0% found this document useful (0 votes)
64 views1 page

03 408301 4800000882 FHD FLS DRG 600001

Uploaded by

vijay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views1 page

03 408301 4800000882 FHD FLS DRG 600001

Uploaded by

vijay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5

GENERAL KEY PLAN:


N

QIBLA
30 30 29
29 29 29 29 AREA=1260 M2
AREA=1260 M2 AREA=1260 M2 AREA=1260 M2 AREA=770 M2 AREA=770 M2

17
29
AREA=1260 M2
29
AREA=1260 M2
30
30
AREA=770 M2 30
AREA=770 M2
ORAGANIC MACHINE AREA
COMPOSTING

HANDLING
WASTE G00-003

G00-001
AREA 51.01 m²

51.49 m²

29 29 AREA=770 M2 COMPACTOR
COMPACTOR

SORTING

G00-005

286.31 m²
AREA STORAGE
WASTE BULKY

G00-007

10.98 m²

COMPACTOR
AREAWASTE
STORAGE

LANDSCAPE

11.75 m²
G00-009

WEEE

RESIDUAL
G00-017 G00-011

24
15.67 m² 7.01 m²

BARRELS OIL
COOKING AND

Waste Management
CABINET
FOR AREA
H.W

DRAIN 0.5 M WIDE


G00-013

PAPER
CARD
AND G00-015
GLASS 11.39 m²

G00-019 16.44 m²

15.72 m²

WASTE TIPPING

FLOOR

251.21 m²
G00-020

Fasility MDR

G00-021

15.72 m²

WC

G00-002

14.94 m²

STORAGE

G00-006

4.60 m²

JINATOR G00-002B
SHD

2.51 m²
G00-002A 1.96 m²

G00-000
COORIDOR

17.16 m² JINATOR (H)

WATER TANK G00-004A G00-004B

10.68 m²
G00-008 2.51 m² 1.96 m²

W1

W1
WC

GFL (+113.330)
G00-004

AC
CA 14.60 m²

CA

AC

CA

AC

AC
W1

W1

CA

W1
W1
DG10-R WF8 WF8 DG10-L DG10-R WF8 WF8 DG10-L DG10-R WF8 WF8 DG10-L

WF10
DG10-L

DG10-R
W1
W1

ID9-2-L

29

WF8
STAIRS

ID9-1-L
W1 13.52 m²
G00-010

K-6
W3 ENTRANCE

AREA=1260 M2
G00-000

W3

ID9-1-R
W1 BALE STORAGE 24.56 m²

ID9-2-R G00-016
ROOM

WF8
ID9-1-R ID9-1-R ID9-1-R 48.34 m²

PAPER&CARDBOARD

AREA=540 M2
HANDLING
AREA COMM ROOM ELEC ROOM

DG10-L
G00-018 G00-014 G00-012

ID9-2-L

ID9-2-R

ID9-2-L

ID9-1-R

ID9-2-R

ID9-2-R
21.53 m² (PAPER,CARDBOARD,METAL AND PLASTIC) 14.55 m² 14.69 m²

CA
W1

17-GM-4
AC

Kommod
AC
ID9-1-L ID9-1-L CA

W3
W1

DG10-L

W5

DG10-R
WF10
W7
22-K-6

WF8
ID9-1-L
W1

W1
W3

GFL (+113.560)

W3

ID9-1-R
ID9-2-R

WF8

23-K-6
DG10-L
WF10 ED10-L WF10 WF10

W1

W1

W1
CA
W1 AC

AC
W1 CA

W4b

UD10-1-R

W4a
W2 240 L

W4a
18

DG10-L

DG10-R
240 L

WF10
W5

W8a 240 L

W7

WF8
FD
240 L WF

ID9-1-L
W4b

W4a

W4a
240 L W1

CA
W2

10. 10.

AC

ID9-1-R
ID9-2-R

WF8
DG10-L
GFL (+111.450)

16-I-5

DG10-L
W1
W3 W2
AC

CA
30 FORKLIFT
CIRCULATION

W4a
240 L

W4b
W3
WF

ED10-L
GFL (+111.250)

FD

WF10
AREA=770 M2
240 L

W7
240 L

WF10
W5

HATCH

DG10-L
UD10-1-R

FLOOR
240 L

W4a
240 L

W4b
W1 W2

CA
AC

AC
W1 CA

W3
DG10-L

DG10-R
EXIT

WF10
OFFICE STAFF

WF8
DISCARDED PANTRY
G00-006 G00-004 ENTRANCE ELECTRICAL

ID9-1-L
W1 FIRST AID
ROOM MATERIAL
ROOM 13.20 m² 7.95 m² G00-002 MECHANICAL COMM. ROOM
CARPENTRY G00-015 G00-009 9.63 m² ROOM
G00-001 G00-003 G00-005
W3 ANDG00-017
PAINTING 13.22 m² WC 16.80 m² STAFF 8.83 m² 8.86 m² 8.14 m²
30.84 m² WC G00-011 G00-008

W3

ID9-1-R
22.64 V
W1 G00-013 12.81 m² 21.08 m²

AREA=540 M2
12.81 m²
ID9-2-R SHOWER SHOWER

WF8
G00-13A G00-11A STORAGE
CHEMICAL
1.64 m² 1.64 m² G00-007 LOBBY SERVICE

DG10-L
103.81 m² G00-000 ENTRANCE
32.31 m² G00-007
19.00 m²

CA
GFL (+112.690)
W1 AC

AC

W3
W1 CA
WELDING
CUTTING
AND
DIRTY LOBBY

WF10
METALS CHANGING

DG10-L

DG10-R
G00-019 LOUNGE AND
BREAKOUT ANDG00-021
LOCKERS CHEMICAL WC
G00-012 MEDICAL G00-000 CLEAN

21-K-6
32.28 m² AREA 6.67 m² STORE 5.15 m² STORE 5.98 m² MEDICAL
G00-020 G00-010 G00-009 STORE
G00-011
25.64 m² 9.33 m² 5.90 m² 5.44 m²

WF8
ID9-1-L
25 26

K-6
W1
W1 PRAYER
ROOM
9.65 m²
G00-010 PPE

W3

ID9-1-R
ELEC. WORKSHOP G00-016

W4a
W5
ID9-2-R G00-006 OFFICE 18.27 m²

WF8
7.65 m² 11.66 m²
G00-19A

W7

DG10-L
Kommod

W4a
DIRTY
MEDICAL CLEAN
MEDICAL

CA
W1 AC WASHER WASHER
SECURITY G00-013 G00-015

AC
G00-004
TOILET G00-018
ROOM G00-022
PANTRY 29.22 m² 27.43 m²

W3
W1 CA 3.38 m² 8.85 m² 4.39 m²

W1
22

WF10
DG10-L

DG10-R
21
WET
ID9-2-L HALLWAY STORAGE

WF8
G00-000 G00-005

ID9-1-L
W1 42.93 m² 137.86 m² DRYER CORRIDOR

G00-022
35.96 G00-000

ADMINSTRATION
W3 44.02 m²

ENTRANCE
W3

ID9-1-R
W1
ID9-2-R

WF8
DG10-L
F&B STORAGE IRONING
(COLDITEMS) G00-22A DRYER
MEDICAL

CA
W1 AC G00-002 35.58 m² G00-017
168.77 m² 39.75 m²

W1

W1
FREEZING -18
INDUSTRIAL

4.6m 3.2m 10.7m

C
G00-02A

3.0m 10.4m 5.7m


48.99 m²

AREA=540 M2
CORRIDOR 1
G00-000
129.86 m²

TAGING
G00-22B
35.86 m²
IRONING
MEDICAL
G00-17A
34.62 m²

COMPRESSOR FREEZER/CHILLER
-15C
ROOM G00-02B DRY
13.15 m²
G00-008 38.29 m² STORAGE
G00-003

K-6
148.91 m²

12.
MEDICAL
TAGING
REVIEVING AND SHIPPING G00-17B
22.97 m²

13.

W2
W1

W1

W1

W1

W1

W1

W1

W1
SYST.
W4a G00-12AWA-05

SPRINKLER
800x605x1755
G00-14A
PANTRY PANTRY
W4a 5.44 m² 5.42 m² FINISH VISITORES
W W W W

W
W W ELEC. G00-014
DRIVER STORE
G00-22C ENTRANCE
G00-024
W4a RB2 G00-016 12.19 m² WAREHOUSE
STAFF 66.39 m² 27.85 m² CLEAN

W3

W3

W3

W3

W3
²m 3.16

W3

W3
10.39 m² OFFICES MEDICAL
G00-012 AIR LOCK
G00-001 STORE
G00-17C
25.08 m² 26.07 m² 21.72 m²
W4a TOILET TOILET
G00-14B G00-12B
2.86 m² 2.85 m²
W7

W7
GFL (+110.650) 15- -5

W5

W1
F UD10-1-R F F

F
F

F
ID9-1-L ID9-1-L ID9-1-L ID9-1-L ID9-1-L ID9-1-L ID9-1-L
WW

Kommod
K-6

W5

FD WF

W1
W4a
WASTE W4a

ID9-2-R

ID9-2-L

ID9-2-R

ID9-2-R

ID9-2-R

ID9-2-R

ID9-2-R

ID9-2-L

ID9-2-R

ID9-2-R

ID9-2-L
ID9-1-R
8.3 m²
FLOOR
HATCH

30
WM WM WM MW

240 L

240 L

240 L

240 L

240 L
WM WM WM WM
ID9-1-R ID9-1-R ID9-1-R ID9-1-R ID9-1-R ID9-1-R ID9-1-R ID9-1-R

AREA=540 M2

W3
W3 W3 W3 W3 W3 W3 W3
W

W
W W W

W W
W
W W W W W W W W

W8a
W

W
W
W W W W W W W W W

W
W W
W1

20-K-6
W

W
W
W W W W W W W W

W
W W W

AREA=770 M2
1:12

Recieving and
W

W
W

W
shipping

W
W W W W W W W W

W
W4b W4b W W
W3 W3 W3 W3 W3

DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R

W2

W2

W1
AC

CA

AC

CA

AC

CA

AC

CA

AC

CA

AC

CA

AC

CA

AC

CA

AC

CA
W1

W1

W1

W1

W1

W1

W1
28
Kitchenette

G00-003
W.C 4.19 m²
G00-002

3.34 m²

Work Place
G00-001 FFL 0.450
SSL 0.332

36.28 m²

GFL (+112.200) 1:12

ESCAPE ESCAPE
DOOR DOOR

W1

W1
23

AC
W1 CA MEAT UTILITY ROOM

CA

AC

CA

AC

CA

AC
COOLER G00-003 ELEC. ROOM

11.

W1

W1
W1
DG10-R WF8 WF8 DG10-L DG10-R WF8 WF8 DG10-L DG10-R WF8 WF8 DG10-L G00-005 10.62 m² G00-001

DG10-L

DG10-R
18.87 m²

WF10
MALE SERVICE MALE TOILET STAFF RM LOBBY FEMALE TOI.
12.51 m²

W1
W1

WF8
35
ID9-2-L

ID9-1-L
MEAT
SERVERY MEAT PREP.

FM Admin Building
W1
G00-009 G00-007 FREEZER
W3 18.29 m² 19.12 m² G00-011 IT Room
W1 9.11 m²

W3

ID9-1-R
G00-019
ID9-2-R 4.36 m²

WF8
ID9-1-R ID9-1-R ID9-1-R CORRIDOR
G00-000
24.37 m²

DG10-L
ID9-2-L

ID9-2-R

ID9-2-L

ID9-1-R

ID9-2-R

ID9-2-R
BREAK ROOM
W1 G00-021

14-GM-4

CA
Kommod AC SEA FOOD
COOLER COOLER 12.19 m²

AC
ID9-1-L ID9-1-L W1 CA G00-015 G00-013

W3
12.36 m² 5.24 m²

DG10-L

W5

DG10-R
SEA FOOD

WF10
W7 G00-017

27.33 m²

WF8
TOILET

ID9-1-L
W1 G00-023
4.31 m²
W3 GENERATOR

ID9-1-R
W3
W1 CORRIDOR TOILET
SUPERMARKET G00-000 G00-025
ID9-2-R SALES AREA 4.38 m²

WF8
GFL (+109.900)
G00-018 11.25 m²
875.72 m² DELIVERIES

DG10-L
1.
WF10 ED10-L WF10 WF10

W1

W1

W1
ACCOUNTANT

CA
W1 OFFICE

OUTDOOR
AC G00-027

AC
W2 W1 CA 9.16 m²

W4b

W4a

UD10-1-R

W4a
N
240 L

DG10-L

DG10-R
SUPERMARKET
240 L

WF10
W5
W8a DELI&BAKERY
240 L PREP. PRAY ROOM

W7
G00-008 G00-002

WF8
FD
240 L WF 58.83 m² 8.74 m²

ID9-1-L
W1

W4b

W4a

W4a
CA
240 L W2

BACK ROOM

ID9-1-R
AC
1500sqm
G00-006
ID9-2-R 120.77 m²

WF8
DG10-L
M
MANAGER
OFFICE

13-I-5

DG10-L
BAKERY G00-004
FREEZER 9.54 m²
DELI & G00-010
AC BAKERY 6.87 m²

BAILING PRESS
SERVERY SCISSOR LIFT
W3 G00-016
39.40 m²

W4a
W2 240 L CA

W4b
W3
W1

WF
BAKERY

WF10
240 L

ED10-L

FD
COOLER

W7
240 L G00-012 SKIP

L
6.43 m²

DG10-L
GFL (+110.150)

HATCH
UNISEX WC

WF10
W5 240 L
ROLLER

UD10-1-R
BREAK ROOM G00-024

FLOOR
BOXING/DE-

W4a
240 L

W4b
CA
W1 W2 AC G00-026 3.00 m² AIR LOCK BOXING AREA SHUTTER
16.59 m² CHASER G00-020
OFFICE DELI COOLER

W3
AC
W1 CA G00-022 CUSTOMER 40.37 m²
13.91 m² SERVICES G00-014
PERSONNEL

G00-001 G00-005 G00-007 G00-000 G00-006


8.20 m²

WF10
DG10-L

DG10-R
H J P
DOOR

WF8
ID9-1-L
W1
1:12 1:12
W3

W3

ID9-1-R
W1 1:12
ID9-2-R 1:12

WF8
DG10-L
CA
W1 AC

AC
CA

W3
W1

DG10-L

DG10-R
WF10
15

WF8
ID9-1-L
W1 W1

RECREATIONAL POOL

W3

W4a

ID9-1-R
W5
ID9-2-R

WF8
W7
Kommod

DG10-L
ESCAPE

W4a
CA
W1
FIRE
AC

AC
W1 CA

W3

W1
DG10-L

DG10-R
WF10

Housekeeping

Waste holding
WF8

Waste holding
ID9-2-L

ID9-1-L

medical
2P Shared

room

general
W1

office
2P Shared
W3

office
W1

W3

ID9-1-R
ID9-2-R

WF8
INTERFACE WITH:

DG10-L
W1
AC AC

W1

W1

Staff lounge
Meeting room
manager
Clinic
Consultation
F&B2

room

Treatment
Building 1

room
192.37

WC - Staff

WC - Staff
9.

Consultation
room

Patient change
F&B

room
W2
W1

W1

W1

W1

W1

W1

W1

W1

treatment room
Nurse

Physiotherapy
station
W4a

Facility Building

SYST.
SPRINKLER
800x605x1755
W4a
W W W

W
W W

Consultation

Physiotherapy
W3

W3

W3

W3

W3
RB2

W3

W3
W4a
²m 3.16

room

store
GFL (+109.450) W4a

8b.

W7
W7
TREATMENT
ROOM1

12- -5

W5

room(Dental)

Compressor
16-MEP BOH Utilities
F F F F F

F
F

F
W1 G00-003

plant
ID9-1-L ID9-1-L ID9-1-L UD10-1-R ID9-1-L ID9-1-L ID9-1-L ID9-1-L

Salon
14.55 m²

WW

Consultation

Vital sign

collection
W5
W4a Kommod

Blood
WF

W1
WASTE

ID9-2-R

ID9-2-L

ID9-2-R

ID9-2-R

ID9-2-R

ID9-2-R

ID9-2-R

ID9-2-L

ID9-2-R

ID9-2-R

ID9-2-L
ID9-1-R

room
FD W4a
8.3 m²

sterilization
FLOOR

Dental
WM WM WM MW

240 L

240 L

240 L

240 L

240 L
HATCH WM WM WM WM MALE TOILET

Dental room
SERVICES
MALE G00-005
ID9-1-R ID9-1-R ID9-1-R ID9-1-R ID9-1-R ID9-1-R ID9-1-R ID9-1-R G00-001 10.24 m²
W3 W3 W3 W3 W3 W3 W3 W3

W8a
W W W

W WW W

W
W W W W W W W W W W 67.01 m²

Store-controlled

Pharmacy
W W W

WW W

WW
W W W W

clean-up
W1 W W W W W W

drug

store

Dental
W W W W W W W W W W
W W W
W W W

W
W W W W W W W W W TREATMENT TREATMENT
ROOM3
W4b W4b ROOM4

W3
W3 W3 W3 W3 RECEPTION G00-011 G00-009
G00-000 7.78 m² 7.78 m²
24.70 m² LOBBY

dispensing
Pharmacy
G00-000 STAFF ROOM

counter

General store

WC
W1

W1

W1

W1

W1

W1
DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R 7.52 m² G00-007

W2

W2

W1

WC
AC

CA

AC

CA

AC

CA

AC

CA

AC

CA

AC

CA

AC

CA

AC

CA

AC

CA
W1
16.64 m²

-SPRINKLER FLOW SWITCH/TAMPER SWITCH.


TREATMENT TREATMENT
ROOM6 ROOM5 STORAGE
G00-010 G00-008 ROOM STAFF W.C
7.78 m² 7.78 m² G00-07A G00-07B
3.89 m² 3.51 m²

SERVICES
FEMALE
G00-002

67.01 m²
FEMALE TOILET
G00-006

10.28 m²
CLINIC

Main Entrance -Air Lock

Waiting area
ENTRANCE

registration
Reception/
TREATMENT
ROOM2 PRIMARY
G00-004
14.55 m²

14
EXERCISING POOL
500 m²
8d.

Crash

equipment
cart
CAFE

Mobile
Building 2

Equipment
Coffee Shops
102.58 m²

Electrical room

Server room/UPS

store
Work station
ICT room

Dirty utility

call room
EMT on
Store clean
linen

Store
Soiled utility

Clean utility
room

room

WC

WC
F&B1
Building 3
188.18 m²

EMT on
call room
Medication

Nurse
9.

station
room
-ALARM CHECK VALVES

EMT on
call room
W1

W1
DN

Hand wash
AC W1 CA

CA

AC

CA

AC

CA

AC

Bay
W1

W1
W1
F&B
DG10-R WF8 WF8 DG10-L DG10-R WF8 WF8 DG10-L DG10-R WF8 WF8 DG10-L

DG10-L

DG10-R

Waiting area
WF10
1
W1 W1

WF8
ID9-2-L

ID9-1-L
W1

Patient bay

Patient bay
W3
W1

W3

ID9-1-R

Patient bay

call room
ID9-2-R

WF8

EMT on
ID9-1-R ID9-1-R ID9-1-R

DG10-L
ID9-2-L

ID9-2-R

ID9-2-L

ID9-1-R

ID9-2-R

ID9-2-R
W1

2
11-GM-4

Triage
AC AC

gases bottles
Store-Medical
Kommod

EMT breakout
AC ID9-1-L ID9-1-L W1 CA

W3

Air lock
Patient room
DG10-L

W5

DG10-R

room
WF10
W7 F&B1

Wheel chair
Building 4

parking
187.39 m²

WF8

WC
ID9-1-L

Decontamination
W1

9. 3

shower
W3

ID9-1-R
W3
W1

ID9-2-R

WF8
F&B
WF10 ED10-L WF10 WF10

DG10-L
GFL (+108.800)

W1

W1

W1
4.
W1
AC AC

AC W2 W1 CA

W4b

W4a

UD10-1-R

W4a
240 L

DG10-L

DG10-R
240 L

WF10
W5

22.74V
W8a
240 L

W7

WF8
FD
WF
240 L

ID9-1-L
GYM
W1

W4b

W4a

W4a
240 L W2
AC

ID9-1-R
AC

GFL (+108.600)
ID9-2-R

WF8
DG10-L
5

10-I-5

DG10-L
AC

W3

W4a
W2 240 L CA

W4b
W3
W1

WF

WF10
240 L

ED10-L

FD
W7
240 L

DG10-L
HATCH
WF10
W5 240 L

-GAS CONTROL PANEL/SOLENOID VALVE

UD10-1-R
6

FLOOR
W4a
240 L

W4b
AC W1 W2 AC

W3
AC W1 CA

WF10
DG10-L

DG10-R
WF8
ID9-1-L
W1

W3

W3

ID9-1-R
4.6m 3.2m
W1
ID9-2-R

WF8
10.4m 5.7m

DG10-L
AC W1 AC

AC CA

W3
W1

DG10-L

DG10-R
WF10
GRAB & GO GRAB & GO GRAB & GO STREET FOOD GRAB & GO GRAB & GO

WF8
9

ID9-1-L
W1 W1

DN

W3

W4a

ID9-1-R
W5
ID9-2-R

WF8
POD 12 pizza

W7
Kommod
G00-015

DG10-L
19.46 m² HALL
G00-011

A B

W4a
1142.46 m²
AC W1 AC

AC W1 CA

W3

W1
DG10-L

DG10-R
WF10
POD 11
shawarma grill

WF8
ID9-2-L G00-013

ID9-1-L
JANITOR 14.22 m² POD 10
W1 EMERGENCY EXIT WOMEN G00-11B coffee&juice bar
G00-009
ENTRANCE 3.01 m² G00-009
W3 7.78 m² 25.74 m²

2.
W1

W3

ID9-1-R

c
ID9-2-R WOMEN PRAY

WF8
MEN MENG00-005
TOILETS G00-007
HALL WOMEN
ABLUTIONS POD 7
ABLUTIONS
WF- 25.58 m² 47.97 m² WOMEN G00-11A sandwich/deli CHILDREN
23.58 m² G00-011
TOILETS 13.39 m² STORAGE G00-003 QUIET AREA

DG10-L
17.21 m² G00-001 21.74 m² G00-019
8.73 m² 18.31 m²
W1

CHAIR
AC AC
STORAGE

FOOD COURT
G00-13A POD 1

W1

W1
3.26 m² sweets&bakery
G00-017
STORAGE
MEN 29.01 m²
G00-013
ENTRANCE G00-021
10.29 m² 6.57 m²

-EXHAUST FRESH AIR FANS


MEN
G00-000
ENTRANCE
10.37 m²
ICT ROOM
G00-023

8.62 m²

5. LOBBY
G00-000
10.59 m²
LOBBY
G00-000
10.57 m²

TRAYS
ELEC ROOM
G00-025
11.32 m²

MOSQUE
G00-029

POD 4 POD 3 Gourmet POD 2 grill 1.17 m²


POD 9 middle POD 8 Health CHINESE Burger G00-033
eastern mezze Focused TROLLEY POD 6 indian POD 5 asian G00-037 G00-035 23.37 m² WASTE
G00-007 G00-005 STORE G00-051 G00-049 23.44 m² 23.17 m² TROLLEY STORE

W2
W1

W1

W1

W1

W1

W1

W1

W1
G00-053 22.58 m² 23.41 m² STORE G00-027
20.34 m² 21.01 m² 6.06 m² G00-031
15.90 m² 14.77 m²
W4a

SYST.
SPRINKLER
800x605x1755
W4a MEN PRAY
HALL CUSTOMER CUSTOMER
W W W

W
W W W G00-001 WC WC LOBBY

W3

W3

W3

W3

W3
RB2

W3

W3
W4a 402.88 m² G00-039 G00-000
²m 3.16 G00-041
STAFF STAFF 30.62 m² 30.62 m² 190.76 m²
LOCKERS LOCKERS
W4a G00-057 G00-055 GENERAL WASTE OUT

GFL (+108.150)
12.33 m² 12.31 m² STORE
G00-047 GENERAL
W7 W7 STORE CHEF HOUSE JANIOTOR FISH SALAD AND MEAT VEGETABLE
20.04 m² G00-045 G00-043 ROOM PREPARATION FRUITS PREPARATION PREPARATION

9- -5

W5
TROLLEY 5.75 m² G00-060 G00-058 PREPARATION G00-054 G00-052 OFFICE
F F F F

F
WASH & 10.43 m² 5.41 m² 7.01 m² AREA 9.12 m² 12.85 m² G00-050

F
W1
ID9-1-L ID9-1-L ID9-1-L UD10-1-R ID9-1-L ID9-1-L ID9-1-L ID9-1-L OS&E / STORE G00-056
PACKAGING DISH WASH POT WASH G00-010 13.48 m² 10.24 m²
WW

W5
W4a Kommod STORE G00-006 G00-008 6.53 m²

WF

W1
G00-004 20.13 m² 9.25 m²

ID9-2-R

ID9-2-L

ID9-2-R

ID9-2-R

ID9-2-R

ID9-2-R

ID9-2-R

ID9-2-L

ID9-2-R

ID9-2-R

ID9-2-L
ID9-1-R
WASTE FD W4a PULPIT RAILING
8.3 m² STAFF WC STAFF WC 10.55 m²
FLOOR G00-059 G00-002 GOODS
WM WM WM MW

240 L

240 L

240 L

240 L

240 L
HATCH WM WM WM WM ELECTRICAL ENTRANCE
PULPIT ROOM G00-006
CCTV G00-008
STORAGE 16.11 m² 16.08 m²
ID9-1-R ID9-1-R ID9-1-R ID9-1-R ID9-1-R ID9-1-R ID9-1-R ID9-1-R IMAM & ADMIN ENTRANCE
ADMIN G00- 02B G00-004 5.96 m² 3.26 m² EMERGENCY EXIT G00-000 GOODS IN
GOODS IN

W3

W3
W3 W3 W3 W3 W3 W3 G00-02A G00-002 2.98 m² 5.96 m² MEAT/POULTRY 37.18 m²

W8a
W W W

W
W W

W
W

W
W W W W W W W EMERGENCY EXIT 6.78 m² 2.41 m² LOBBY CHILLER BEVERAGE
G00-000 FOOD HALL G00-036 VEGETABLE STORE DRINK STORE
W W W

WW
W

WW
W

W
W1 W W W W W W W W G00-020 UTENSIL CHEMICAL CHARCOAL CHARCOAL MAIN KITCHEN LARGE 4.51 m² CHILLER CHILLER CHILLER DRY STORE
W W W W W W W ICT 18.34 m² DRY STORE STORE STORE STORE AREA CATERING FREEZER FISH FREEZER MEAT/POULTRY G00-046 PURCHASE

WW
W W W W W W G00-012 CLEANERS DELIVERY 39.68 m² G00-022 G00-024 G00-026 G00-028 SERVICE G00-032 G00-034 FREEZER G00-040 G00-042 G00-044 14.31 m² OFFICE
W W W

W
W W W W W W W

W
W W W G00-014 G00-016 G00-018 7.60 m² 6.44 m² 6.01 m² 9.39 m² G00-030 8.33 m² 8.37 m² 8.28 m² 8.24 m² 8.16 m² G00-048
W4b W4b 3.34 m² 2.58 m² 7.44 m² 5.69 m² 35.98 m² G00-038 11.76 m²
W3 W3 W3 W3 W3 4.75 m²

W1

W1

W1

W1

W1
DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R DG10-L WF8 WF8 DG10-R

W2

W2

W1
AC

CA

AC

CA

AC

CA

AC

CA

AC

CA

AC

CA

AC

CA

AC

CA

AC

CA
W1

W1
-A.H.US RECIPTION FEMALE SERVICE STAFF FEMALE STAFF MALE
OUTDOOR
AC AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC
AC

AC

D10-L
AC

32.
6-AM-5
AC
AC AC

W3
SCHOOL
HATCH HATCH
FLOOR FLOOR

D10-L
8-AM-4

FD
FD

WF
AC
UD10-3-R AC
AC AC

W3
AC AC

GFL (+108.030)

D10-L
-ACCS.
AC

G00-000 G00-001 TOILET TOILET


AC
AC AC

W3
D10-L D10-L D10-L D10-L D10-L

D10-L
AC
AC

E
AC AC

W3

D10-L
AC
AC
AC AC

W3

D10-L
AC
AC
AC AC

W3

FD 240 L

240 L

240 L

240 L

240 L

240 L

240 L

240 L

240 L

240 L
ED10-L
GFL (+107.510)

FD
WF

UD10-1-R

UD10-1-R
AC

GFL (+107.660)
AC
AC AC

W3
GFL (+107.840)

21:1

D10-L
AC
AC
AC AC

W3

UD10-1-R

UD10-1-R
W5

W7

ED10-L

D10-L
FD

FD
WF

240 L

240 L

240 L

240 L

240 L
W3

240 L

240 L

240 L

240 L

240 L
W2
AC AC
AC AC

21:1
-B.M.S.

D10-L
AC AC
AC AC

W3

D10-L
AC AC
AC AC

W3

W2

D10-L
AC AC
AC AC

W3

D10-L
W7

5-AM-6 7-AM-5
AC

AC
UD10-3-R AC UD10-3-R AC
AC AC

W3

W5

WF
FD FD

FLOOR

FLOOR
HATCH

HATCH

D10-L
AC AC
AC AC

W3

W3

W3
W3

D10-L
W2

AC

AC
AC

AC

AC

AC

AC

AC

AC

AC

AC

AC
AC

SALON CAFE
AC

32 33

AC
AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC
AC

AC
AC
4-AM-5 AC

AC
AC

W3

W3
HATCH
FLOOR

2-AM-5 HATCH
FLOOR

WF FD
GFL (+106.930)
FD

WF
UD10-3-R AC AC

AC
AC UD10-3-R

W3

W3
AC AC

AC AC

AC
AC

W3

W3
AC AC

AC
AC

W3

W3
AC AC

AC
AC

W3

W3
AC AC

GFL (+106.880)

AC
AC

W3

W3
FD 240 L

240 L

240 L

240 L

240 L

240 L

240 L

240 L

240 L

240 L
ED10-L

FD
WF WF

ED10-L
UD10-1-R

UD10-1-R
AC AC

AC
AC

W3

W3
GFL (+106.500)
AC AC

AC
AC

W3

W3
UD10-1-R

UD10-1-R
W5
W5

W7

W7
FD

FD
W3

240 L

240 L

240 L

240 L

240 L

W3

240 L

240 L

240 L

240 L

240 L
W2 W2
AC AC

AC
AC

AC AC

AC
AC

W3

W3
AC AC

AC
AC

W3

W3
W2

W2
AC AC

AC
AC

W3

W3
GFL (+107.030)
W7 W7

1-AM-6 3-AM-6

AC
AC
UD10-3-R AC UD10-3-R AC

AC
AC

W3

W5

W3

W5
FD FD

FLOOR

FLOOR
HATCH

HATCH
AC AC

AC
AC

W3

W3
W3

W3

W3
W3 W3 W3

W2

AC

W2
AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC
AC AC

SAFE-T- Line 2Cx 1.5SHEILDED FIRE RESISTANT

12
13
14

19

12
13
14

19
9 10 11 15 16 17 18 9 10 11 15 16 17 18

6
7
8

6
7
8
MANAGERS STAIR MANAGERS STAIR
OFFICE G00-009 OFFICE G00-009
G00-003 17.19 m² G00-003 17.19 m²
11.50 m² 11.50 m²

26
25
24

26
25
24
30 29 28 27 23 22 21 20 30 29 28 27 23 22 21 20

G00-000
LOBBY WORK G00-000
LOBBY WORK
21.71 m² G00-015
STATION 21.71 m² G00-015
STATION
STATION
WORK ELEVATOR 80.09 m² STATION
WORK ELEVATOR 80.09 m²
G00-001 4.36 m²
G00-011 G00-001 4.36 m²
G00-011
88.73 m² 88.73 m²
IT ROOM
G00-005 ELEC. ROOM
G00-007 IT ROOM
G00-005 ELEC. ROOM
G00-007
7.12 m² 6.43 m² 7.12 m² 6.43 m²
STORE STORE
G00-013 G00-013
5.65 m² 5.65 m²
CORRIDOR CORRIDOR
G00-000 G00-000
67.26 m² 67.26 m²

PRINTER PRINTER
G00-016 G00-016
JAN. ROOM 7.75 m² JAN. ROOM 7.75 m²
JAN. ROOM OFFICE JAN. ROOM OFFICE
OFFICE MEETING G00-014 OFFICE MEETING G00-014
G00-017 ROOM 14.33 m² G00-017 ROOM 14.33 m²
14.33 m² G00-023 14.33 m² G00-023
15.95 m² 15.95 m²

3 3 3
CORRIDOR CORRIDOR
G00-000 G00-000

OFFICES
OFFICE COMMON 22.08 m² OFFICE OFFICE COMMON 22.08 m² OFFICE
14.62 m²
G00-019 G00-022
AREA TOILET & G00-012 14.62 m²
G00-019 CORRIDOR G00-022
AREA TOILET & G00-012
CORRIDOR
G00-000 62.05 m² WASH 14.62 m² G00-000 62.05 m² WASH 14.62 m²
17.39 m² TOILET &
WASH 30.84 m²
G00-020 17.39 m² TOILET &
WASH 30.84 m²
G00-020
G00-027 G00-027
30.84 m² MEETING 30.84 m² MEETING
ROOM G00-018
ROOM
32.85 m²
G00-018 32.85 m²

GFL (+105.850)
MEETING MEETING
G00-021
OFFICE G00-025
ROOM OFFICE G00-021
OFFICE G00-025
ROOM OFFICE

GFL (+105.650) OFFICES


14.22 m² 15.93 m² PANTRY G00-010 14.22 m² 15.93 m² PANTRY G00-010
14.22 m² 14.22 m²
Shaft Shaft Shaft Shaft

CORRIDOR CORRIDOR
G00-000 G00-000
72.44 m² 72.44 m²

PRINTING AREA PRINTING AREA

WORK WORK

11
10

11
10
G00-002
STATION 6 LOBBY OFFICE
MANAGERS G00-002
STATION 7 6 LOBBY OFFICE
MANAGERS

9
8
7

9
8
, LPCB APPROVED MULTI CONDUCTOR,
65.32 m² 30 11.72
G00-000
m² G00-006 WORK 65.32 m² 30 11.72 m²
G00-000 G00-006 WORK
29 21.86 m² STATION 29 21.86 m² STATION
12 STAIR 28 G00-008 12 STAIR 27
28 G00-008
13 G00-004 26
27 66.66 m² 13 G00-004 26 66.66 m²
14 16.34 m² 25 14 16.34 m² 25
15 15
16 16

21
22
23

21
22
17 18 19 20 24 17 18 19 20 24

23
NAC 02

NAC 01
TOILET
G01-004
4.72 m²

GFL (+105.05)
3
INDOOR
G01-001
SEATING G01-003
KITCHEN
CAFE
73.15 m² 11.70 m²

TOILET
G01-002
4.71 m²

BS 6387CWZ, EN 50200PH, 120SILICON RUBBER

21
20
19
18

22
21
20
19
22 23 24 23 24 18

12 13 14 15 17
16

12 13 14 15 17
16
27 26 25
16.34 m² 25 16.34 m²
66.66 m² G00-004 66.66 m² 26 G00-004

30 29 28
G00-008 STAIR G00-008 27 STAIR
STATION 21.86 m² STATION 21.86 m² 28
29
WORK G00-006 11.72 m² 65.32 m² WORK G00-006 11.72 m² 30 65.32 m²

11

10
11
6
7

9
MANAGERS
OFFICE G00-000
LOBBY 8 10 9 G00-002 MANAGERS
OFFICE G00-000
LOBBY 7 8 G00-002
STATION
WORK STATION
WORK

PRINTING AREA PRINTING AREA

72.44 m² 72.44 m²
G00-000 G00-000
CORRIDOR CORRIDOR

Shaft Shaft Shaft Shaft

14.22 m² PANTRY 15.93 m² 14.22 m² 14.22 m² PANTRY 15.93 m² 14.22 m²


G00-010
OFFICE G00-025
ROOM OFFICE
G00-021 G00-010
OFFICE G00-025
ROOM G00-021
OFFICE
MEETING MEETING

32.85 m² 32.85 m²
G00-018
ROOM G00-018
ROOM

INSULATION, LOW SMOKE ZERO HALGEN JACKET.


MEETING 30.84 m² MEETING 30.84 m²
G00-027 G00-027
30.84 m² WASH 17.39 m² 30.84 m² WASH 17.39 m²

3 3 3
14.62 m² G00-020
WASH 62.05 m² TOILET & G00-000 14.62 m² G00-020
WASH 62.05 m² TOILET & G00-000
G00-012 TOILET & AREA
G00-022 CORRIDOR 14.62 m² G00-012 TOILET & G00-022 CORRIDOR 14.62 m²
OFFICE 22.08 m² COMMON OFFICE
G00-019 OFFICE 22.08 m² COMMON
AREA G00-019
OFFICE
G00-000 G00-000
CORRIDOR CORRIDOR

15.95 m² 15.95 m²
G00-023 G00-023
14.33 m² ROOM 14.33 m²
G00-017 14.33 m² ROOM 14.33 m²
G00-014 MEETING OFFICE G00-014 MEETING G00-017
OFFICE
OFFICE JAN. ROOM OFFICE
7.75 m² JAN. ROOM 7.75 m² JAN. ROOM JAN. ROOM
G00-016 G00-016

GFL (+104.800) GFL (+104.45)


PRINTER

OFFICES
PRINTER

G00-013
5.65 m²
STORE
67.26 m²
G00-000
CORRIDOR

G00-013
5.65 m²
STORE
OFFICES 67.26 m²
G00-000
CORRIDOR

6.43 m² 7.12 m² 6.43 m² 7.12 m²


G00-007 IT ROOM
G00-005 G00-007 G00-005
ELEC. ROOM 88.73 m² ELEC. ROOM IT ROOM 88.73 m²
4.36 m² G00-001 4.36 m² G00-001
80.09 m² G00-011
ELEVATOR STATION 80.09 m² ELEVATOR
G00-011 STATION
G00-015 21.71 m² WORK G00-015 21.71 m² WORK
STATION
WORK G00-000
LOBBY WORK
STATION G00-000
LOBBY

20
21

26
27
28
SCHOOL LIMIT NEW
25 24 23 22 30 29

20

25
26
27
28
24 23 22 21 30 29
17.19 m² 11.50 m²
G00-003 17.19 m² 11.50 m²
G00-009 OFFICE G00-009 G00-003
OFFICE
STAIR MANAGERS STAIR MANAGERS

19
18
17

12
11
10

19
18

13
12
11
9

7
6
13 14 15 16 8 7 14 15 16 17 10 9 8

TO BE CONNECTED TO FACP LOCATED


MICRO-MOBILITY
ESCOOTERAS PARKING=72
NEV OVERNIGHT PARKING
NEV PICK UP / DROP OFF E-MOBILITY PARKING CANOPY
EBiKES PARKING=28
NEV PARKING CANOPY
5 4 3 2 1
NEV Pick-up / Drop-off CANOPY OVER CANOPY OVER
15 SPACES
(15 SPACES)
1 2 3 4 5 6 7
PV PANEL PV PANEL PV PANEL PV PANEL

VISITORS WITH
OUT GATE PASS

FFL +0.150
FFL +0.300
OFFICE2 OFFICE1 PV PANEL PV PANEL PV PANEL PV PANEL
12.88 m² 11.55 m² FFL 0.600
8 9 10 11 12 13 14 15
FFL +0.150 FFL +0.300

CHARGING CULSTER ( 12 SPACES ) GENERAL PARKING ( 23 spaces ) ADMINISTRATION


18.63 m²
MEETING
ROOM
G00-003
21.78 m²
SYSTEM
G00-005
SERVER
37.96 m²
CCTV
G00-007
25.51 m²
CONTROL
SECURITY
STUFF
G00-009
27.19 m²
FFL +0.150

PV PANEL PV PANEL PV PANEL PV PANEL

27
STAIR

8.43 m²

EMPLOYEES
FFL 0.600

ENTRANCE
20
MAIN HALL
G00-000 CORRIDOR
74.40 m² G00-000
VISTORE TOILET CLASSROOM 44.17 m²

8.75 m² 16.25 m²

JANITOR JANITOR
2.52 m² G00-014
SECURITY
OBSERVATION 3.01 m² BREAK OUT
LOBBY ROOM SECURITY PRAYER RM.
G00-012
33.94 m² G00-001 OFFICER ROOM 31.48 m²
FFL +0.300 FFL +0.150

1:12
45.82 m² G00-002 G00-008
17.64 m² 8.85 m² FFL +7.350
LOBBY FEMALE
9.54 m² MELE TOILET G00-016
TOILET
G00-012 16.77 m² FFL +0.300
16.77 m²

RIDE-HAILING STAGING
KITCHEN G00-04A
W.B
19.59 m² 3.13 m² ELEC. RM.
G00-010 FLAT METALLIC DECK FLAT METALLIC
RM.
G00-004
WAITING 11.40 m² 1.5 DEGREES DECK 1.5 DEGREESFFL +0.300
11.34 m²
G00-04B
TOILET SLOPE SLOPE

GENERAL PARKING (17 spaces)


4.01 m²

ENGINE BAY STORE

(3 SPACES)
459.72 m² SECURITY
AREA

DROP OFF
18.28 m²

SHOWER

GENERAL PARKING
6.16 m²

GENERAL PARKING

(9 SPACES )
FFL 0.600

AHU
LOCKERS
LOBBY 6.39 m²
LOBBY 4.41 m²
3.97 m²

POTENTIAL PV PANELS AREA FFL +6.380

( 26 spaces ) ( 26 spaces ) PPE STORE


12.51 m²
ELECTRIC ROOM
9.88 m² WAITING AREA

A A A A A A A A A A A
VISITORS WITH NO IDS 1.5 DEGREES 1.5 DEGREES 1.5 DEGREES

FACP-SALON
ENTRANCE FFL +0.300
SLOPE SLOPE SLOPE POTENTIAL PV PANELS AREA

FFL +7.350

AT FIRE STATION BUILDING


IN

FFL +0.300 CANOPY


CANOPY OVER
FFL +0.300 FFL +0.300
FFL +0.300

18- PARKING LOT

(3 SPACES)
DROP OFF
GENERAL PARKING GENERAL PARKING 19- Regional Transit Hub
( 26 spaces ) ( 26 spaces )

THROUGH 2*6 S.M F.O.C

EMERGENCY LANE
ONLY BUS LANE
CARSHARING ( 36 spaces )

ONLY BUS LANE


(ANALOGUE ADDRESSABLE FIRE
ADDITIONAL BUS PARKING / OVERNIGHT PARKING AREA

ALARM CONTROL PANEL) RECEPTION RECEPTION RECEPTION FEMALE SERVICE FEMALE SERVICE FEMALE SERVICE
JANITOR 01 JANITOR 01
STAFF MALE STAFF FEMALE STAFF FEMALE STAFF FEMALE STAFF MALE STAFF MALE STAFF MALE STAFF MALE STAFF FEMALE STAFF FEMALE TREATMENT RM TREATMENT RM TREATMENT RM TREATMENT RM TREATMENT RM TREATMENT RM
G00-000 G00-000 G00-000 G00-002 G00-002 G00-002 TOILET TOILET CHANGING ROOM CHANGING ROOM CHANGING ROOM CHANGING ROOM BREAKOUT BREAKOUT BREAKOUT BREAKOUT G00-010 G00-010 G00-011 G00-011 G00-009 G00-009
LOCATED IN GROUND FLOOR
L1-01 L1-02 L1-03 L1-04 L1-05 L1-06 L1-07 L1-08 L1-09 L1-10 L1-11 L1-12 L1-13 L1-14 L1-15 L1-16 L1-17 L1-18 L1-19 L1-20 L1-21 L1-22 L1-23 L1-24
AUTO DAILER 2 LOOPS (1 LOOP SPARE)

AT FIRE STATION BUILDING


FOR DDC FOR DP-SC
FOR FAHU-01
A A A A A A A A A A A
BATT POWER SUPPLY MM
NOTES:
CM MC
1.CONTRACTOR SHALL SUBMIT WORKSHOP DRAWINGS FOR THE FIRE ALARM.
TREATMENT TREATMENT TREATMENT TREATMENT TREATMENT COMPLETE AS SHOWN ON THE DRAWINGS AND AS REQUIRED FULLY COORDINATED WITH FALSE CEILING
MALE SERVICE MALE SERVICE MALE SERVICE MALE SERVICE MALE SERVICE MALE SERVICE MALE-TOILET KITCHEN KITCHEN LOBBY LOBBY LOBBY FEMALE TOILET FEMALE SERVICE FEMALE SERVICE TREATMENT RM TREATMENT RM
BATTERY 24V-12 A.H ROOM1 ROOM1 ELEC.RM ROOM2 ROOM2 ROOM2
G00-001 G00-001 G00-001 G00-001 G00-001 G00-001 G00 - 005 G00 - 005 G00 - 005 G00-000 G00-000 G00-000 G00-006 G00-002 G00-002 G00-008 G00-008 LAYOUT AND OTHER SERVICES TO THE APPROVAL OF SITE ENGINEER AND LOCAL CIVIL DEFENSE AUTHORITY.
G00-003 G00-003 G00-004 G00-004 G00-004
L1-47 L1-46 L1-45 L1-44 L1-43 L1-42 L1-41 L1-40 L1-39 L1-38 L1-37 L1-36 L1-35 L1-34 L1-33 L1-32 L1-31 L1-30 L1-29 L1-28 L1-27 L1-26 L1-25 2.FIRE ALARM & EMERGENCY LIGHTING SYSTEM LOOPS SHOWN ON THIS DRAWING ARE INDICATIVE & FOR
POWER SOURCE (230V- AC) INFORMATION ONLY CONTACTOR SHOULD PREPARE WORKSHOP DRAWING INDICATING ALL SYSTEM
COMPONENTS & ACCESSORIES TO THE APPROVAL OF LOCAL CIVIL DEFENSE AUTORITY & ENGINEER ON SITE.
GROUND FLOOR 3 .FIRE ALARM CONTROL PANEL SHOULD BE INTERFACE WITH
ii. AIR HANDLING/PACKAGE UNITS IF FOUND
iii. SPRINKLER SYSTEM (ZONE CONTROL VOLVE)
iv. CENTRAL MONITORING UNIT
v. AUDIO VISUAL SYSTEM
vi.ACCESS CONTROL SYSTEM

SAFE-T- Line 2Cx2.5 SHEILDED FIRE RESISTANT, LPCB APPROVED MULTI CONDUCTOR,
BS 6387 CWZ, EN 50200 PH120, SILICON RUBBER INSULATION,
FIRE ALARM SYSTEM SCHEMATIC DIAGRAM vii.BMS
ANY OTHER AS PER SPECIFICATION & CIVIL DEFENCE TO ENGINEER APROVAL.
4.SMOKE DETECTOR INSIDE VOID/ABOVE FALSE CEILING WITH INDICATOR LIGHT ON IT SHOULD BE PROVIDED
LOW SMOKE ZERO HALGEN JACKET. SCALE: NTS
WHERE VOID/FALSE CEILING DEPTH IS EQUAL OR MORE THAN 80 CM.
D
5. All DETECTORS INCLUDE ISOLATE FAULT
6. All electrical works and installations shall be in conformance to the NEOM standards the National Electrical Code
3.0m 10.4m 5.7m 4.6m 3.2m 22.74V (NFPA-70), NFPA 72 , SBC 801 and relevant local regulations.,
24.00 V NAC 01
RECIPTION FEMALE SERVICE STAFF FEMALE STAFF MALE 7. THE CONTRACTOR SHALL COORDINATE LOCATION OF DETECTTORS WITH LIGHTING FIXTURE AND MECHANICAL DEVICES
OUTDOOR
G00-000 G00-001 TOILET TOILET 8. FIRE ALARM CABLE SHALL BE :
a- SAFE-T- Line 2Cx1.5 SHEILDED FIRE RESISTANT, LPCB APPROVED MULTI CONDUCTOR,BS 6387 CWZ, EN 50200 PH120, SILICON
RUBBER INSULATION, LOW SMOKE ZERO HALGEN JACKET FOR DETECTORS,CALL STATIONS AND INTERFACE MODULES.
b- SAFE-T- Line 2Cx2.5 SHEILDED FIRE RESISTANT, LPCB APPROVED MULTI CONDUCTOR,BS 6387 CWZ, EN 50200 PH120, SILICON
RUBBER INSULATION, LOW SMOKE ZERO HALGEN JACKET FOR SOUNDERS.
3.0m 10.4m 5.7m 4.6m 3.2m 10.7m 22.64 V REFERENCE NUMBER DESCRIPTION
24.00 V NAC 02
MALE SERVICE MALE TOILET STAFF RM LOBBY FEMALE TOI.
OUTDOOR
G00-001 G00-005 G00-007 G00-000 G00-006
GROUND FLOOR LEGEND:
0m 2m 4m 6m 8m 10m
SYMBOL: DESCRIPTION

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF NEOM. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT FROM NEOM.
ADDRESSABLE SMOKE DETECTOR OPTICAL TYPE,IP20 VISUAL SCALE :NTS @ A1
STAGE:
LOW VOLTAGE VD,DIAGRAM ADDRESSABLE SMOKE DETECTOR OPTICAL TYPE,ABOVE FALSE
CEILING WITH LED INDICATOR,IP20
3D - IFC
SCALE: NTS D
ADDRESSABLE DUCT SMOKE DETECTOR OPTICAL TYPE,IP20

ADDRESSABLE COMBINED HEAT AND SMOKE DETECTOR,IP20


A 3D - IFC S.M 08-SEP-2024
ADDRESSABLE HEAT DETECTO,IP20 REV DESCRIPTION APP DATE
C PURPOSE OF ISSUE:
DOUBLE ACTION ADDRESSABLE MANUAL CALL POINT
IP20
FOR APPROVAL
WALL MOUNTED BELL WITH INTEGRATED STROBE CLIENT: PROJECT MANAGEMENT CONSULTANT:
LIGHT,RATING:110 dB & 15cd
INDICATED ON DRAWINGS,IP 20
WALL MOUNTED BELL WITH INTEGRATED STROBE
LIGHT,RATING:110 dB & 75cd
INDICATED ON DRAWINGS,IP ,65 WEATHER PROOF

FIRE ALARM CONTROL PANEL (N): INDICATE


REFERENCE NAME HEIGH=1800mm FROM FFL TO TOP

ADDRESSABLE INTERFACE MODULE (MONITOR)


MM

ADDRESSABLE CONTROL MODULE


CM
DESIGN CONSULTANT NAME & LOGO (s): CONTRACTOR NAME & LOGO (s):
SAFE-T- Line 2Cx1.5 SHEILDED FIRE RESISTANT, LPCB APPROVED MULTI
CONDUCTOR, BS 6387 CWZ, EN 50200 PH120, SILICON RUBBER
INSULATION, LOW SMOKE ZERO HALGEN JACKET.
SAFE-T- Line 2Cx2.5 SHEILDED FIRE RESISTANT, LPCB APPROVED MULTI
CONDUCTOR, BS 6387 CWZ, EN 50200 PH120, SILICON RUBBER INSULATION,
LOW SMOKE ZERO HALGEN JACKET.
Z:\02-REVIT-FILES 19-11-2023\05 Mosque\03-450000-4800000882-AFC-ARC-DRG-000050-Mosque.rvt

B DESIGN CONSULTANT / CONTRACTOR: NEOM'S REVIEW:


DRAWN: R.A 08-SEP-2024
CHECKED: O.S 08-SEP-2024 CHECKED: NEOM DD.MM.YY
APPROVED: S.M 08-SEP-2024 APPROVED: NEOM DD.MM.YY

SCALE: NTS SHEET SIZE: A 1


DISCIPLINE NAME:
FIRE LIFE SAFETY

SALON CAFE
FIRE ALARM SYSTEM SCHEMATIC DIAGRAM
PROJECT NAME:

South Business Community Expansion

NEOM COMMUNITY EXPANSION


NEOM
A
KINGDOM OF SAUDI ARABIA
REGION ASSET CODE CONTRACT CODE

03 408301 4800000882
12/10/2023 05:19:47 ‫م‬

DRAWING NUMBER
ORIGINATOR DISCIPLINE DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

FHD FLS DRG 600001 A


NEOM-NEN-PRC-009_TMP13_02.00

You might also like