Plate 2 Airport
Plate 2 Airport
01
(PROJECT AREA SETTING)
NOT FUNCTIONING PROPERLY AND OF OLD AGE. THEREFORE IT
(PROJECT AIRPORT 2) SEPTEMBER 19,2022 2. DEMONSTRATED KNOWLEDGE/ DATAS
COL. OF ARCHITECTURE NEEDS TO BE REPLACED OR FIXED AS SOON AS POSSIBLE TO
ARC 145 ARCH DESIGN 7 ENSURE THE SERVICE TOWARDS THE PASSENGER WILL GO
DATE SUBMITTED:
W.M.S.U TATEL, MANOLO L. SEPTEMBER 19,2022 3. GRAPHICS / MAPS SMOOTHLY.
Z
I ZAMBOANGA INTERNATIONAL AIRPORT
A
INVENTORY AND ASSESSMENT OF
EXISTING AIRPORT RESCUE & FIRE FIGHTING
FACILITY (RFFF)
TAXIWAY & APRON GENERAL AVIATION
THE RFFF BUILDING IS LOCATED BESIDE THE TOWER FACILITY
1.4 AIRSIDE STRUCTURE. IT IS A ONE (1) STOREY STRUCTURE WITH A FLOOR AREA OF
247.28 SQUARE METERS, IT HAS THREE (3) GARAGE BAYS, OFFICE AND
FACILITIES THERE IS NO SPECIFIC PORTION OF
SLEEPING QUARTERS BOTH FOR VISITORS AND ARFF PERSONNEL.
THE APRON IS LOCATED AT THE EAST PORTION THE APRON STAND, ALLOCATED
OF THE AIRPORT. IT IS CONSTRUCTED OF FOR GENERAL AVIATION (I.E SMALL THE EXISTING CATEGORY OF THE FACILITY IS CAT 8. TWO OSKNOSH 4X4
RIGID CONCRETE PAVEMENT (PCCP) AND HAS TRUCK WITH A CAPACITY OF 6000 LITERS OF WATER IS COMMISSIONED
CRAFTS, MILITARY AIRCRAFT),
FOR THE AIRPORT. THE PRESENT CATEGORY OF THE RFFF WAS UPGRADED
TAXIWAY RUNWAY
A DIMENSION OF 310M X 150M. ASSESSMENT:
CONSIDERING THE LOW PEAK
THE APRON SHOWS SIGNS OF PROGRESSIVE FROM CAT 6 TO CAT 8, WHICH RECOMMENDS THREE (3) RESCUE AND FIRE
DETERIORATION.CRACKS ARE VISIBLE ON HOUR TRAFFIC, CURRENTLY BEING FIGHTING VEHICLES. WATER SUPPLY FOR THE FIRE-FIGHTING PURPOSES
MAJOR PORTIONS OF THE APRON. IS PROVIDED BY WATER WELL WITH SUBMERSIBLE PUMP AND A 200
SERVED BY THE AIRPORT. THE GALLONS ELEVATED WATER STORAGE TANK.
GROUND CONTROL CREW
CONTROL LS APRON PARKING AND
SPACE UTILIZATION POWER PLANT
CARGO HANDLING AREA IS LOCATED THE ANS POWER PLANT, IS A SINGLE STOREY WITH A FLOOR AREA OF 143
BESIDES THE PASSENGER TERMINAL SQUARE METERS IS SITED ADJACENT TO THE CONTROL TOWER BUILDING. IT
LEGEND; BUILDING. IT WAS ANS IS OPERATED HOUSES THREE (3) POWER GENERATING EQUIPMENT WHICH SUPPLIES
BY CEBU PACIFIC. THE STRUCTURE IS EMERGENCY POWER TO THE TOWER AND ANS NAMELY; PERKINS 165
CURRENTLY BEING RENOVATED. THE KVA/60HZ/220V, PERKINS 151KVA/60HZ/220V AND 115 KVA/60HZ/220V,
RUNWAY CARGO BASICALLY CONSISTS OF RESPECTIVELY.
GENERAL CARGO, NON- GENERAL
CARGO AND VOLUME CARGO. THE
TAXIWAY TOTAL FLOOR AREA IS 255 SQUARE
METERS.
AIR NAVIGATION SERVICE
PAL (PHILIPPINE AIRLINES) HAS IT
OWN CARGO BUILDING AND IA (ANS) BUILDING
APRON LOCATED NEAR THE RFFF. THE
BUILDING HAS AN APPROXIMATE LEGEND;
FLOOR AREA OF 309 SQUARE ANS BUILDING IS LOCATED ADJACENT TO THE FIRE STATION BUILDING. IT HAS A
PASSENGER METERS. PAL HAS AN X-RAY MACHINE CONTROL TOWER TOTAL AREA OF APPROXIMATELY 163 SQUARE METERS. THE BUILDING IS MADE
TERMINAL TO INSPECT ALL CARGO. CEBU OF CONCRETE COLUMNS, MASONRY WALLS, REINFORCED CONCRETE ROOF
THE AIRPORT COVERS A
PACIFIC AND AP CARGO HAVE NO X- RESCUE AND FIRE DECK, ALUMINUM DOORS, TILEF FLOORING AND THE BUILDING IS IN GOOD
BUILDING TOTAL LAND AREA OF 270 RAY MACHINE, SO ALL CARGO HAS TO FIGHTING CONDITION. IT HOUSES THE ANS OFFICE AND STORAGE SPACE FOR EQUIPMENT.
HECTARES BE MANUALLY SEARCHED. FACILITY(RFFF)
AIR NAVIGATION
SYSTEM(ANS)
RUNWAY 2. FINAL DISPOSITION OF THE
CONTROL TOWER POWER PLANT EXISTING AIRPORT SITE
THE EXISTING ZAMBOANGA INTERNATIONAL
AIRPORT IS CLASSIFIED AS PRECISION CARGO BUILDING
THE BUILDING IS LOCATED AT THE ONCE THE NEW ZAMBOANGA INTERNATIONAL AIRPORT IS
APPROACH AND THE APPLICABLE
RIGHT SIDE OF THE TERMINAL BUILDING PASSENGER FULLY OPERATIONAL, THE OLD SITE OF THE AIRPORT CAN
REFERENCE CODE UNDER ICAO ANNEX 14 IS
BESIDE THE RFFF. IT IS A FIVE (5) TERMINAL BUILDING THEN BE DISPOSED OF BY THE GOVERNMENT FOR OTHER
4C. A TOTAL RUNWAY LENGTH OF 2609 ASSESSMENT: MAJOR PORTIONS OF THE STORY REINFORCED CONCRETE
METERS, RUNWAY WIDTH IS 44 METERS SOCIAL AND ECONOMIC USES THAT WILL FURTHER BENEFIT
EXISTING RUNWAY/TAXIWAYX WHICH IS AN STRUCTURE WITH A FOOTPRINT OF 25 APRON
SQUARE METERS. IT HOUSES THE THE LOCAL PEOPLE OF ZAMBOANGA CITY AND ITS ENVIRONS.
ASPHALT PAVEMENT HAS SHOWN SIGNS OF
PROGRESSIVE DETERIORATION. SCOURING FOLLOWING AREAS: ANS STOCK ROOM, IT COULD FOLLOW THE MODEL OF THE DEVELOPMENT OF THE
RUNWAY VCR, STORAGE ROOMS AND TOILETS. NEW ILOILO AIRPORT, WHEREIN TGE OLD AIRPORT SITE AT
OF ASPHALT PAVEMENT IS VISIBLE ON THE
ITIS EQUIPPED WITH RADIO MANDURRIAO, ILOILO CITY WAS BID OUT TO DEVELOPERS
RUNWAY
2,609 M X 44M
LANDING ZONE OF THE RUNWAY AS WELL AS NAVIGATIONAL AIDS NDB, PAPI AND
ASSESSMENT:
DIMENSIONS
ON MAJOR PORTIONS OF THE RUNWAY FOR A BIG SUM. CONSEQUENTLY, THE OLD AIRPORT SITE HAS
TELECOMMUNICATIONS SYSTEM, VHF
AWR-GROUND, 124.1 MHZ PRIMARY, TWR
THE HIGH STRUCTURE HOTEL BEEN TRANSFORMED INTO A NEW ECONOMIC CENTER OF THE
ORIENTATION 9/27 BUILDING WHICH IS THE GARDEN
123.5 MHZ SECONDARY AND 123 MHZ CITY. THE SAME IS ALSO ENVISIONED FOR THE OLD
RUNWAY THE RUNWAY STRIP (RWY 27) AT ORCHID HOTEL LOCATED AT
EMERGENCY. ZAMBOANGA INTERNATIONAL AIRPORT. INSTEAD OF
SURFACE ASPHALT NORTHEAST IS LESS THAN 300 METERS SOUTHEAST OF THE CONTROL TOWER
BUILDING BLOCKS THE AIR TRAFFIC BISECTING THE CITY AND HINDERING FURTHER PROGRESS
CONTROLLER'S VISION OF INCOMING AND DEVELOPMENT OF THE CITY, AS IS THE CASE
AIRCRAFT AND CAUSES RADIO SIGNAL PRESENTLY, THE DEVELOPMENT OF THE NEW ZAMBOANGA
SHADOWS TO INCOMING AIRCRAFT IN INTERNATIONAL AIRPORT, ABD THE CLOSURE OF THE
GROUP NO. 08 PLATE NO. 2 DATE GIVEN: THE GENERAL DIRECTION BEHIND THE
CABANLIT, CRISCIA CALE SHT. NO. CRITERIA 100 75 50 25 CRITERIA EXISTING AIRPORT AND ITS EVENTUAL TRANSFORMATION
RATING ZAMBOANGA HOTEL. IF IT WOULD BE DECIDED TO
SEPTEMBER 06,2022
INTERNATIONAL AIRPORT
1. EXPLANATION INTO A NEW ECONOMIC CENTER IN THE CITY WILL REDOUND
CASCAJO, ALEXIE INSTEAD CONSTRUCT A NEW TOWER,
DATE DUE:
02
(PROJECT AREA SETTING) THEN THE HEIGHT OF THE TOWER TO MORE ECONOMIC BENEFITS FOR THE LOCAL AND
COL. OF ARCHITECTURE (PROJECT AIRPORT 2) SEPTEMBER 19,2022 2. DEMONSTRATED KNOWLEDGE/ DATAS SHOULD CONSIDER THIS TIME. NATIONAL ECONOMY.
ARC 145 ARCH DESIGN 7
DATE SUBMITTED:
W.M.S.U 3. GRAPHICS / MAPS
TATEL, MANOLO L. SEPTEMBER 19,2022