0% found this document useful (0 votes)
751 views4 pages

NC-Standard-Affidavit K-Electric

Uploaded by

aamirhk1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
751 views4 pages

NC-Standard-Affidavit K-Electric

Uploaded by

aamirhk1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

AFFIDAVIT – NEW CONNECTION

I, s/o, holding CNIC N o . adult resident o f


Do hereby solemnly affirm, as under, that:

1. I have applied for [new connection/additional meter/load extension/load regularization] to K-Electric vide
application number and ID (“Application”) and that this irrevocable and unconditional
affirmation is being provided in consideration of my Application being processed by K-Electric.

2. That the documents provided by me, in connection with the Application are valid, true and correct in all
material respects, in the event that any details mentioned herein, or documents provided with the Application
change at a later stage, I shall promptly inform K-Electric of the same along provision of any relevant
documents thereto.

3. I do not have an existing electricity connection at (“Premises”) for which


Application is applied for and I have provided complete details of all already existing electrical connections (if
any) registered under my name. Further that, if any previously existing electricity connection at the Premises is
noticed later on, I shall be liable to promptly pay K-Electric any outstanding dues in respect of such previously
existing connection.

4. All dues pertaining to supply of electricity with respect to the Premises and/or registered in my name have been
cleared and, if I am found to be a defaulter of any electricity bills, once my Application is processed and
approved by K-Electric then the [n e w connection/additional meter/load extension/load regularization] to the
Premises may be disconnected by K-Electric subject to issuance of (07) days written notice to the Applicant.

5. I agree to wait for provision of connection if my desired load is not available in the system at the time of getting
permanent connection.

6. I have amalgamated the Premises with plot no. the amalgamated premises are adjoining in
nature with a common boundary wall. Furthermore, I am the sole and exclusive owner (both legally and
beneficially) of the amalgamated premises. If any dispute and/or litigation arises in the future an or any
objection is raised by any competent authority and/or Court of Law, K-Electric reserves the right to disconnect
and dismantle the electricity connection to the Premises after issuance of a prior seven (07) day notice.

7. The Premises have been purchased and/or amalgamated after fulfilment of all legal requirements/formalities
from the relevant/competent authorities (registered documents of all plots have been annexed herewith as
Annexure “A”).

Continued on page (2)…


(Page 2)

8. In the event any order/objection is raised by any Court of law or authority in relation to the Premises and or the
lawful title/ownership of the Premises, including but not limited to the lawful sale, transfer and/or legality of the
occupancy thereof, any construction thereon, encroachment or unavailability/ deviation of approved building
plans etc. or otherwise, K-Electric will be authorized not to provide electricity connection to the Premises and if
[new connection/additional meter/load extension/load regularization ] in respect thereof is already granted or
under process then K-Electric shall have the right to disconnect and dismantle the electricity connection to the
Premises after issuance of a prior seven (07) day notice.

9. Further to the above in case of any dispute whatsoever pertaining to the Premises with the concerned
Authorities, any private party and/or before any Court of Law, I undertake not to involve K-Electric as a party to
any such dispute. In the event K-Electric is referred as a party in any of the afore-mentioned disputes, K-
Electric has the right to disconnect, and dismantle the electricity connection to the Premises after issuance of a
prior seven (07) day notice.

10. I affirm and undertake that I shall fully obey the terms and conditions on the basis of which K-electric shall
prepare the estimate for the [new connection/ additional meter/load extension/load regularization] and shall
make payments accordingly

11. I shall not indulge in any dishonest, fraudulent, or malicious activity against K-Electric, its business or
operations in any way whatsoever. In this regard, I undertake not to encourage or support any theft or illegal
abstraction of electricity from K-Electric system.

12. I hereby bind myself and further undertake that I shall allow representatives of K-Electric for site inspection of
Premises at any time including electrical connections and connected load/equipment from time to time and will
not create hindrance in any manner and in this regard and further I shall not permit or allow any abuse of K-
Electric sanctioned limit for the above [new connection/additional meter/load extension/load regularization] .

13. I agree to pay the charges as per tariff (which shall be in force from time to time) and all charges including but
not limited to service connection cost, security deposit and other payments (if any) in accordance with K-
Electric policy read together with NEPRA approved terms and conditions as well as the provision s of the
Consumer Service Manual approved by NEPRA.

14. There is no litigation, complaint, reference and/or any other matter of similar nature pending at any forum,
whether legal or otherwise against me by K-Electric which shall hinder the provision of electricity to the
Premises or payment of electricity bills in relation thereto and that I have provided complete details of any
litigation, complaint, reference and/or any other matter of similar nature that are pending at any forum whether
legal or otherwise that pertains to any of existing connections registered under my name.

15. I hereby indemnify K-Electric against any losses or damages of whatsoever nature which K-Electric may incur
by reason of its reliance on this Affidavit. Any demand by K-Electric under this Affidavit shall be final and
conclusive for all purposes whatsoever and that the effect of this indemnity shall be continuing in nature and
Shall not be affected by any partial demand from time to time.

16. This Affidavit is in addition to and not in derogation or substitution of any other rights or remedies Electric may
be entitled to under the applicable law / rules & regulations including but not limited to the NEPRA ACT 1997,
Consumer Service Manual issued by NEPRA, Electricity Act, 1910 and Rules made thereunder, Distribution
Code issued by NEPRA, etc.

17. I agree to abide by all that is stated above, along with any policies framed or issued by K-Electric from time to
time which are applicable to consumers in the relevant category and further to agree to abide by all the relevant
National Electric Power Regulatory Authority (NEPRA) rules and regulations including the Consumer Service
Manual and Consumer Eligibility Criteria, 2003.

18. Any breach of this Affidavit by the deponent, in sole determination of K-Electric shall be sufficient ground for
cancelling, withdrawing or restricting my connection with K-Electric.

19. Whatever stated above is all true and correct to the best of my knowledge and belief.

20. I accept and acknowledge that K-Electric will use my information, including my personal information provided
in the Application for internal business purposes.

21. I accept and permit K-Electric to utilize my personal information to enhance, enrich, and analyze it for the
purpose of improving its services and for this purpose allow K-Electric to share, transfer and process the same
with any authorized company and/or competent authority.

22. I acknowledge that I shall bear any increase in costs or estimates arising from alterations in the scheme's design
and/or material specifications, which shall be my responsibility

23. I understand that I shall be responsible for covering any additional costs resulting from fluctuations in material
prices and/or taxes during the project execution.

Continued on page (3)…


(Page 3)

24. I accept full responsibility in the event of material theft or loss occurring on the project premises during the
execution process. I commit to bearing all expenses associated with the replacement of lost or stolen materials.

25. In case in changes in any company policy or guidelines, prevailing policy would be applied.

26. After delivery, if warranty of the material will expire due to the delay occurred at applicant’s end while
execution stage, owing to the non-fulfilment of necessary requirements. K-Electric will not take responsibility
of such warranty claims, if needed.