My Electrical SOP For Stationary Crusher Plant

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
170 views5 pages

My Electrical SOP For Stationary Crusher Plant

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Doc. No.

ELECTRICAL STANDARD TEMPL/ELEC./SOP-04


Version: 1.0
OPERATING PROCEDURES
Stationary Electrified Date: 19.09.2017
Page 1 of 5
Crusher Plants

1. “Site” Related :

(A) Only Authorised Personnel With Proper PPE are Allowed to enter the Working
Area .
(B) No Person Should be allowed to Work in the Plant Unless he/she has Undergone
Vocational Training .
(C) Ensure that the Loading & Unloading (i.e. , Stockpile & Hopper) Areas are Free
from Slip , Trip & Fall Hazards .
(D) Keep Work Area Clean and Free of Rubbish Things ; Do not allow Material Build-
Up around the Equipment , Over Walkways , Platforms , Ladders and Under
Conveyors .
(E) Keep Safety Equipment (i.e. , Fire Extinguisher , First-Aid Kit etc.) in selected
Places and ensure that Work Area Personnel know about the Location and Proper
Use of the Safety Equipment .
(F) Make Sure that required Guards and Warning Signs are duly Provided .
(G) Sufficient Illumination as Compliant to DGMS Standards Should be there in &
around the Plant Area .
(H) Be Alert to Conditions which may Unclear Vision in and around Work Area ,e.g.,
Welding & alike .

2. “Equipment” Related :

(A) An Authorized Person Should be responsible for Control , Management &


Supervision of Safe Operation of the Plant .
(B) Ensure that the Lock Out and Tag Out System of Electrical Equipment and the
Plant are Used Only When in Working & reliable Conditions .
(C) Make an Inspection of all the Equipment & Panels as per the checklist Concerned .
(D) Ensure the Provision and Working Condition of Belt Sway Switch , Pull Cord
Switch , Emergency switch, Limit Switch & Zero Speed Switch in Conveyors .
(E) Keep Equipment , Panels & Switchgear Clean , Dry and Free of Dust Or Oil or
Grease .
(F) Store Spare Parts , Consumables and Tools etc. in the designated Places When not
actually in Use .

Prepared By Approved By
Doc. No.
ELECTRICAL STANDARD TEMPL/ELEC./SOP-04
Version: 1.0
OPERATING PROCEDURES
Stationary Electrified Date: 19.09.2017
Page 2 of 5
Crusher Plants

3. “Starting” Related :

(A) Only Authorized Personnel equipped With Proper PPE are allowed to Enter the
Control Room .
(B) Ensure that You have been Properly Instructed for Control Room Operation and
Trained to do So by an Authorized Person .
(C) Read and Understand each of the Warning Cautions and Instructions in the
Various Instruction Manuals .
(D) Ensure that none of the Equipment Or Conveyors is Under Operations Locally .
(E) Ensure that the Crusher Area is Clear of Unauthorized People before Starting the
Plant .
(F) Ensure to have Checked the Starting Siren before Starting the Crusher Plant .
(G) Locate the Emergency Push Buttons & be Familiar With Operating those .
(H) Ensure the Availability of Feed Material to the Crusher Plant .
(I) Start the Plant in Sequence as Per the Flow Sheet Concerned .

4. “Running” Related :

(A) Keep all Parts of Your Body and Clothing Safely Clear of the Rotating , Moving &
Electrically Charged Parts all the time .
(B) No Person Should be allowed to adjust , repair , clean or lubricate the Equipment ,
Panels Or Switchgear in Operation .
(C) Operate the Plant Within the Design Capacity .
(D) Ensure to Start Dry Fog Or Water Sprinkler System So as to reduce the dust
according to the Feed Material Or Climatic Conditions While running the Crusher
Plant .
(E) While the Conveyor Belts and Other Equipment are Under Operation , the Field
Workers Should remain at an easily reachable distance of an Emergency Stop
Control .
(F) If any Fault Occurs in any Circuit , Isolate the affected Part Without any delay
from the Main Circuit and it Should remain Isolated Until the Fault is rectified .

Prepared By Approved By
Doc. No.
ELECTRICAL STANDARD TEMPL/ELEC./SOP-04
Version: 1.0
OPERATING PROCEDURES
Stationary Electrified Date: 19.09.2017
Page 3 of 5
Crusher Plants
5. “Stopping” Related :

(A) Ensure the Unavailability of Material in the Feed Hopper .


(B) Stopping the Plant Should be in Sequence as Per the Flow Sheet Concerned .
(C) Stopping Should be initiated Only When the Plant becomes Idle ; Never Stop On
Load .
(D) Trip the MCC Incomer Breakers & Put Lock Out and Tag Out Over those So that
the Plant Can no way be Started again Until the Locking Mechanism is authorizedly
removed .

6. “Electrical” Related Only :

(A) Maintenance and Repairs Should Only be Carried Out by Qualified and Trained
Personnel along With Well Insulated Tools .
(B) Earthing Should always be as Per the Standard IS : 3043 .
(C) Every Person Working On an Electric Supply Line Or Apparatus Should Use
Proper PPE to remain Protected from any Kind of injury .
(D) Ensure the Lock Out and Tag Out System of Supply Isolating Point before Starting
of any Work .
(E) Always disconnect Battery Leads before Carrying Out any Maintenance as Battery
Contains Sulphuric Acid , an Electrolyte Which Can Cause Severe Burns and
Produce Explosive Gases : Avoid Contact With Skin , Eyes or Clothing .
(F) No Person Should Work On any Electric Supply Line Or Apparatus and No Person
Should assist Such a Person Unless he is duly Authorized in that respect .
(G) Prior to Operating Electricity Powered Tools , Ensure that You are On a Dry
Surface .
(H) No Electrical Panel , Switchboard Or Wiring Should be Left Uncovered for any
reason .
(I) Check the Provision , Incorporation and Condition of the Interlocking System .
(J) Use Only Original Fuses of Specified Current Rating .
(K) While Working inside the Crusher Plant , Always Ensure to Maintain Minimum
Safety Clearance from the Over Head Power Lines if any .
(L) Upon Completion of any Maintenance Activity , always Test the Concerned
Equipment before Starting the Plant .

Prepared By Approved By
Doc. No.
ELECTRICAL STANDARD TEMPL/ELEC./SOP-04
Version: 1.0
OPERATING PROCEDURES
Stationary Electrified Date: 19.09.2017
Page 4 of 5
Crusher Plants
7. “Maintenance” Related :

(A) Ensure that all required PPE are in good Condition and Correctly Used .
(B) Never allow Unqualified Or Untrained Personnel to attempt Removal or
Replacement of any Part of the Plant , Panel , Switchgear Or Equipment and
anyone to remove large Or heavy Components Without Suitable Lifting Tool .
(C) Ensure the Lock Out and Tag Out System of the Equipment of interest both
Electrically and Mechanically before Carrying Out any Maintenance .
(D) Take Off Rings, Watches, Necklaces and Bracelets etc. if required before Carrying
Out any Maintenance Activity in the Plant .
(E) Do not Carry Out Maintenance Work of any Fuel System near Sources of Sparks
Such as Naked Lighting , Wiring Or Welding Equipment .
(F) Always do the Maintenance as Per the Check List at Specified Intervals .
(G) While Working at Heights , Always Use the Specified Ladder for Proper Rest &
Safe Working of the Person(s) On the Ladder .
(H) After Maintenance , Always Examine all the Fuel , Lubricant and Hydraulic Fluid
Lines Concerned for Leaks , Loose Connections and Damage etc. before Energizing
the System Electrically ; Any Defects Found must be rectified Without Delay .
(I) Do not Stand Or Allow Anyone to Stand Under Anything that is being Hoisted .
(J) Ensure to determine the Weight of the Object or Load Prior to a Lift So that the
Lifting Equipment Operates Within its Capabilities .
(K) Ensure that Your Lifting Device is Positioned On the determined Centre of Gravity
Or Point of Balance .
(L) Ensure that all Used Consumables and Replaced Parts are always disposed off Safely
and With Minimal Environmental Impact .

8. “Tools” Related :

(A) Ensure the Use of Correct Tools for the Jobs to be Carried Out .
(B) All the Tools Should be kept in Good Condition .
(C) Inspect the Tools to be Used Periodically & if any Defects Found , those Should be
tagged as “Out of Service” .
(D) Inspect each Sling Or Chain for Cuts , Marks , Bent Links , bent Hooks etc. before
each Use . If in doubt , never Use it .
(E) Use Slings of Proper Reach ; Never Shorten a Line by Twisting . Never Use Bolts &
Nuts With Chain Slings .

Prepared By Approved By
Doc. No.
ELECTRICAL STANDARD TEMPL/ELEC./SOP-04
Version: 1.0
OPERATING PROCEDURES
Stationary Electrified Date: 19.09.2017
Page 5 of 5
Crusher Plants
9. “Arc Welding” Related :

(A) Ensure there Should not be any Physical damage Occurred to the Welding Cables ,
Welding Holders & the Machine itself .
(B) Ensure Use of a Welding Cable of Sufficient Length for Earthing Purpose Up to the
Welding Point .
(C) Keep Flammable Gases (Acetylene & LPG) far away from any Welding Point .

10. “Grinding” Related :

(A) Ensure that the Area Surrounding the Grinding Location is Clear of People Since a
Stream of Sparks from an Angle Grinder Can travel Up to Several Meters and thus
Cause Injury .
(B) Check the External Surface of the Grinder including the Power Cable and Plug also
So as to Ensure that there are no Breaks , Damages Or Defects . Any Defective Tool
Should be Tagged Out of Service and repaired before it is Used again .
(C) Ensure to have a firm Hold of the Grinder With both Your Hands as it Kicks While
Starting Up ; Angle Grinders Should never be Used With One Hand therefore .
(D) Switch On the Grinder and Always allow it to build up Full Speed before You Start
Grinding .

11. “Diesel Generator” Related :

(A) Basic Installation , Operation & Maintenance Knowledge is a Must .


(B) Mountings Bolts of Engine , Radiator , Alternator , Canopy & Fan Guard etc.
Should be Checked and to be Found Tightened Under All Circumstances .
(C) Engine Oil , Radiator Water , Coolant , Hoses and Clamps of those Should always be
Monitored against Any Leakages .
(D) Fan and Alternator Belts’ Condition to be Checked Prior to Starting .
(E) Battery Terminals and Positive-Negative Cables Should be Checked Properly .
(F) Alternator’s Output Cable and it’s Lugs & Gland Should be Checked .
(G) Internal Wiring of DG’s OEM System Should be Checked Properly Prior to
Starting .
(H) Check that the Display Indications are Working and in Good Condition .
(I) When Working Under Or around DG Sets, for Inspections or Repairs etc., the DG
must be Locked and Tagged Out and Immobilized & Secured against Inadvertent
Movement .

Prepared By Approved By