QP-IT-F09 Electric Water Pump Inspection Checklist (Rev01)
QP-IT-F09 Electric Water Pump Inspection Checklist (Rev01)
LEFT
SECTION
REAR
SECTION
RIGHT
SECTION
TOP
SECTION
BOTTOM
SECTION
SECTION H – CONCLUSIONS
□ EQUIPMENT READY FOR DEPLOYMENT □ EQUIPMENT REQUIRE ADDITIONAL LOAD TEST □ EQUIPMENT REQUIRE IMMEDIATE REPAIR
SECTION I – INSPECTOR DETAILS
INSPECTION PERFORM BY: INSPECTION CHECKLIST CHECKED BY:
QP-IT-F09/Rev01