/06/2021 03:00 PM 28/06/2021 05:00 PM
16 CP & Sanitory fixtures fixing 29/06/2021 09:00 AM 29/06/2021 01:00 PM
17 Floor tile Repair/ Grouting 29/06/2021 03:00 PM 29/06/2021 05:00 PM