0% found this document useful (0 votes)
56 views1 page

03 408301 4800000882 FHD FLS DRG 100003

Uploaded by

vijay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views1 page

03 408301 4800000882 FHD FLS DRG 100003

Uploaded by

vijay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5

GENERAL KEY PLAN:


N

B
200001 29
AREA=1260 M2
29
AREA=1260 M2
29 29
AREA=1260 M2
30
AREA=770 M2
30
AREA=770 M2
29
AREA=1260 M2
QIBLA
01 30
AREA=770 M2
30
AREA=770 M2
29
AREA=1260 M2
29
AREA=1260 M2

30 ORAGANIC

HANDLING
WASTE

AREA

G00-001
51.49 m²
17

COMPOSTING

MACHINE
G00-003
AREA

51.01 m²

29 29 AREA=770 M2 COMPACTOR
COMPACTOR

G00-005
SORTING

286.31 m²
AREA STORAGE

G00-007BULKY
WASTE

10.98 m²

COMPACTOR AREA STORAGE

LANDSCAPE
WASTE

G00-009

11.75 m²

RESIDUAL G00-011
WEEE

24
G00-017 7.01 m²

15.67 m²

300001
BARRELS OIL

COOKINGAREA
CABINET AND

Waste Management
FOR G00-013
H.W

DRAIN 0.5 M WIDE


PAPER AND GLASS 11.39 m²

CARD G00-015

G00-019
15.72 m² 16.44 m²

WASTE
FLOOR
TIPPING

G00-020

251.21 m²

Fasility G00-021
MDR

15.72 m²

WC
G00-002
14.94 m²

STORAGE

G00-006
4.60 m²

SHD

G00-002A
JINATOR G00-002B

2.51 m² 1.96 m²

COORIDOR

G00-000

17.16 m² JINATOR (G00-004B


H)

G00-008TANK
WATER G00-004A
2.51 m² 1.96 m²

10.68 m²

W1

W1

WC
GFL (+113.330)
G00-004

AC W1 CA 14.60 m²

CA

AC

CA

AC

CA

AC
W1

W1
W1
DG10-R WF8 WF8 DG10-L DG10-R WF8 WF8 DG10-L DG10-R WF8 WF8 DG10-L

DG10-L

DG10-R
WF10
29
W1 W1

WF8
ID9-2-L

ID9-1-L
G00-010
STAIRS

W1 13.52 m²

K-6
W3 ENTRANCE

W1

AREA=1260 M2
G00-000
24.56 m²

ID9-1-R
W3
BALEROOM
STORAGE

ID9-2-R G00-016

WF8
ID9-1-R ID9-1-R ID9-1-R 48.34 m²

PAPER&CARDBOARD
HANDLING

AREA=540 M2
AREA COMM ROOM ELEC ROOM

DG10-L
G00-018
21.53 m² G00-014 G00-012

ID9-1-R
ID9-2-L

ID9-2-R

ID9-2-L

ID9-2-R

ID9-2-R
(PAPER,CARDBOARD,METAL AND PLASTIC) 14.55 m² 14.69 m²

AC W1

17-GM-4
AC
Kommod

AC ID9-1-L ID9-1-L W1 CA

W3
DG10-L

W5

DG10-R
WF10
W7

22-K-6

WF8
ID9-1-L
W1

W1
W3

GFL (+113.560)

ID9-1-R
W3
ID9-2-R

WF8

23-K-6
DG10-L
WF10 ED10-L WF10 WF10

W1

W1

W1
AC W1 AC

AC W1 CA

UD10-1-R

W4a
W2 240 L

W4b

W4a
18

DG10-L

DG10-R
240 L

WF10
W5

W8a 240 L

W7

WF8
WF
FD
240 L

ID9-1-L
W4b

W4a

W4a
240 L W1
AC W2

10. 10.
AC

ID9-1-R
ID9-2-R

WF8
DG10-L
GFL (+111.450)

16-I-5

DG10-L
W1
W3 W2
AC

CA
30 FORKLIFT
CIRCULATION

W4a
240 L

W4b
W3

ED10-L
GFL (+111.250)

FD

WF10
AREA=770 M2
WF 240 L

W7
240 L

WF10
W5

HATCH

DG10-L
FLOOR
240 L

W4a

UD10-1-R

W4b
240 L W2
AC W1 AC

AC W1 CA

W3
DG10-L

DG10-R
WF10
EXIT

OFFICE STAFF

WF8
DISCARDED PANTRY G00-004 ENTRANCE

ID9-1-L
FIRST AID MATERIAL
ROOM G00-006 7.95 m² G00-002 MECHANICAL COMM. ROOM
ELECTRICAL
W1 CARPENTRY G00-015
ROOM G00-009 13.20 m² 9.63 m² ROOM G00-003 G00-005
AND PAINTING 13.22 m² 16.80 m² G00-001 8.86 m² 8.14 m²
W3 30.84 m²
G00-017 G00-011
WC STAFF
G00-008 8.83 m²
W1 G00-013
WC 12.81 m² 21.08 m²

ID9-1-R
W3

AREA=540 M2
12.81 m²
ID9-2-R SHOWER

WF8
G00-13A G00-11A
SHOWER CHEMICAL
1.64 m² 1.64 m² G00-007
STORAGE LOBBY
103.81 m² G00-000 SERVICE

DG10-L
32.31 m² ENTRANCE
G00-007
19.00 m²

GFL (+112.690)
W1
AC AC

AC W1 CA

W3
WELDING AND
METALS
CUTTING CHANGING

DG10-L

DG10-R
WC DIRTY LOBBY CLEAN

WF10
G00-019 LOUNGE AND AND LOCKERS G00-000

21-K-6
32.28 m² BREAKOUT
AREA G00-021 CHEMICAL G00-012 STORE
MEDICAL 5.98 m² MEDICAL
G00-020 6.67 m² STORE
G00-010 5.15 m² G00-009 STORE
25.64 m² 9.33 m² 5.90 m² G00-011

WF8
5.44 m²

25 26

ID9-1-L

K-6
W1 W1 PRAYER
ROOM
G00-010
9.65 m² PPE

ID9-1-R
W3

W4a
W5 G00-006
ELEC. WORKSHOP
OFFICE G00-016
ID9-2-R 7.65 m² G00-19A 18.27 m²

WF8
11.66 m²

W7
Kommod

DG10-L
DIRTY CLEAN

W4a
W1 MEDICAL MEDICAL
AC AC SECURITY WASHER
G00-013 WASHER
G00-015
TOILET ROOM PANTRY 29.22 m² 27.43 m²
AC W1 CA G00-004 G00-018 G00-022

W3

W1
3.38 m² 8.85 m² 4.39 m²

22

DG10-L

DG10-R
WF10
ID9-2-L HALLWAY STORAGE
WET

21

WF8
G00-000 G00-005

ID9-1-L
W1 42.93 m² 137.86 m² DRYER
G00-022 CORRIDOR

ADMINSTRATION
W3 35.96 m² G00-000
44.02 m²

ENTRANCE
W3
W1

ID9-1-R
ID9-2-R

WF8
DG10-L
IRONING
F&B STORAGE G00-22A MEDICAL
W1 G00-002
(COLDITEMS) 35.58 m² DRYER
AC AC 168.77 m² G00-017
39.75 m²

W1

W1
INDUSTRIAL
FREEZING -18
G00-02A
C
48.99 m²

AREA=540 M2
CORRIDOR 1
129.86 m²
G00-000

TAGING
G00-22B
35.86 m² MEDICAL
IRONING
G00-17A
34.62 m²
FREEZER/CHILLER
COMPRESSOR
ROOM -15C
G00-008 G00-02B DRY
13.15 m² 38.29 m² STORAGE
G00-003

K-6
148.91 m²

12.
MEDICAL
TAGING
REVIEVING AND SHIPPING G00-17B

13.
22.97 m²

W1

W1

W1

W2

W1

W1

W1

W1

W1
PANTRY PANTRY

SYST.
W4a G00-12AWA-05

SPRINKLER
G00-14A
800x605x1755 W4a DRIVER 5.44 m² 5.42 m² STORE
FINISH ENTRANCE
VISITORES
W W W W W W

W
ELEC. G00-014 WAREHOUSE G00-22C G00-024

W3

W3

W3

W3

W3
RB2

W3
W4a G00-016 12.19 m² STAFF 66.39 m² 27.85 m² CLEAN
²m 3.16

W3
10.39 m² G00-012
OFFICES AIR LOCK STORE
MEDICAL
25.08 m² G00-001 G00-17C
26.07 m² 21.72 m²
W4a TOILET TOILET
G00-14B G00-12B
2.86 m² 2.85 m²
W7 W7

15- -5

W5
GFL (+110.650)
F F F F F F F

F
W1
ID9-1-L ID9-1-L ID9-1-L UD10-1-R
ID9-1-L ID9-1-L ID9-1-L ID9-1-L
W W

K-6

W5
Kommod

FD WF
W4a W1

ID9-1-R
WASTE W4a

ID9-2-R

ID9-2-L

ID9-2-R

ID9-2-R

ID9-2-R

ID9-2-R

ID9-2-R

ID9-2-L

ID9-2-R

ID9-2-R

ID9-2-L
8.3 m²

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18

FLOOR
WM WM WM MW

240 L

240 L

240 L

240 L

240 L
WM WM WM WM

30

HATCH
ID9-1-R ID9-1-R ID9-1-R ID9-1-R ID9-1-R ID9-1-R ID9-1-R ID9-1-R

AREA=540 M2

W3

W3
W3 W3 W3 W3 W3 W3

W8a
W W W W W W W W

W W W W
W W W W W W W

W W W W W W W W W W W W W W W
W1

20-K-6
W W W W W W W W W W W W W W W

AREA=770 M2
1:12

Recieving and
W W W W W W W4b W4b W W W W W W W W W shipping
W3 W3 W3 W3 W3

DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R

W2

W2

W1
AC

CA

AC

CA

AC

CA

AC

CA

AC

CA

AC

CA

AC

CA

AC

CA

AC

CA
W1

W1

W1

W1

W1

W1

W1
28
Kitchenette

G00-003
W.C 4.19 m²
G00-002

3.34 m²

Work Place
G00-001 FFL 0.450
SSL 0.332

36.28 m²

GFL (+112.200) 1:12

ESCAPE ESCAPE
DOOR DOOR

W1

W1
23

CA
AC MEAT UTILITY ROOM

CA

AC

CA

AC

CA

AC
W1 COOLER G00-003

W1

W1
W1
G00-005 ELEC. ROOM

11.
DG10-R WF8 WF8 DG10-L DG10-R WF8 WF8 DG10-L DG10-R WF8 WF8 DG10-L
10.62 m² G00-001

WF10
DG10-L

DG10-R
18.87 m² 12.51 m²

W1
W1

35
ID9-2-L

WF8
MEAT

ID9-1-L
SERVERY MEAT PREP.

FM Admin Building
W1
G00-009 G00-007 FREEZER
W3 G00-011
18.29 m² 19.12 m² IT Room

ID9-1-R
W3
W1 9.11 m² G00-019
ID9-2-R 4.36 m²

WF8
ID9-1-R ID9-1-R ID9-1-R CORRIDOR
G00-000

DG10-L
24.37 m²

ID9-2-R

ID9-1-R
ID9-2-L

ID9-2-L

ID9-2-R

ID9-2-R
BREAK ROOM

AC
AC W1 SEA FOOD G00-021

14-GM-4
Kommod COOLER COOLER 12.19 m²
AC

W3

CA
ID9-1-L ID9-1-L W1 G00-015 G00-013
12.36 m² 5.24 m²

W5

WF10
DG10-L

DG10-R
SEA FOOD
W7 G00-017
27.33 m²
TOILET

WF8
G00-023

ID9-1-L
W1
4.31 m²
W3 GENERATOR
TOILET

ID9-1-R
W3
W1 SUPERMARKET CORRIDOR G00-025
ID9-2-R SALES AREA G00-000

WF8
GFL (+109.900)
G00-018 11.25 m² 4.38 m²

1.
875.72 m² DELIVERIES

DG10-L
WF10 ED10-L WF10 WF10

W1

W1

W1
ACCOUNTANT

AC
AC W1 OFFICE
G00-027

CA
AC 9.16 m²
W2 W1

W4b

W4a

UD10-1-R

W4a
N
240 L

DG10-L

WF10

DG10-R
SUPERMARKET
240 L W5 DELI&BAKERY
W8a PREP.
240 L PRAY ROOM

W7
G00-008 G00-002

WF8
FD
WF
240 L 58.83 m² 8.74 m²

W4a

ID9-1-L
W1

W4b

W4a
AC 240 L W2

AC BACK ROOM

ID9-1-R
1500sqm
G00-006
ID9-2-R 120.77 m²

WF8
M
MANAGER

DG10-L
OFFICE

13-I-5

DG10-L
BAKERY G00-004
DELI & FREEZER 9.54 m²
BAKERY G00-010

AC
SERVERY 6.87 m²

BAILING PRESS
SCISSOR LIFT

CA
W3 G00-016

W2
39.40 m²

W4a
240 L

W4b
W3
W1

ED10-L
BAKERY

WF10
WF 240 L

FD
COOLER

W7
240 L G00-012 SKIP

GFL (+110.150) L
6.43 m²

DG10-L
UNISEX WC

WF10
W5

HATCH
240 L
ROLLER

UD10-1-R
BREAK ROOM G00-024

FLOOR
G00-026 3.00 m² BOXING/DE- SHUTTER

W4a
240 L W2

W4b

AC
AC W1 AIR LOCK BOXING AREA
16.59 m² CHASER G00-020

CA
AC OFFICE 40.37 m² DELI COOLER

W3

W1
G00-022 CUSTOMER G00-014
13.91 m² SERVICES

DG10-L
8.20 m² PERSONNEL

WF10

DG10-R
H J P
DOOR

WF8
ID9-1-L
W1
1:12 1:12
W3

ID9-1-R
W3
W1 1:12
ID9-2-R 1:12

WF8
DG10-L
AC
AC W1

CA
AC

W3

W1
DG10-L

DG10-R
WF10
15

WF8
ID9-1-L
W1 W1

RECREATIONAL POOL

ID9-1-R
W3

W4a
W5
ID9-2-R

WF8
W7
Kommod

DG10-L
ESCAPE

W4a

AC
AC W1
FIRE

CA
AC

W3

W1

W1
DG10-L

DG10-R
WF10

WF8

Housekeeping

Waste holding

Waste holding
ID9-2-L

medical
ID9-1-L

2P Shared

room

general
W1

office
2P Shared
W3

office
W1

ID9-1-R
W3
ID9-2-R

WF8
DG10-L
AC
AC W1

W1

W1

Staff lounge
Meeting room
manager
Clinic
Consultation
F&B2

Treatment
room

room
Building 1
192.37

WC - Staff

WC - Staff
9.

Consultation
room

Patient change
F&B

room
W2
W1

W1

W1

W1

W1

W1

W1

W1

treatment room
Physiotherapy
Facility Building

station
SYST.

Nurse
800x605x1755
W4a

SPRINKLER
W4a
W W W W W

W
W4a RB2

Consultation

Physiotherapy
W3

W3

W3

W3

W3
²m 3.16

W3

W3

room

store
GFL (+109.450) W4a

W7 W7
8b. TREATMENT
ROOM1

12- -5

room(Dental)
W5
W1 G00-003

16-MEP BOH Utilities

Compressor
F F F F F F

F
14.55 m²

plant
Salon
ID9-1-L ID9-1-L ID9-1-L UD10-1-R ID9-1-L ID9-1-L ID9-1-L ID9-1-L
W W

collection
W5
Kommod

Consultation

Vital sign

Blood
FD WF
W4a W1
WASTE W4a

ID9-2-R

ID9-2-L

ID9-2-R

ID9-2-R

ID9-2-R

ID9-2-R

ID9-2-R

ID9-2-L

ID9-2-R

ID9-2-R

ID9-2-L
ID9-1-R

room
8.3 m²

sterilization
FLOOR

Dental
WM WM WM MW

240 L

240 L
HATCH

240 L

240 L

240 L
WM WM WM WM MALE MALE TOILET

Dental room
ID9-1-R ID9-1-R ID9-1-R ID9-1-R ID9-1-R ID9-1-R ID9-1-R ID9-1-R SERVICES G00-005

W3

W3
W3 W3 W3 W3 W3 W3 G00-001 10.24 m²
W W W W W

W W W W
W

W W W W

W W W W
W W W W W W

W
67.01 m²

W8a

Store-controlled
W W W W W W W W W W W W

Pharmacy

clean-up
W1

drug

store

Dental
W W W W W W W W W W W W

W
TREATMENT TREATMENT
W W W W W W W W W W W W

W
W4b W4b ROOM4 ROOM3
W3 W3 RECEPTION G00-011 G00-009
W3 W3 W3 G00-000 7.78 m² 7.78 m²
LOBBY
24.70 m²

dispensing
Pharmacy

General store
DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R G00-000 STAFF ROOM

W2

W2

W1

counter

WC

WC
W1

W1

W1

W1

W1

W1

W1
7.52 m² G00-007

AC

CA

AC

CA

AC

CA

AC

CA

AC

CA

AC

CA

AC

CA

AC

CA

AC

CA
16.64 m²

TREATMENT
ROOM6 TREATMENT
ROOM5
G00-010 G00-008 STORAGE STAFF W.C
ROOM G00-07B
7.78 m² 7.78 m² G00-07A 3.51 m²
3.89 m²

FEMALE
SERVICES
G00-002
67.01 m²
FEMALE TOILET
G00-006
10.28 m² CLINIC

Main Entrance -Air Lock

Waiting area
ENTRANCE

registration
Reception/
ROOM2
TREATMENT
PRIMARY
G00-004

14
14.55 m²

EXERCISING POOL
500 m²
8d.

Crash

equipment
cart
CAFE

Mobile
Building 2

Equipment
Coffee Shops
102.58 m²

Server room/UPS
Electrical room

store
ICT room

Work station

Dirty utility

call room
EMT on
Store clean
linen

Store
Soiled utility

Clean utility
room

room

WC

WC
F&B1
Building 3
188.18 m²

EMT on
call room
Medication
9.

station
Nurse
room

EMT on
call room
W1

W1
DN

Hand wash
CA
AC

CA

AC

CA

AC

CA

AC

Bay
W1
W1

W1
W1
F&B
DG10-R WF8 WF8 DG10-L DG10-R WF8 WF8 DG10-L DG10-R WF8 WF8 DG10-L

DG10-L

DG10-R

Waiting area
WF10
W1
1
W1

WF8
ID9-2-L

ID9-1-L
W1

Patient bay

Patient bay
W3
W1

ID9-1-R
W3

Patient bay

call room
ID9-2-R

WF8

EMT on
ID9-1-R ID9-1-R ID9-1-R

DG10-L
ID9-1-R
ID9-2-L

ID9-2-R

ID9-2-L

ID9-2-R

ID9-2-R
2

Triage
AC
AC W1

11-GM-4

gases bottles
Store-Medical
Kommod

CA
AC ID9-1-L ID9-1-L

W3

Air lock

EMT breakout
W1

Patient room
DG10-L

W5

DG10-R
WF10

room
W7
F&B1
Building 4

Wheel chair
187.39 m²

WF8

parking
ID9-1-L

WC

Decontamination
3
W1

shower
W1
W3

9.

ID9-1-R
W3
ID9-2-R

WF8
F&B

DG10-L
GFL (+108.800)
WF10 ED10-L WF10 WF10

W1

W1

W1
4.

AC
AC W1

CA
W1
AC

UD10-1-R
240 L

4
W2

W4b

W4a

W4a
DG10-L

DG10-R
240 L

WF10
W5
W8a 240 L

W7

WF8
FD
240 L WF

ID9-1-L
GYM

W4b

W4a

W4a
240 L W1
AC W2

AC

ID9-1-R
GFL (+108.600) ID9-2-R

WF8
DG10-L
5

10-I-5

DG10-L
AC

W2
W3 CA
W1

W4a
240 L

W4b
W3

ED10-L

FD

WF10
WF 240 L

W7
240 L

HATCH

DG10-L
W5
WF10
240 L

FLOOR
UD10-1-R
6

W4b
W4a
240 L W2
AC W1 AC

W1
AC CA

W3
DG10-L

DG10-R
WF10

WF8
ID9-1-L
7
W1

W3
W1

ID9-1-R
W3
ID9-2-R

WF8
DG10-L
AC W1 AC

W1
AC CA

W3
DG10-L

DG10-R
WF10
GRAB & GO GRAB & GO GRAB & GO STREET FOOD GRAB & GO GRAB & GO

WF8
ID9-1-L
W1 W1

DN 9

ID9-1-R
W3

W4a
W5
ID9-2-R

WF8
POD 12 pizza

W7
Kommod
G00-015 HALL

DG10-L
19.46 m² G00-011

A B

W4a
1142.46 m²
AC W1 AC

W1
AC CA

W3

W1
DG10-L

DG10-R
WF10
POD 11
shawarma grill

WF8
ID9-2-L G00-013

ID9-1-L
JANITOR 14.22 m² POD 10
W1 EMERGENCY EXIT WOMEN G00-11B coffee&juice bar
ENTRANCE
G00-009 3.01 m² G00-009

2.
W3 7.78 m² 25.74 m²
W1

ID9-1-R
W3

c
ID9-2-R WOMEN PRAY

WF8
MEN MEN TOILETS
G00-005 G00-007
HALL ABLUTIONS
WOMEN POD 7
ABLUTIONS
WF- 25.58 m² 47.97 m² WOMEN G00-11A sandwich/deli CHILDREN
23.58 m² G00-011
TOILETS 13.39 m² STORAGE G00-003 QUIET AREA

DG10-L
17.21 m² G00-001 21.74 m² G00-019
8.73 m² 18.31 m²
W1
AC AC CHAIR
STORAGE

FOOD COURT
G00-13A POD 1

W1

W1
3.26 m² sweets&bakery
G00-017
STORAGE
MEN 29.01 m²
ENTRANCE
G00-013 G00-021
10.29 m² 6.57 m²
MEN
G00-000
ENTRANCE
10.37 m²
ICT ROOM
G00-023

8.62 m²

5. LOBBY
G00-000
10.59 m²
LOBBY
G00-000
10.57 m²

TRAYS
ELEC ROOM
G00-025
11.32 m²

MOSQUE
G00-029

POD 4 POD 3 Gourmet POD 2 grill 1.17 m²


POD 9 middle POD 8 Health CHINESE Burger G00-033
eastern mezze Focused TROLLEY POD 6 indian POD 5 asian G00-037 G00-035 23.37 m² WASTE
G00-007 STORE G00-051 G00-049 23.44 m² 23.17 m² TROLLEY STORE
G00-005 G00-053 STORE G00-027

W2
W1

W1

W1

W1

W1

W1

W1

W1
20.34 m² 21.01 m² 6.06 m² 22.58 m² 23.41 m² G00-031
15.90 m² 14.77 m²

SYST.
W4a

SPRINKLER
800x605x1755
W4a MEN PRAY CUSTOMER
W W W W

W
G00-001
HALL CUSTOMER WC LOBBY
W4a RB2 402.88 m² WC

W3

W3

W3

W3

W3
²m 3.16

W3

W3
G00-041 G00-039 G00-000
STAFF STAFF 30.62 m² 30.62 m² 190.76 m²
LOCKERS LOCKERS
W4a G00-057 G00-055 GENERAL WASTE OUT

GFL (+108.150)
12.33 m² 12.31 m² STORE
G00-047
W7 W7 GENERAL CHEF HOUSE JANIOTOR FISH SALAD AND MEAT VEGETABLE
20.04 m² STORE G00-043 ROOM PREPARATION FRUITS PREPARATION PREPARATION

9- -5

W5
TROLLEY G00-045 G00-060 G00-058 PREPARATION G00-054 G00-052 OFFICE
F F F W1 WASH & 10.43 m² 5.75 m² 5.41 m² 7.01 m² AREA 12.85 m²
UD10-1-R F OS&E / STORE G00-056 9.12 m² G00-050

F
F

F
ID9-1-L ID9-1-L ID9-1-L ID9-1-L ID9-1-L ID9-1-L ID9-1-L PACKAGING DISH WASH POT WASH G00-010 10.24 m²
WW STORE G00-006 G00-008 13.48 m²

W5
Kommod

WF
W4a W1 20.13 m² 9.25 m² 6.53 m²
RAILING
WASTE FD W4a PULPIT G00-004

ID9-2-R

ID9-2-L

ID9-2-R

ID9-2-R

ID9-2-R

ID9-2-R

ID9-2-R

ID9-2-L

ID9-2-R

ID9-2-R

ID9-2-L
ID9-1-R
8.3 m² STAFF WC 10.55 m²
FLOOR STAFF WC
HATCH
WM G00-059 G00-002 GOODS
WM WM MW

240 L

240 L

240 L

240 L

240 L
WM WM WM WM 02B
ROOM
ELECTRICAL CCTV STORAGE 16.11 m² 16.08 m² ENTRANCE
ID9-1-R ID9-1-R ID9-1-R ID9-1-R ID9-1-R ID9-1-R ID9-1-R ID9-1-R IMAM & ADMIN ADMIN G00-
PULPIT G00-004 G00-006 3.26 m²
G00-008 EMERGENCY EXIT G00-000
GOODS IN

W3

W3

W3

W3
W3 W3 W3 W3 G00-02A ENTRANCE
G00-002 2.98 m² 5.96 m² 5.96 m² MEAT/POULTRY 37.18 m²
W W W W

W W W W

W W W W
W

W W W W

W W W W
W W W W W

W
EMERGENCY EXIT 6.78 m² 2.41 m² CHILLER

W8a
LOBBY G00-036 BEVERAGE
W W W W W W W W W W

W
G00-000 FOOD HALL UTENSIL CHEMICAL CHARCOAL CHARCOAL MAIN KITCHEN LARGE VEGETABLE STORE DRINK STORE DRY STORE

W1
18.34 m² G00-020 STORE STORE STORE AREA CATERING FREEZER FISH FREEZER 4.51 m² CHILLER CHILLER CHILLER G00-046 PURCHASE
W W W W W W W W W W

W
ICT CLEANERS DELIVERY DRY STORE 39.68 m² G00-022 G00-024 G00-026 G00-028 SERVICE G00-032 G00-034 MEAT/POULTRY G00-040 G00-042 G00-044 OFFICE
G00-012 G00-014 G00-016 G00-018 G00-030 8.37 m² FREEZER 8.28 m² 8.24 m² 8.16 m² 14.31 m² G00-048
W W W W W W W W W W

W
W4b W4b 3.34 m² 5.69 m² 7.60 m² 6.44 m² 6.01 m² 9.39 m² 35.98 m² 8.33 m² G00-038

W3
W3 W3 W3 W3 2.58 m² 7.44 m² 4.75 m² 11.76 m²

DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R

W2

W2

W1
W1

W1

W1

W1

W1

W1

W1
AC

CA

AC

CA

AC

CA

AC

CA

AC

CA

AC

CA

AC

CA

AC

CA

AC

CA
AC AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC
AC

AC

D10-L
AC
AC AC

32.
6-AM-5

E
AC

W3
SCHOOL
HATCH HATCH
FLOOR FLOOR

D10-L
8-AM-4
FD FD

WF
AC AC
UD10-3-R
AC AC

W3
AC AC

GFL (+108.030)

D10-L
AC AC

AC AC

W3
D10-L D10-L D10-L D10-L D10-L

D10-L
AC
AC
AC AC

W3

D10-L
AC
AC
AC AC

W3

D10-L
AC AC
AC AC

W3

WF 240 L

240 L

240 L

240 L

240 L

240 L

240 L

240 L

240 L

240 L
ED10-L
GFL (+107.510)

FD

FD
UD10-1-R

UD10-1-R
GFL (+107.660)
AC AC
AC AC

W3
GFL (+107.840)

21:1

D10-L
AC AC
AC AC

W3

UD10-1-R

UD10-1-R
W5

W7

ED10-L

D10-L
FD

FD
WF

W3

240 L

240 L

240 L

240 L

240 L

240 L

240 L

240 L

240 L

240 L
W2
AC AC
AC AC

21:1

D10-L
AC AC
AC AC

W3

D10-L
AC AC
AC AC

W3

W2

D10-L
AC AC
AC
AC

W3

D10-L
W7

5-AM-6 7-AM-5
AC AC
AC AC
AC UD10-3-R UD10-3-R
AC

W3

W5

WF
FD

FD
FLOOR FLOOR
HATCH HATCH

D10-L
AC AC

AC AC

W3

W3
W3 W3

D10-L
W2

AC

AC
AC

AC

AC

AC

AC

AC

AC

AC

AC

AC
AC AC

F.F.L
SALON CAFE
32 33

F.F.L AC AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC
AC

AC
AC
AC
AC 4-AM-5 AC

W3

W3
FD
HATCH
FLOOR

2-AM-5 FD
HATCH
FLOOR

GFL (+106.930)

WF

WF
AC AC
AC UD10-3-R AC UD10-3-R

W3

W3
AC AC

AC AC
AC AC

W3

W3
AC AC
AC AC

W3

W3
109.35
AC AC
AC AC

W3

W3
AC AC
AC AC

GFL (+106.880)

WF 240 L

240 L

240 L

240 L

240 L
W3

W3

240 L

240 L

240 L

240 L

240 L
WF
ED10-L

ED10-L
FD

FD
109.55

UD10-1-R

UD10-1-R
AC AC
AC
AC

W3

W3
GFL (+106.500)
AC AC

AC AC

W3

UD10-1-R

W3

UD10-1-R
W5 W5

W7

W7
FD 240 L

FD 240 L
240 L

240 L

240 L

240 L

240 L

240 L

240 L

240 L
W3

W3
W2 AC W2 AC

AC AC

AC AC

AC AC

W3

W3
AC
AC
AC AC

W3

W3
W2

W2
AC AC
AC AC

W3

W3
GFL (+107.030)
W7 W7

1-AM-6 3-AM-6
AC
AC
UD10-3-R AC UD10-3-R AC
AC AC

W3

W3
W5

W5

FD
FD

FLOOR FLOOR
HATCH HATCH

AC AC
AC AC

W3

W3
W3

W3

W3
W3 W3 W3

W2

AC

W2
AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC
AC AC

12
13
14

11
12
13

18
19
9 10 11 15 16 17 18 19 8 9 10 14 15 16 17

6
7
8

6
7
OFFICE
MANAGERS STAIR OFFICE
MANAGERS STAIR
G00-003 17.19 m²
G00-009 G00-003 17.19 m²
G00-009

F.F.L
11.50 m² 11.50 m²

26
25
24

28
27
26
25

20
30 29 28 27 23 22 21 20 30 29 24 23 22 21

LOBBY WORK LOBBY WORK


G00-000 STATION G00-000 STATION
WORK 21.71 m² ELEVATOR G00-015 WORK 21.71 m² ELEVATOR G00-015
STATION G00-011 80.09 m² G00-001
STATION G00-011 80.09 m²
88.73 m²
G00-001 4.36 m² 88.73 m² 4.36 m²
IT ROOM ELEC. ROOM IT ROOM ELEC. ROOM
G00-005 G00-007 G00-005 G00-007
7.12 m² 6.43 m² STORE 7.12 m² 6.43 m² STORE
G00-013 G00-013
5.65 m² 5.65 m²

CORRIDOR CORRIDOR
G00-000 G00-000
67.26 m² 67.26 m²

G00-016
PRINTER G00-016
PRINTER
JAN. ROOM 7.75 m² JAN. ROOM 7.75 m²
JAN. ROOM JAN. ROOM
OFFICE OFFICE OFFICE OFFICE
G00-017 MEETING G00-014 G00-017 MEETING G00-014
14.33 m² G00-023
ROOM 14.33 m² 14.33 m² G00-023
ROOM 14.33 m²
15.95 m² 15.95 m²

3 3 3
CORRIDOR
G00-000 CORRIDOR
G00-000
OFFICE 22.08 m² OFFICE 22.08 m²

OFFICES
G00-019 COMMON
AREA OFFICE G00-019 COMMON
AREA OFFICE
14.62 m² CORRIDOR G00-022 TOILET &
WASH G00-012 14.62 m² CORRIDOR G00-022 TOILET &
WASH G00-012
G00-000 TOILET & 62.05 m² G00-020 14.62 m² G00-000 TOILET & 62.05 m² G00-020 14.62 m²
17.39 m² WASH 30.84 m² 17.39 m² WASH 30.84 m²
G00-027 30.84 m²
G00-027
30.84 m² MEETING
ROOM ROOM
MEETING
G00-018 G00-018
32.85 m² 32.85 m²

GFL (+105.850)
OFFICE MEETING
ROOM OFFICE MEETING
ROOM OFFICE

1
G00-021 G00-025 G00-010
OFFICE G00-021 G00-025 G00-010

GFL (+105.650) OFFICES


14.22 m² 15.93 m² PANTRY 14.22 m² 14.22 m² 15.93 m² PANTRY 14.22 m²

Shaft Shaft Shaft Shaft

CORRIDOR CORRIDOR
G00-000 G00-000
72.44 m² 72.44 m²

PRINTING AREA PRINTING AREA

STATION
WORK STATION
WORK

11
10

11
G00-002 8 7 6 G00-000
LOBBY OFFICE
MANAGERS G00-002 10 9 8 G00-000
LOBBY MANAGERS
OFFICE

7
6

28 30
65.32 m² 30 11.72 m² G00-006 WORK 65.32 m² 11.72 m² G00-006 WORK

25 26 27 29
28
29 21.86 m² STATION 21.86 m² STATION

15 14 13 12

15 14 13 12
STAIR 27 66.66 m²
G00-008 STAIR 66.66 m²
G00-008
G00-004 26 G00-004
16.34 m² 25 16.34 m²

17 16

17 16
19
20
21
22

18
19
20
18 23 24 21 22 23 24

109.85 3
GFL (+105.05) INDOOR
SEATING
73.15 m²
G01-001
CAFE
KITCHEN
11.70 m²
G01-003
TOILET
G01-004
4.72 m²

TOILET
G01-002
4.71 m²

500007

21
20
19
18

23
22
21
22 23 24 24 18 19 20

12 14 15 16 17
17
16
25 25 15
26 G00-004
16.34 m² 26 16.34 m² 14

13
66.66 m² 27 STAIR 66.66 m² 27 G00-004
STAIR 12
13
G00-008 28 G00-008 28
STATION
WORK 21.86 m²
G00-006 11.72 m² 29 65.32 m² WORK
STATION 21.86 m² 11.72 m² 29 65.32 m²
OFFICE G00-000 30 G00-002 G00-006
OFFICE G00-000 30 G00-002

11

10
11
6

8
9
MANAGERS LOBBY 7 8 10 9 STATION MANAGERS LOBBY 6 7 STATION
WORK WORK

PRINTING AREA PRINTING AREA

72.44 m² 72.44 m²
G00-000 G00-000
CORRIDOR CORRIDOR

Shaft Shaft Shaft Shaft


14.22 m² 15.93 m² 14.22 m² 14.22 m² 15.93 m² 14.22 m²
G00-010 PANTRY G00-025 G00-021 G00-010 PANTRY G00-025 G00-021
OFFICE ROOM OFFICE OFFICE ROOM OFFICE
MEETING MEETING
32.85 m² 32.85 m²
G00-018 G00-018
ROOM ROOM
MEETING 30.84 m² MEETING 30.84 m²
30.84 m² G00-027 30.84 m² G00-027
G00-020 62.05 m² TOILET &
WASH 17.39 m² G00-020 TOILET &
WASH 17.39 m²

3 3 3
14.62 m² WASH G00-022 CORRIDOR
G00-000 14.62 m² 14.62 m² WASH 62.05 m²
G00-022 CORRIDOR
G00-000 14.62 m²
G00-012
OFFICE TOILET & AREA G00-019 G00-012 TOILET & AREA G00-019
22.08 m² COMMON OFFICE OFFICE 22.08 m² COMMON OFFICE
G00-000 G00-000
CORRIDOR CORRIDOR

15.95 m² 15.95 m²
G00-023 14.33 m² G00-023 14.33 m²
14.33 m² ROOM
MEETING G00-017 14.33 m² ROOM G00-017
G00-014
OFFICE OFFICE G00-014
OFFICE MEETING OFFICE
JAN. ROOM JAN. ROOM
7.75 m² JAN. ROOM 7.75 m² JAN. ROOM
G00-016 G00-016

GFL (+104.800) GFL (+104.45)


OFFICES OFFICES
PRINTER PRINTER

67.26 m² 67.26 m²
G00-000 G00-000
CORRIDOR CORRIDOR
5.65 m² 5.65 m²

1
G00-013 G00-013
STORE STORE
6.43 m² 7.12 m² 6.43 m² 7.12 m²
ELEC. ROOM
G00-007 IT ROOM
G00-005 ELEC. ROOM
G00-007 IT ROOM
G00-005
88.73 m² 88.73 m²
G00-011
4.36 m² G00-001 4.36 m² G00-001
80.09 m² ELEVATOR WORK
STATION 80.09 m² ELEVATOR
G00-011 STATION
WORK
STATION
G00-015 21.71 m² STATION
G00-015 21.71 m²
WORK G00-000
LOBBY WORK G00-000
LOBBY

20

25
26
27

23
24
25
SCHOOL LIMIT NEW
24 23 22 21 30 29 28 22 21 20 30 29 28 27 26
11.50 m² 11.50 m²
17.19 m² G00-003 17.19 m² G00-003
G00-009 OFFICE G00-009 OFFICE
STAIR MANAGERS STAIR MANAGERS

19

13
12
11

15
14
13
7
6

9
8
7
6
14 15 16 17 18 10 9 8 16 17 18 19 10 11 12

F.F.L
MICRO-MOBILITY
ESCOOTERAS PARKING=72 NEV OVERNIGHT PARKING
NEV PICK UP / DROP OFF EBiKES PARKING
E-MOBILITY CANOPY
PARKING=28

F.F.L F.F.L
NEV PARKING CANOPY
5 4 3 2 1
NEV Pick-up / Drop-off CANOPY OVER CANOPY OVER
15 SPACES
(15 SPACES)
1 2 3 4 5 6 7
PV PANEL PV PANEL
PV PANEL PV PANEL

SAFE-T- Line 2Cx2.5 SHEILDED FIRE RESISTANT,


VISITORS WITH
OUT

F.F.L
GATE PASS

FFL +0.150
FFL +0.300
OFFICE2 OFFICE1 PV PANEL
12.88 m² 11.55 m² PV PANEL PV PANEL PV PANEL
FFL 0.600 8 9 10 11 12 13 14 15
FFL +0.150 FFL +0.300

CHARGING CULSTER ( 12 SPACES ) GENERAL PARKING ( 23 spaces ) ADMINISTRATION


18.63 m²
ROOM
MEETING
G00-003
21.78 m²
SYSTEM
SERVER
G00-005
37.96 m²
25.51
CCTV

G00-007
SECURITY
STUFF
CONTROL
G00-009
27.19 m²
FFL +0.150

PV PANEL PV PANEL PV PANEL PV PANEL

27 STAIR
8.43 m²

FFL 0.600

ENTRANCE
EMPLOYEES
20
HALL
G00-000
MAIN CORRIDOR
74.40 m² G00-000
44.17 m²

LPCB APPROVED MULTI CONDUCTOR,


VISTORE TOILET CLASSROOM
8.75 m² 16.25 m²

JANITOR JANITOR
2.52 m² G00-014
SECURITY 3.01 m²
OBSERVATION RM.OUT
BREAK
LOBBY G00-001
ROOM SECURITY PRAYER G00-012
FFL +0.300

1:12
33.94 m²

500012
45.82 m² G00-002
OFFICER G00-008
ROOM 31.48 m²
17.64 m² 8.85 m² FFL +0.150
LOBBY FFL +7.350
TOILET
FEMALE
9.54 m² MELE TOILET G00-016
G00-012 16.77 m² FFL +0.300
16.77 m²

RIDE-HAILING STAGING
KITCHEN W.B
G00-04A
19.59 m² 3.13 m² ELEC. RM.
WAITING RM. G00-010 1.5 DEGREES FLAT METALLIC DECK FLAT METALLIC DECK
G00-004 11.40 m² 1.5 DEGREESFFL +0.300
11.34 m² TOILET SLOPE SLOPE

GENERAL PARKING (17 spaces)


G00-04B
4.01 m²

(3 SPACES)
ENGINE BAY STORE
459.72 m² 18.28 m² SECURITY AREA

DROP OFF
SHOWER

GENERAL PARKING
6.16 m²

(9 SPACES )
GENERAL PARKING
FFL 0.600

AHU

109.25
LOCKERS
LOBBY LOBBY 6.39 m²
4.41 m²
3.97 m²
POTENTIAL PV PANELS AREA
FFL +6.380

( 26 spaces ) ( 26 spaces ) PPE STORE


12.51 m²
ELECTRIC ROOM
9.88 m² WAITING AREA

BS 6387 CWZ, EN 50200 PH120,


110.00 110.00
VISITORS WITH NO IDS 1.5 DEGREES 1.5 DEGREES 1.5 DEGREES
ENTRANCE FFL +0.300
SLOPE POTENTIAL PV PANELS AREA
SLOPE SLOPE

FFL +7.350
IN

110.00
CANOPY OVER
FFL +0.300 CANOPY
FFL +0.300 FFL +0.300
FFL +0.300

18- PARKING LOT

SILICON RUBBER INSULATION,

(3 SPACES)
DROP OFF
GENERAL PARKING GENERAL PARKING
( 26 spaces ) ( 26 spaces )
19- Regional Transit Hub

LOW SMOKE ZERO HALGEN JACKET.

EMERGENCY LANE
ONLY BUS LANE
CARSHARING ( 36 spaces )

ONLY BUS LANE


ADDITIONAL BUS PARKING / OVERNIGHT PARKING AREA

A CM
L1-31

01 L1-16 L1-15
L1-40 L1-30 L1-18
A A A A
500013
L1-41 L1-17
A

L1-38 L1-37
L1-29

NOTES:
A
L1-32 A
1.CONTRACTOR SHALL SUBMIT WORKSHOP DRAWINGS FOR THE FIRE ALARM.
L1-39
COMPLETE AS SHOWN ON THE DRAWINGS AND AS REQUIRED FULLY COORDINATED WITH FALSE CEILING
L1-36
MM
DP - SC DB - SC
LAYOUT AND OTHER SERVICES TO THE APPROVAL OF SITE ENGINEER AND LOCAL CIVIL DEFENSE AUTHORITY.
FHRC 2.FIRE ALARM & EMERGENCY LIGHTING SYSTEM LOOPS SHOWN ON THIS DRAWING ARE INDICATIVE & FOR
PFE

A
SAFE-T- Line 2Cx 1.5SHEILDED FIRE RESISTANT L1-35
, LPCB APPROVED MULTI CONDUCTOR,
BS 6387CWZ, EN 50200PH, 120SILICON RUBBER L1-34
INFORMATION ONLY CONTACTOR SHOULD PREPARE WORKSHOP DRAWING INDICATING ALL SYSTEM
INSULATION, LOW SMOKE ZERO HALGEN JACKET. L1-33 COMPONENTS & ACCESSORIES TO THE APPROVAL OF LOCAL CIVIL DEFENSE AUTORITY & ENGINEER ON SITE.
A A
L1-11
L1-14 3 .FIRE ALARM CONTROL PANEL SHOULD BE INTERFACE WITH
A L1-12 L1-13
L1-27 L1-28
ii. AIR HANDLING/PACKAGE UNITS IF FOUND
iii. SPRINKLER SYSTEM (ZONE CONTROL VOLVE)
c D
A
F.F.L
L1-43 L1-42
L1-25 110.00
iv. CENTRAL MONITORING UNIT
L1-23 A
200001 A
200001 v. AUDIO VISUAL SYSTEM
L1-24 L1-26 F.F.L
SAFE-T- Line 2Cx 1.5SHEILDED FIRE RESISTANT
vi.ACCESS CONTROL SYSTEM
, LPCB APPROVED MULTI CONDUCTOR, 110.00
L1-20 BS 6387CWZ, EN 50200PH, 120SILICON RUBBER vii.BMS
L1-22 A A INSULATION, LOW SMOKE ZERO HALGEN JACKET.
ANY OTHER AS PER SPECIFICATION & CIVIL DEFENCE TO ENGINEER APROVAL.
L1-21 L1-19
4.SMOKE DETECTOR INSIDE VOID/ABOVE FALSE CEILING WITH INDICATOR LIGHT ON IT SHOULD BE PROVIDED
WHERE VOID/FALSE CEILING DEPTH IS EQUAL OR MORE THAN 80 CM.
D L1-47
L1-04 5. All DETECTORS INCLUDE ISOLATE FAULT
6. All electrical works and installations shall be in conformance to the NEOM standards the National Electrical Code
1 (NFPA-70), NFPA 72 , SBC 801 and relevant local regulations.,
A A
L1-03
A
L1-10 L1-09 500008 7. THE CONTRACTOR SHALL COORDINATE LOCATION OF DETECTTORS WITH LIGHTING FIXTURE AND MECHANICAL DEVICES
L1-46 L1-05 L1-06 8. FIRE ALARM CABLE SHALL BE :
A
CM a- SAFE-T- Line 2Cx1.5 SHEILDED FIRE RESISTANT, LPCB APPROVED MULTI CONDUCTOR,BS 6387 CWZ, EN 50200 PH120, SILICON
L1-01
DDC

L1-44 L1-45 RUBBER INSULATION, LOW SMOKE ZERO HALGEN JACKET FOR DETECTORS,CALL STATIONS AND INTERFACE MODULES.
A
b- SAFE-T- Line 2Cx2.5 SHEILDED FIRE RESISTANT, LPCB APPROVED MULTI CONDUCTOR,BS 6387 CWZ, EN 50200 PH120, SILICON
L1-02 RUBBER INSULATION, LOW SMOKE ZERO HALGEN JACKET FOR SOUNDERS.

REFERENCE NUMBER DESCRIPTION


L1-07 L1-08

B F.F.L
SAFE-T- Line 2Cx2.5 SHEILDED FIRE RESISTANT,
109.90 LPCB APPROVED MULTI CONDUCTOR,
BS 6387 CWZ, EN 50200 PH120,
SILICON RUBBER INSULATION,
LOW SMOKE ZERO HALGEN JACKET. 0m 2m 4m 6m 8m 10m

VISUAL SCALE 1:125 @ A1


F.F.L F.F.L F.F.L F.F.L F.F.L F.F.L
F.F.L
109.83 109.84 110.00 109.77 109.50
110.00
109.355 STAGE:
3D - IFC
1400
1200

MANHOLE1200X1200X1200mm
1400
1200

TO MAIN FIRE STATION

A 3D - IFC S.M 08-SEP-2024

GROUND FLOOR FIRE ALARM PLAN REV DESCRIPTION APP DATE


C 01 1:125 AREA = 503.45 SQ.M. 0 125 250
PURPOSE OF ISSUE:

FOR APPROVAL
CLIENT: PROJECT MANAGEMENT CONSULTANT:

LEGEND:
SYMBOL: DESCRIPTION

ADDRESSABLE SMOKE DETECTOR OPTICAL TYPE,IP20

ADDRESSABLE SMOKE DETECTOR OPTICAL TYPE,ABOVE FALSE


CEILING WITH LED INDICATOR,IP20
D
ADDRESSABLE DUCT SMOKE DETECTOR OPTICAL TYPE,IP20
DESIGN CONSULTANT NAME & LOGO (s): CONTRACTOR NAME & LOGO (s):
ADDRESSABLE COMBINED HEAT AND SMOKE DETECTOR,IP20

ADDRESSABLE HEAT DETECTO,IP20

DOUBLE ACTION ADDRESSABLE MANUAL CALL POINT


IP20

WALL MOUNTED BELL WITH INTEGRATED STROBE


LIGHT,RATING: 110 dB & 15cd
INDICATED ON DRAWINGS,IP 20
WALL MOUNTED BELL WITH INTEGRATED STROBE
LIGHT,RATING: 110 dB & 15cd
INDICATED ON DRAWINGS,IP ,65 WEATHER PROOF

FIRE ALARM CONTROL PANEL (N): INDICATE


REFERENCE NAME HEIGH=1800mm FROM FFL TO TOP DESIGN CONSULTANT / CONTRACTOR: NEOM'S REVIEW:
B
ADDRESSABLE INTERFACE MODULE (MONITOR)
MM DRAWN: R.A 08-SEP-2024
ADDRESSABLE CONTROL MODULE
CM CHECKED: O.S 08-SEP-2024 CHECKED: NEOM DD.MM.YY
SAFE-T- Line 2Cx 1.5SHEILDED FIRE RESISTANT, LPCB APPROVED MULTI APPROVED: S.M 08-SEP-2024 APPROVED: NEOM DD.MM.YY
CONDUCTOR, BS 6387CWZ, EN 50200PH, 120SILICON RUBBER
INSULATION, LOW SMOKE ZERO HALGEN JACKET.
SAFE-T- Line 2Cx2.5 SHEILDED FIRE RESISTANT, LPCB APPROVED MULTI
CONDUCTOR, BS 6387 CWZ, EN 50200 PH120, SILICON RUBBER INSULATION,
LOW SMOKE ZERO HALGEN JACKET. SCALE: 1:125 SHEET SIZE: A1
DISCIPLINE NAME:
FIRE LIFE SAFETY

SALON
GROUND FLOOR FIRE ALARM PLAN
PROJECT NAME:

South Business Community Expansion

NEOM COMMUNITY EXPANSION


NEOM
A
KINGDOM OF SAUDI ARABIA
REGION ASSET CODE CONTRACT CODE

03 408301 4800000882
DRAWING NUMBER
ORIGINATOR DISCIPLINE DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

FHD FLS DRG 100003 A

You might also like