Activities 2

Sample list of activities

Uploaded by

Yashica
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views2 pages

Activities 2

Sample list of activities

Uploaded by

Yashica
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Activity ID Activity Name Original Duration Remaining Schedule Start Finish Total

Duration %
Complete Float
ANNEX CONSTRUCTION 325 325 0% 02-Nov-24
30-Jan-260

ANNEX.1 INITIAL CONSTRUCTION PHASE 302 302 0% 02-Nov-24


30-Dec-250

ANNEX.1.1 Site Preparation 5 5 0% 02-Nov-24


08-Nov-240
A1520 Moving in 5 5 0% 02-Nov-24
08-Nov-24
A1530 Site Clearing andd Grubbing 5 5 0% 02-Nov-24
08-Nov-24
ANNEX.1.2 Earthworks 5 5 0% 02-Nov-24
08-Nov-240
A1540 Excavation for Foundation & Wall Footing 5 5 0% 02-Nov-24
08-Nov-24
A1570 Backfilling and Compaction 5 5 0% 02-Nov-24
08-Nov-24
A1810 Excavation for Septic Tank & Catch Basins 5 5 0% 02-Nov-24
08-Nov-24
ANNEX.1.3 Reinforcement Steelworks 5 5 0% 02-Nov-24
08-Nov-240
A1580 Steelworks for Footing 5 5 0% 02-Nov-24
08-Nov-24
A1590 Steelworks for Wall Footing 5 5 0% 02-Nov-24
08-Nov-24
A1600 Steelworks for Column 5 5 0% 02-Nov-24
08-Nov-24
A1610 Steelworks for Grade Beam 5 5 0% 02-Nov-24
08-Nov-24
A1611 Steelworks for Intermediate Beam 5 5 0% 02-Nov-24
08-Nov-24
A1620 Steelworks for Ground Floor Slab 5 5 0% 02-Nov-24
08-Nov-24
A1630 Steelworks for 2nd Floor Slab 5 5 0% 02-Nov-24
08-Nov-24
A1640 Steelworks for 3rd Floor Slab 5 5 0% 02-Nov-24
08-Nov-24
A1650 Steelworks for 4th Floor Slab 5 5 0% 02-Nov-24
08-Nov-24
A1660 Steelworks for Roof Beam 5 5 0% 02-Nov-24
08-Nov-24
A1820 Steelworks for Septic Tank & Catch Basins 5 5 0% 02-Nov-24
08-Nov-24
ANNEX.1.4 Formworks 5 5 0% 02-Nov-24
08-Nov-240
A1670 Formworks for Footings 5 5 0% 02-Nov-24
08-Nov-24
A1680 Formworks for Wall Footings 5 5 0% 02-Nov-24
08-Nov-24
A1690 Formworks for Columns 5 5 0% 02-Nov-24
08-Nov-24
A1700 Formworks for Beams 5 5 0% 02-Nov-24
08-Nov-24
A1710 Scaffoldings 5 5 0% 02-Nov-24
08-Nov-24
ANNEX.1.5 Concrete Works 5 5 0% 02-Nov-24
08-Nov-240
A1720 Concrete Works for Footing 5 5 0% 02-Nov-24
08-Nov-24
A1730 Concrete Works for Column 5 5 0% 02-Nov-24
08-Nov-24
A1740 Concrete Works for Lean Concrete 5 5 0% 02-Nov-24
08-Nov-24
A1750 Concrete Works for Grade Beam 5 5 0% 02-Nov-24
08-Nov-24
A1751 Concrete Works for Intermediate Beam 5 5 0% 02-Nov-24
08-Nov-24
A1760 Concrete Works for Ground Floor Slab 5 5 0% 02-Nov-24
08-Nov-24
A1770 Concrete Works for 2nd Floor Slab 5 5 0% 02-Nov-24
08-Nov-24
A1780 Concrete Works for 3rd Floor Slab 5 5 0% 02-Nov-24
08-Nov-24
A1790 Concrete Works for 4th Floor Slab 5 5 0% 02-Nov-24
08-Nov-24
A1800 Concrete Works for Roof Beam 5 5 0% 02-Nov-24
08-Nov-24
A1840 Concrete Works for Septic Vault 5 5 0% 02-Nov-24
08-Nov-24
A1850 Concrete Works for Catch Basins 5 5 0% 02-Nov-24
08-Nov-24
ANNEX.1.6 Masonry Works 5 5 0% 02-Nov-24
08-Nov-240
A1830 Masonry Works for Exterior Walls 5 5 0% 02-Nov-24
08-Nov-24
A1860 Masonry Works for Interior Walls 5 5 0% 02-Nov-24
08-Nov-24
A1870 Masonry Works for Septic Vault 5 5 0% 02-Nov-24
08-Nov-24
A1880 Masonry Works for Catch Basins 5 5 0% 02-Nov-24
08-Nov-24
ANNEX.1.7 Roofing Works 5 5 0% 02-Nov-24
08-Nov-240
A1920 Roof Framing Works 5 5 0% 02-Nov-24
08-Nov-24
A1930 Roof Framing Works 5 5 0% 02-Nov-24
08-Nov-24
ANNEX.1.8 Elevator Shaft and Stairs Construction 197 197 0% 02-Nov-24
05-Aug-250
A1120 Pit Excavation & Foundation 10 10 0% 25-Jun-25*
08-Jul-25
A1130 Shaft Construction 10 10 0% 25-Jun-25*
08-Jul-25
A1140 Steelworks for Stairs 20 20 0% 09-Jul-25*05-Aug-25
A1890 Concrete Works for Stairs 5 5 0% 02-Nov-24
08-Nov-24
A1900 Masonry Works for Stairs 5 5 0% 02-Nov-24
08-Nov-24
A1910 Masonry Works for Elevator Walls 5 5 0% 02-Nov-24
08-Nov-24
ANNEX.1.9 Installation of MEPF Systems 232 232 0% 02-Nov-24
23-Sep-250
A1150 HVAC Ducting 15 15 0% 06-Aug-25*
26-Aug-25
A1160 Electrical Wiring & Conduits 20 20 0% 27-Aug-25*
23-Sep-25
A1170 Plumbing Pipes & Fixtures 15 15 0% 27-Aug-25*
16-Sep-25
A1180 Fire Safety Systems 10 10 0% 27-Aug-25*
09-Sep-25
A1200 Rainwater Harvesting System 5 5 0% 02-Nov-24
08-Nov-24
ANNEX.1.10 Interior Finishing 287 287 0% 02-Nov-24
09-Dec-250
A1189 Doors and Windows Installation 10 10 0% 12-Nov-25*
25-Nov-25
A1190 Railings and Handrails Installation 5 5 0% 02-Nov-24
08-Nov-24
Activity ID Activity Name Original Duration Remaining Schedule Start Finish Total
Duration %
Complete Float
A1191 Tile Works 15 15 0% 24-Sep-25*
14-Oct-25
A1192 Painting Works 20 20 0% 15-Oct-25*
11-Nov-25
A1220 Fixtures & Fittings 20 20 0% 12-Nov-25*
09-Dec-25
ANNEX.1.11 Commissioning 302 302 0% 02-Nov-24
30-Dec-250
A1230 System Testing 10 10 0% 10-Dec-25*
23-Dec-25
A1240 Elevator Testing 5 5 0% 10-Dec-25*
16-Dec-25
A1250 Final Inspections 5 5 0% 24-Dec-25*
30-Dec-25
A1550 Moving out 5 5 0% 02-Nov-24
08-Nov-24
A1560 Handover 5 5 0% 02-Nov-24
08-Nov-24
ANNEX.2 OPERATIONAL PHASE 325 325 0% 04-Nov-24
30-Jan-260

ANNEX.2.1 Utilities 5 5 0% 05-Jan-2609-Jan-260


A1260 Utility Management 5 5 0% 05-Jan-26*
09-Jan-26
ANNEX.2.2 Cleaning and Custodial Services 10 10 0% 19-Jan-2630-Jan-260
A1270 Daily Cleaning 5 5 0% 19-Jan-26*
23-Jan-26
A1280 Waste Collection & Disposal 5 5 0% 26-Jan-26*
30-Jan-26
ANNEX.2.3 Elevator Operation 1 1 0% 04-Nov-24
04-Nov-240
A1290 Elevator Operation 1 1 0% 04-Nov-24
04-Nov-24

ANNEX.3 MAINTENANCE PHASE 5 5 0% 02-Nov-24


08-Nov-240

ANNEX.3.1 Routine Inspections 3 3 0% 04-Nov-24


06-Nov-240
A1300 Monthly Visual Inspections 1 1 0% 04-Nov-24
04-Nov-24
A1310 Quarterly System Testing 3 3 0% 04-Nov-24
06-Nov-24
ANNEX.3.2 HVAC System Maintenance 5 5 0% 02-Nov-24
08-Nov-240
A1320 Filter Replacement 5 5 0% 02-Nov-24
08-Nov-24
A1330 Duct Cleaning 5 5 0% 02-Nov-24
08-Nov-24
A1340 Cooling/Heating Maintenance 5 5 0% 02-Nov-24
08-Nov-24
ANNEX.3.3 Elevator Maintenance 5 5 0% 02-Nov-24
08-Nov-240
A1350 Monthly Safety Checks 5 5 0% 02-Nov-24
08-Nov-24
A1360 Annual Inspection 5 5 0% 02-Nov-24
08-Nov-24
A1370 Component Lubrication 5 5 0% 02-Nov-24
08-Nov-24
ANNEX.3.4 Plumbing and Electrical Maintenance 5 5 0% 02-Nov-24
08-Nov-240
A1380 Pipe Inspections 5 5 0% 02-Nov-24
08-Nov-24
A1390 Electrical Panel Maintenance 5 5 0% 02-Nov-24
08-Nov-24
A1400 Lighting Replacement 5 5 0% 02-Nov-24
08-Nov-24
ANNEX.4 REPAIR & REPLACEMENT PHASE 15 15 0% 02-Nov-24
22-Nov-240

ANNEX.4.1 Major Repairs 15 15 0% 04-Nov-24


22-Nov-240
A1410 Roof Repair/Replacements 15 15 0% 04-Nov-24
22-Nov-24
A1420 Facade Repairs 15 15 0% 04-Nov-24
22-Nov-24
ANNEX.4.2 System Replacements 15 15 0% 02-Nov-24
22-Nov-240
A1430 Elevator System Replacement 15 15 0% 04-Nov-24
22-Nov-24
A1440 HVAC System Replacement 10 10 0% 04-Nov-24
15-Nov-24
A1450 Electrical & Plumbing Upgrade 5 5 0% 02-Nov-24
08-Nov-24
ANNEX.4.3 Interior Refurbishments 10 10 0% 04-Nov-24
15-Nov-240
A1460 Flooring Replacement 10 10 0% 04-Nov-24
15-Nov-24
A1470 Interior Painting 10 10 0% 04-Nov-24
15-Nov-24

ANNEX.5 END-OF-LIFE (DISPOSAL) PHASE 15 15 0% 02-Nov-24


22-Nov-240

ANNEX.5.1 Demolition & Site Clearing 15 15 0% 02-Nov-24


22-Nov-240
A1480 Pre-Demolition Inspection 5 5 0% 02-Nov-24
08-Nov-24
A1490 Structural Demolition 15 15 0% 04-Nov-24
22-Nov-24
ANNEX.5.2 Salvage or Recycling 7 7 0% 04-Nov-24
12-Nov-240
A1500 Material Sorting & Salvage 7 7 0% 04-Nov-24
12-Nov-24
ANNEX.5.3 Site Restoration 5 5 0% 02-Nov-24
08-Nov-240
A1510 Site Cleanup & Restoration 5 5 0% 02-Nov-24
08-Nov-24