Question Paper Code : 52877
B.E/B.Tech. DEGREE EXAMINATIONS, APRIL/MAY 2019.
Seventh Semester
Computer Science And Engineering *
CS 6704 ~ RESOURCE MANAGEMENT TECHNIQUES
(Regulation 2013)
‘Time : Three hours Maximum : 100 marks
10,
Answer ALL questions.
PART A — (10 x 2= 20 marks)
What is OR techniques? Where it can be used?
Define following terms. (a) Solution (b) Feasible solution,
Explain degeneracy in transportation problem.
Write down the steps of North West Corner Method for solving transportation
problem.
Why integer programming is needed? Generalize it.
Summarize the main disadvantage of the branch and bound method.
List the uses of classical optimization theory.
Describe the concepts of Lagrangian multiplier.
Illustrate the primary rules for Network construction.
Point out the uses of GANTT chart.11.
12.
(a)
(b)
(a)
b)
PART B— (6 x 13 = 65 marks)
Solve by Simplex Method
@ Max Z= 8x, + 4x,
Subject to the conditions
2x, + 4x, £120; 2x, + 2x, < 80; x, 20,2220
(i) Maximize Z = 8x, + 2x, +5:x,
Subject to Constraints
By +X_ +X $9; 2x, +3x, +5; x, <30; 2x,-x,-x,58 and
By ,XqX4 20. ‘
Or :
‘The advertising alternative for a company include television, radio, and
newspaper advertisements. The costs and estimates for audience
coverage are given in the table below.
Television Radio Newspaper
Cost per advertisement £2,000 £300 £600
Audience per advertisement 1,00,000 18,000 40,000
The local newspaper limits the number of weekly advertisements from a
single company to ten. Moreover, in order to balance the advertising
among:the three types of media, no more than half of the total numiber of
advertisements should occur on the radio, and at least 10% should occur
on television. The weekly advertising budget is £18,200. How many
advertisements should be run in each of the three types of media to
maximize the total audience?
Find the initial feasible solution for the following problem using North
West Corner Method. Optimize solution using stepping stone.
Consumption centres Warehouses _ Requirements
“Units)
Pl P2 P3 P4
C1 4 9 5 25
c2 nS ag 25
cs 3 8 6 9 25
Capacity 9 28 20 18
Or
Solve by Vogel’s Approximation Method.
Plants Warehouses Supply
W1 W2 W3 W4 W5
Pl “20 28 32 55 70 50
P2 48 36 40 44 25 100
P3 35 «55 «22 «45 «48 150
Demand 100 70 50 40 40 300
2 5287713.
14,
16,
(@)
(a)
(b)
(a)
Discuss “Gomary’s Cutting plane method and solve it.
Maximize z=x,+4x, Subject to 2x, + 4x, <7, 5x + 3x, < 15;
2, xzare integers 20
Or
Summarize and find the optimum integer solution to the following alll
LPP:
Maximize z
+ Diy
Subject to 2x, <7; x, +2, <7; 2x, <11; x,, x) > 0 and integers.
Discuss the Non Linear programming problem and solve by using
Logrange multipliers with equality constraints
Maximize Z = 4x, — 0.1x? + 5x, - 0.248
Subject to x, +2x, = 40; x,, x, 20
Or
Describe in detail about the Newton-Raphson method.
A project has the following characteristics. Construct a own PERT
network. Find critical path and variance for each event and also
analyze it.
Or
A project consists of the following activities as. shown in table. The
duration in weeks and the manpower requirement for each of the
activities are also summarized in the same table. Find and give the
project schedule which minimizes the peak manpower requirement and
+ also minimizes period-to-period variation in manpower requirement
(number of iteration = 2),
Activity Duration Manpower
(months) Required
1-2 5 12
13
23
24
3-4
25
35
5-6
4-6
Aare RIBS
one wan
3 5287716.
(@)
)
PART C—(1 x 15 = 15 marks)
Unit profit of five salesmen in four places are given below
Pi
Pa
Pa
Py
Demand
S
40
woe
ou
30
Ss
aoa e
40
Si
40
Ss Available
6 40
5 50
60,
50,
30
Solve the problem to maximize the profit.
Or
Solve the integer programming problem
Maximize Z.= 80x, + 45%,
Subject to
tay <7
12x, + 5x, < 60
and x,, x, > Oand integer.
52877