Draft IEC TR 61850-90-1: Communication networks and systems for power utility automation – Part
90-1: Use of IEC 61850 for the communication between substations
1. Background
As documented in 57/790/RVN, the national committees had approved the new work item, to standardise the
use of IEC 61850 for the communication between substations. The related project was originally registered
as IEC 62445-1.
The work was allocated to WG10. Instead of being a standard by itself, the result of the work will have an
impact on different parts of IEC 61850. Therefore, the working group decided to first issue a technical report
that describes the different aspects and solutions to the problem and later, once the report is approved, to
integrate the result into the relevant parts of IEC 61850.
In addition, TC57 decided that all work done by working groups of TC57 related to IEC 61850 shall receive a
publication number within the IEC 61850 series. As a consequence, the number IEC 61850-90-1 was
allocated to the technical report that is the result of that work that has originally been registered as IEC
62445-1 and is described above.
2. Action
This is a first draft of the future technical report IEC 61850-90-1. It is circulated in order to get a feedback
from a wider range of experts than the ones in the working groups.
On the basis of the comments received WG 10 will revise the draft and circulate a DTR which will be
published, in case of approval, as IEC TR 61850-90-1.
CONTENTS
FOREWORD...........................................................................................................................6
INTRODUCTION.....................................................................................................................8
1 Scope ...............................................................................................................................9
2 Normative references .......................................................................................................9
3 Terms and definitions .......................................................................................................9
4 Abbreviated terms ............................................................................................................9
5 Use cases ...................................................................................................................... 10
5.1 Distance line protection with permissive tele-protection scheme ............................ 10
5.1.1 Summary ................................................................................................... 10
5.1.2 Constraints / Assumptions / Design Considerations ................................... 10
5.1.3 Use case diagram...................................................................................... 11
5.1.4 Actor(s) ..................................................................................................... 11
5.1.5 Use Case(s) .............................................................................................. 11
5.1.6 Basic Flow ................................................................................................. 11
5.2 Distance line protection with blocking tele-protection scheme................................ 12
5.2.1 Summary ................................................................................................... 12
5.2.2 Constraints / Assumptions / Design Considerations: .................................. 13
5.2.3 Use case diagram...................................................................................... 13
5.2.4 Actor(s) ..................................................................................................... 14
5.2.5 Use Case(s) .............................................................................................. 14
5.2.6 Basic Flow ................................................................................................. 14
5.3 Directional comparison protection.......................................................................... 15
5.3.1 Summary ................................................................................................... 15
5.3.2 Constraints / Assumptions / Design Considerations ................................... 15
5.3.3 Use case diagram...................................................................................... 16
5.3.4 Actor(s) ..................................................................................................... 16
5.3.5 Use Case(s) .............................................................................................. 16
5.3.6 Basic Flow ................................................................................................. 16
5.4 Transfer/Direct Tripping......................................................................................... 17
5.4.1 Summary ................................................................................................... 17
5.4.2 Constraints / Assumptions / Design Considerations ................................... 17
5.4.3 Use case diagram...................................................................................... 17
5.4.4 Actor(s) ..................................................................................................... 18
5.4.5 Use Case(s) .............................................................................................. 18
5.4.6 Basic Flow ................................................................................................. 18
5.5 Interlocking ........................................................................................................... 19
5.5.1 Summary ................................................................................................... 19
5.5.2 Constraints / Assumptions / Design Considerations ................................... 19
5.5.3 Use Case Diagram .................................................................................... 20
5.5.4 Actor(s) ..................................................................................................... 20
5.5.5 Use Case(s) .............................................................................................. 20
5.5.6 Basic Flow ................................................................................................. 20
5.5.7 Pre-conditions ........................................................................................... 21
5.5.8 Post-conditions .......................................................................................... 21
5.6 Multi-phase auto-reclosing application for parallel line systems ............................. 21
5.6.1 Summary ................................................................................................... 21
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 –3– 57/924/DC
Figure 1: Distance line protection with permissive overreach tele-protection scheme [1] ....... 10
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 –5– 57/924/DC
Figure 2: Distance line protection with blocking tele-protection scheme [1] ........................... 13
Figure 3: Directional comparison with permissive scheme..................................................... 15
Figure 4: Transfer/Direct Tripping ......................................................................................... 17
Figure 5: Interlocking – Interoperation................................................................................... 19
Figure 6: Auto-reclosing........................................................................................................ 21
Figure 7: Current differential line protection [1] ..................................................................... 24
Figure 8: Phase comparison protection ................................................................................. 26
Figure 9: Principle to detect internal fault by phase comparison ............................................ 27
Figure 10: Fault locator system (2 and/or 3 terminals)........................................................... 29
Figure 11: Example of a System Integrity Protection Scheme [7]........................................... 31
Figure 12: Real time predictive type generator shedding system [1] ...................................... 34
Figure 13: Out-of-step detection ........................................................................................... 37
Figure 14 - Levels and logical interfaces in substation automation systems .......................... 40
Figure 15 - Definition of "overall transfer time" ...................................................................... 43
Figure 16 Basic SS to SS Communication Structure ............................................................. 53
Figure 17 SS to SS Communication via Tunnel ..................................................................... 54
Figure 18 SS to SS Communication via Proxy Gateway ........................................................ 56
Figure 19 Allocation of the LN RTPC representing the communication channel and the
LNs providing the data to be exchanged between substations............................................... 57
Figure 20 Protection application example for permissive underreach distance
teleprotection scheme and appropriate logical node modelling .............................................. 59
Figure 21: SCD files and SED region for SS – SS communication......................................... 66
Figure 22 - Enhanced engineering process ........................................................................... 67
Figure 23 - IED states when exchanging SED files................................................................ 68
Figure 24 - Proxy gateway method (AA1F3, AA2F3 are Proxy gateways) .............................. 76
FOREWORD
1) The IEC (International Electrotechnical Commission) is a worldwide organisation for standardisation comprising
all national electrotechnical committees (IEC National Committees). The object of the IEC is to promote
international co-operation on all questions concerning standardisation in the electrical and electronic fields. To
this end and in addition to other activities, the IEC publishes International Standards. Their preparation is
entrusted to technical committees; any IEC National Committee interested in the subject dealt with may
participate in this preparatory work. International, governmental and non-governmental organisations liaising
with the IEC also participate in this preparation. The IEC collaborates closely with the International
Organisation for Standardisation (ISO) in accordance with conditions determined by agreement between the
two organisations.
2) The formal decisions or agreements of the IEC on technical matters express, as nearly as possible, an
international consensus of opinion on the relevant subjects since each technical committee has representation
from all interested National Committees.
3) The documents produced have the form of recommendations for international use and are published in the form
of standards, technical specifications, technical reports or guides and they are accepted by the National
Committees in that sense.
4) In order to promote international unification, IEC National Committees undertake to apply IEC International
Standards transparently to the maximum extent possible in their national and regional standards. Any
divergence between the IEC Standard and the corresponding national or regional standard shall be clearly
indicated in the latter.
5) The IEC provides no marking procedure to indicate its approval and cannot be rendered responsible for any
equipment declared to be in conformity with one of its standards.
6) Attention is drawn to the possibility that some of the elements of this International Standard may be the subject
of patent rights. The IEC shall not be held responsible for identifying any or all such patent rights.
IEC 61850 consists of the following parts, under the general title Communication networks
and systems for power utility automation.
Part 1: Introduction and overview
Part 2: Glossary
Part 3: General requirements
Part 4: System and project management
Part 5: Communication requirements for functions and device models
Part 6: Configuration description language for communication in electrical substations
related to IEDs
Part 7-1: Basic communication structure – Principles and models
Part 7-2: Basic communication structure – Abstract communication service interface (ACSI)
Part 7-3: Basic communication structure – Common data classes
Part 7-4: Basic communication structure – Compatible logical node classes and data
classes
Part 7-410: Hydroelectric power plants - Communication for monitoring and control
Part 7-420: Communications systems for distributed energy resources (DER) - Logical nodes
Part 7-500: Using logical nodes to model functions of a substation automation system
Part 7-510: Using logical nodes to model functions of a hydro power plant
Part 8-1: Specific communication service mapping (SCSM) – Mappings to MMS (ISO/IEC
9506-1 and ISO/IEC 9506-2) and to ISO/IEC 8802-3
Part 9-1: Specific communication service mapping (SCSM) – Sampled values over serial
unidirectional multidrop point to point link
Part 9-2: Specific communication service mapping (SCSM) – Sampled values over
ISO/IEC 8802-3
Part 10: Conformance testing
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 –7– 57/924/DC
Part 80-1: Guideline to exchange information from a CDC based data model using IEC
60870-5-101/104
Part 90-1: Using IEC 61850 for the communication between substations
Part 90-2: Using IEC 61850 for the communication between substations and control centres
The scope of IEC 61850 is not limited anymore to substations. This is reflected in the
changed title of the series. New domain specific parts have been added to the series. TC57,
WG10 is currently preparing the second edition of the basic parts from IEC 61850.
IEC 61850-90-1 © IEC:2008 –8– 57/924/DC
INTRODUCTION
When IEC 61850 was prepared, it was intended for the use of information exchange between
devices of a substation automation system. In the mean time, the concepts are as well used in
other application domains of the power utility system. Therefore, IEC 61850 is on the way, to
become the foundation for a globally standardized utility communication network.
With existing and new applications in the field of the power system operation and protection,
the requirement to exchange standardized information directly between substations increases.
IEC 61850 shall be the basis for this information exchange.
IEC 61850 provides the basic features to be used for that information exchange, however,
some extensions to IEC 61850 may be required. This technical report provides a
comprehensive overview on the different aspects that need to be considered while using IEC
61850 for information exchange between substations. Areas that require extension of specific
parts of the existing IEC 61850 standard will later be incorporated in future editions of the
affected part of IEC 61850.
A similar report discussing the use of IEC 61850 for communication between substations and
control centres is under preparation as IEC 61850-90-2. Further, a similar report discussing
the use of IEC 61850 for wide-area RAS (Remedial Action Schemes) is being contemplated;
this will likely be IEC 61850-90-3.
This is a first draft of the future technical report that is not considered to be complete. It is a
first draft circulated among the national committees to get comments from a wider audience.
There are still some issues within that draft that need further improvement.
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 –9– 57/924/DC
1 Scope
This technical report provides a comprehensive overview on the different aspects that need to
be considered while using IEC 61850 for information exchange between substations. In
particular, this technical report:
2 Normative references
The following referenced documents are indispensable for the application of this document.
For dated references, only the edition cited applies. For undated references, the latest edition
of the referenced document (including any amendments) applies.
tbd
For the purposes of this International Standard, the terms and definitions given in IEC 61850-
2 and IEC 61850-7-2 apply.
4 Abbreviated terms
NOTE Abbreviations used for the identification of the common data classes and as names of the attributes are
specified in the specific Clauses of this document and are not repeated here.
IEC 61850-90-1 © IEC:2008 – 10 – 57/924/DC
5 Use cases
For the purpose of communication between substations, the following functions are
considered.
Conventional CTs and VTs are assumed for input to relays in the following use cases.
However, they could be replaced by newer technology, such as digital input based on process
bus, without any significant change in the descriptions.
5.1.1 Summary
When a distance relay detects a forward fault, it sends a permissive signal to the remote end.
If the relay also receives a permissive signal (from the remote end), the relay sends a trip
signal to the local CB.
Figure 1: Distance line protection with permissive overreach tele-protection scheme [1]
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 11 – 57/924/DC
Measuring
Data sending
equipment Sending
(CT/VT) Comm. I/F -S
Data receiving
Receiving
Comm. I/F -R
Relay decision
Trip
CB
5.1.4 Actor(s)
Name Role description
Measuring equipment Measures current and voltage from protected line
Comm. I/F –S Receives data from the local relay and sends the data to the remote end
Comm. I/F -R Receives data from the remote end and gives the data to the local relay
Relay decision When the distance protection detects the forward faults and receives
permissive signal from remote end, the distance protection issues a trip
command to the CB
Step 1 Current and Voltage are given to Distance protection by Measuring equipment
Step 2 Distance Protection samples an analogue value and converts it to digital data
Step 3 Distance Protection removes any unwanted frequency components from the sampled data
using a digital filter
IEC 61850-90-1 © IEC:2008 – 12 – 57/924/DC
Data sending
Data receiving
Relay Decision
Step 1 When the distance protection detects the forward faults in a predetermined zone, and
receives a permissive signal from the remote end, the distance protection issues a trip
command to the CB
5.2.1 Summary
When a distance relay detects reverse faults, it sends a blocking signal to the remote end. If
the relay detects a forward fault and does not receive the blocking signal the relay sends a
trip signal to the local CB.
The variant Directional Comparison Blocking (DCB) may use a non-directional element to
send a blocking signal for any fault (in other words: “starts the carrier”). The operation of the
forward element removes the blocking signal (“stops the carrier”) and sends a trip signal to
the local CB.
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 13 – 57/924/DC
Measuring
equipment Data sending
Sending data
(CT/VT) Comm. I/F -S
Data receiving
Receiving data
Comm. I/F -R
Relay decision
Trip command
CB
IEC 61850-90-1 © IEC:2008 – 14 – 57/924/DC
5.2.4 Actor(s)
Name Role description
Measuring equipment Measures current and voltage from the protected line
Comm. I/F -S Receives data from the local relay and sends the data to the remote end
Comm. I/F -R Receives data from the remote end and gives the data to the local relay
CB Disconnects the protected line from the other system (Circuit Breaker)
Data sampling and filtering Samples current and voltage data from the Measuring equipment and filters
them
Data sending Calculates a distance to the fault using filtered data. When a distance
protection detects a reverse fault the distance protection sends the blocking
signal to Comm. I/F –S (the remote end).
Data receiving Receives the blocking signal from Comm. I/F –R (the remote end).
Relay decision When the distance protection detects the forward faults, and does not receive
a blocking signal from the remote end, the distance protection issues a trip
command to the CB
Data sending
Data receiving
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 15 – 57/924/DC
Relay Decision
5.3.1 Summary
When a directional relay (typically a directional overcurrent relay) detects a forward fault, the
relay sends a permissive signal to the remote end. If the relay also receives a permissive
signal from the remote end, the relay sends a trip signal to the local CB.
DF DF
Measuring
equipment Data sending
Sending data
(CT/VT) Comm. I/F -S
Data receiving
Receiving data
Comm. I/F -R
Relay decision
Trip command
CB
5.3.4 Actor(s)
Name Role description
Measuring equipment Measures current and voltage from a protected line
Comm. I/F -S Receives data from the local relay and sends the data to the remote end
Comm. I/F -R Receives data from the remote end and gives the data to the local relay
Relay decision When the directional relay detects a forward fault and receives a permissive
signal from remote end, the directional relay issues a trip command to the
CB.
Step 1 Current and Voltage are given to directional relay by the Measuring equipment
Step 2 Directional relay samples an Analogue value and converts it to digital data
Step 3 Directional relay removes the unwanted frequency components from the sampled data
using a digital filter
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 17 – 57/924/DC
Data sending
Data receiving
Relay Decision
5.4.1 Summary
Local equipment sends a trip command to the remote equipment. This function is sometimes
called inter-tripping as well.
Trip signal
Trip T.T
T.T T.T
Initiation Trip signal
T.T
Trip signal
Transfer/Direct tripping
Trip command
Commander
Data sending
Sending data
Comm. I/F -S
Data receiving
Receiving data
Comm. I/F -R
Tripping
Trip command
CB
5.4.4 Actor(s)
Name Role description
Commander Requests local equipment to send a trip command to the remote equipment
Comm. I/F -S Receives data from the local relay and sends the data to the remote end
Comm. I/F -R Receives data from the remote end and gives the data to the local relay
Data sending Sends the trip command to Comm. I/F –S (the remote end).
Data receiving Receives the trip command from Comm. I/F –R.
Data sending
Data receiving
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 19 – 57/924/DC
Step 1 Comm. I/F –R gives the received command to the remote equipment
Step 2 Remote equipment receives the data
Tripping
5.5 Interlocking
5.5.1 Summary
The interlocking of the line earth switch depends on whether there is voltage on the line or not.
To be able to detect this, the states of the earthing switch, and the line disconnector switch of
the other line side, should be transferred and used; making a local voltage measurement,
which is also unreliable, superfluous.
QC1 QC1
QC8 QC8
Interlocking
Data acquisition
XSWI
states
Switch
position Data sending
Sending
switch states Comm. I/F -S
Switch
States Data receiving
Receiving
Comm. I/F -R
switch statesa
Interlocking
Release or
block
IS, ES command
The Use Case Diagram applying to Process Control System is shown as a figure.
5.5.4 Actor(s)
Name Role description
Switch state acquisition Switch states from line, at least earth switch and line disconnector
equipment
Comm. I/F -S Receives data from the local acquisition, and sends the data to the remote
end
Comm. I/F -R Receives data from the remote end and gives the data to the local
interlocking controller
Interlocking controller Uses remote switch states for local interlocking logic
Step 1 Acquires switch states from the line, at least earth the switch and the line disconnector
Step 2 Receives data from the local acquisition and sends the data to the remote end
Step 3 Receives data from the remote end and gives the data to the local interlocking controller
Step 4 Uses the remote switch states for local interlocking logic
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 21 – 57/924/DC
5.5.7 Pre-conditions
None.
5.5.8 Post-conditions
Correct interlocking - no line disconnector closes on earthed line, no earthing switch closes
on active (disconnector closed) line.
5.6.1 Summary
This use case focuses on how to use or how to transmit CB status information for multi-phase
auto-reclosing. Normal auto-reclosing processes (e.g. checking dead time etc.) are omitted in
the explanation.
CB status
Trip
AR AR
CB status CB status
AR AR
Figure 6: Auto-reclosing
Tripping by
protection relay
Trip signal
Protection
Data sending
Sending
Comm. I/F -S
Status
Data receiving
Receiving
Comm. I/F -R
Relay decision
Trip
CB
5.6.4 Actor(s)
Name Role description
Protection relay Gives the tripping information to the auto-reclosing scheme
Comm. I/F –S Receives data from the local relay and sends the data to the remote end
Comm. I/F –R Receives data from the remote end and gives the data to the local relay
Relay decision If the auto-reclosing scheme decides to trip other phases, it sends a trip
signal to the local CB
Data sending
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 23 – 57/924/DC
Data receiving
Step 1 If a fault occurs in the protected line, a protection relay trips the faulted phase and gives
the trigger to start the auto-reclosing scheme to the auto-reclosing scheme of the protected
line and of the other line located in the local substation.
Step 2 Auto-reclosing scheme receives the data
Relay Decision
Step 1 By using the CB status of both ends of both lines, the auto-reclosing scheme checks which
phases are alive.
The auto-reclosing scheme decides whether other phases must be tripped, or if the relay
just continues to count up dead time by comparing the auto-reclosing conditions with the
information of alive phases (*1).
Step 2 If the auto-reclosing scheme decides to trip other phases, it sends a trip signal to the local
CB
5.6.7 References
[1] K.Kasuga, Y.Sonobe “Multi-phase Autoreclose Function Installed in Line Differential Relay”, 61st
Annual Georgia Tech Protective Relaying Conference, May 2-4, 2007, Atlanta, Georgia
5.7.1 Summary
Current differential relays measure the current of the protected line at both ends. A local relay
sends the current data (I A ) to the remote end and receives the current data from the remote
end (I B ). Current differential relays detect faults in the protected line (internal faults) by
comparing the current from the remote relay with the current of the local terminal. When
current differential relays detect an internal fault, they send a trip signal to the local circuit
breaker.
IEC 61850-90-1 © IEC:2008 – 24 – 57/924/DC
Data sampling
and filtering
V、I
Measuring
Data sending
equipment Sending
(CT/VT)
Data receiving
Receiving
Comm. I/F -R
Relay decision
Trip
CB
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 25 – 57/924/DC
5.7.4 Actor(s)
Name Role description
Comm. I/F -R Receives data from the remote end and gives the data to the local relay
Data sampling and filtering Samples the current (and voltage) data from the Measuring equipment and
filters them
Data sending Stores the filtered instantaneous data. Sends the sampled data to Comm. I/F
–S (the remote end).
Data receiving Receives the sampled current data from Comm. I/F –R (the remote end).
Relay decision Calculates the differential current etc. If a fault in the protected line is
detected, a trip command is issued to the CB
Step 1 Current (and Voltage, when charging current compensation is needed) are given to the
Current differential protection by the Measuring equipment
Step 2 Current Differential Protection samples an Analogue value and converts it to digital data
Step 3 Current Differential Protection removes the unwanted frequency components from the
sampled data using a digital filter
Data sending
Data receiving
Relay Decision
5.7.7 Pre-conditions
5.7.8 References
5.8.1 Summary
When a phase comparison relay detects a positive current, the relay sends an “on” signal to
the remote end. The relay compares the local data signal with that from the remote end. If the
time that both signals are “on” is very short, the phases of the currents detected by both ends
are opposite and the relay restrained. If the time is sufficiently long the relay recognises there
is an internal fault and sends a trip signal to the local CB.
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 27 – 57/924/DC
Data sampling
and filtering
V、I
Measuring
Data sending
equipment Sending
(CT) Comm. I/F -S
Data receiving
Receiving
Comm. I/F -R
Relay decision
Trip
CB
IEC 61850-90-1 © IEC:2008 – 28 – 57/924/DC
5.8.4 Actor(s):
Name Role description
Measuring equipment Measures current from the protected line
Comm. I/F -S Receives data from the local relay and sends the data to the remote end
Comm. I/F -R Receives data from the remote end and gives the data to the local relay
Relay decision The phase comparison relay compares the local signal with the signal from
the remote end. If the time that both signals are on is not long enough, the
relay issues a trip command to the CB
Step 1 Current is given to the phase comparison relay by the Measuring equipment
Step 2 The relay samples the Analogue value and converts it to digital data
Step 3 The relay removes the unwanted frequency components from the sampled data using a
digital filter
Data sending
Data receiving
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 29 – 57/924/DC
Relay Decision
There are other applications of which the requirement for communication is almost the same
as the requirement for current differential protection. Examples of the applications are as
follows.
5.9.1.1 Summary
By using all terminal information, precise estimation of the fault location is possible. The
voltages and currents of all ends are necessary.
V I V I
FL FL
Result
HMI HMI
Data sampling
and filtering
V、I
Measuring
Data sending
equipment Sending
(CT/VT) Comm. I/F -S
Data receiving
and Fault locating Receiving
Comm. I/F -R
Operator
5.9.1.4 Actor(s)
Name Role description
Measuring equipment Measures current and voltage from the line
Comm. I/F -S Receives data from the local relay and sends the data to the remote end
Comm. I/F -R Receives data from the remote end and gives the data to the local relay
Data receiving and fault location Receives the sampled data from Comm. I/F –R (from the Network computing
calculation terminal).
Step 1 Currents and Voltages are given to the local terminal by the Measuring equipment
Step 2 A network computing terminal samples the Analogue values and converts them to digital
data
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 31 – 57/924/DC
Data sending
Step 1 Comm. I/F –R gives the received data to the local terminal
Step 2 The local terminal receives the data
Step 3 The local terminal estimates the location the fault. It shows and stores the result.
5.9.1.7 Pre-conditions
5.9.2.1 Summary
The described system integrity protection scheme comprises Remote Terminals and a Central
Equipment. Remote Terminals are located at power stations and measure voltage. These
Remote Terminals periodically send measured data to the Central Equipment. The central unit
calculates the differences of the voltage angles between the western generators and the other
generator groups (northern group, eastern group and south-eastern group), and also
estimates the future angle differences. If the central unit predicts that the generators will lose
synchronisation, the central unit sends a trip signal to the circuit breaker of the tie line.
C D
B E
System integrity
protection scheme
Data sampling
and filtering
V、I
Measuring
Data sending-RT
equipment Sending
(CT/VT) Comm. I/F –S-
Data receiving-CE
Receiving
Comm. I/F –R-
Data sending-CE
Sending
Comm. I/F –S-
Data receiving-RT
Receiving
Comm. I/F –R-
Tripping
Trip
CB
5.9.2.4 Actor(s)
Name Role description
Measuring equipment Measures current and voltage from the protected line
Comm. I/F –S-RT Receives sampled data from the Remote Terminal and sends the data to the
Central Equipment
Comm. I/F –R-RT Receives trip command from Comm. I/F –S-CE (the Central Equipment) and
passes the command to the Remote Terminal
Comm. I/F –R-CE Receives sampled data from Comm. I/F –S-RT (the Remote Terminal) and
passes the data to the Central Equipment
Comm. I/F –S-CE Receives a trip command from the Central Equipment and sends the
command to the Remote Terminal
CB Disconnects the tie line, which is connected to the western generators, with
other generator groups (Circuit Breaker)
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 33 – 57/924/DC
Data sampling and filtering Samples current and voltage data from the Measuring equipment and filters
them
Data sending-RT Sends the sampled data and information bits to Comm. I/F –S (to the Central
Equipment).
Data receiving-CE Receives the sampled data and information bits from Comm. I/F –R (from the
Remote Terminal).
Data sending-CE Sends the trip information from Comm. I/F –R (to the Remote Terminal).
Data receiving-RT Receives the trip information from Comm. I/F –R (from the Central
Equipment).
Tripping According to the trip information from the Central Equipment, the Central
Equipment and/or Remote Terminal issues a trip command to the CB
Step 1 Remote terminal put the sampled voltage data to sending data format with other
information bits
Step 2 Remote terminal sends the data to Comm. I/F –S-RT (in order to send the data to Central
Equipment)
Step 3 Comm. I/F –S-RT sends the information to the Central Equipment
Step 1 Comm. I/F –R-CE gives the received data to the Central Equipment
Step 2 Central Equipment receives the data
Data receiving-RT
IEC 61850-90-1 © IEC:2008 – 34 – 57/924/DC
Step 1 Comm. I/F –R-RT gives a trip command to the Remote Terminal
Step 2 Remote Terminal receives the data
Tripping
Step 1 If the Remote terminal B receives the trip command, it issues a trip command to the CB
5.9.2.7 Pre-conditions
5.9.2.8 References:
5.9.3.1 Summary
This wide area protection system comprises Remote Terminals and Central Equipment.
Remote Terminal A and B measure the voltage and current at Power Station A and B. These
Remote Terminals periodically send the active power, which is calculated from the voltage
and current, to the Central Equipment. Remote Terminal C sends voltage data to the central
unit. When a fault occurs, if the central unit predicts that the generators will loose
synchronisation, the central unit sends a trip signal to the generators.
A B
Figure 12: Real time predictive type generator shedding system [1]
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 35 – 57/924/DC
Measuring
Data sending-RT
equipment Sending
(CT/VT) Comm. I/F –S-
Data receiving-CE
Receiving
Comm. I/F –R-
Data sending-CE
Sending
Comm. I/F –S-
Data receiving-RT
Receiving
Comm. I/F –R-
Tripping
Trip
CB
5.9.3.4 Actor(s)
Name Role description
Measuring equipment Measures current and voltage from a protected line
Comm. I/F –S-RT Receives sampled data from the Remote Terminal and send the data to the
Central Equipment
Comm. I/F –R-RT Receive a trip command from the Comm. I/F –S-CE (the Central Equipment)
and passes the command to the Remote Terminal
Comm. I/F –R-CE Receives sampled data from the Comm. I/F –S-RT (the Remote Terminal) and
passes the data to the Central Equipment
Comm. I/F –S-CE Receives the trip command from the Central Equipment, and sends the
command to the Remote Terminal
CB Disconnects the line which is connected to a generator from the power station
(Circuit Breaker)
IEC 61850-90-1 © IEC:2008 – 36 – 57/924/DC
Data sampling and filtering Samples current and voltage data from the Measuring equipment, and filters
them
Data sending-RT Sends the sampled data and information bits to Comm. I/F –S (to the Central
Equipment).
Data receiving-CE Receives the sampled data and information bits from Comm. I/F –R (from the
Remote Terminal).
Data sending-CE Sends the trip information to Comm. I/F –R (to the Remote Terminal).
Data receiving-RT Receives the trip information from Comm. I/F –R (from the Central
Equipment).
Tripping According to the trip information from Central Equipment, the Remote
Terminal issues a trip command to the CB
Step 1 Current and Voltage are given to the Remote Terminals by the Measuring equipment
Step 2 Remote terminal samples an Analogue value, and converts it to digital data
Step 3 Remote terminal removes the unwanted frequency components from the sampled data,
using a digital filter
Step 1 Central Equipment executes a calculation for the generator angle prediction
Step 2 If Central Equipment predicts the generator will go to the out-of-step, it calculate the
minimum number of generators which is necessary to be shed in order to stabilise the
power system
Step 3 Central Equipment sends the trip information (the number of the generator to be shed) to
Comm. I/F –S-CE
Step 4 Comm. I/F –S-CE sends the information to Remote Terminal
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 37 – 57/924/DC
Data receiving-RT
Step 1 Comm. I/F –R-RT gives the trip information to the Remote Terminal
Step 2 Remote Terminal receives the data
Tripping
5.9.3.7 Pre-conditions
5.9.3.8 References
5.9.4.1 Summary
By comparing the angle of voltage between the two ends, it can be detected whether the
centre of the out-of-step is between the two ends or not as shown in Figure 13. When the two
voltages are in the opposite direction, an out-of-step occurs and the centre of out-of-step is in
between the two ends.
V V
Trip
OST OST
Out-of-step detection
Data sampling
and filtering
V、I
Measuring
Data sending
equipment Sending
(CT/VT) Comm. I/F -S
Data receiving
Receiving
Comm. I/F -R
Relay decision
Trip
CB
5.9.4.4 Actor(s)
Name Role description
Measuring equipment Measures voltage from protected line
Comm. I/F -S Receives data from the local relay and sends the data to the remote end
Comm. I/F -R Receives data from the remote end and gives the data to the local relay
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 39 – 57/924/DC
Data sending
Data receiving
Relay Decision
5.9.4.7 Pre-conditions
5.9.5.1 Summary
Synchrophasors are measured via Phasor Measurement Units (PMUs). These units provide
synchronised measured data for a certain purpose or multiple purposes. Hence the
application can vary widely. System Integrity Protection Schemes (SIPS) as described in
section 5.9.2, are one typical application of synchrophasors. Therefore the detail of an
application is not explained here again.
5.9.6.1 Summary
Remedial Action Schemes (RAS) are designed to monitor and protect electrical systems. They
perform automatic switching operations in response to adverse network conditions to ensure
the integrity of the electrical system and to avoid a collapse of the network.
The RAS action is generally performed by a central controller. The controller needs data
collected by field units. The field units are capable of measuring currents and voltages and/or
transducer quantities (W, VAr) and deliver these to the central unit for evaluation and
comparison with data from other locations in the power system. The field unit also acts as a
remote controller, such as performing breaker operations via programmable logic and
inputs/outputs when a command is received from the central unit.
IEC 61850-90-1 © IEC:2008 – 40 – 57/924/DC
The functions of a substation automation system (SAS) refer to tasks, which have to be
performed in the substation. These are functions to control, monitor and protect the
equipment of the substation and its feeders. In addition, there exist functions, which are
needed to maintain the SAS, i.e. for system configuration, communication management or
software management.
The functions of the substation automation system (SAS) are extended via links to the remote
control centre (mainly Telecontrol) and to the neighboring substation (mainly line protection).
6.1.2 Logical allocation of functions and interfaces (5.2 from IEC 61850-5)
The functions of a substation automation system may be allocated logically on three different
levels (station, bay/unit, or process). These levels are shown by the logical interpretation of
Figure 14 together with the logical interfaces 1 to 10.
Interface related station level functions are functions representing the interface of the SAS to
the local station operator HMI (human machine interface), to a remote control centre TCI
(telecontrol interface) or to the remote engineering for monitoring and maintenance TMI
(telemonitoring interface). These functions communicate via the logical interfaces 1 and 6 with
the bay level and via the logical interface 7 and the remote control interface to the outside
world.
10 7
STATION LEVEL FCT. A FCT. B
9
1,6 1,6
8
3 3
BAY/UNIT LEVEL
PROT. CONTR. CONTR. PROT.
Remote 2 2 Remote
protection protection
4,5 4,5
HV Equipment
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 41 – 57/924/DC
IF2: protection-data exchange between bay level and remote protection (also inside the scope
of the Ed2 of the standard)
IF4: CT and VT instantaneous data exchange (especially samples) between process and bay
level
IF7: data exchange between substation (level) and a remote engineer’s workplace
IF8: direct data exchange between the bays especially for fast functions like interlocking
IF10: control-data exchange between substation (devices) and a remote control centre (also
inside the scope of the Ed2 of the standard)
The interface 7 is dedicated for external communication with a remote monitoring centre. It
could be realized by a direct interface to the station/interbay bus also. The interface 2
dedicated to communication with a remote protection device and the interface 10 dedicated to
remote control are also inside the scope of the Ed2 of standard. It should be noted that
interfaces to parts outside the substation may be interfaces to a communication network not
native IEC 61850 but these networks have to allow to tunnel IEC 61850 data and services
without degradation. The performance of distributed functions running in interconnected
IEC 61850 based parts has to stay within the required limits.
According to the function allocation, the message types of clause 6.3 based on
communication performance requirements may be assigned to the different interfaces. The
free allocation of functions means that such an assignment may not be common for all
substation automation systems.
Since interoperability is claimed for a proper running of functions, the reaction of the
application in the receiving node has to be considered.
a) The reaction of the receiving node has to fit into the overall requirement of the distributed
function to be performed.
b) The basic behaviour of the functions in any degraded case, i.e. in case of erroneous
messages, lost data by communication interrupts, resource limitations, out of range data,
etc. has to be specified. This is important if the overall task cannot be closed successfully,
e.g. if the remote node does not respond or react in a proper way.
c) The external communication system has to fit into the overall requirements of the
distributed function to be performed.
IEC 61850-90-1 © IEC:2008 – 42 – 57/924/DC
These requirements are function related local issues and, therefore, outside the scope of this
communication standard. But the requirement left for this standard is the provision of proper
quality attributes to be transferred with the data under consideration.
Most of the functions comprise a minimum of three logical nodes, i.e. the LN with the core
Open issue: replace LNs in Sections 6.2.1-6.2.3 with references. LNs are modeled in Sec. 8.
Current transformer TCTR There is one instance per phase. These three/four
instances may be allocated to different physical devices
mounted in the instrument transformer per phase.
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
Transfer time t = ta + tb + tc
IEC 61850-90-1 © IEC:2008 – 43 – 57/924/DC
ta tb tc
Communi-
f1 f2
Communi-
cation cation
processor processor
Voltage transformer TVTR There is one instance per phase. These three/four
instances may be allocated to different physical devices
mounted in the instrument transformer per phase.
… to represent the mentioned instrument transformers with all its data and related settings (if
applicable), and communication relevant behavior in the SA system.
When the complete transfer time is specified below, this means the complete transmission of
a message including necessary handling at both ends. The time counts from the moment the
sender puts the data content on top of its transmission stack up to the moment the receiver
extracts the data from its transmission stack.
The time requirement is applicable for the complete transmission chain as indicated in Figure
15. In physical device PD1, a function f 1 sends data to another function f 2 , located in physical
device PD2. The overall transfer time will however consist of the individual times of the
communication processors and the network transfer time, including wait times and time used
by routers and other devices being part of the complete network. Any testing and verification
of the complete transfer time must be performed during the Site Acceptance Testing, since
the physical devices and network equipment might be supplied from different manufacturers.
The time t b is neglectable for electrical or optical cables but reasonable time may be added by
active communication components like gateways and, for links outside the substation, the
time consumed in the interconnecting network tunnelled by IEC 61850 messages.
All requirements are valid under normal conditions without disturbed communication links.
Disturbances may need a logical reconnection of the communication link, repetition of
messages or other means delaying the transfer time. This behavior is a matter of
implementation and detailed in part 7-2 of this standard (services).
6.3.2 The introduction and use of message types (13.5 in IEC 61850-5)
The main difference between PICOMs and messages types are that PICOMs refer to
information transfer strictly based on a single dedicated functionality, and include source and
sink. The message types are based on a grouping of the performance related PICOM
attributes and, therefore, define the performance requirements to be supported. Since the
performance requirements are defined per message, they are independent from the size of
the substation. Scenarios with multiple messages for substations are given in Clause 6.4.
6.3.3 The introduction and use of performance classes (13.5 in IEC 61850-5)
To allow for different requirements of the substations, the some message types are also
subdivided in Performance Classes. There are two independent groups of performance
classes, one for control and protection, another one for metering and power quality
applications. Since the performance classes are defined according to the functionality needed,
they are independent from the size of the substation.
Within a specific substation, all communication links does not necessarily need to support the
same performance class. Station level communications and process level communications
may be selected independent of each other and within the process level, different
performance classes can be used for communications in different bays, depending on the
number and rating of equipment located in each bay.
Performance class M1 refers to revenue metering with accuracy class 0.5 (IEC 60687) and
th
0.2 (IEC 60044) and up to the 5 harmonic.
Performance class M2 refers to revenue metering with accuracy class 0.2 (IEC 60687) and
th
0.1 (IEC 60044) and up to the 13 harmonic.
th
Performance class M3 refers to quality metering up to the 40 harmonic.
This type of message typically contains a simple binary code containing data, command or
simple message, for example "Trip", "Close", “Reclose order”, "Start", "Stop", "Block",
"Unblock", “Trigger”, “Release”, “State change”, maybe “State” for some functions also. The
receiving IED will normally act immediately in some way by the related function on receipt of
this type of message since, otherwise, no fast messages are needed.
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 45 – 57/924/DC
The trip is the most important fast message in the substation. Therefore, this message has
more demanding requirements compared to all other fast messages. Same performance may
be requested for interlocking, intertrips (direct trips) and logic discrimination between
protection functions.
a) For Performance Class P1, the total transfer time shall be in the order of half a cycle.
Therefore, 10 ms are defined.
b) For Performance Class P2/3, the total transfer time shall be below the order of a quarter
of a cycle. Therefore, 3 ms are defined.
c) Trips and similar signals of type 1A to the neighbouring substation (e.g. for line protection)
request for all performance classes case a)
Open issue : make reference to IEC60834-1/-2
All other fast messages are important for the interaction of the automation system with the
process but have less demanding requirements compared to the trip.
a) For Performance Class P1, the total transfer time shall be less or equal 100 ms.
b) For Performance Class P2/3, the total transfer time shall be the order of one cycle.
Therefore, 20 ms are defined)
c) Fast messages of type 1B to the neighbouring substation (e.g. some automation) request
for all performance classes case a)
NOTE: These messages are typical for interfaces IF3, IF5, and IF8
These are messages, as defined in clause 6.3.4.1, where the time at which the message
originated is important but where the transfer time is less critical. It is expected that IEDs will
have their own clocks. The message shall include a time-tag set by the sender, and the
receiver will normally react after an internal time delay, which then will be calculated from the
time given in the time-tag. Also normal “state” information belongs to this type of message
This type may alternatively include a single measurand, such as a rms value calculated from
type 4 signals.
This type includes complex messages that may require being time-tagged. This type should
be used for slow speed auto-control functions, transmission of event records, reading or
changing set-point values and general presentation of system data. Whether a time-tag is
required (normally) or not (exception) will be stated by the actual application. Also time
tagged alarms and events for normal alarm/event handling and non-electrical measurands like
temperature belong to this type, but some automatics and values (e.g. pressure) may request
message type 2.
Commands and related SCADA information e.g. to the remote Network Control Centre belong
also to these low speed messages of type 3.
NOTE: These messages are typical for nearly all interfaces, at least for its use for parameter setting: IF1, IF3, IF4,
IF5, IF6, IF5, IF7, IF8, and IF9
IEC 61850-90-1 © IEC:2008 – 46 – 57/924/DC
This message type includes the output data from digitizing transducers and digital instrument
transformers independent from the transducer technology (magnetic, optic, etc.). The
analogue information needed on the other side of the line e.g. for differential line protection
are also of type 4.
The data will consist of continuous streams of synchronized data from each IED, interleaved
with data from other IED.
NOTE: These messages are typical for interfaces IF4, and in some applications, for IF8
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 47 – 57/924/DC
This type of message is used to transfer large files of data for recording, information purposes,
settings, etc. Data must be split in blocks of limited length, to allow for other communication
network activities. Typically, the bit lengths of the file type PICOMs are equal or greater than
512 bits.
Transfer times are not critical; no specific limits. Typically, the time requirements are equal or
greater than 1000 ms.
For remote access, the request for file transfer shall have an access control; i.e. the access
needs some authorization (see Type 7 message). Therefore, this request messages shall be
of type 7.
NOTE: In case of configuration setting, these messages are typical for nearly all interfaces: IF1, IF3, IF4, …In case
of disturbance recording, these messages are typical for interfaces IF1, IF6, IF7 and – if the records are stored
near the process, IF4.
This type of message is used to synchronize the internal clocks of the IED in the SAS.
Depending of the purpose (time tagging of events or sampling accuracy of raw data) different
levels of time synchronizing accuracy are required.
These are functional requirements. It’s up to the implementation if e.g. the time synchronizing
of the clocks in IEDs has to be one order of magnitude better than requested by the functional
requirements. Part 8 and Part 9 shall define how the time synchronization mechanism is
implemented.
IEC 61850-90-1 © IEC:2008 – 48 – 57/924/DC
No direct requirements for the synchronization messages are defined except for the resulting
time accuracy in the whole system.
Time synchronization is also important for communication between the substations, either for
a common event time or for the synchronization of samples to be compared from both sides of
the line.
Open issue : IEEE 1588 reference needs to be noted in the solutions rather than here.
T2 ± 0.1 Time tagging of zero crossings and of data for the distributed
synchrocheck. Time tags to support point on wave switching.
NOTE: These messages are typical for nearly all interfaces because of the system wide synchronization: IF1, IF3,
IF4, IF5, IF6, IF5, IF8, and IF9. The time performance class needed depends strongly on the supported
functionality. Synchronizing of digital instrument transformers and Type 4 messages see below.
The requested time accuracy results from the referenced performance classes (column 3)
introduced above. To give some indications on the related power system values columns 4,5
and 6 have been added.
Time Perf. Class Accuracy [ µ s] Reference Phase angle [‘] Phase angle [‘] Fault location
50Hz 60Hz [m]
T3 ± 25 P1 27 32 7500
T4 ±4 P2 M1 4 5 1200
T5 ±1 P3 M2/3 1 1 300
NOTE: The performance classes T3, T4, and T5 are typical for interfaces IF4, and in some applications, for IF8.
6.3.4.7 Type 7 - Command messages with access control (13.7.7 in IEC 61850-5)
This type of message is used to transfer control orders, issued from local or remote HMI
functions, where a higher degree of security is required. All messages using interface 7
(external Technical Services) shall include access control. This type of message is based on
Type 3, with additional password and/or verification procedures.
These command messages propagating over some control levels from the operator down to
the switchgear or to some other controllable object may be converted to messages requesting
type 1 properties at least on process level.
NOTE: These messages are typical for the operators access via a local or remote HMI: IF1, IF6 and IF7.
Integrity means that for given conditions of the communication link (e.g. signal to noise ratio)
the resulting errors are below a certain acceptable limit. In part IEC 61850-3, the three
integrity classes according to IEC 60870-4 are referenced. Integrity was also introduced as
st
PICOM attribute in clause 10.1.2 of IEC61850-5, 1 edition 2003.. All safety related messages
like commands and trips with direct impact on the process shall have the highest integrity
class, i.e class 3. All other messages may be transmitted with a lower data integrity but not
lower then class 2.
Normally, the noise level is given and cannot be influenced. Nevertheless, to reach integrity
three groups of known measures exist to limit its impact.
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 49 – 57/924/DC
a) Proper design of devices and the communication system, e.g. protecting enclosures and
the use of fibre optic links
b) Apply an appropriate coding to achieve the desired residual error rate
c) Use of at least two step sequences like select-before-operate (SBO) for commands
The use of these measures is outside the scope of part 5 but the required data integrity shall
be considered in modelling the services (IEC 61850-7-2, e.g. SBO) and defining the mapping
(IEC 61850-8-x, 61850-9-x, e.g. coding).
For the various protection schemes, the Cigre brochure TB192 “Protection using
Telecommunications” (2001) addresses the requirements from protection on the teleprotection
interfaces and the communication channels.
The term “teleprotection” refers to the equipment needed to interface the protection
equipment to the telecommunication equipment; for IEC 61850 systems this would comprise
the equipment generating and processing the Ethernet packets for the protection functions
(e.g. GOOSE).
Non-protection IEC 61850 functions are far less critical, e.g. delivery times of an order of 1 s
for SCADA functions and of an order of 100 ms for automatics may be tolerable.
This section will therefore focus on delivering protection traffic with the required Security and
Dependability.
The “Security” requirements from protection on telecommunications, per Tables 6-1-1 and 6-
1-2 in the Cigre TB192 vary from “medium” to “high”, with a reference to IEC 60834-1.
The IEC 60834-1 Figure 21 shows that the probability of an “unwanted command” (from an
-4 -8
error burst) should be less than 10 (for blocking schemes) through 10 (for intertripping
schemes).
(An “unwanted message” is a message that would result in a very-undesirable event, such as
a false trip.)
-6
The IEC 60834-1 Figure 21 shows that the probability of a “missed command” (from a 10
-2 -4
continuous BER) should be less than 10 (for permissive-underreach schemes) through 10
(for intertripping schemes).
The IEC 60834-1 Figure 21 also shows that the “maximum actual transmission time” (called
transfer time in IEC61850) should be < 10ms for all the protection schemes.
The downside of using Ethernet for teleprotection networks is that they have a “best effort”
nature.
This clause highlights the specific problems of Ethernet networks, and provides solutions so
substation networks can be engineered to guarantee the security and dependability required
by the teleprotection applications.
By using different VLANs for intra-substation and inter-substation GOOSE packets, the
broadcast range of the former will be limited to the one substation.
(This would require IEDs to repeat some GOOSE packets, to provide packets for both VIDs.)
For applications requiring the use of GOOSE packets to provide a multipoint-to-point delivery
of IED data to a central processor, the use of separate VIDs for the “up” and “down” traffic
avoids the broadcasting of all the IED packets to all the other IEDs.
For the reasons cited above, in order that typical Ethernet telecommunications networks can
provide the required Security and Dependability for protection functions, the IEC 61850
packets should normally be IEEE 802.1Q “tagged” frames.
As noted above, IEC 60834-1 specifies that the probability of a “command” not being received
-4
within 10 ms should be <10 .
For an Ethernet network, the reasons for a packet not being received within 10 ms comprise:
7.4.1 Congestion
Whenever two or more Ethernet packets compete for a network path, such as to egress the
port of a switch, one of them must wait in a “queue”.
If for some duration the arriving packets exceed a port’s capacity, the queue depth increases,
and eventually packets may be discarded.
For networks transporting different classes of traffic with different degrees of priority, the use
of switches with several priority-dependent queues at each egress port will improve the
latencies of the higher-priority traffic (assuming the packets have IEEE 802.1Q/p “tags” with
the correct priority values).
Note that though these tags support 8 priority levels, most switches provide only 4 or 2 priority
level queues.
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 51 – 57/924/DC
The time for the network to establish an alternate link after the failure of a network’s link
(most links are fibre) may be too slow.
Note that none of the standard path-failure recovery algorithms for Ethernet networks come
even close to the 10 ms required; SONET is < 60ms, SDH < 50ms, Ethernet Spanning Tree is
about 1 minute, and Ethernet Rapid Spanning Tree takes tens of milliseconds to a few
seconds.
As a result, communication vendors for the power utility market provide proprietary solutions
with much faster recovery times. (These require ring topology networks.)
This clause uses the telecom terms “drop” for the equipment ports connecting to the traffic
sources (e.g. for VF, data, video etc.), and “line” for the equipment ports connecting the
networks’ nodes (typically fibre connections).
At each egress switch port, a high-priority packet may have to wait for a maximum-length
lower-priority packet to egress; a 1518 byte packet takes 122us at 100 Mbit/sec, 12us at 1
Gbit/sec.
A potential 2ms extra delay could therefore be incurred for a network path comprising 16 hops
if at 100 Mbit/sec, 160 hops if at 1 Gbit/sec.
At each egress switch port, a high-priority packet may also have to wait for many other high-
priority packets to egress; a 600 byte packet (typical for GOOSE) requires 48us at 100
Mbit/sec, 4.8us at 1 Gbit/sec.
A potential 2ms extra delay could therefore be incurred for an event-triggered burst of 40
GOOSE packets if at 100 Mbit/sec, 400 packets if at 1 Gbit/sec.
For such applications, the “encapsulation” of such traffic in a second 802.1Q VLAN tag
(sometimes known as “nested VLANS”, or “QinQ”) is a good solution; this also preserves the
original traffic’s priority tags (without such nesting, the utility would need to be able to modify
the original tags to ensure that such traffic is kept out of the network’s GOOSE queues).
Some Ethernet Telecommunication networks use SONET rather than Ethernet for their
transport formats (for the fibre signals); this technology allows the provisioning of a plurality of
Ethernet WANs, each with its own dedicated bandwidth and immunity to the traffic on the
others WANs.
Some Ethernet Telecommunication switches provide an extra set of queues on their line ports
(e.g. 16 c.f. 8) so that for traffic at a particular priority level, the “through” traffic (line to line)
has priority over the “add” traffic (drop to line). This mitigates the delay accumulations over
multi-hop paths.
Some Ethernet Telecommunication networks monitor the latency of critical traffic paths,
recording the peak values over time, so that the user can confirm that the expected
performance is being realized.
It is acknowledged that the use of the 802.1Q VIDs (VLAN IDs) to control traffic and provide
security, plus the use of the 802.1Q priority field to meet dependability requirements requires
the use of switches that support these features; however it has also been demonstrated that
such features are required if such networks are used.
The technology for assigning these VIDs and priorities is beyond the scope of this document.
• GVRP and GMRP are IEEE standards (in 802.1p) that allow IEDs to request VLAN
assignments.
• The devices could be configured manually.
• The devices could be configured by whatever configures the 61850 substation IEDs.
An important consideration is that there is a strong argument for the entire communication
network’s settings and performance to be continually monitored; some utilities are already
requiring this feature.
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 53 – 57/924/DC
8 Communication aspects
8.1 Services
This clause provides an overview of the information that needs to be transmitted and the
service from IEC 61850-7-2 that shall be used.
Status information: Status information shall be transmitted using the GOOSE service from
IEC 61850-7-2.
Phasors: If phasors are acquired cyclically, the service for the transmission of sampled
values shall be applied. Both the unicast as well as the multicast services can be used. If
phasors are time stamped and not necessarily cyclic, the GOOSE service shall be used.
NOTE – With the sampled value transmission as defined in IEC 61850-7-2, the minimal sampling rate is 1 sample
per net period. That means that, if phasors are transmitted using the sampled value service, at least one phasor
per period needs to be calculated and transmitted.
EDITOR NOTE – in the case it is required to support less than one phasor per period, an extension of the sampled
value model may be required. Options are: (a) to add an attribute to differentiate between samples per period and
samples per second; (b) to use negative values to indicate fractions of samples per period, e.g. -2 would mean one
sample per 2 periods.
Sampled values: Where sampled values need to be transmitted, the services for unicast or
multicast transmission of sampled values shall be used.
The situation is looked at from the viewpoint of function A2; thus station A is called "local",
station B is called "remote".
SS to SS
Communication
Station A Mechanism Station B
Function Function
A1 B1
Function Function
A2 B2
IEC 61850-90-1
The scope of this report is the communication between substations, effectively exchanging
data between the station networks. Consequently, the "blue areas" containing "Station A" and
"Station B" mean in fact the local communication networks (station networks). In the same
sense, any of the "Functions" could be associated to a logical node when applying IEC 61850.
Thus, the terms "Station" or "Station Network" and "Function" or "Logical Node" are often
used synonymously in the following.
(1) Tunnelling
(2) The Gateway approach using specific teleprotection communication equipment.
8.2.2 Tunnelling
"Tunnelling" means a method to connect multiple substation networks that allows "direct
access" to functions in remote stations.
The tunnel is configured for a specific kind of traffic, e.g. based on a VLAN ID. The kinds of
traffic are the only information needed for configuring the tunnel. For IEC 61850, the relevant
kinds of traffic would be TCP/IP (for C/S communication) and multicast messages on Ethernet
layer 2 (for GOOSE, eventually even SV).
The tunnel accepts any message of a kind it is configured for and passes it through
unchanged. The tunnel does not care about the actual information content of the messages.
Consequently, the tunnel does not need to be reconfigured if the "communication" becomes
reconfigured, e.g. when the information exchanged between functions changes or if additional
functions exchange information.
For the C/S communication, devices (servers) in the remote station become addressable;
technically speaking a route is provided for the IP addresses in the remote station.
For GOOSE/SV, the broadcast domain extends into the remote station.
Transparent Tunnel
(typically high
Station A bandwidth) Station B
Function Function
A1 B1
Function Function
A2 B2
IEC 61850-90-1
Typically, a tunnel will be only applied if sufficient bandwidth is available. What "sufficient"
means, depends on the application.
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 55 – 57/924/DC
The exchange of non-time-critical status information for SCADA purposes may work well over
a slower link.
Exchanging GOOSE messages for remote interlocking may require higher bandwidth just to
achieve low enough latency. Even if the data volume of the GOOSE traffic is low, higher
bandwidth of a communication mechanism typically correlates with lower latency.
8.2.3 Gateway
For the gateway approach, explicit teleprotection equipment is involved. The teleprotection
equipment on the sending side filters and re-codes information for the special communication
mechanism used to transfer the information. On the receiving side, the teleprotection
equipment re-creates the information from the remote end to provide it in a form that is usable
for the functions in the substation.
Gateways can deliver a wide range of functionality. For the further considerations, two kinds
of gateways shall be distinguished:
A number of arbitrary I/O points are exchanged between the stations. In IEC 61850, this
would be implemented by using GGIOs. A separate cross-reference list is necessary to
interpret the actual meaning of the anonymous data points of the GGIOs. This approach
provides no semantics and delivers very little value within the scope of IEC 61850 conformant
engineering.
Therefore, the GGIO Gateway will not be further covered by this document.
The teleprotection equipment on the receiving side acts as a proxy for the function on the
sending side. This means it re-creates the interface and the behavior of the real function, at
least for the scope that is involved in the communication between the functions.
For C/S communication, the data model of the remote function is re-created by the proxy to
serve the transmitted information. For GOOSE (and eventually SV), the messages are
published by the proxy with the same format as on the remote side.
Thus, the Proxy Gateway is re-iterating the functionality of the tunnelling approach.
IEC 61850-90-1 © IEC:2008 – 56 – 57/924/DC
Special Communication
Mechanism
Station A (typically low Station B
bandwidth)
Function Function
A1 B1
? ?
Function Proxy Function
A2 B2 B2
"Teleprotection Equipment"
acting as Gateway IEC 61850-90-1
From A2’s perspective, Proxy B2 is providing the subset of information required for A2.The
teleprotection equipment can provide other features to make efficient use of the
communication mechanism. E.g. for GOOSE, only state changes might be actually transferred,
while the retransmissions with constant state information may be filtered out at the sending
side and the retransmission are locally re-created in the proxy. Missing retransmissions at the
sending side must then be signalled via status information between the teleprotection
equipment to the proxy.
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 57 – 57/924/DC
9 Modelling
Open issue : Comment which uses cases of Sec. 5 can be modelled without additional LNs.
Proxy
PTRC PTRC
GOOSE LPHD RTPC RTPC
GOOSE
trip LLN0 trip
PSCH sig4 PSCH
Figure 19 Allocation of the LN RTPC representing the communication channel and the
LNs providing the data to be exchanged between substations
The LN RTPC comprises all information for communication channel setting and supervision.
RTPC is not intended to generate direct process data. Thus, it does not contain the input and
output data to be transmitted and it has no ‘operate’ data object.
Note: EEHealth is used to indicate the state of the communication channel, whereas
PhyHealth is used to indicate the state of the (physical) communication device.
If RTPC receives a GOOSE message with quality attribute "invalid" or "questionable" or no
GOOSE message at all within Tmax, it will set PhyHealth to "Warning". Other actions are a
local issue.
RTPC class
Attribute Name Attr. Type Explanation T M/O
LNName Shall be inherited from Logical-Node Class (see IEC 61850-7-2)
Data
Common Logical Node Information
LN shall inherit all Mandatory Data from Common Logical Node M
Class
Measured Values
BerCh MV Bit Error Rate of the communication channel. Used in case of a O
digital communication channel
FerCh MV Frame Error Rate of the communication channel. Used in case of O
a digital communication channel. May be vendor specific
LoopTestTm MV Time measured at last loop test O
CarrierLevel MV Power of received signal in case of an analogue communication O
channel
SNR MV Signal to noise ratio in dB, used in case of analogue O
communication.
Status Information
EEHealth INS Communication channel health M
GrdRxCmdRx SPS Alarm situation: Guard received together with the command, may O
indicate interference on the channel. Used in case of an analogue
communication channel.
IEC 61850-90-1 © IEC:2008 – 58 – 57/924/DC
SecTmms ING Pickup security timer on loss of carrier guard signal: if a command O
is received within SecTmms after the guard has disappeared this
command is considered valid, used in case of an analogue
communication channel.
TxPwrPEPdBm ING Transmit power (peak envelope power) in dBm. Used in case of an O
analogue communication channel
This model is applicable for the following use cases (acc. to chapter 5):
State comparison protection schemes and direct trip signals shall be modelled by use of the
logical node PSCH. The protection scheme requires the transmission of at least one binary
signal from the protection device from one line end to the remote line end.
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 59 – 57/924/DC
As an example the following figure shows the relation between protection application and
logical modelling according to IEC 61850.
9.3.2 LN PSCH
PSCH class
Attribute Name Attr. Type Explanation T M/O
LNName Shall be inherited from Logical-Node Class (see IEC 61850-7-2)
Data
Common Logical Node Information
LN shall inherit all Mandatory Data from Common Logical Node Class M
OpCntRs INC Resetable operation counter O
Status Information
TxPrm ACT Permissive information to be transmitted to the other side (Teleprotection T O
permissive signal)
TxBlk ACT Blocking information to be transmitted to the other side (Teleprotection TO
blocking signal)
IEC 61850-90-1 © IEC:2008 – 60 – 57/924/DC
PSCH class
Attribute Name Attr. Type Explanation T M/O
TxTr ACT Direct trip information to be transmitted to the other side TO
RxPrm1 ACT Activation information RxPrm1 received from the other side(s), for TO
logging purposes (Teleprotection permissive signal received)
RxBlk1 ACT Activation information RxBlk1 received from the other side(s), for logging T O
purposes (Teleprotection blocking signal received)
RxTr1 ACT Activation information RxTr1 received from the other side(s), for logging O
purposes (direct trip signal received)
Op ACT Operate TM
Echo SPS TxPrm is being sent as echo signal (in case of weak infeed) TO
WeiOp SPS Indicates operate from weak end infeed function (typically with TO
undervoltage control)
Blk SPS Teleprotection in blocked state O
Configuration
RxSrc1 ORG Source for activation information RxPrm or RxBlk, must refer to data of O
type ACT
RxSrcTr1 ORG Source for activation information RxTr, must refer to data of type ACT O
Settings
OpDlTmms ING Operate Delay Time O
CrdTmms ING Co-ordination timer for blocking scheme O
DurTmms ING Minimum duration of TxPerm in case of operate of PSCH O
UnBlkMod ING Unblock function mode for scheme type O
UnBlkTmms ING Unblocking time (check application??) O
WeiMod ING Mode of weak end infeed function O
WeiTmms ING Co-ordination time for weak end infeed function O
Depending on the trip mode requirements the data exchange can be implemented with one
general send/receive signal (e.g. PSCH.TxPrm.general) or with three phase selective
send/receive signals (e.g. PSCH.TxPrm.phsA, PSCH.TxPrm.phsB, PSCH.TxPrm.phsC).
Telecom Telecom
Protection equipment equipment
Protection
relay Public or dedicated relay
network (e.g. SDH)
Station Station
Bus Bus
Fig.9.2.1 Communication system based on current system
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 61 – 57/924/DC
Interface (A)
Protection relay
Protection relay
Wide area network (e.g.
Giga Ether, SDH)
Interface (B)
MU MU
Station
Bus Telecom Telecom
Process Process
equipment equipment
Bus Bus
Basically interface (B) is out of this scope. However if Ethernet is applied to the
communication network, interface (B) will be equivalent to the interface (A).
This model can be drawn as Fig.9.2.3 for 2-terminal model and as Fig.9.2.4 for 3-terminal
model.
IEC 61850-90-1 © IEC:2008 – 62 – 57/924/DC
MDIF MDIF
CT
TCTR TCTR
SV’ SV’
VT
TVTR TVTR
Sampled Value
Or
External PDIF Vector Value PDIF External
Condition with Condition
Information bits
CB trip
XCBR PTRC PTRC XCBR
MDIF MDIF
CT
TCTR TCTR
SV’ SV’
VT TVTR Sampled Value TVTR
Or
PDIF
PDIF Vector Value
External with External
Condition Information bits Condition
PTRC XCBR
PTRC
CB trip XCBR
Protection Relay (Local) SV’ Protection Relay (Remote)
TCTR MDIF
CT
TVTR
VT
PDIF
External
Condition
9.4.2 LN MDIF
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 63 – 57/924/DC
LN MDIF is also used with function 87 according to IEEE device function number designation
(IEEE 32 R.2 1996)
MDIF class
Attribute Name Attr. Explanation T M/O
Type
LNName …. Shall be inherited from Logical-Node Class (see IEC61850-7-2)
Data
Common Logical Node Information
LN shall inherited all Mandatory Data from Common Logical M
Node Class
Measured values
OpARem WYE Operate Current (Phasor) of the remote local current C
measurement
Amp SAV Operate Current (Sampled value) of the local current C
measurement
Status [1..n] INT16U Local status according to predetermined format O
Condition C : Either OpARem or Amp shall be used
As explained in previous section, SV needs to be modified to be able to send phasor data and
status data as follows.
• Propagation delay affects the operating time. Therefore a small propagation delay is
needed for differential protection. An especially small propagation delay is required for
EHV, HV feeder protection(e.g. Less than 6ms for EHV, HV feeders, less than 20ms for LV
feeders)
• Any change of the propagation delay must be very small in order that the relays establish
sampling synchronisation by themselves (e.g. less than 0.2ms for synchronisation). When
a reliable external signal (e.g. GPS signal) is available and external signal synchronisation
is applied to the relay, the requirement for changes of the propagation delay is not very
strict (e.g. less than 20ms)
-6
• High quality (e.g. BER less than 10 )
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 65 – 57/924/DC
If the difference of the propagation times between going and coming is fixed, self
synchronisation can be applied even if the communication is asymmetrical. Therefore the
symmetry of the communication is not mandatory for self synchronisation. Nevertheless it is
more secured for self synchronisation if symmetry of the communication is ensured especially
when there is a possibility of the switching of the communication. Therefore it is useful to
know whether the communication is symmetrical or asymmetrical.
10 Configuration aspects
The practical approach to system configuration depends on the kind of communication system
architecture as well as the split of responsibility between the engineering in the concerned
substations. The following two scenarios relate to the direct communication connection
(Figure 17 SS to SS Communication via Tunnel) with one method, and a dedicated tele-
protection equipment hiding the communication between the two substations (Figure 18 SS to
SS Communication via Proxy Gateway) as a second method.
For high bandwidth wide area connections the IEC61850 Ethernet frame can be directly
mapped to a wide area Ethernet connection. This corresponds then to a switch in the Ethernet
architecture, with possibly lower performance (throughput, delay) than a real switch. To
reduce the load on this ‘switch’, the data sent between substations should belong to an own
VLAN.
Switches are currently not modelled in SCL. However, the data flow from some IEC 61850
IED in one substation to some appropriate IED in the other substation has to be described. In
a meshed power network with all lines needing SS – SS communication, this can end up in
the situation that the whole power network with all substations and substation IEDs must
appear within one SCL file. As normally for a certain engineering purpose the concerned IEDs
only have to know a part of the other system(s), it seems to be appropriate to use ‘System
interface Exchange Descriptions’ (SED), which contain only a part of the overall system to be
engineered for a certain purpose. This SED file is then transferred from one substation project
to the other project, to include the needed DATA into the data flow. The engineered data flow
then is transferred back to the originating system / project by means of an enhanced SED file,
so that both systems then have the same consistent state regarding the data to be exchanged
between them across the connecting Ethernet link.
SCD1
SED SCD2
High bandwidth wide area connection looks like switch
Figure 21: SCD files and SED region for SS – SS communication
From the view of the concerned tools this means that several system configuration tools exist,
each responsible to configure a certain part of the overall system, i.e. each ‘owner’ of a
certain amount of IEDs. We call a set of IEDs, which is engineered and also configured by a
system tool and its connection to the corresponding IED tools, a project . These projects
(project system configuration tools) exchange engineering data, which describe the
overlapping parts. These overlapping parts are for some projects a boundary part, which they
are not allowed to change, or only to change in a limited way before re-export to the ‘owner’
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 67 – 57/924/DC
of this part. Only the IED owner project is allowed to give an SCD file to the IED tool for IED
configuration. See Figure 22 for this engineering process.
System specification
.SSD (Single line, LNs, …)
IED Capabilities
(LN, DO, …)
IED System .SED System
DB .ICD Configurator Configurator
Part system
Associations,
relation to single line, .SCD .SCD
preconfigured reports, ...
IED Other IEC61850 project
Configurator with interfaces between
Engineering projects
Engineering Workplace
environment File transfer
.CID remote
File transfer File transfer and
Local Substation Parametrization with
gateway IEC61850 services
SA system
IED IED IED
In Figure 21 the IEDs AA1F1 and AA1F2 are owned by the system tool handling the AA1
project (substation), while AA2F1 and AA2F2 are owned by the system tool handling the AA2
project. AA1F2 is a ‘boundary’ IED for the AA2 project, while AA2F1 is a boundary IED for the
AA1 project.
Important for SED files is how they are handled at export and import of the system
configuration tools. For this purpose, at export a system tool can decide which kind of
engineering rights another system tool might have. The engineering rights as defined in
IEC61850-6 are shown in the following table.
It should be remembered, that the only tool which is allowed to change the IED data model, is
the IED tool. So, changes of data model are only allowed by the IED tool, and the handling
after system integration is described in IEC61850-6.
of the IED (data sets, control definitions (also in existing data model allowed,
engineering blocks) are exported, control blocks) and new Input no removal of already
capability (especially which are needed / sections, and these modified / engineered parts, no
new client allowed for further imported; then state is set to change in existing
references); engineering. Note that if full again. This might mean data sets & control
ownership stays at new clients can be added that previously all other IEDs blocks (confRev
exporting project for report control blocks, of the SED have to be unchanged). Only
then all existing clients imported, which are additions of DS and
must also be contained referenced. CBs are allowed.
at least as fix IEDs, else Engineering
the RCB instance If the owner is some other capabilities can be
allocation would be project, it is imported. If it restricted at export by
disturbed. Similar it is exists already, the versions of setting the capability
with input section existing parts should be options appropriately.
references. checked, and only newer parts
imported, replacing existing
parts.
full Full engineering of Not allowed to export in Should not appear within a
data flow is allowed. a SED file. SED file – stop import
This right can not be
formally transferred
When an IED is exported to a SED file, then the IED ownership is marked by means of the
(new) owner attribute of the IED, which is set to the SCD header identification respective
project identification, and an IED exported as dataflow is blocked for changes within the
owning system tool, e.g. by setting it to fix.
If a dataflow IED with same owner id as the project id is re-imported, then the change block is
taken away again. The owner attribute at IEDs with fix and dataflow engineering right marks
to which project they belong, to block changes at the owner after dataflow export.
The different IED states within a project and the triggers from one to the other are shown in
Figure 23. Observe that there are two automata. One is valid in case that a system
configuration tool starts with full control, the other is for an IED imported with dataflow control.
Import fix
Export fix Src=own
Src=own Check revisions!
Full
Src=own If different, mark for transfer back
Export dataFlow
Import dataFlow Src=own
Src=own
Include additions Interface IED states
fix
Src=own Data set /
IED owner states data flow changes
Mark for transfer to other
Import part
Src=other dataflow
Src=other
IED
not known Import dataFlow
Src=other
Check changes!
fix Export dataFlow
Import fix Src=other
Src=other Src=other
Replace, keep references
Above definitions only concern IED sections. IEDs can also be referenced by the
Communication section, and by the Substation section. Therefore these must also be
considered:
• Communication section : all parts belonging to exported IEDs respective IED parts must
be contained. For part IEDs and fixed IEDs only those parts of access points and control
block parameters shall appear, which are still contained in the exported IED part. Both is
not allowed to be changed. If address coordination is an issue, all access points with
addresses can be exported (and the IED as fix, just containing the access point).
• Substation section : All elements down to bay, which contain references to LNs on some
of the exported IEDs, have also to be exported, inclusive the references to IEDs to be
exported. For any concerned bay its topology as well as primary equipment has to be
exported completely, only references to logical nodes not contained in the exported part
are allowed to be removed. No links are allowed to be modified or added for exported
IEDs, just for newly introduced own IEDs. Also new bays and new IEDs might be added,
but it is not allowed to delete bays or primary equipment.
It might happen, that several SED files from the same system part are exported at different
points in time. Each of them shall have an identification and a revision index with time of
modification. This allows identifying the latest version of a certain SED file, which then also
indicates a specific purpose respective an export to a specific project. It is the responsibility of
the importing project engineer, to identify different SED files and their versions. In any case,
any owned IED marked as fix should only be exported as fix, if needed at all.
It is the responsibility of the project engineer as well as the exporting system tool, that a SED
file containing IEDs with dataflow right for a certain engineering purpose is only used for this
purpose, and not in parallel for another purpose in another (third) system tool / project. This
also includes that an exporting system tool is only allowed to export dataflow IEDs once for a
certain purpose, and not a second time in parallel as dataflow IED for another purpose, before
the possibly modified IED has been again re-imported. Fixed IEDs can be exported as fix in
parallel as often as needed, because they do not have to be re-imported. The owner attribute
value at fix and dataflow IEDs supports the system tool to remember, that it is the ‘owner’ of
the IED, so that it can reset the state to ‘full’ after a re-import of the IED.
For the purpose defined above, the following SCL enhancements are introduced (see
IEC61850-6):
a) Optional attribute engRight at the IED element with values fix, dataflow; the default value,
if missing, is full, which is not allowed within a SED file.
b) Optional attribute owner of type string at the IED element with default value identical to
the Header id. This id contains the SCL ID / project ID of the system configurator project,
which has exported this IED to a SED file. The SED identification must be different from
the owner values.
An example of a SED file for SS-SS communication is contained in the next clause.
The example is based on the system configuration of Figure 21. The engineering process in
this case works as follows:
a) Project AA2 exports a SED file for IED AA2F1, with AA2F1 as data flow IED, and all
needed source IEDs as fix IEDs.
b) Project AA1 imports the SED file, and engineers the data flow between AA1F2 and AA2F1.
c) Project AA1 now can configure AA1F2 with its IED tool; then it exports a SED file with
same identification as the imported SED, containing AA1F2 as fixed IED and AA2F1 as
IEC 61850-90-1 © IEC:2008 – 70 – 57/924/DC
original data flow IED (plus all needed source IEDs as fix) with the added data flow
definitions.
d) Project AA2 imports the SED file, and finalizes any engineering on AA2F1 based on its
now complete system description; now AA2F1 can be configured by its IED tool.
Note that it is the responsibility of the project engineer, to communicate any project changes
(e.g. in project AA1) which influence the boundary IEDs owned by other projects (e.g. AA2F1
in project AA2), to the appropriate project. If this is forgotten, a sudden failure in
communication especially with GOOSE and SAV services between the concerned IEDs might
happen due to mismatch of message confRev values.
An alternative engineering approach could have been to export AA2F1 in step1 as fix, but with
already preconfigured data set and control block to be sent to AA2F1. In this case within step
2 only the data flow from AA1F2 to AA2F1 could be engineered, and within step 4 the still
missing data flow from AA1F2 to AA2F1 has to be added. This simplifies the tasks of the tools,
because they have only to handle import and export of fix IEDs, however might complicate the
engineering, because the complete communication engineering between AA1F2 and AA2F1
has been split into several parts (steps 1, 2, 4) instead of one step (step 2). Especially, it can
not be indicated in step 1, that AA1F2 is the GOOSE client of AA2F1.
The following shows the SED file example to be imported in engineering step 4. It also
contains the modelling of the line connection between the two substations as
ConductingEquipment of type LIN (overhead line), to make the primary system modelling
complete and show, that the two bays in the substations are connected by a common line.
Further, the protection IED AA1FP2, which in principle is the same IED type as AA2FP1, is
exported as fix, and therefore only the relevant (interface) parts for AA1FP2 are contained in
it. It might contain more, but this is not necessary.
<?xml version="1.0"?>
<SCL xmlns:sxy="http://www.iec.ch/61850/2003/SCLcoordinates" xmlns="http://www.iec.ch/61850/2003/SCL">
<Header id="SS-SS AA1 - AA2" toolID="SSI-Tool" nameStructure="IEDName" />
<Substation name="AA1" desc="Substation">
<VoltageLevel name="D1" desc="Voltage Level">
<Bay name="Q1" desc="Bay" sxy:x="55" sxy:y="62" sxy:dir="vertical">
<LNode iedName="AA1FP1" ldInst="LD1" lnClass="PTOC" lnInst="1" />
<LNode iedName="AA1FP1" ldInst="LD1" lnClass="PTRC" lnInst="1" />
<LNode iedName="AA1FP1" ldInst="LD1" prefix="F21" lnClass="PSCH" lnInst="1" />
<LNode iedName="AA1FP1" ldInst="LD1" prefix="F21" lnClass="PDIS" lnInst="1" />
<ConductingEquipment name="BI1" desc="Current Transformer" type="CTR" sxy:x="8" sxy:y="15"
sxy:dir="vertical">
<Terminal name="AA1D1Q1N2" connectivityNode="AA1/D1/Q1/N2" substationName="AA1"
voltageLevelName="D1" bayName="Q1" cNodeName="N2" />
<Terminal name="AA1D1Q1N3" connectivityNode="AA1/D1/Q1/N3" substationName="AA1"
voltageLevelName="D1" bayName="Q1" cNodeName="N3" />
</ConductingEquipment>
<ConductingEquipment name="QC2" desc="Isolator" type="DIS" sxy:x="10" sxy:y="21" sxy:dir="vertical">
<Terminal name="AA1D1Q1N6" connectivityNode="AA1/D1/Q1/N6" substationName="AA1"
voltageLevelName="D1" bayName="Q1" cNodeName="N6" />
<Terminal name="grounded" connectivityNode="AA1/D1/Q1/grounded" substationName="AA1"
voltageLevelName="D1" bayName="Q1" cNodeName="grounded" />
</ConductingEquipment>
<ConductingEquipment name="BU2" desc="Voltage Transformer 3Phase" type="VTR" sxy:x="12" sxy:y="14"
sxy:dir="vertical">
<Terminal name="AA1D1Q1N3" connectivityNode="AA1/D1/Q1/N3" substationName="AA1"
voltageLevelName="D1" bayName="Q1" cNodeName="N3" />
</ConductingEquipment>
<ConductingEquipment name="QB2" desc="Isolator" type="DIS" sxy:x="12" sxy:y="4" sxy:dir="vertical">
<Terminal name="AA1D1QBBN4" connectivityNode="AA1/D1/QBB/N4" substationName="AA1"
voltageLevelName="D1" bayName="QBB" cNodeName="N4" />
<Terminal name="AA1D1Q1N5" connectivityNode="AA1/D1/Q1/N5" substationName="AA1"
voltageLevelName="D1" bayName="Q1" cNodeName="N5" />
</ConductingEquipment>
<ConductingEquipment name="QC1" desc="Isolator" type="DIS" sxy:x="10" sxy:y="8" sxy:dir="vertical">
<Terminal name="AA1D1Q1N5" connectivityNode="AA1/D1/Q1/N5" substationName="AA1"
voltageLevelName="D1" bayName="Q1" cNodeName="N5" />
<Terminal name="grounded" connectivityNode="AA1/D1/Q1/grounded" substationName="AA1"
voltageLevelName="D1" bayName="Q1" cNodeName="grounded" />
</ConductingEquipment>
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 71 – 57/924/DC
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 73 – 57/924/DC
</ConductingEquipment>
</Bay>
</VoltageLevel>
</Substation>
<Communication>
<SubNetwork name="AA1WA1" desc="IEC61850 through both stations" type="8-MMS">
<ConnectedAP iedName="AA2FP1" apName="S1">
<Address>
<P type="SA">0</P>
<P type="IP">172.17.1.4</P>
<P type="IP-SUBNET">255.255.0.0</P>
<P type="OSI-AP-Title">1,3,9999,23</P>
<P type="OSI-AE-Qualifier">23</P>
<P type="OSI-TSEL">0001</P>
<P type="OSI-PSEL">00000001</P>
<P type="OSI-SSEL">0001</P>
</Address>
<GSE ldInst="LD1" cbName="SSAA2dist">
<Address>
<P type="MAC-Address">01-0C-CD-01-02</P>
<P type="APPID">2001</P>
</Address>
<MinTime unit="s">2</MinTime>
<MaxTime unit="s">1000</MaxTime>
</GSE>
</ConnectedAP>
<ConnectedAP iedName="AA1FP1" apName="S1">
<Address>
<P type="SA">0</P>
<P type="IP">172.16.1.3</P>
<P type="IP-SUBNET">255.255.0.0</P>
<P type="OSI-AP-Title">1,3,9999,23</P>
<P type="OSI-AE-Qualifier">23</P>
<P type="OSI-TSEL">0001</P>
<P type="OSI-PSEL">00000001</P>
<P type="OSI-SSEL">0001</P>
</Address>
<GSE ldInst="LD1" cbName="SSAA2dist">
<Address>
<P type="MAC-Address">01-0C-CD-01-01</P>
<P type="APPID">2001</P>
</Address>
<MinTime unit="s">2</MinTime>
<MaxTime unit="s">1000</MaxTime>
</GSE>
</ConnectedAP>
<ConnectedAP iedName="AA2OPC1" apName="S1">
<Address>
<P type="SA">0</P>
<P type="IP">172.17.0.100</P>
<P type="IP-SUBNET">255.255.0.0</P>
<P type="OSI-AP-Title">1,3,9999,23</P>
<P type="OSI-AE-Qualifier">23</P>
<P type="OSI-TSEL">0001</P>
<P type="OSI-PSEL">00000001</P>
<P type="OSI-SSEL">0001</P>
</Address>
</ConnectedAP>
</SubNetwork>
</Communication>
<IED name="AA2OPC1" type="OPCServer" manufacturer="XYZ" configVersion="1.0" engRight="fix"
owner="AA2" >
<AccessPoint name="S1">
<LN inst="1" lnClass="IHMI" lnType="IHMI_OPCServer_IEC61850" />
</AccessPoint>
</IED>
<IED name="AA1FP1" type="REL316-4" manufacturer="ABC" configVersion="1.0" engRight="fix" owner="AA1" >
<Services>
<DynAssociation />
<SettingGroups>
<SGEdit />
</SettingGroups>
<GetDirectory />
<GetDataObjectDefinition />
<DataObjectDirectory />
<GetDataSetValue />
IEC 61850-90-1 © IEC:2008 – 74 – 57/924/DC
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 75 – 57/924/DC
<OptFields />
<RptEnabled max="5">
<ClientLN iedName="AA2OPC1" ldInst="none" lnInst="1" lnClass="IHMI" />
</RptEnabled>
</ReportControl>
<GSEControl name="SSAA2dist" desc="to AA1" datSet="PSCHtoAA1" confRev="1" appID="">
<IEDName>AA1FP1</IEDName>
</GSEControl>
</LN0>
<LN inst="1" lnClass="LPHD" lnType="Physical Device_REL316-4_IEC61850" />
<LN inst="1" lnClass="PSCH" lnType="F21_Distance Scheme_REL316-4_IEC61850" prefix="F21" />
<LN inst="1" lnClass="PTOC" lnType="NPS DT_REL316-4_IEC61850" />
<LN inst="1" lnClass="PTRC" lnType="System Protection_REL316-4_IEC61850" />
<LN inst="1" lnClass="TCTR" lnType="CT_REL316-4_IEC61850" />
<LN inst="1" lnClass="TVTR" lnType="VT_REL316-4_IEC61850" />
<LN inst="1" lnClass="PDIS" lnType="F21_Distance Z1_REL316-4_IEC61850" prefix="F21" />
</LDevice>
</Server>
</AccessPoint>
</IED>
<DataTypeTemplates>
………………
</DataTypeTemplates>
</SCL>
The teleprotection equipment communicates with the IEC 61850 IEDs in the substation by
means of IEC 61850, typically GOOSE or SAV type of service, i.e. it is an IEC 61850 IED
within each of the substations. To retain the semantics of the communicated signals, here the
proxy gateway approach is used, which works like this (see also Figure 21):
• Each end of the teleprotection is a client (ITCI logical node), which receives the DATA to
be sent and used in the other substation(s).
• These DATA to be sent to the other substation are mapped onto a proxy gateway data
model within the other substation; e.g. substation AA1 contains a proxy GW for substation
AA2 and vice versa, if data flow is bidirectional.
• The data model of the proxy contains as image all those logical devices and logical nodes
from IEDs at the other side, which contain data to be used in the receiving substation (e.g.
all LDs from the IEDs, which would have been exported with dataflow right in the previous
method). This could be defined by analysing the data to which the proxy subscriber has
been configured as client in the source substation, or as a separate proxy engineering
step, which then at the end generates this client data flow. Together with the logical
devices also the part of the substation section to which the LNs to be used are bound,
should be put into the proxy IID file.
• The proxy has an own LPHD logical node, which shows its state and by means of the (new)
RTPC logical node also the state of the wide area communication link.
• The proxy defines a message (typically GOOSE or SAV, but also reports are possible) by
gathering the data communicated for use in the receiving substation into a data set,
allocated to a (GOOSE, SV or report) control block.
• Based on this message definition the client/subscriber at the sending substation, which
could be a part of the corresponding proxy or a separate (client) IED, connects its
client/subscriber input signals to the corresponding channels and message bits on the
wide area connection. It is recommended to use the proxy data model’s sAddr attributes or
the ITCI client’s intAddr attribute (or both) to identify the telecommunication signal used
for transfer.
IEC 61850-90-1 © IEC:2008 – 76 – 57/924/DC
The proxy logical devices and their kept references to the substation section define the
source meaning of the data for the destination SA system, and define which signals to receive,
to transfer via the wide area connection, and to map to the possibly predefined (GOOSE or
SAV) telegram at the source substation. This works even for simple proxies, which can only
send a fix GOOSE data set, by assuring in the teleprotection IED tool, that only data from the
LD with a matching data type is mapped to the appropriate preconfigured GOOSE signal.
Naturally, for high speed connections the proxy method has the disadvantage that it defines a
further (proxy) IED, which might introduce delays. On the other hand it might be implemented
replacing the switch coupling to the WAN connection in the high speed scenario, so that in
reality the performance loss will be small or even zero.
Above figure assumes, that data has to be sent from substation AA1 to AA2, represented
there in the proxy IED AA2F3, as well as the other way round, there represented locally in
AA1 at the proxy IED AA1F3.
The subscriber IED can either be considered the (ITCI) client part of the Proxy IED, or can be
considered to be an own IED, which then must have an own IED name to configure sending
DATA to it.
As the proxy SCL files look from SCL point of view like any other proxy gateway files, there is
no example given. After the IID SCL file for the proxy has been generated from the SCD file of
the other substation, this can be included into the project like any other IED’s ICD or IID file,
and configuring the subscriber is done with the Proxy’s IED tool. All in all this is a three step
system engineering process for each substation, flowed by the proxy IED engineering step:
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 77 – 57/924/DC
Annex A
This annex includes some additional concepts on how to address security and dependability
issues when using Ethernet networks. We expect experts to comment on these concepts in
order to decide whether they shall be included in the final technical report.
Note that though these tags support 8 priority levels, most switches provide only 4 or 2
priority level queues.
(b) Fibre Failure
The time for the network to establish an alternate link after the failure of a network’s
link (most links are fibre) may be too slow.
Note that none of the standard path-failure recovery algorithms for Ethernet networks
come even close to the 10 ms required; SONET is < 60ms, SDH < 50ms, Ethernet
Spanning Tree is about 1 minute, and Ethernet Rapid Spanning Tree takes tens of
milliseconds to a few seconds.
As a result, communication vendors for the power utility market provide proprietary
solutions with much faster recovery times. (These require ring topology networks.)
An alternate solution is to provide duplicate and physically-separate communication
paths between the protection IEDs.
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007
IEC 61850-90-1 © IEC:2008 – 79 – 57/924/DC
(a) If some of the Ethernet Telecommunications network equipment is outside the utility’s
“Security Perimeter” (e.g. when Ethernet circuits are leased from a service provider),
the Ethernet links through such equipment should be secured through a technology
such as “L2TP” (Layer 2 Tunnelling Protocol) to create a “VPN” (Virtual Private
Network), and the security should be maintained through the implementation of the
associated key-management requirements. Note that this technology provides
authentication of each message’s source (encryption is not required for protection
applications, and may significantly increase the messages latencies).
(b) Unless dual-port IEC 61850 IEDs are used (with physically separate paths), the
Ethernet network shall recover (restore traffic) from a fibre failure within 10ms.
(c) All the network switches’ “drop” ports connected to IEC 61850 IEDs should be
configured for memberships only in the VLANs supported by the connected IEDs.
Such connections should be monitored to detect momentary link loss events; this
allows the detection of malicious attempts to use such ports to access other IEDs on
the critical VLANs.
(d) All the network switches’ “drop” ports connected to other services (e.g. Video,
rd
Corporate, VoIP, 3 -party WANs) shall be configured to block ingressing traffic with
VIDs for the critical VLANS, and to prevent ingressing traffic using the network’s
priority queues handling the GOOSE protection traffic (e.g. by controlling the priority
fields of the ingressing packets’ IEEE 802.1Q tags).
(e) The probability of a GOOSE packet taking more than 10ms to traverse the network
-4
shall be constrained to < 10 ; by limiting the number of switches on the longest path,
and by limiting the traffic loading (see the next sub-sections for some examples).
A potential 2ms extra delay could therefore be incurred for a network path comprising 16 hops
if at 100 Mbit/sec, 160 hops if at 1 Gbit/sec.
At each egress switch port, a high-priority packet may also have to wait for many other high-
priority packets to egress; a 600 byte packet (typical for GOOSE) requires 48us at 100
Mbit/sec, 4.8us at 1 Gbit/sec.
A potential 2ms extra delay could therefore be incurred for an event-triggered burst of 40
GOOSE packets if at 100 Mbit/sec, 400 packets if at 1 Gbit/sec.
It is acknowledged that the use of the 802.1Q VIDs (VLAN IDs) to control traffic and provide
security, plus the use of the 802.1Q priority field to meet dependability requirements requires
the use of switches that support these features; however it has also been demonstrated that
such features are required if such networks are used.
The technology for assigning these VIDs and priorities is beyond the scope of this document.
GVRP and GMRP are IEEE standards (in 802.1p) that allow IEDs to request VLAN
assignments.
The devices could be configured manually.
The devices could be configured by whatever configures the 61850 substation IEDs.
An important consideration is that there is a strong argument for the entire communication
network’s settings and performance to be continually monitored; some utilities are already
requiring this feature.
Draft R0.12, TF draft after TF meeting no. 3 in Baden, 20/ and 21/11/2007