550 - 12 Andhuan Zone-1, Ghazipur Block, Ghazipur District, U.P.
550 - 12 Andhuan Zone-1, Ghazipur Block, Ghazipur District, U.P.
550_12
18 GAUGE G I
4-12 # HOOPS SHEET COVER
LIGHTNING CONDUCTOR
316 - 12 # @ 100 C/C RADIALLY.
8 # @ 200 MESH
CURTAIL ALTERNATE RADIAL BARS AT 1500
100
6Ø ANCHOR FROM INNER FACE OF BEAM IN MIDDLE
80
ISA 50X50X6 4 - 12 # 6 - 16 # HOOPS
BARS 300 LONG 2550 2550 + 2 - 16 #, 2550 LONG 14 - 12 # HOOPS
ISA 50X50X6 6 - 16 # HOOPS (OVERLAP AT MID ONLY)
00 A
5
250
600
DI
8 # STR @150 C/C TOP DOME 7 ISA 50X50X6 POSTS OR
10
0
125X125 R.C.C.POSTS FOUNDATION
700
4 - 8 # HOOPS
4-12 # RING BEAM
MANHOLE ( 550 X 700 )
200
10 # STR
250
200 1200 200 125 125
5 - 16 # HOOPS A
(OVERLAP AT SUPPORTS ONLY) 5 - 16 # HOOPS
500
575
23 - 10 # 2-LEGGED STIRRUPS @ 125 C/C
DETAILS OF VENTILATOR
20 DIA M. S. BARS @ 250 C/C 8 - 10 # RINGS @ 75 C/C
R = 6950
115
R = 2250
7 - 16 #
200
8 # RINGS @ 190 C/C
1500
1675 2475 21 - 12 # HOOPS
550
4700 450 DIA COLUMNS
R = 13334
(10 NOS.)
8 - 10 # RINGS @ 75 C/C REINFORCEMENT PLAN OF ANNULAR RAFT
10 - 10 # HOOPS
575
1000 1000 1000 1000
3 - 16 # + 2 -12#
1700
3 - 16 # + 2 -12# B 3 - 16 # C 2450 LONG
80
2450 LONG 3 - 16 #
0
120
500
50
3 - 16 # + 2 -12#
250
200
575
200
SECTION B-B SECTION C-C ℄ OF COLUMN ℄ OF TANK
9 - 8 # 2 LEGGED 9 - 8 # 2 LEGGED 5 - 8 # 2 LEGGED 9 - 8 # 2 LEGGED 9 - 8 # 2 LEGGED
STIRRUPS @ 115 C/C STIRRUPS @ 115 C/C STIRRUPS @ 160.03 C/C STIRRUPS @ 115 C/C STIRRUPS @ 115 C/C
302-12 # @ 140 C/C 920 920 800.17 920 920
R = 6515
170
MADE - UP LEVEL
450 2640.17 450
715 MM FILLING
302-12 # @ 140 C/C
L - SECTION OF BRACE
3872
3820
GL
3420
450 450
R = 5000
27 -12 # HOOPS @ 135 C/C
316 - 12 # @ 100 C/C RADIALLY.
CURTAIL ALTERNATE RADIAL BARS AT 1500
14 - 12 # HOOPS
2000
500
GRADE BEAM ( DETAILING WILL BE SAME AS BRACING) FROM INNER FACE OF BEAM IN MIDDLE
274 -12 #
250
550
10-10 # HOOPS
2692
7 - 16 # 20 - 10 # RINGS @ 75 C/C 100 MM
THICK P.C.C.
1500
1000 274 -12 # @150 C/C 300 MM THICK SAND/GANGA SAND/STONE DUST FILLING IN TWO LAYERS
1415
302-12 # @ 140 C/C 1377 21 - 12 # HOOPS
138
150
H 4-16 #
0
21 -10 # HOOPS O
30
O HOOPS
PS
(1
7
O
1377
N
EA
R= 8546
700
700
4-12 #
C
H 12 # STR
FA
C
1183
E) 0
120
100
1600
SECTION OF TANK
1000 2. USE M30 GRADE OF CONCRETE FOR CONTAINER AND M25 FOR STAGING REV. DATE DESCRIPTION DESIGN DRAWN CHKD APPD
3. USE HYSD BARS FE 500 CONFORMING TO IS 1786-1985.
1377 138 10
00 4. CLEAR COVER TO REINFORCEMENT SHALL BE AS FOLLOWS: PROJECT:
150
UP
· CYLINDRICAL WALL 45MM CONSTRUCTION OF WATER SUPPLY SCHEME DISTRICT-GAZIPUR WITH RELEVANT
BRACE 300X500
· COLUMNS-45MM WORKS INCLUDING COMMISSIONING AND OPERATION AND MAINTENANCE
1ST FLIGHT · DOME - 45MM
0
30
· FOOTING -75MM AT BOTTOM & SIDES Namami Gange & Rural Water Supply Department
1487
21
03 -50MM AT TOP Government of Uttar Pradesh
RL = 2013
B1 5. WORKMANSHIP TO CONFIRM TO IS 456-2000 Lucknow, Uttar Pradesh - 226001
6. FABRICATION OF REINFORCEMENT SHALL BE AS PER SP-34
135
0
120 7. DISCREPANCY IN THE DRAWING IF ANY SHALL BE BROUGHT TO THE NOTICE OF CONTRACTOR:
ENGINEER VSA INFRA PROJECT PVT. LTD.
302-12 # @ 140 C/C
274 -12 # @150 C/C IN CHARGE BEFORE EXECUTION OF WORK.
20
2ND FLIGHT
9. BOTTOM RING BEAM SHOULD BE CAST MONOLITHIC WITH BOTTOM DOME
700
10. SBC OF SOIL CONSIDERED AS 8.00 T/M TO BE CONFIRMED BEFORE GOING AHEAD 10
388
274 - 12 # B2
BASIC WIND SPEED IS CONSIDERED AS 47 M/SEC.
CONSULTANT: MATSHUI ENGINEERING
RL = 4026 11. SEISMIC ZONE CONSIDERED AS IV.
500 B1
12. ALL LAPS SHALL BE STAGGERED AND LAP LENGTH SHALL BE 50 X DIA OF BAR SERVICES PVT. LTD.
RL
=
GROUND WATER TABLE IS CONSIDERED AS NIL
13
32 13. WATER LEVEL INDICATOR AND LIGHTENING CONDUCTOR SHALL BE PROVIDED AS PER
RL = 10065 5
3RD FLIGHT THE APPROVED SPECIFICATION
245 -12 # @170 C/C CONTAINER: TITLE:
214 - 10 # RADIALLY @ 140 C/C
B1 B1 5TH FLIGHT 1. HOOP BARS IN WOLLS. RING BEAM WHERE D IS DIAMETER OF BAR: TWICE THE LAP STRUCTURAL DRAWINGOF OVER HEAD TANK (550 KL-12 m STAGING)
RL = 6039 LENGTH
4TH FLIGHT RL = 8052
2. LAPS IN ALL CIRCULAR RODS IN CONTAINER PORTION SHALL BE SO STAGGERED THAT FOR WATER SUPPLY SCHEME AT ANDHUAN ZONE-1,GHAZIPUR BLOCK,
NOT MORE THAN 1/4 OF THE TOTAL RODS ARE LAPPED IN ONE PLACE GHAZIPUR DISTRICT,U.P.
3. CONTAINER PROPER SHOULD BE KEPT DAMP DURING CONSTRUCTION TO PREVENT
245 -12 # @170 C/C 6TH FLIGHT SHRINKAGE.
10 - 10 # HOOPS AT TOP
PLAN SHOWING STAIR - CASE ARRANGEMENT
DRG. NO : SCALE- REV- SIZE- SHEET- 1/2
VSAIPPL-SMC JV 42 of 83 JJM/U.P.
ANDHUAN ZONE-1,GHAZIPUR BLOCK,GHAZIPUR DISTRICT,U.P. 550_12
2940
1000 1490 450
2640
LIGHTNING CONDUCTOR
RL = 13325
250
B B
VENTILATOR
00
ISA 50X50X6 POST 00
11
15
OR RCC POST
RL = 17447 9 - 12 #
9 - 12 #
20 DIA G.I. PIPE RAILING 9 - 12 #
9 - 12 #
14
170 R = 6515 R = 6685 0
TH
6TH FLIGHT K
FIRST FIVE FLIGHTS HAVE 200 50
3420
217.3333
1 100
10 TRADES - 264 9 - 12 # 15 RISERS OF- 217.3333
9 - 12 #
3260
RL = 13325 6Ø RINGS
9 - 12 # @ 150 C/C
1000
B
264
8 # @ 150 C/C
1377
100 Ø
183
14
500
2013
140 THK
0T
200
4-8 #
700
6TH FLIGHT
HI
BOTTOM
K
RING BEAM
1623
00
15
9 - 12 #
DETAILS OF RCC RAILING POST
8 # @ 150 C/C OR ISA 50X50X6 POST
RL = 10065
B2
3433
1 1 00
11
3 4 9 - 12 # 1000
3 - 16 # 3 - 16 # 4 - 16 #
4 - 16 #
RL = 10065 8 # @ 150 C/C
110
250
MADE UP-GL 9 - 12 #
250
350
8 # STR.@ 100 C/C 8 # STR.
500
350
2ND BRACE 2-8# @ 100 C/C
650
B1 3 - 12 # 3 3 - 12 # 4 - 12 #
250 8 # STR.
8 # STR.@ 100 C/C
4 - 12 # 4 @ 100 C/C SECTION 4-4
SECTION 3 - 3
450 1000 1400 2600 400
BEAM B1
12000
1ST BRACE
200 250 5
250 1740
1200 BALCONY 6
1000
450
3433
3510 5
BEAM - B
6
1 1 SECTION 1 - 1
3-16 # 2940
250
RL = 0.00
B
MADE UP GL
RL = 13325
2255
500
GRADE BEAM
3-16 #
2500
300X500 8 # STR.@100 C/C 250
GL SECTION 5-5
715 MM FILLING
1200
150 8 # STR.
2000
@ 100 C/C
1000 1140 800
R=
600
700
250
L
300 MM THICK SAND/GANGA SAND/STONE DUST FILLING IN TWO LAYERS
2040X IGHT 274 - 12 # B
150
1000
100
VSAIPPL-SMC JV 43 of 83 JJM/U.P.