PT. KOMOTECH INDONESIA - BUSINESS FIELDS
BUSINESS FIELDS
PT. KOMOTECH INDONESIA
OVERSEAS MARKETING
- OVERSEAS PROJECT
- WEAR RESISTANT OVERLAY PLATE
& FLUX CORED WELDING WIRE
FOR EXPORT
EMPLOYEE STATUS
1 Korean 1 - 1
Indonesia: 0
2 Finance & Administration 4 - 4
3 Human Resources & General Affairs 2 - 2
4 Procurement 2 - 2
5 Engineering 8 - 8
6 Production 7 - 7
7 Shop Worker: 0
Supervisor 2 2 4
Foreman 3 4 7
Fitter / Iron Worker 3 5 8
Helper 2 10 12
Welder 2 15 17
Electrician 1 2 3
Welding Business 8 2 10
8 Site Worker: 0
Supervisor 2 3 5
Foreman 0 7 7
Fitter 0 140 140
Helper 0 20 20
Welder 0 35 35
Rigger 0 12 12
Electrician 0 1 1
TOTAL MANPOWER 47 258 305
MAN POWER
• ENGINEERING : 1. MECHANICAL ENGINEER : 8 PERSONS
2. ST’L STRUCTURE ENGINEER : 2 PERSONS
3. CIVIL ENGINEER : 2 PERSONS
4. SOFTWARE OPERATOR : 4 PERSON
FACILITIES
• COMPUTER : 1. ENGINEERING COMPUTATIONAL UNIT
2. DESIGN, DRAWING & DATA UNIT
• SOFTWARE
Sesuai dengan Pasal 2 ayat (1)/Pasal 2 ayat (4) UU No. 6 Tahun 1983 tentang Ketentuan Umum
dan Tata Cara Perpajakan sebagaimana telah diubah terakhir dengan UU No. 16 Tahun 2009,
Peraturan Menteri Keuangan Nomor 73/PMK/2012, dan Peraturan Direktur Jenderal Pajak Nomor
PER-20/PJ/2013, dengan ini diterangkan bahwa :
5. Merk Dagang/Usaha
6. Kewajiban Pajak : [ X] PPN [ ] PPnBM
Telah dikukuhkan sebagai Pengusaha Kena Pajak terhitung sejak 1 Desember 2015.
1. NIB merupakan identitas Pelaku Usaha dalam rangka pelaksanaan kegiatan berusaha dan berlaku selama
menjalankan kegiatan usaha sesuai ketentuan peraturan perundang-undangan.
2. NIB adalah bukti Pendaftaran Penanaman Modal/Berusaha yang sekaligus merupakan pengesahan Tanda
Daftar Perusahaan, Angka Pengenal Importir, hak akses kepabeanan dan bukti pemenuhan laporan pertama
kewajiban Lapor Ketenagakerjaan di Perusahaan (WLKP).
3. Lembaga OSS berwenang untuk melakukan evaluasi dan/atau perubahan atas izin usaha (izin
komersial/operasional) sesuai ketentuan perundang-undangan.
4. Lembaga OSS berwenang memperbaiki status atas API-U atau API-P sesuai karakteristik pelaku usaha
(perseorangan atau non-perseorangan). Ke-efektifan API sesuai dengan standar yang ditetapkan Kementerian
Perdagangan.
5. Seluruh data yang tercantum dalam NIB dapat berubah sesuai dengan perkembangan kegiatan berusaha
6. Apabila di kemudian hari ternyata terdapat kekeliruan dalam Keputusan ini, maka akan dilakukan perbaikan
sebagaimana mestinya.
Dokumen ini diterbitkan melalui Sistem OSS atas dasar data dari pelaku usaha. Kebenaran dan keabsahan atas data yang ditampilkan
dalam dokumen ini dan data yang tersimpan dalam Sistem OSS menjadi tanggung jawab pelaku usaha sepenuhnya.
Dengan ketentuan bahwa NIB tersebut hanya berlaku untuk Nama KBLI dan Kode KBLI
yang tercantum dalam lampiran ini
ISO 9001:2015
QUALITY MANAGEMENT SYSTEM
Construction of utility project for fluids, architectural and engineering activities and related technical consultancy,
manufacture of load bearing structures and other metal products
Managing Director
EASTAC REGISTRAR
The certification has 3 years of period from Certified date. Validity of the
certificate is subject to successful completion of audits. The authenticity of this
document may be re-affirmed by writing to [email protected] or please
scan QR Code. This certificate remains property of EAST Assessment &
Certification Registrar and must be returned on request.
CERTIFICATE OF REGISTRATION
This is to certify that
ISO 14001:2015
ENVIRONMENT MANAGEMENT SYSTEM
Construction of utility project for fluids, architectural and engineering activities and related technical consultancy,
manufacture of load bearing structures and other metal products
Managing Director
EASTAC REGISTRAR
The certification has 3 years of period from Certified date. Validity of the
certificate is subject to successful completion of audits. The authenticity of this
document may be re-affirmed by writing to [email protected] or please
scan QR Code. This certificate remains property of EAST Assessment &
Certification Registrar and must be returned on request.
CERTIFICATE OF REGISTRATION
This is to certify that
ISO 45001:2018
OCCUPATIONAL HEALTH & SAFETY MANAGEMENT SYSTEM
Construction of utility project for fluids, architectural and engineering activities and related technical consultancy,
manufacture of load bearing structures and other metal products
Managing Director
EASTAC REGISTRAR
The certification has 3 years of period from Certified date. Validity of the
certificate is subject to successful completion of audits. The authenticity of this
document may be re-affirmed by writing to [email protected] or please
scan QR Code. This certificate remains property of EAST Assessment &
Certification Registrar and must be returned on request.
Sertifililit P~fuir9aan
Certificate of Appreciation
SISTEM MANAJEMEN
KESELAMATAN DAN KESEHATAN KERJA
OCCUPATIONAL SAFETY AND HEALTH
MANAGEMENT SYSTEM
Berdasarkan
Surat Keputusan Menteri Ketenagakerjaan Republik Indonesia
No. 7. Ot Tahun 2017
Menyatakan bahwa
This is to certify that
Nama perusahaan I Name of company
PT. KOMOTECH INDONESIA ENC
Alamat I Address
JI. KIG Raya Barat Kav. G No. 7, Kawasan lndustri Gresik,
Kabupaten Gresik, Provinsi Jawa Timur
i .•
Ii }1
...
·' .
00 . . .:!
PERFORMANCE AND SALES RECORD
(ENGINEERING AND CONSTRUCTION)
10 DEC. 2006 ~ LATERITE STORAGE EXTENSION 40X30. FABRICATION AND ERECTION PT. INDOCEMENT TUNGGAL BATULICIN - BANJARMASIN
MAR. 2007 LATERITE STORAGE PRAKARSA P-12
PERFORMANCE AND SALES RECORD
(ENGINEERING AND CONSTRUCTION)
13 AUG. 2007 DISMANTLE AND INSTALL BOILER PART INCLUDE PRE- PT. TRANS PACIFIC TUBAN – JAWA TIMUR
COMMISSIONING, COMMISSIONING AND START UP PETROCHEMICAL INDOTAMA
14 NOV. 2007 CONSTRUCTION WORK OF LATERITE STORAGE ROOFING EXTENSION PT. TRANS PACIFIC BATULICIN – BANJARMASIN,
PROJECT PETROCHEMICAL INDOTAMA KALSEL
15 APR. 2008 TARJUN LOGISTIC NEW JETTY PROJECT PT. INDOCEMENT TUNGGAL BATULICIN - BANJARMASIN
PRAKARSA TBK. P-12
16 JUL. 2008 ROP GRANULE Ⅱ PLAT, CAP.500.000MTPY PT. KARAKATAU ENGINEERING PETROKIMIA – GRESIK, JAWA
TIMUR
17 JUL. 2008 NPK GRANULATION Ⅱ AND IV PLANT PROJECT CAP.2X100.000MTPY PT. KARAKATAU ENGINEERING PETROKIMIA – GRESIK, JAWA
TIMUR
18 AUG. 2008 GRANULATION INTERNAL SUPPORT PT. KARAKATAU ENGINEERING PETROKIMIA – GRESIK, JAWA
TIMUR
19 AUG. 2008 DUCTING NPK Ⅲ & Ⅳ PROJECT PT. KARAKATAU ENGINEERING PETROKIMIA – GRESIK, JAWA
TIMUR
20 SEP. 2008 CYCLONE ROP Ⅱ PT. KARAKATAU ENGINEERING PETROKIMIA – GRESIK, JAWA
TIMUR
PERFORMANCE AND SALES RECORD
(ENGINEERING AND CONSTRUCTION)
34 JAN. 2010 HYUNDAI STEEL WASTEWATER TREATMENT PLANT TASET INC S.KOREA
35 MAR. 2010 SCREW CONVEYOR EPC PT. HANIL JAYA STEEL SIDOARJO – JAWA TIMUR
36 MAY. 2010 NAJEON COAL MAEN WATER TREATMENT PLANT TASET INC S.KOREA
37 JUL. 2010 ESP FABRICATION & INSTALLATION KC-COTTRELL CO.LTD GRESIK – JAWA TIMUR
38 AUG. 2010 FABRICATION COOLER CASING & KILN HOOD PT. BOMA BISMA INDRA GRESIK – JAWA TIMUR
39 SEPT. 2010 FABRICATION & HOT GAS DUCT INSTALLATION PT. YIN GRESIK – JAWA TIMUR
40 OCT. 2010 EPC CONVEYOR SYSTEM PT. YIN GRESIK – JAWA TIMUR
PERFORMANCE AND SALES RECORD
(ENGINEERING AND CONSTRUCTION)
44 JUN. 2011 FABRICATION AND ERECTION REFINERY (MECHANIC & PIPING) PT. CHIEL JEDANG INDONESIA JOMBANG – JAWA TIMUR
45 AUG. 2011 PROJECT FABRICATION AND ERECTION REFINERY (TANK) PT. CHIEL JEDANG INDONESIA JOMBANG – JAWA TIMUR
46 MEI. 2012 PROYEK EPC PENGEMBANGAN PELABUHAN PETROKIMIA GRESIK PT. HUTAMA KARYA GRESIK – JAWA TIMUR
47 SEP. 2012 PERBESAR KAPASITAS CONVEYOR ZA-Ⅱ PT. PETROKIMIA GRESIK GRESIK – JAWA TIMUR
48 SEP. 2012 FIRE PROTECTION SYSTEM CONVEYOR PELABUHAN PT. PETROKIMIA GRESIK GRESIK – JAWA TIMUR
49 DES. 2012 FABRIKASI SCREW, CYCLONE & FRAME CONVEYOR PT. IL JUNG - CILEGON CILEGON - BANTEN
52 NOV. 2013 STRUCTURE CONVEYOR (GALLERY DAN TOWER) GUDANG III PADA PT. PETROKIMIA GRESIK GRESIK – JAWA TIMUR
PROYEK PEMBUATAN GUDANG BAHAN BAKU KAPASITAS 3 x 50.000
TON PT. PETROKIMIA
53 JUN. 2014 PENGADAAN NO.2 GYPSUM CONVEYOR M-3103 B PT. PETRO JORDAN ABADI GRESIK – JAWA TIMUR
54 JUN. 2014 PENGADAAN PADDLE MIXER (M-3116) PT. PETRO JORDAN ABADI GRESIK – JAWA TIMUR
55 JUN. 2014 PENGADAAN LIME CONVEYOR (M-3115) PT. PETRO JORDAN ABADI GRESIK – JAWA TIMUR
56 JUN. 2014 PENGADAAN AGITATOR (M-3104 B) PT. PETRO JORDAN ABADI GRESIK – JAWA TIMUR
57 JUL. 2014 SLURRY TANK (TK-3101B) PT. PETRO JORDAN ABADI GRESIK – JAWA TIMUR
58 JUL. 2014 PENGADAAN SLURRY TANK AGITATOR (M-3111B) PT. PETRO JORDAN ABADI GRESIK – JAWA TIMUR
59 JAN. 2015 FABRICATION EQUIP AREA STACK PT. SEMEN GRESIK REMBANG – JAWA TENGAH
62 APR. 2015 CEMENT DISCHARGE SYSTEM PT. LASER JAYA SENTOSA PT. TONASA LINE -
63 APR. 2015 FABRICATION EQUIPMENT CONVEYOR AREA RAW MILL & COAL MILL PT. SEMEN GRESIK REMBANG – JAWA TENGAH
64 JUN. 2015 FABRICATION & ERECTION MODIFIKASI NEW STACK FOR EXISTING PT. KRAKATAU ENGINEERING PT. GUNAWAN DIANJAYA
FURNACE STEEL – MARGOMULYO,
JAWA TIMUR
65 AUG. 2015 STEEL STRUCTURE FABRICATION & ERECTION DAN ARCHITECTURAL PT. SEMEN GRESIK REMBANG – JAWA TENGAH
WORK AREA HOT GAS CONDITIONING TOWER TO COAL
MILL(PACKAGE 10D)
66 AUG. 2015 FABRICATION & ERECTION AREA PALLETIZER PT. SEMEN GRESIK REMBANG – JAWA TENGAH
67 SEPT. 2015 FEEDING SYSTEM AL (OH)3 UNIT ALF3 PT. PETROKIMIA GRESIK GRESIK – JAWA TIMUR
68 OCT. 2015 FABRICATION & ERECTION AREA CEMENT SILO PT. SEMEN GRESIK REMBANG – JAWA TENGAH
69 OCT. 2015 ERECTION AUTOMATIC SAMPLE TRANSPORT PT. SEMEN GRESIK REMBANG – JAWA TENGAH
PERFORMANCE AND SALES RECORD
(ENGINEERING AND CONSTRUCTION)
72 JAN. 2016 FABRIKASI MECHANICAL BUKIT ASAM TYPE MS 2 PT. WIKA INDUSTRI & PT. BUKIT ASAM – BOGOR,
KONSTRUKSI JAWA BARAT
73 FAB. 2016 FABRIKASI DAN INSTALASI DASAR PONDASI POMPA PT. MIWON INDONESIA DRIYOREJO – JAWA TIMUR
74 FAB. 2016 FABRIKASI DAN INSTALASI STEEL STRUCTURE EVAPORATOR PT. MIWON INDONESIA DRIYOREJO – JAWA TIMUR
HOLDING CELL, F/G
75 FAB. 2016 PRODUKSI DAN INSTALASI TANK UNTUK PROSES SYRUP PT. MIWON INDONESIA DRIYOREJO – JAWA TIMUR
76 APRIL. 2016 KONSTRUKSI PIPING & INSTALASI MESIN PROSES SWEETENER PT. MIWON INDONESIA DRIYOREJO – JAWA TIMUR
77 APRIL. 2016 PEMASANGAN MESIN EVAPORATOR PT. MIWON INDONESIA DRIYOREJO – JAWA TIMUR
PERFORMANCE AND SALES RECORD
(ENGINEERING AND CONSTRUCTION)
80 JULI. 2016 PEMBUATAN HOUSING ND FILTER UNTUK FERMENTOR 9 – PLANT PT. MIWON INDONESIA DRIYOREJO – JAWA TIMUR
FERMENTASI
81 JULI. 2016 PEMBUATAN TANGKI & AGITATOR 10 KL, (TK GA2, GA3, GA4 & TK CIP) PT. MIWON INDONESIA DRIYOREJO – JAWA TIMUR
4 UNIT/SET
83 JULI. 2016 PEMBUATAN TANGKI & AGITATOR RAW SUGAR MIXING TANK 60KL (2 PT. MIWON INDONESIA DRIYOREJO – JAWA TIMUR
UNIT)
84 AGUSTUS. 2016 PRODUKSI INSTALASI PIPE RACK AND HANDRAIL PT. MIWON INDONESIA DRIYOREJO – JAWA TIMUR
85 AGUSTUS. 2016 PEMBUATAN DAN PEMASANGAN 3 UNIT TANKI NL DAN 3 SET PT. MIWON INDONESIA DRIYOREJO – JAWA TIMUR
AGITATOR- PLANT CGA
86 FEB. 2017 PIPING WORKS (MATERIAL, FABRICATION, ERECTION, TEST ) UNIFOS E&C DRIYOREJO – JAWA TIMUR
87 FEB. 2017 FABRIKASI & ERECTION SCREW CONVEYOR CV. MASTARMAN JAYA PT. PETROKIMIA GRESIK
GRESIK-JAWA TIMUR
88 FEB. 2017 FABRIKASI & ERECTION PIPE BRIDGE OSBL AMUREA II CROSSING PT. PANCA INDAH JAYAMAHE PT. PETROKIMIA GRESIK
ROAD & CROSSING RIVER GRESIK-JAWA TIMUR
PERFORMANCE AND SALES RECORD
(ENGINEERING AND CONSTRUCTION)
97 APRIL.2018 JASA HARDFACING COVER FLIGHT BEARING PT. PETROKIMIA GRESIK PT. PETROKIMIA GRESIK
GRESIK-JAWA TIMUR
PERFORMANCE AND SALES RECORD
(ENGINEERING AND CONSTRUCTION)
98 APRIL.2018 PERBAIKAN GALERI CONVEYOR M7101-2 PT. PETROKIMIA GRESIK PT. PETROKIMIA GRESIK
GRESIK-JAWA TIMUR
99 JUNI.2018 FABRIKASI LINER AREA GRINDING & AREA HOT GAS PT. CEMINDO GEMILANG PT. CEMINDO GEMILANG
GRESIK-JAWA TIMUR
100 JULI.2018 JASA HARDFACING COVER FLIGHT BEARING PT. PETROKIMIA GRESIK PT. PETROKIMIA GRESIK
GRESIK-JAWA TIMUR
101 AGUSTUS.2018 PENAMBAHAN UNIT DECANTER TK-2381 C PT. PETROKIMIA GRESIK PT. PETROKIMIA GRESIK
GRESIK-JAWA TIMUR
102 AGUSTUS 2018 SUPPLY MATERIAL, FABRICATION, INSTALLATION OUTLET AND INLET GRATI CCPP (PEAKER) GRATI CCPP (PEAKER)
OF CW PIPE ADDITIONAL STEEL STRUCTURE EXTENSION PROJECT 450 MW
103 SEPTEMBER.2018 NA’OUR WASTE WATER PROJECT TASET INC S.KOREA
104 NOVEMBER.2018 PEMBUATAN LANTAI 2 GUDANG BAHAN BAKU & MATERIAL PT. PETROSIDA GRESIK PT. PETROSIDA GRESIK
GRESIK-JAWA TIMUR
105 NOVEMBER.2018 J4 PJT FAB & INSTAL 8 TH TANK & SILINCER PT. CHEIL JEDANG PT. CHEIL JEDANG INDONESIA-
INDONESIA JOMBANG JAWATIMUR
106 DESEMBER.2018 J4 PJT FAB & INSTALL HOIST CARGO 5T AREA J4 PT. CHEIL JEDANG PT. CHEIL JEDANG INDONESIA-
INDONESIA JOMBANG JAWATIMUR
107 DESEMBER.2018 J4 PJT SANDBLAST STEEL STRUCTURE MTL J4 PT. CHEIL JEDANG PT. CHEIL JEDANG INDONESIA-
INDONESIA JOMBANG JAWATIMUR
PERFORMANCE AND SALES RECORD
(ENGINEERING AND CONSTRUCTION)
108 DESEMBER.2018 FABRIKASI GIMPOLE 36M PT. TRI RAYA SEJAHTERA PT. TRI RAYA SEJAHTERA
109 FEBRUARI 2019 FABRIKASI STRUKTUR BAJA FIX BRIDGE PT. TRI RAYA SEJAHTERA BANDARA KULONPROGO-
YOGYAKARTA
110 APRIL.2019 REHABILITASI CONVEYOR M7101-4C, 03M604 DAN M7106-1A PT. ANEKA JASA GRHADIKA PT. PETROKIMIA GRESIK
111 MEI.2019 J4-PJT : ADDITIONAL SANDBLAST MT’L J4 PT. CHEIL JEDANG PT. CHEIL JEDANG INDONESIA-
INDONESIA JOMBANG JAWATIMUR
112 JUNI.2019 WAREHOUSE FAB & CONSTRUCTION WORK PT. TAE KWANG METECH PT. TAE KWANG METECH
113 JULI.2019 PEK FABRIKASI W.S, FABRIKASI SIDDING, FABRIKASI ROOF DAN PT. TIMUR SATRIA PERKASA SITE PT. DDU PROJECT-KINTAP
PEKERJAAN SANBLAST
114 JANUARI 2020 DIVERTER GATE DAN CONNECTION CHUTES PT. ENERSOL DAYA OPTIMA PLTU LOMBOK FTP-2
115 FEBRUARI.2020 PLOW BLADE BW-500 PT. ENERSOL DAYA OPTIMA PLTU LOMBOK FTP-2
116 FEBRUARI.2020 PLOW BLADE BW-1000 PT. ENERSOL DAYA OPTIMA PLTU LOMBOK FTP-2
PERFORMANCE AND SALES RECORD
(ENGINEERING AND CONSTRUCTION)
117 MARET.2020 CHUTE MAGNETIC SEPARATOR DAN COVER PUSH ROLL PT. ENERSOL DAYA OPTIMA PLTU LOMBOK FTP-2
118 MARET.2020 COAL SAMPLER BW-1000 PT. ENERSOL DAYA OPTIMA PLTU LOMBOK FTP-2
119 APRIL.2020 COVER PLOW BLADE PT. ULAN BUANA PLTU LOMBOK FTP-2
ENGINEERING
120 MEI.2020 COVER METAL DETECTOR PT. ULAN BUANA PLTU LOMBOK FTP-2
ENGINEERING
121 JULI 2020 BYPASS CONNECTION CHUTE JETTY BELT FEEDER DAN DIVERTER PT. ULAN BUANA PLTU LOMBOK FTP-2
GATE MANUAL ENGINEERING
122 AGUSTUS 2020 CRUSHING STATION PT. MEGANUSA BSSR
TRANSMISSION
122 SEPTEMBER 2020 CONVEYOR LOA JANAN PROJECT BSSR (TOWER DAN GALERI) PT. MEGANUSA BSSR
TRANSMISSION
123 OKTOBER 2020 HEAD CHUTE CONVEYOR LOA JANAN PT. MEGANUSA BSSR
TRANSMISSION
124 NOVEMBER 2020 HEAD FRAME CONVEYOR LOA JANAN PT. MEGANUSA BSSR
TRANSMISSION
125 NOVEMBER 2020 FABRIKASI DUCTING PT. ULAN BUANA PLTU LOMBOK FTP-2
ENGINEERING
PERFORMANCE AND SALES RECORD
(ENGINEERING AND CONSTRUCTION)
126 OKTOBER 2020 PEMASANGAN BUNDLE SWC HE-3210 PT. PETROWIDADA PT. PETROWIDADA
127 DESEMBER 2020 PEKERJAAN REPAIR CONVEYOR BC 3 DAN DUST COLLECTOR DC-3 PT. INDO SUTECH PT. DHARMAPALA USAHA
SEJAHTERA SUKSES
128 DESEMBER 2020 PEKERJAAN REPAIR GATE VALVE 10” INSTALLATION OF NEW PT. INDO SUTECH PT. DHARMAPALA USAHA
MANUAL GLOBE VALVE 8”, REPAIR STEAM VALVE 8” CLASS 600 ETC SEJAHTERA SUKSES
129 DESEMBER 2020 PEKERJAAN SAFETY VALVE OVERHOUL PT. INDO SUTECH PT. DHARMAPALA USAHA
SEJAHTERA SUKSES
130 JANUARI 2021 FAT BAG FILTER PT. ULAN BUANA PLTU LOMBOK FTP-2
ENGINEERING
131 FEBRUARI 2021 PLOW BLADE KSO ULAN BUANA PLTU TIMOR-1
132 FEBRUARI 2021 SAND BUCKET PT. ULAN BUANA PLTU LOMBOK FTP-2
ENGINEERING
133 FEBRUARI 2021 COAL SAMPLER PT. ULAN BUANA PLTU TIMOR-1
ENGINEERING
134 FEBRUARI 2021 PEMBUATAN SIDING GUDANG KARUNG PT. PETROKIMIA GRESIK PT. PETROKIMIA GRESIK
GRESIK-JAWA TIMUR
135 APRIL 2021 DIVERTER GATE 1,2 DAN 3 KSO ULAN BUANA PLTU TIMOR-1
PERFORMANCE AND SALES RECORD
(ENGINEERING AND CONSTRUCTION)
136 APRIL 2021 TAIL PART (MECHANICAL PART) PT. ULAN BUANA PLTU TIMOR-1
ENGINEERING
137 APRIL 2021 HEADPART (MECHANICAL PART) PT. ULAN BUANA PLTU TIMOR-1
ENGINEERING
138 MEI 2021 FABRIKASI GANTRI CRANE CAP 3 TON PT. GD INDONESIA PT. GD INDONESIA
139 JULI 2021 MEKANIKAL PAKET-2 PT. SEMEN PADANG PT. SEMEN PADANG
TELUK BAYUR
140 JUNI 2021 STEEL STRUCTURE TT-02 KSO ULAN BUANA PLTU TIMOR-1
141 JUNI 2021 STEEL STRUCTURE TT-01 KSO ULAN BUANA PLTU TIMOR-1
142 JUNI 2021 STRUCTURE PART BC-2 A/B KSO ULAN BUANA PLTU TIMOR-1
143 JUNI 2021 STRUCTURE PART BC-3 PT. ULAN BUANA PLTU TIMOR-1
ENGINEERING
144 JUNI 2021 STRUCTURE PART BC-1 A/B, 05 DAN 08 A/B PT. ULAN BUANA PLTU TIMOR-1
ENGINEERING
145 AGUSTUS 2021 REHAB STRUKTUR BETON PABRIK NPK III PT. PETROKIMIA GRESIK PT. PETROKIMIA GRESIK
GRESIK-JAWA TIMUR
PERFORMANCE AND SALES RECORD
(ENGINEERING AND CONSTRUCTION)
146 OKTOBER 2021 JASA FABRIKASI 2 UNIT MEGA TOWER & TRANSPORTATION 3 UNIT MEG PT. TIMUR SATRIA PERKASA PT.TIMUR SATRIA PERKASA
A TOWER SITE PT.DPC PROJECT-KINTAP
147 NOVEMBER 2021 SUPPLY DIVERTER GATE-PALU 3 PT. ULAN BUANA ENGINEERING PALU-3
148 OKTOBER 2021 SUPPLY COAL SAMPLER-PALU 3 PT. ULAN BUANA ENGINEERING PALU-3
149 FEBRUARI 2022 PRE FABRICATED TANK PT. BUKIT MAKMUR RESOURCES PROYEK KABAENA
150 FEBRUARI 2022 PRE FABRICATION FOR TPS LIMBAH B3 BUILDING PT. BUKIT MAKMUR RESOURCES PROYEK KABAENA
151 FEBRUARI 2022 PRE FABRICATION PRODUCT WAREHOUSE & DRY PACKAGING PT. BUKIT MAKMUR RESOURCES PROYEK KABAENA
152 MEI.2022 PEKERJAAN PENGGANTIAN POMPA DARI SI KE EWS PT. PETROKIMIA GRESIK PT. PETROKIMIA GRESIK
GRESIK-JAWA TIMUR
153 AGUSTUS.2022 FABRIKASI MEGA TOWER PT. TIMUR SATRIA PERKASA PT. TIMUR SATRIA PERKASA-
BANJAR BARU
154 SEPTEMBER.2022 CONTAINER WAREHOUSE DAN FABRIKASI RAK BESI PT. TIMUR SATRIA PERKASA PT. TIMUR SATRIA PERKASA-
BANJAR BARU
155 SEPTEMBER.2022 OIL STORAGE TANK DAN PONDASI PT. ECO JAYA INOTEK PT. ECO JAYA INOTEK
156 NOVEMBER.2022 FABRIKASI & ERECTION KONSTRUKSI BAJA, PEMASANGAN ATAP & PT. NEOCELINDO INTIBETON PELINDO – TELUK LAMONG
CLADDING GUDANG CFS & LCL TELUK LAMONG
PERFORMANCE AND SALES RECORD
(ENGINEERING AND CONSTRUCTION)
157 FEBRUARI 2022 REHABILITASI CONVEYOR PABRIK II NPK III PT. PETROKIMIA GRESIK GRESIK - EAST JAVA
158 NOVEMBER 2022 PROYEK PEMBANGUNAN GUDANG CFS DAN KANTOR BEA CUKAI PT. NEOCELINDO GRESIK - EAST JAVA
159 JUNE 2023 FABRICATION & INSTALATION STRUCTURE RAKE M-5204 PT. PETRO JORDAN ABADI GRESIK - EAST JAVA
160 JUNE 2023 KERNEL CRUSHING PLANT & BIOGAS PROJECT PT. MIJU E&C MERAUKE - PAPUA
161 JUNE 2023 PHONSKA V : SUB PROCESS PLANT PT. NINDYA KARYA GRESIK - EAST JAVA
162 OCTOBER 2023 EPC TUBAN JETY UPGRADE PT. SILOG TUBAN - EAST JAVA
163 JANUARY 2024 FABRICATION TRAVO TANK 5000 KVA PT. BAMBANG DJAJA MOJOKERTO - EAST JAVA
ERECTION WORKS
Dust Collector Fabrication & installation
ESP Fabrication & installation Hot Gas Dust Fabrication & installation