CURRICULUM VITAE
VIVEK KUMAR
PROFESSIONAL REVIEW :
A dynamic and competent professional having with 14+ years of delivering proactive and efficient
support to good knowledge and solid experience as API Inspector, Expediting Engineer, Inspection
Engineer, Third Party Inspector & QA/QC Inspector in the field of Engineering Procurement in
construction and attended shutdowns in Oil & Gas plant and petrochemical plant, power plant.
Provided services to wide range of client from different Projects in India &Middle East.
Page 1 of 7
KORA
Page 2 of 7
KORA
Page 3 of 7
KORA
Visual Inspection of Weld Joints, Dimensional Inspection of Pipes, Interpretation of Test
Reports as Per Various Standards and Codes.
To monitor Welder performance and their repair rates in accordance with job quality
requirements.
Follow of QA/QC procedures, method statement and ITP
To provide verification of electrodes backing and holding temperature including control and
issue.
Examining visually work in progress and effectively supervising repair procedures.
Inspecting the use of filler material depending on the base material so as they comply
approved welding procedures.
Checking and quality inspecting welded joints during technical process and control results.
Monitor and Control the Condition and storage of filler metals and adequacy of equipment
to be used. Inspect weld joint edge geometries, joint fit-up, preheating.
Ensuring that all the welding related records such as weld maps, welding procedure, welder
qualification documents and calibration records of welding related equipment’s etc.
Base material Inspection as per supplier / manufacture document/ mill certificate With respect
to type, size, quantity identification and visual inspection.
Radiographic film interpretation and evaluation in compliance with relevant codes.
Monitoring welding parameters during procedures qualifications for ferrous materials such as
carbon steels, low alloy steels, stainless Steels and Non-Ferrous Materials Such as Titanium.
Working with sound knowledge & experience on welding processes SMAW And GTAW
Promotes a total quality work ethic and environment within his area of responsibility.
Promotes a safe, organized and pleasant work environment within his area of responsibility.
Establishes and promotes an environment of mutual respect and teamwork with all
employees.
Raw material & welding consumable Inspection With certificates and approving for usage.
Visual weld inspection, Shell plates end bevel inspection, Shell dimension Checking, hydro test
inspection and Recording As per procedure.
Overall responsibility for monitoring performance and reporting of NDT works are carried out
in effective
manner.
Identify non conformances and take preventive and corrective actions.
Lead non-conformance investigation with the relevant departments.
Assists as necessary the Engineering department in the evaluation and correction of specific
quality control problems and issues.
Performs QA/QC Checks, audits and reviews & maintain the Quality file system.
Performs all other duties, tasks and initiatives contributing to the success of the company.
Experience in Vendor Shop Expediting activities for Valves, Pressure vessel, reactor,
To visit the construction site daily to check whether all works, materials, equipment, are in
accordance with QA/QC program, Project drawing & specification. When defective materials,
equipment, or workmanship are found, immediate action to be taken to correct them, & to
report the corrective action to the Site Supervisor.
Preparing the weld inspection & material traceability certificate & updating the same.
To check all repairs are perform correctly &nondestructive tests are regularly repeated.
Coordinating with quality control departments & representing matters with the client.
Page 4 of 7
KORA
Supervising & coordinating with work force in executing job to completion on time as per work
plan & with safety precautions/procedures.
NDE - RT, PT, VT, oil penetrate test and MT inspection of completed welds.
Monitoring post weld heat treatment activities (PWHT)&Review of as built drawings.
Interpretation of UT Test, MPI Test and Radiographic Films, Witnessing Of Hydro Tests.
Responsible For Inspection Of All Pre, Post And Final Inspection Of Activities & Analysis
Inspection of atmospheric fractionators and crude distillation columns during
construction/maintenance & refurbishment such as verification of foundation template check,
Internal trail assembly check, Internal& External dimension checks for TSR, DCBB, Seal pan,
trap out assembly, vapor assembly chimney trap, feed distributor assembly, ladder, pipe,
platform support, Insulation ring, Stiffener ring, column davits, Pickling/ passivation and
copper sulphate check for stainless steel material, Nozzle and manway orientation check, Skirt
to dish end set-up, shell to top dish set-up Hydro test of columns, thickness verification after
fabrication, etc.
Subsystem & system wise walk down for reinstatement and mechanical completion.
Generating punch-list and ensuring the raised punch list has been closed.
Verified test packages as per piping system drawing, weld maps, as built design, and as per
required specification.
Line checking with Test Packages for punch list preparing and Punch Clearing.
Experience in Fire and Gas system for Buildings and inspection checks as per cause and effect
diagram.
Vendor Inspection for various commodity like Valves, Pipes, Plate, Filters etc.
Hands on Experience in inspection of Double Bleed Ball Valves at vendor location.
Inspection of pre blast work such as solvent cleaning, hydro jetting, etc.
On-site inspection of abrasive blasting cleanliness level, surface profile and comparing with
Standards as per specification.
Determination of climatic conditions (relative humidity, dew point, substrate temperature)
Testing of blast cleaned surface for the presence of various soluble salts
Measurement of dry film thickness on substrate by using elcometer.
Having good experience of inspecting Columns with cladded plate, clad restoration weld
Overlay, hastelloyC-276,SS317 &410S materials.
Having good experience in inspecting pickling & passivation using CuSO4 Solution.
Conduct internal, external planned & unplanned inspections on all static equipment/facilities
such as Heat exchangers, Pressure vessels, tanks and piping, etc.
To advise on repair techniques, materials selection, welding procedures, inspection and
testing requirements.
To identify areas of concern and propose dedicated inspection procedures to follow- up their
resolution to improve plants integrity.
Shut down Inspection carried out for Piping & Static Equipment CUI-Inspection,
Performing UT thickness survey and corrosion rate calculations and remaining life calculations
for off-shore Piping Equipment.
Read and review of Equipment data sheets and Previous Inspection History, Hold points such
as Fin fan coolers, Heat Exchangers, Columns, Storage Tanks.
External and CUI Inspection of piping, pressure vessel and cone and floating roof storage
Tanks according to API.
Page 5 of 7
KORA
Inspects plant stationary equipment by entering into vessels, boilers and towers, during
shutdowns, to check condition of equipment. Includes noting observations on cracks, pits,
thinning and any other pattern of erosion, corrosion and otherinterior failure. Makes
interpretations of findings, analyses for failure, prepares report and issues recommendation to
Inspection Supervisor.
Review of purchase order, project specifications and identify key milestones.
Meet and discuss with the key project personals regarding the project progress and pro-active
planning.
Understanding current project status through site walk and interactions with down the level
production team who are responsible for the actual production.
Identifying lags in project schedule.
Foreseeing bottlenecks and resolving it through pro-active planning.
Prepare Recovery plans on Orders those are behind the delivery schedule to achieve targets.
Monitor the timely delivery of sub-contracted items.
1) Pressure vessel
2) Tanks
3) Reactor
4) Columns
5) Exchanger
6) Centrifugal Pumps
7) Piping
8) Pipe Line
9) Valves
10) Fittings
11) Towers
12) Structural
13) Boiler Piping
Personal Profile:
Nationality: Indian