Final Inspection Report for Part 430.50

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views1 page

Final Inspection Report for Part 430.50

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Final Inspection Report

Supplier Code : Customer : Kirloskar Pneumatic Co. Pvt. Ltd.

Supplier Name:SPARK ENGINEERING COMPANY Part Name : AIR/OIL SEP. WITH TOP COVER ASSLY(R2) Quantity : 05 nos. Challan No : Date :24/08/2024

Part No. :271.01.430.50. Rev.No. : R Po No: Report No.:


Observations with Sr.No.
Sr. Specified
Inspection Parameter Instrument Used S.N.-1 S.N.-2 S.N.-3 S.N.-4 S.N.-5
No. value in mm REMARK
SEAOS-6178 SEAOS-6179 SEAOS-6180 SEAOS-6181 SEAOS-6182

1 Total Length Aos 597 ±2 Vernier 596 596 595 596 596

Bottom Mountng C.D. 193*221 +/-0.5 Vernier 193*221 193*221 193*221 193*221 193*221

Thread plug
2 Threading 1/2"BSP OK OK OK OK OK
gauge
Thread plug
3 Threading 3/4"BSP OK OK OK OK OK
gauge
Thread plug
4 Threading (2x) 1"BSP OK OK OK OK OK
gauge
Thread plug
5 Threading 3/8"BSP OK OK OK OK OK
gauge
Thread plug
6 Threading 1/4"BSP OK OK OK OK OK
gauge

Thread plug
7 Threading (8x) M12*1.75*12 deep OK OK OK OK OK
gauge&Vernier

8 Shell overall dimension OD 273*L597±2 Measuring tape OD 273*L428 OD 273*L428 OD 273*L428 OD 273*L428 OD 273*L428

9 Oil level indicator CD from bottom(N5) 293+/-2.0 Measuring tape 294 294 291 292 294

Air oil inlet Nozzle Distance from


10 422+/-2.0 Measuring tape 423 421 421 422 421
bottom(N1)
Oil filler elbow face Distance from
11 337+/-2.0 Measuring tape 336 335 338 336 336
bottom(N4)

12 Oil Filter Bracket CD 20 +/-0.2 Vernier 20 20 20 20 20

13 Oil Filter Bracket CD 20 +/-0.2 Vernier 20 20 20 20 20

14 Oil outlet elbow CD from bottom(N2) 225+/-2.0 Measuring tape 224 224 223 224 223

Con. With dia. 10.5,pro.


15 M8 Weld Nut Visual Inspection Visually inspection found ok
Welded & free from paint
Fitment at specified
16 Nozzle N1-N7 Visual Inspection Visually inspection found ok
location
No tool marks,No
17 Top cover face resting on shell Visual Inspection checked visually & found ok
damage
Perp. To threding (No
18 All Threading top face gap after fitment of resp. Visual Inspection Visually inspection found ok
fitting)
Should be
19 All openings Visual Inspection Visually inspection found ok
plugged/covered

20 Hydrotest at 21 kg/cm2 for 30min. No Leakage Test Rig. Testing done at 21 kg/cm2 for 30min no leakage observed

No dust,dirt & foreign


21 Tank Area from inside Visual Inspection Visually inspection found ok
particles inside tank

22 Paintng (Inner surface of shell) castrol oil Visual Inspection Visually inspection found ok

No any foreign
patticles,loose welding
23 Cleaning & flushing material,spatters allowed Visual Inspection checked visually & found satisfactory
inside tank.To be removed
properly.

24 All other not mentioned dimensions & geometrical parameters has to be maintained & ensured.

Note : 1. For Lot size less than 10 Nos, record of all parts should be mentioned in PDIR . 2. For Lot size more than 10 Nos, record of minimum 10
parts should be mentioned in PDIR & Inspected parts should be separatly identified.

For Customer For Supplier

Accepted Rejected Rework


TC Enclosed Chemical / Physical/ Magnaflux / U.T. / Hardness / Performance / Hydro Test

GRR No. GRR Date GRR Location

Checked By Approved By
Format No:
Rev. No. - 00