APPROVED BY:
ARCHITECTURAL
A1 - TABLE OF CONTENTS, PERSPECTIVE BUILDING OFFICIALS DATE
STRUCTURAL
S1- GENERAL NOTES,
S2 - FOUNDATION PLAN, COLUMN FOOTING
DETAIL, BLEACHER DETAIL, WF DETAIL
S4 - ROOF FRAMING PLAN,TYPICAL ROOF BEAM DETAIL
TIE BEAM DETAIL
S5 - FT-1 DETAIL, FT-1A DETAIL, BASE PLATE DETAIL
LINE & GRADE
S6 - RAFTER TRUSS DETAIL, HALF TRUSS DETAIL, TRUSS
CONNECTOR DETAIL
ELECTRICAL
E1 - GENERAL NOTES AND SPECIFICATION,
LEGENDS AND SYMBOLS, RISER DIAGRAM,
LOCATION MAP
E2 - SCHEDULE OF LOADS, ARCHITECTURAL
SINGLE LINE DIAGRAM,
HIGHBAY LIGHTING MOUNTING DETAIL
SANITARY
ELECTRICAL
MECHANICAL
PERSPECTIVE
(ACTUAL REFERENCE PHOTO)
FIRE SAFETY
NAME OF PROJECT : SHEET CONTENT : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
CONSTRUCTION OF MULTI-PURPOSE, PERSPECTIVE, CHARMINE B. OCITE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEERING AIDE
BUILDING BRGY. EBRO, LA PAZ, TABLE OF CONTENTS
1
OFFICE OF THE DISTRICT ENGINEER A-1
CARAGA REGION AGUSAN DEL SUR PREPARED : LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE
ENGINEER II/ ASST. CHIEF, ACTING CHIEF,PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 8 20
ELMO M. ALONDE PLANNING AND DESIGN SECTION
KARAOS, SAN FRANCISCO,AGUSAN DEL SUR LOCATION : SAN FRANCISCO, ADS
ARCHITECT II DATE : DATE : DATE :
LUZON N
PROJECT
SITE
N
VISAYAS
CARAGA
REGION
MINDANAO
KEY MAP
VERDU FILI
New Tiniwisan
THIS SITE
MAYGATASAN TAGLATAWAN
HAMOGAWAY
TAG-ANAHAO
POBLACION
OSMEÑA
CAGBAS STA. TERESITA
ESPERANZA
Bantayan MAHAGKOT
BENTAHON
KINAMAYBAY BAKINGKING GAMAO PANAYTAY
BALOBO REMEDIOS BATOHON SAN JOSE SAN LORENZO
AGSABU CHARITO SAN ISIDRO
HAWILIAN CROSSING LUNA MABUHAY
STA IRINE
Agsabo Little Bohol
TAGABASE STA MARIA
PIGLAWIGAN New Davao SAN MARTIN
Malinawon DACUTAN LIBERTAD
LA PERIAN SALIMBUGAON
NATO MARCELINA SAN SALVADOR
CATMONON
Kisay Demar
CALABOAN
SALUG
TAHINA
OROMICA DUANGAN
ODIONG
ANOLINGAN
PROSPERIDAD
POBLACION
Pusilao
ANISLAGAN
SAN JOSE MAPAGA
CECELIA
NAPO PATIN-AY BITAN - AGAN
TAGBALILI MALIWANAG
DIMASALANG SAN VICENTE
SAN VICENTE
PISAAN Supon
LA CARIDAD
SAN ISIDRO
MARITULA Estrella
Locahon HUBANG Mabuhay
STA. INES
Sta. Cruz Moreca
Cocton
Tuburan SAN RAFAEL TAGAPUA BARANGAY I
Burgos BARANGAY II
NUEVO TRABAJO BARANGAY III BARANGAY IV ALEGRIA
MALIGAYA
ZILLOVIA
Pamintigan
BUENA GRACIA Patindog PASTA
COALICION Kinamasan
CAIMPUGAN Kuliba-an
New Leyte Ignacio Kaagsaman
Batas
MABTAY
MARBON LIBUAC
Cabugan
POBLACION Latay
LA FLORA CABANTAO
MAHAYAHAY
TAGBAYAGAN Buhisan ROSARIO Nyholm Guban
DESAMPARADOS Kisanga
Manlawigan Tomowahong
MAHARLIKA
STA. CRUZ
Valentina NOVELE CABAWAN
Catigbawan
Palibo Padigusan
SABANG GIBONG
BINICALAN Lahi
Kiago WASIAN
Binitayan SABANG ADGAWAN
Leo Larona Mong Soan
LA PAZ
Libon
OSMEÑA BAYUGAN III Sinog-ang
COMOTA
Gesok
Agpangon
Kagulo-an
Magbuya Kiandag
HALAPITAN
LANGASIAN SAGUNTO
Puntod Cabacungan
COO
PANAGANGAN
Taytay Masapia
Panlabuhan
BATAAN
Maitom Away
SAN MARCOS Agnaya Singanan
Motto
Liboton
VALENTINA Batohon
Immaculada Jandayugong MAMBALILI SAN ANDRES
Valentina Guitas MAGAUD Tawilon Bong
VIOLANTA KATIPUNAN Binahanan
Kasapa II
Mabuhay Palaygon
Pilang KASAPA II HUBANG Simolao
Boboya-on Haon
TRENTO
Tadasi
Ilang - Ilang
Leo
Basag LA FORTUNALuzvimin BINONGAN Upper Lucad
Mahabu CEBOLEN
Limbasan TAPAZ Calman Bato
D. O. Antonio Isdaon
San Miguel SAWAGAN CUEVAS
La Tondena SAMPAGUITA STA. MARIA
Mampao STO. NIÑO
Miguel
Mandanaw Sua Kauswagan SALVACION
BINUCAYAN Daga-an AURORA
Panghan Tinangasan Baubo STA. ISABEL PULANGLUPA
Boom SAN IGNACIO
Badas Maitom
El Papa SAN JOSE
Cab - Cab
SABOD
Yamaticon Sto. Niño
KAUSWAGAN El Mondo
Tagbuyawan Lower
Tagbuyawan
VERUELA
Tagbulete
Sta. Teresa
Kandingan
VICINITY MAP
NOT DRAWN TO SCALE
LOCATION
NOT DRAWN TO SCALE
MAP
GEOTAGGED PHOTO
NAME OF PROJECT : SHEET CONTENT : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
CONSTRUCTION OF MULTI-PURPOSE VICINITY MAP CHARMINE B. OCITE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS BUILDING,BRGY. EBRO, LOCATION MAP ENGINEERING ASSISTANT
OFFICE OF THE DISTRICT ENGINEER
SAN FRANCISCO AGUSAN DEL SUR
GEOTAGGED PHOTO
PREPARED :
A-2 2
CARAGA REGION LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE
ENGINEER II/ ASST. CHIEF, ACTING CHIEF,PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2 7 19
ELMO M. ALONDE PLANNING AND DESIGN SECTION
KARAOS, SAN FRANCISCO,AGUSAN DEL SUR LOCATION : BRGY. SAN FRANCISCO,ADS
ARCHITECT II DATE : DATE : DATE :
1 2 3 4 5 6 7
4.00 12.00 4.00
1 2 6 7
21.80
1.00 3.00 2.05 3.00 3.00 3.95 3.00 1.00
1.70 2.20 1.00 12.00 1.00 2.20 1.70
0.427MM THK. CORR. G.I SHEET
ROOFING
LONGSPAN COLOR ROOF
I DS DS
1.00
PWD
FEMALE
1.90
TOILET MALE
TOILET TOILET OFFICE
I
H
4.00
4.70
2.10
3.70
H
STAGE SLOPE
1.41
1.40
1.70
1.70
STAIR - UP STAIR - UP
G DS DS
5.00
5.00
100 MM THK. CONCRETE SLAB BLEACHERS
W/ 10MMØ TEMPERATURE BARS
SPCD @ 0.20 MOC BOTHWAYS
5.00
F
F
BLEACHERS
BLEACHERS
5.00
5.00
5.00
100 MM THK. CONCRETE SLAB
W/ 10MM DIA. RSB SPACED
E @ 600MM BOTHWAYS ON
100MM THK. GRAVEL BED
2.50
DS DS
35.60
5.00
5.00
101
38.10
38.10
1
BLEACHERS
D
5.00
MULTI PURPOSE HALL
30.00
D
SLOPE SLOPE
5.00
5.00
2.50
C
C DS DS
BLEACHERS
BLEACHERS
5.00
5.00
5.00
B
B
5.00
5.20
5.20
A
A
2.25
DS DS
1.70
1.50
ROOF LINE
1
101
1.00 0.30 0.70
1.70 18.40 1.70
6.20 6.00 6.20
21.80
0.80 18.40 0.80
20.00
NAME OF PROJECT : SHEET CONTENT : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
CHARMINE B. OCITE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF MULTI-PURPOSE FLOOR PLAN
ROOF PLAN
ENGINEERING ASSISTANT
OFFICE OF THE DISTRICT ENGINEER BUILDING BRGY. EBRO,SAN A -3 3
CARAGA REGION PREPARED : LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
FRANCISCO, AGUSAN DEL SUR ENGINEER II/ ASST. CHIEF, ACTING CHIEF,PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 3 8 20
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE ELMO M. ALONDE PLANNING AND DESIGN SECTION
KARAOS, SAN FRANCISCO,AGUSAN DEL SUR LOCATION : SAN FRANCISCO, AGUSAN DEL SUR
ARCHITECT II DATE : DATE : DATE :
PRE-PAINTED FLASHING GAUGE 24
RIB TYPE SIDE WALLING
STEEL LOUVER
1.70 5.00 5.00 5.00 5.00 5.00 5.00 1.70 3.70 1.00
1.70 3.20 12.00 3.20 1.70
TOP OF ROOF
APEX LINE
3.56
PRE-PAINTED
GUTTER GAUGE 24
3.56
10.02
4.26
10.02
4.06
TOP OF BLEACHER
0.80
TOP OF STAGE BLEACHERS BLEACHERS FINISH FLOOR LINE
1.00
1.40
FINISH FLOOR LINE
1.40
1 2 3 4 5 6 7 I H F E D B A
PRE-PAINTED GUTTER GAUGE 24
G C
38.10
1.70 3.20 12.00 3.20 1.70
1.00 3.70 1.70 5.00 5.00 5.00 5.00 5.00 5.00 1.70
3.56
TOP OF ROOF BEAM TOP OF ROOF BEAM
10.02
10.02
5.06
5.06
BLEACHERS BLEACHERS
1.40
NAME OF PROJECT : SHEET CONTENT : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
CHARMINE B. OCITE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF MULTI-PURPOSE FRONT ELEVATION
RIGHT SIDE ELEVATION
ENGINEERING ASSISTANT
OFFICE OF THE DISTRICT ENGINEER BUILDING BRGY. EBRO,SAN LEFT-SIDE ELEVATION A -4 4
CARAGA REGION REAR ELEVATION PREPARED : LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
FRANCISCO, AGUSAN DEL SUR ENGINEER II/ ASST. CHIEF, ACTING CHIEF,PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 4 8 20
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE ELMO M. ALONDE PLANNING AND DESIGN SECTION
KARAOS, SAN FRANCISCO,AGUSAN DEL SUR LOCATION : SAN FRANCISCO, AGUSAN DEL SUR
ARCHITECT II DATE : DATE : DATE :
TRUSS CONNECTOR (SEE DETAIL)
1 2 6 7
A B C D E F G H I 1.70 3.20 12.00 3.20 1.70
38.10
APEX LINE
1.70 5.00 5.00 5.00 5.00 5.00 5.00 1.70 3.70 1.00
3.56
SEE TRUSS DETAIL
3.56
10.02
5.06
10.02
4.26
STAGE
BLEACHERS BLEACHERS
1.40
0.80
1 LONGITUDINAL SECTION
A-5 SCALE : 1:100 MTS.
14.00
12.00
6.20
6.20
FIBER CEMENT CEILING BOARD
NAME OF PROJECT : SHEET CONTENT : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
CHARMINE B. OCITE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF MULTI-PURPOSE LONGITUDINAL SECTION
CROSS SECTION
ENGINEERING ASSISTANT
OFFICE OF THE DISTRICT ENGINEER BUILDING BRGY. EBRO,SAN SCHEDULE OF DOORS & WINDOWS A -5 5
CARAGA REGION PREPARED : LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
FRANCISCO, AGUSAN DEL SUR ENGINEER II/ ASST. CHIEF, ACTING CHIEF,PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 5 8 20
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE ELMO M. ALONDE PLANNING AND DESIGN SECTION
KARAOS, SAN FRANCISCO,AGUSAN DEL SUR LOCATION : SAN FRANCISCO, AGUSAN DEL SUR
ARCHITECT II DATE : DATE : DATE :
1.55
1.20
0.17 0.17 0.17 0.17 0.15 0.15 0.15 0.15 0.15
1.55
5
TOP OF STAGE 0.22
STAGE
0.20
4
1.90
0.20
0.90
3 TOP OF STAGE
2.80
2.94
0.05
5
0.20
1.00
0.30
4
0.20
0.90
0.20
0.05
FINISH FLOOR LINE
0.05
0.30
3
0.20
1.20
0.20
0.05
0.30
2 FINISH FLOOR LINE
1.00
0.05
0.30
1
DETAILED ELEVATION
0.50
0.35
5 DETAILED SECTION
A-7
1 2
1200 1200
0
40
3 CEILING SECTION
0
A-6 NOT TO SCALE
40
G.I ROOFING
SPOT DETAIL
PRIMARY CHANNEL 1.2 NOT TO SCALE
0
2 PERSPECTIVE (CEILING)
A-6 NOT TO SCALE
NAME OF PROJECT : SHEET CONTENT : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
CHARMINE B. OCITE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF MULTI-PURPOSE DETAIL OF STAGE STAIR
PERSPECTIVE CEILING
ENGINEERING ASSISTANT
OFFICE OF THE DISTRICT ENGINEER BUILDING BRGY. EBRO,SAN CEILING SECTION A -6 6
CARAGA REGION SPOT DETAIL PREPARED : LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
FRANCISCO, AGUSAN DEL SUR ISOMETRIC VIEW OF CONNECTION ENGINEER II/ ASST. CHIEF, ACTING CHIEF,PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2 8 20
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE OF G.I SHEET ROOFING TO PURLINS
ELMO M. ALONDE PLANNING AND DESIGN SECTION
KARAOS, SAN FRANCISCO,AGUSAN DEL SUR LOCATION : SAN FRANCISCO, AGUSAN DEL SUR
ARCHITECT II DATE : DATE : DATE :
0.60
DOOR
INDICATOR LOCK
2.05 3.00 3.00
SELF CLOSING HINGE
LOUVER PANEL
1.30 1.70 1.70 1.30
1.24 0.75
W2 W2 D2 W2 W2 W2
D2
0.60
PWD D3 D3
TOILET
1.90
MALE FEMALE
101
C
D3
0.086
D1 D3 0.21
0.25
20MM THICK MARINE PLYWOOD
2 LOUVER DETAIL 0.21
A B A-7 SCALE : 1:20 MTS.
101 101
2.00
CORNER BRACKET
WITH SCREWS
0.20
ADJUSTABLE LEG FOOT
0.80
0.80
0.80
5 SECTION B SECTION C
A-7 SCALE : 1:20 MTS 4 SECTION A 6
A-7 SCALE : 1:20 MTS A-7 SCALE : 1:20 MTS
NAME OF PROJECT : SHEET CONTENT : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
CHARMINE B. OCITE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF MULTI-PURPOSE TOILT PLAN DETAIL
LOUVER DETAIL
ENGINEERING ASSISTANT
OFFICE OF THE DISTRICT ENGINEER BUILDING BRGY. EBRO,SAN PERSPECTIVE (TOILET) A -7 7
CARAGA REGION SECTION A PREPARED : LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
FRANCISCO, AGUSAN DEL SUR SECTION B ENGINEER II/ ASST. CHIEF, ACTING CHIEF,PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 7 8 20
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE SECTION C
ELMO M. ALONDE PLANNING AND DESIGN SECTION
KARAOS, SAN FRANCISCO,AGUSAN DEL SUR LOCATION : SAN FRANCISCO, AGUSAN DEL SUR
ARCHITECT II DATE : DATE : DATE :
CL
PLAIN CEMENT FLOOR FINISH WITH
FLOOR HARDENER
GROUND FLOOR LINE (CORRIDOR)
250
100 2-19 mmG.I.BAR VERTICAL RAILING
(FULLY WELDED ON HANDRAIL) 300
200
6 mm THK. NON-SKID 6 mm THK. NON-SKID METAL
METAL NOSING STRIP NOSING STRIP (SUBMIT SAMPLE)
150
(SUBMIT SAMPLE) REINFORCED CONCRETE STAIR
300
19 mm G.I. BAR VERTICAL
RAILING EMBEDDED ON REINFORCED
150
CRASH GRAVELED STONE
CONCRETE STAIR NATURAL GRADE LINE
100
REINFORCED
CONCRETE STAIR
SPOT DETAIL 1
1 (WITH NON-SKID NOSING STRIP)
A-8 SCALE : 1:10 MTS.
CL
SPOT DETAIL 2
SPOT DETAIL 3 4 (WITH NON-SKID NOSING STRIP)
A-8 SCALE : 1:10 MTS.
3 (TYP. HANDRAIL)
A-8 SCALE : 1:10 MTS.
NAME OF PROJECT : SHEET CONTENT : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
CHARMINE B. OCITE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF MULTI-PURPOSE SPOT DETAIL 1
TYP. SPOT DET. SEC. OF STAIR STEP
ENGINEERING ASSISTANT
OFFICE OF THE DISTRICT ENGINEER BUILDING BRGY. EBRO,SAN SPOT DETAIL 3 A -8 8
CARAGA REGION SPOT DETAIL 2 PREPARED : LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
FRANCISCO, AGUSAN DEL SUR ENGINEER II/ ASST. CHIEF, ACTING CHIEF,PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 8 8 20
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE ELMO M. ALONDE PLANNING AND DESIGN SECTION
KARAOS, SAN FRANCISCO,AGUSAN DEL SUR LOCATION : SAN FRANCISCO, AGUSAN DEL SUR
ARCHITECT II DATE : DATE : DATE :
GENERAL NOTES 4.0 MATERIALS
4.1 CONCRETE
1.0 STANDARDS AND REFERENCE 4.1.1 CONCRETE COVER OVER REINFORCING BARS SHALL BE AS FOLLOWS:
THE FOLLOWING SHALL GOVERN THE DESIGN, FABRICATION AND CONSTRUCTION OF THE PROJECT. A.FOOTINGS, FOOTING-TIE BEAMS (CAST AGAINST EARTH) 75MM
50mm
B.BEAMS AND COLUMNS (TO STIRRUPS AND TIES) 40MM
1.1 NATIONAL STRUCTURAL CODE OF THE PHILIPPINES (N.S.C.P) VOL. 1. 6TH EDITION, 2010 TOOLED EGDE
C.WALLS, SIDE OF FOOTING-TIE BEAMS (CAST AGAINST FORMS) 40MM
T/3 T/3
2.0 DESIGN CRITERIA
T/3
D.SUSPENDED SLAB 20MM T
2.1 LOADINGS
A. DEAD LOAD 4.1.2 BEFORE CONCRETE IS POURED, CHECK WITH ALL TRADES TO ENSURE PROPER
CONCRETE -23.56kN/m³ PLACEMENT OF ALL OOPENING, SLEEVES, CURBS,CONDUITS, ETC. RELATING TO THE WORK. CONSTRUCTION JOINT
STEEL -76.93kN/m³
4.2 REINFORCING BARS SAWED JOINT 3mm
150mm THK. CHB WALL -2.73 kPa
W/ SEALANT
100mm THK. CHB WALL -2.11 kPa
B. LIVE LOAD 4.2.1 ALL REINFORCING BARS BE CLEAN OF RUST, GREASE OR OTHER MATERIALS THAT WILL IMPAIR
T/2
ROOF -1.00 kPa BOND
T
CLASSROOMS -1.90kPa
TOILETS -2.40 kPa 4.2.2 ALL REINFORCING BARS SHALL BE ACCURATELY AND SECURELY PLACED BEFORE POURING
CORRIDORS ABOVE, STAIRS -3.80 kPa CONCRETE OR APPLYING MORTAR OR GROUT. WEAKENED PLAN JOINT
CORRIDORS ON GROUND -4.80 kPa
C. WIND LOAF (NSCP 2010) 4.2.3 LAPPED SPLICES SHALL BE STAGGERED WHER POSSIBLE. NOTE: CONTROL JOINT CAN BE EITHER CONSTRUCTION JOINT
BASIC WIND VELOCITY, V= 250 KPH OR WEAKEND PLAN JOINT.
P=qh VELOCITY PRESSURE, kPa) 4.2.4 UNLESS OTHERWISE INDICATED, SPLICING OF REINFORCEMENT SHALL BE IN ACCORDANCE WITH
WHERE: qh = VELOCITY PRESSURE, kPa) ACI-38M, EXCEPT THAT THE MINIMUM LAP SPLICE SHALL BE 40 BAR DIAMETER BUT NOT LESS
GCpf = EXTERNAL PRESSURE COEFFICIENT THAN 600MM.
GCpi = INTERNAL PRESSURE COEFFICIENT
D. SEISMIC LOAD (NSCP 2010) 4.2.5 UNLESS SHOWN OTHERWISE ON PLANS, SPLICES SHALL BE AS FLLOWS:
Cvl
V = ---------- W (DESIGN BASE SHEAR) A. INTERMEDIATE BEAMS; TOP BARS SHALL BE SPLICED AT MID-SPAN. AND BOTTOM BARS AT THE 1C
RT SUPPORT
S-1 NOT TO SCALE
2.50 Cal B. BEAMS FRAMING TO COLUMNS: TOP BARS SHALL BE SPLICED AT MID-SPAN, AND BOTTOM BARS AT
Vmax =------------------- W Vmin = 0.11 CalW THE SUPPORT.
R 12d
0.80 ZNvl C. COLUMNS; LAP SPLICES SHALL BE MADE WITHIN THE CENTER HALF OF HEIGHT AND THE SPLICE
D
60MM (MIN.)
Vmin = ----------------- W (ZONE 4) SHALL NOT BE LESS THAN 30 BAR DIAMETER. WELDING OR THE USE OF APPROB=VED MECHANICAL
R DEVICES MAY BE PERMITTED PROVIDED NOT MORE THAN ALTERNATE BARS ARE WELDED OR
W = TOTAL DEAD LOAD SPLICED AT ANY LEVEL AND THE MINIMUM VERTICAL DISTANCE BETWEEN TWO ADJACENT BAR 4d
SPLICES SHALL BE 600MM. D
2.23
T = NATURAL PERIOD = Ct (hn)²/³;
10
d
d
WHERE: C = NUMERICAL COEFFICIENT
M
D. CHB WALLS; VERTICAL BARS SHALL BE SPLICED AT THE TOP OF WALL FOOTINGS OR FOOTING-TIE d d
IN
R = BUILDING HEIGHT
.
I = IMPORTANCE FACTOR = 1.50 BEAMS AND AT THE BOTTOM OF REINFORCED CONCRETE LINTEL BEAMS OR BEAMS.
R= NUMERICAL FACTOR = 8.50
SEISMIC COEFFICIENT Cv = 0.44Nv 4.2.6 UNLESS OTHERWISE INDICATED: ALL BEAMS TERMINATING AT A COLUMN SHALLHAVE TOP AND
90° HOOK 180° HOOK TIE HOOK
Ca = 0.64N BOTTOM BARS EXTENDING TO THE FAR FACE OF THE COLUMN, TERMINATING IN AS STANDARD 90
D
NEAR SOURCE FACTOR (10km) Nv = 1.2 HOOK LENGTH OF ANCHORAGE SHALL NOT BE LESS THAN 600MM.
BAR SIZE
Na = 1.0 90° HOOK 180° HOOK
Z = SEISMIC ZONE = 0.40 (ZONE 4) 4.2.7 SHOP DRAWING FOR REINFORCEMENT SHALL BE SUBMITTED FOR APPROVAL OF THE ENGINEER
PRIOR TO FABRICATION & INSTALLATION. 10MMØ THRU 25MM Ø 6d 4d
S = SOIL TYPE = D
28MMØ THRU 36MM Ø 8d 4d
2.2 DESIGN STRESSES 4.2.8 DEVELOPMENT LENGTH (Ld) OF REINFORCING BARS SHALL BE AS FOLLOWS:
SIZE OF REBARS
10 MM
DEVELOPMENT LEGTH
170 MM
NOTE: 1. ALL BENDS SHOWN IN DETAILS/SCHEDULES SHALL BE
A. CONCRETE STANDARD HOOK OTHERWISE NOTED.
COMPRESSIVE STRENGTH @ 28 DAYS fc' = 20.7 Mpa (3,000 psi) 12 MM 220 MM
2. 180° HOOKS MAY BE SUBSTITUTED FOR 90° HOOKS
B. REINFORCING BARS 16 MM 270 MM
a.FOR BARS 16mmØ AND GREATER fy = 275 MPa (40,000 psi) 20 MM 380 MM 40d
b. FOR BARS LESS THAN 16mmØ fy = 230 MPa (33,000 psi) 25 MM 600 MM
6 600MM (MIN.)
C. STRUCTURAL STEEL,ASTM -A36 1
FOR TRUSSES, BRACING, & STRUTS fy = 248 MPa (36,000 psi) 4.3 STRUCTURAL STEEL
WIRE TIGHTLY
D. PURLINS 4.3.1 ALL STRUCTURAL STELL SHALL CONFORM TO ASTM A36 AND SHALL HAVE A MINIMUM YIELD TOGETHER
STRESS, Fy = 248 MPa (36,000 psi)
E.
COLD FORMED LIGHT CAGE SHAPES
MASONRY UNIT (CHB)
fy = 248 MPa )36,000 psi)
OFFSET LAP SPLICE
NON-LOAD BEARING CHB WALLS fm' = 3.45 MPa (500 psi) 4.3.2 ALL STRUCTURAL STEEL SHALL BE FABRICATED AND ERECTED IN ACCORDANCE WITH THE AISC
3.1.4 NO FOOTING SHALL REST ON FILL 4.4.1 UNLESS OTHERWISE INDICATED, CHB USED IN THIS WORK SHALL HAVE A MINIMUM ULTIMATE 3 EXTRA STIRRUPS
AT 75MM. O.C BEAM REINFORCEMENT
COMPRESSIVE STRENGTH f'm = 3.45 MPa (500 psi) (DO NOT INTERRUPT)
3.1.5 BOTTOM OF FOOTING SHALL BE AT LEAST 1.00m. BELOW NATURAL GRADE LINE
4.4.2 ALL CHB CELLS SHALL BE FILLED SOLIDLY WITH GROUT.
3.1.6 SOIL BEARING CAPACITY SHALL BE INCREASED BY 33% WHEN IN COMBINATION WITH SEISMIC
OR WIND LOAD.
3.2 ALL COLUMN FOOTINGS & TIE BEAMS SHALL REST ON 100mm THK. WELL COMPACTED GRAVEL BASE COURSE.
5.0 CONSTRUCTION JOINT 1A BEAM CONSTRUCTION JOINT
5.1 CONSTRUCTION JOINT NOT INDICATED ON THE PLANS SHALL BE MADE SO AS TO LEAST IMPAIR THE S-1 NOT TO SCALE
3.3 BACK FILL SHALL BE PLACED IN LAYER AND EACH LAYER SHALL BE 200mm THK. AND SHALL BE STRENGTH OF THE STRUCTURE AND SHALL BE SUBJECT TO THE APPROVAL OF THE ENGINEER EXCEPT SLAB ON GRADE.
COMPACTED TO 95% MAXIMUM DRY DENSITY.
5.2 UNLESS SHOWN OTHERWISE, SLAB ON GRADE SHALL HAVE CONTROL JOINTS SPACED AT 6000MM MAXIMUM
CENTER TO CENTER.
3.4 WHERE LOOSE/SOFT MATERIAL IS ENCOUNTERED AT DEPTH OF EMBEDMENT INDICATED, EXCAVATE TO FIRM
LAYER AND REPLACE LOOSE/MATERIALS UNDERNEATH THE FOOTING WITHIN THE FOOTING AREA PLUS 21 DEPTH 5.3 BEAMS CONSTRUCTION JOINT SHALL BE LOCATED W/ IN THE MIDDLE THIRD OF THE SPAN.
OF SOFT MATERIAL ON ALL SIDES WITH SELECT GRANULAR BACKFILL. COMPACT SELECT GRANULAR BACKFILL IT SHALL BE PROVIDED WITH 3 EXTRA STIRRUPS @ 75MM O.C. ON EACH SIDE OF THE JOINT.
TO 95% OF MAXIMUM DRY DENSITY.
NAME OF PROJECT : SHEET CONTENT : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
CHARMINE B. OCITE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF MULTI-PURPOSE GENERAL NOTES
ENGINEERING ASSISTANT
OFFICE OF THE DISTRICT ENGINEER BUILDING BRGY. EBRO,SAN S -1 9
CARAGA REGION PREPARED : LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
FRANCISCO, AGUSAN DEL SUR ENGINEER II/ ASST. CHIEF, ACTING CHIEF,PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 7 20
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE NILO B. NABAUNAG PLANNING AND DESIGN SECTION
KARAOS, SAN FRANCISCO,AGUSAN DEL SUR LOCATION : SAN FRANCISCO, AGUSAN DEL SUR
ENGINEER II DATE : DATE : DATE :
100MM CHB w/ 10MMØ VERT
1 2 3 4 5 6 7 SPACED @ 400 MM & EVERY 3RD
LAYER OF CHB, REPECTIVELY
0.20 0.20
TOP OF ROOF BEAM
0.40
4.00 12.00 4.00
0.50
0.20 0.20
3.00 2.05 3.00 3.00 3.95 2.95
2.20
ON FILL
F2C2 F2C2 F2C2 F2C2 F2C2 FINISH FLOOR LINE
I WF WF WF WF
1.40
ON FILL
1.90
WF WF
H WF WF WF WF
NATURAL GRADE LINE
F2C2 F2C2 F2C2 F2C2 F2C2
2.10
0.40
2-10MMØ HOR. BARS w/ 10MM TB
TRANSVERSE BARS
12-16MMØ VERTICAL BARS SPACED @ 300MM O.C.
1.40
WF
FTB FTB
G FTB
FTB
FTB
WF
7-100MM, 7-150MM REST @ 200MM O.C
5.06
FINISH FLOOR LINE
4.56
WF W/ 10MM DIA. RSB SPACED F1C1
@ 600MM BOTHWAYS ON
100MM THK. GRAVEL BED
F 100MM CHB w/ 10MMØ VERT &. HOR. BARS
1.40
SPACED @ 600 MM & EVERY
F1C1 18-16MMØ MATTING BARS 3RD LAYER OF CHB, REPECTIVELY
SPACED EQUALLY BOTHWAYS
WF
WF
FTB
5.00
FTB
WF
WF NATURAL GRADE LINE
1.50
0.40
F1C1
0.20
12-16MMØ VERTICAL BARS SPACED @ 300MM O.C.
F1C1
0.40
0.05
WF
FTB
5.00
WF
FTB
WF DETAIL
37.50
0.40
1.50
F1C1
WF
FTB
5.00
FTB WF
PLAN
1.40
WF WF
1.40
F1C1
C
NATURAL GRADE LINE
F1C1
2 COLUMN & FOOTING DETAIL (F1C1)
S-2 SCALE : 1:20 MTS.
5.00
WF
0.70
2.90
FTB
WF WF WF
10-16MMØ BED BARS SPACED
EQUALLY BOTHWAYS
NATURAL GRADE LINE
F1C1 FTB
0.10 0.30
0.10
1.20
F1C1
GRAVEL BED G1
WF 100MM THK. GRAVEL BED
0.40
WF
5.00
WF WF
FTB
BOULDERS
0.10
2.10
WF WF WF SECTION
0.20
1.00
1.00
0.75 0.750.30 5.20 6.00 5.20 0.30 0.75
NAME OF PROJECT : SHEET CONTENT : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
CHARMINE B. OCITE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF MULTI-PURPOSE FOUNDATION PLAN
COLUMN & FOOTING
ENGINEERING ASSISTANT
OFFICE OF THE DISTRICT ENGINEER BUILDING BRGY. EBRO,SAN DETAIL (F1C1) S -2 10
CARAGA REGION DETAIL OF F2C2 PREPARED : LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
FRANCISCO, AGUSAN DEL SUR BLEACHER DETAIL ENGINEER II/ ASST. CHIEF, ACTING CHIEF,PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2 7 20
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE NILO B. NABAUNAG PLANNING AND DESIGN SECTION
KARAOS, SAN FRANCISCO,AGUSAN DEL SUR LOCATION : SAN FRANCISCO, AGUSAN DEL SUR
ENGINEER II DATE : DATE : DATE :
1 2 3 4 5 6 7
1.00
RB-3
I
RAFTER-1
RAFTER-1
3.70
RB-3
HT-1
HT-1
0.40 1.15 2.30 1.15 0.40 1.15 0.30 0.30
1.70
0.40
0.40
6-16MMØ BOTTOM BARS 4-16MMØ BOTTOM BARS
50 X 150 X20 X 1.5MM C-PURLINS 10MMØ STIRRUPS SPACED @ 2-50MM, 8-10MM, REST @ 200MM O.C.
RB-1
RB-1
SPACED EQUALLY AS SHOWN
5.00
F FT-1A
RB-1
W/ 12MM TURNBUCKLE
5.00
℄
2.90 2.90
E FT-1A 0.30
0.30
TRUSS CONNECTOR
TRUSS CONNECTOR
2.50
TRUSS CONNECTOR
4-16MMØ TOP BARS 4-16MMØ TOP BARS
RB-1
RB-1
0.60
0.60
2-12MMØ EXTRA BARS
38.10
RB-1
5.00
C FT-1A
0.30
0.56 1.68 0.56
RB-1
RB-1
5.00
0.20 0.20
0.40
6-16MMØ HOR. BARS
2-16MMØ TOP BARS W/ 10MMØ TIES SPACED @ 2-50MM,
0.30
3-16MMØ TOP BARS
0.30
8-10MM, REST @ 200MM O.C
3-16MMØ BOTTOM BARS 2-16MMØ BOTTOM BARS
B
0.10
FT-1A
RB-1
5.00
A FT-1
1.70
21.80
NAME OF PROJECT : SHEET CONTENT : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
CHARMINE B. OCITE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF MULTI-PURPOSE ROOF FRAMING PLAN
TYPICAL ROOF BEAM
ENGINEERING ASSISTANT
OFFICE OF THE DISTRICT ENGINEER BUILDING BRGY. EBRO,SAN DETAIL S -3 11
CARAGA REGION TIE BEAM DETAIL PREPARED : LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
FRANCISCO, AGUSAN DEL SUR ENGINEER II/ ASST. CHIEF, ACTING CHIEF,PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 3 7 20
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE NILO B. NABAUNAG PLANNING AND DESIGN SECTION
KARAOS, SAN FRANCISCO,AGUSAN DEL SUR LOCATION : SAN FRANCISCO, AGUSAN DEL SUR
ENGINEER II DATE : DATE : DATE :
ROOF LENGTH
2∠ - 65MM X 65MM X 6MM
TOP CHORD LENGTH TOP & BOTTOM CHORD
23.84
& WEB-MEMBER
20.12 0.40
0.40
2.30
0.40
TRUSS CONNECTOR
TOP
0.82 0.59
RB BOTTOM CHORD
21.66
0.20
SIDE
12M THK. BASE PLATE
W/ 4-16MMØ X 300MM
ANCHORED BOLTS
W/ NUTS & WASHER
SECTION
FULLY WELD TO THE 12M THK. BASE PLATE
W/ 16MMØ X 300MM
1 FT-1A DETAIL BOTTOM CHORD
ANCHORED BOLTS
W/ NUTS & WASHER
S-4 SCALE : 1:100 MTS.
NAME OF PROJECT : SHEET CONTENT : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
CHARMINE B. OCITE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF MULTI-PURPOSE FT-1A DETAIL
BASE PLATE DETAIL
ENGINEERING ASSISTANT
OFFICE OF THE DISTRICT ENGINEER BUILDING BRGY. EBRO,SAN FASCIA FRAME DETAIL S -4 12
CARAGA REGION PREPARED : LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
FRANCISCO, AGUSAN DEL SUR ENGINEER II/ ASST. CHIEF, ACTING CHIEF,PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 4 7 20
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE NILO B. NABAUNAG PLANNING AND DESIGN SECTION
KARAOS, SAN FRANCISCO,AGUSAN DEL SUR LOCATION : SAN FRANCISCO, AGUSAN DEL SUR
ENGINEER II DATE : DATE : DATE :
ROOF LENGTH
0.427MM THK. CORR. G.I. SHEET ROOFING
LONGSPAN COLOR ROOF TOP CHORD LENGTH
1.8
1.67
1.49
1.
7
3
63
2.0
2.80
1.49
3.28
2.92
4
4
3.9
3.8
2.
2.31
62
2.1
1.90
3.
1.7
1.42
1. 2.
05
5
31 58
0.85
3
58 62
2. 2.
0.50
1.42
1.1
0.95
0.8
0.7
0.53
RB RB
4
7
2
2∠ - 50MM X 50MM X 6MM DIAGONAL & WEB MEMBER
0.50
0.75 0.68
1.00
0.40 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 9.40 1.43
21.66
1 FT-1 DETAIL
S-4 SCALE : 1:100 MTS.
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
0.50
5.00
NAME OF PROJECT : SHEET CONTENT : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
CHARMINE B. OCITE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF MULTI-PURPOSE FT-1 DETAIL
TRUSS CONNECTOR DETAIL
ENGINEERING ASSISTANT
OFFICE OF THE DISTRICT ENGINEER BUILDING BRGY. EBRO,SAN S -5 13
CARAGA REGION PREPARED : LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
FRANCISCO, AGUSAN DEL SUR ENGINEER II/ ASST. CHIEF, ACTING CHIEF,PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 5 7 20
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE NILO B. NABAUNAG PLANNING AND DESIGN SECTION
KARAOS, SAN FRANCISCO,AGUSAN DEL SUR LOCATION : SAN FRANCISCO, AGUSAN DEL SUR
ENGINEER II DATE : DATE : DATE :
0.70 1∠ - 50MM X 50MM X 6MM
0.70 TOP & BOTTOM FRAME &
WEB MEMBERS
0.70 6.48
0.20 0.70
0.70
0.70
0.70
0.70
0.5
7 0.70
0.5
7
0.5
0.20
7
0.36
5.47 0.5
0.28
7
7
RB RB 0.5
RB
4
0.5
6.42
30
1.05
1. 3
0.88
5
1.2 1.1
0.72
0.56
8
1.0
0.40
1.22
7
0.5
0.36
0.82
0.20
4
0.5
NAME OF PROJECT : SHEET CONTENT : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
CHARMINE B. OCITE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF MULTI-PURPOSE RAFTER DETAIL 1
HALF TRUSS DETAIL 1
ENGINEERING ASSISTANT
OFFICE OF THE DISTRICT ENGINEER BUILDING BRGY. EBRO,SAN S -6 14
CARAGA REGION PREPARED : LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
FRANCISCO, AGUSAN DEL SUR ENGINEER II/ ASST. CHIEF, ACTING CHIEF,PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 6 7 20
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE NILO B. NABAUNAG PLANNING AND DESIGN SECTION
KARAOS, SAN FRANCISCO,AGUSAN DEL SUR LOCATION : SAN FRANCISCO, AGUSAN DEL SUR
ENGINEER II DATE : DATE : DATE :
0.49 mm (BMT) LONGSPAN
.PRE-PAINTED CORR. ROOFING
(0.50 mm TCT)
J -BOLTS @
EVERY 3RD CORR. 2-1/2
SIDE LAP
PANEL 1 PANEL 2
.LC PURLIN 19mm CORR. (MIN)
2 J-BOLT SPACING
S-7 SCALE : 1:10 MTS.
1 J-BOLT SPACING
S-7 SCALE : 1:10 MTS.
3 ROOFING FIXER
S-7 SCALE : 1:10 MTS.
FULL 6mm 50 100
WELD
50
.12mm 100
STANDARD NUT & WASHER
50 6mm
FULL TYP.
WELD
6mm
50
50
50
10mm THICK STEEL
FULL
, WELD
T.C. 6mm
LC
. PURLINS W/ STANDARD TURN-BUCKLE 10mm THICK STEEL
W/ STANDARD TURN-BUCKLE
AT APEX OF TRUSS ALONG GRID LINE A & C
150
150 x 150 x 6mm SPLICE 250
PLATE CONNECTOR (FULL
WELD) STAGGERED
LC PURLINS
400
150
T.C.
BOLTS W/ STD. NUTS &
WASHERS, SPACED AS SHOWN 250
IN BETWEEN TRUSSES 300
B.C.
W.M.
W.M.
6 DETAIL OF PURLINS SPLICE 7 DETAIL 1
S-7 SCALE : 1:10 MTS.
S-7 SCALE : 1:10 MTS.
8 DETAIL 2
S-7 SCALE : 1:10 MTS.
NAME OF PROJECT : SHEET CONTENT : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
J-BOLT SPACING CHARMINE B. OCITE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION OF MULTI-PURPOSE ROOFING FIXER
DET. CONNECTION OF PURLINS TO SAG
OFFICE OF THE DISTRICT ENGINEER BUILDING BRGY. EBRO,SAN ROD S -7 15
CARAGA REGION PREPARED : LEONE FE A. LUCENIO ELMELYN C. POLANCOS WILFRED R. VISAYA BEN ALDEN R. SERNA
FRANCISCO, AGUSAN DEL SUR DET. CONNECTION OF CROSS BRACING
DET. OF PURLINS SPLICE ENGINEER II/ ASST. CHIEF, ACTING CHIEF,PLANNING AND DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 7 7 20
AGUSAN DEL SUR 2nd DISTRICT ENGINEERING OFFICE DETAIL 1 NILO B. NABAUNAG PLANNING AND DESIGN SECTION
KARAOS, SAN FRANCISCO,AGUSAN DEL SUR LOCATION : SAN FRANCISCO, AGUSAN DEL SUR DETAIL 2 ENGINEER II DATE : DATE : DATE :
Construction of Multi-Purpose Building, Barangay Ebro, San Francisco, Agusan del Sur
SAN FRANCISCO, AGUSAN DEL SUR
FORM POW-2015-01D-00
No. of
Designation Persons No. of Hrs Hourly Rate Amount
A.1 Labor
Name and Capacity No. of Units No. of Hrs Hourly Rate Amount
B.1 Equipment
FORM POW-2015-01D-00
No. of
Designation Persons No. of Hrs Hourly Rate Amount
A.1 Labor
Name and Capacity No. of Units No. of Hrs Hourly Rate Amount
B.1 Equipment
PPE
Helmet (Hard Hats) man-day 500.00 0.68 340.00
Safety Gloves man-day 1,000.00 3.67 3,670.00
Rain Coat man-day 100.00 0.34 33.55
Safety Dusk Masks man-day 500.00 3.57 1,785.00
Rubber Boots man-day 500.00 1.78 890.00
FORM POW-2015-01D-00
No. of
Designation Persons No. of Hrs Hourly Rate Amount
A.1 Labor
FORM POW-2015-01D-00
No. of
Designation No. of Hrs. Hourly Rate Amount
Persons
A.1 Labor
Name and Capacity No. of Units No. of Hrs. Hourly Rate Amount
B.1 Equipment
75mm dia. PVC Downspout (w/ Hub) S-1000 x3m pc 17.00 1,896.00 32,232.00
75mm dia. PVC Elbow, 90 deg. Bend pc 8.00 57.76 462.08
75mm dia. PVC Coupling pc 8.00 252.00 2,016.00
Solvent can 1.00 312.00 312.00
Consumables 5%of Materials 1,683.94
No. of
Designation No. of Hrs. Hourly Rate Amount
Persons
A.1 Labor
Construction Foreman 1 3.00 103.63 310.89
Skilled Laborer 1 3.00 74.86 224.58
Unskilled Laborer 1 3.00 57.65 172.95
Name and Capacity No. of Units No. of Hrs. Hourly Rate Amount
B.1 Equipment
FORM POW-2015-01D-00
No. of
Designation No. of Hrs. Hourly Rate Amount
Persons
A.1 Labor
Fabrication
Construction Foreman 1 25.54 103.63 2,647.16
Skilled Laborer 1 25.54 74.86 1,912.25
Unskilled Laborer 2 25.54 57.65 2,945.27
Name and Capacity No. of Units No. of Hrs. Hourly Rate Amount
B.1 Equipment
Item No./ Description 1100(10) Conduits, Boxes & Fittings (Conduit Works/Conduit Rough-in)
No. of
Designation No. of Hrs. Hourly Rate Amount
Persons
A.1 Labor
Name and Capacity No. of Units No. of Hrs. Hourly Rate Amount
B.1 Equipment
FORM POW-2015-01D-00
No. of
Designation Persons No. of Hrs. Hourly Rate Amount
A.1 Labor
Name and Capacity No. of Units No. of Hrs. Hourly Rate Amount
B.1 Equipment
5/8" X 10' COPPER CLAD GROUNDING ROD length 1.00 770.00 770.00
TWO SINGLE POLE WALL SWITCH IN ONE SWITCH PLATE sets 1.00 138.00 138.00
THREE SINGLE POLE WALL SWITCH IN ONE SWITCH PLATE sets 2.00 335.00 670.00
DUPLEX CONVENIENCE OUTLET (FLUSH TYPE) sets 4.00 205.75 823.00
ELECTRICAL TAPE rolls 5.00 48.00 240.00
Item No./ Description 1102(1) Panel Board with Main & Branch Breakers
No. of
Designation No. of Hrs. Hourly Rate Amount
Persons
A.1 Labor
Name and Capacity No. of Units No. of Hrs. Hourly Rate Amount
B.1 Equipment
PANELBOARD WITH CENTER MAIN AND 6 BRANCHES, unit 1.00 8,200.00 8,200.00
BOLT-ON TYPE, 2P
MAIN: 60 AT, 250 V, 10 KAIC, 2 POLE MCCB pc 1.00 1,500.00 1,500.00
BRANCHES: 15 AT, 250 V,10 KAIC, 2 POLE, ACB pcs 2.00 500.00 1,000.00
20 AT, 250 V,10 KAIC, 2 POLE, ACB pcs 2.00 500.00 1,000.00
30 AT, 250 V,10 KAIC, 2 POLE, ACB pcs 2.00 500.00 1,000.00
FORM POW-2015-01D-00
No. of
Designation Persons No. of Hrs. Hourly Rate Amount
A.1 Labor
Name and Capacity No. of Units No. of Hrs. Hourly Rate Amount
B.1 Equipment