RFP: LPG Facilities Consultants Needed
RFP: LPG Facilities Consultants Needed
FEBRUARY 2018
Page 1 of 95
INTRODUCTION
1. This Standard Request for Proposals (SRFP) has been prepared for use by public
entities in Kenya in the procurement of consultancy services and selection of
consultants.
2. The SRFP includes Standard form of Contract for Large Assignments and small
assignment which are for lump sum or time based payments.
4. The General Conditions of Contract should not be modified and instead the Special
Conditions of Contract should be used to reflect the unique circumstances of the
particular assignment. Similarly the information to consultants should only be
clarified or amended through the Appendix to information to Consultants.
5. This SRFP document shall be used where a shortlist of consultancy firms already
exist or has been obtained through a shortlist after an advertisement of Expression
of Interest for Consultancy required.
Page 2 of 95
SECTION I- LETTER OF INVITATION
1.1 Kenya Pipeline Company Limited invites sealed tenders from eligible service
providers to offer Preliminary Engineering Design, Tender Documentation and
Construction Supervision for the Proposed Liquefied Petroleum Gas Facilities
Development in Mombasa and Nairobi.
1.2 Interested eligible candidates can view and download the documents from the
website www.kpc.co.ke at no cost. Bidders will be required to register on the
website and ONLY email queries to [email protected]. No other email
addresses should be used. No other email addresses shall be used and KPC shall
not be liable if bidders choose to send their queries to other email addresses.
1.3 Interested eligible candidates shall attach the following mandatory requirements and
place them in a separate envelope marked “Mandatory Requirements”
Page 3 of 95
g) Signed site visit certificate and report; site visits shall be held on the
following days
Mombasa on the 22nd February 2018 at Kenya Petroleum Refineries
(KPRL), 10:00 am.
Nairobi on the 23rd February 2018 at Kenpipe Plaza, 10:00 am.
1.4 Prices quoted should be net inclusive of all taxes and delivery costs, must be
expressed in Kenya Shillings and shall remain valid for a period of (150) days from
the closing date of the tender.
1.5 There shall be no correction of arithmetic errors. The completed Price Schedules
shall match KPC requirements. Any amendments to the KPC price schedule shall be
considered non-responsive and result in disqualification of the bid.
1.6 Completed tender documents are to be enclosed in plain sealed envelopes, marked
with the tender number and be deposited in the tender box provided at Kenpipe
Plaza, Sekondi Road, Off Nanyuki Road, Industrial Area or be addressed and posted
to:
1.7 Tenders will be opened immediately thereafter in the presence of the tenderers
representatives who choose to attend the opening at Kenya Pipeline Company
Limited’s Kenpipe Plaza, Sekondi Road, Off Nanyuki Road, Industrial Area.
1.8 Tender documents are not transferable. Kenya Pipeline Ltd reserves the right to
accept or reject any tender either in whole or in part and is not bound to give reasons
thereof
Page 4 of 95
SECTION II – INFORMATION TO CONSULTANTS (ITC)
Table of Contents
Page
2.1 Introduction
2.9 Negotiations
2.11 Confidentiality
Page 5 of 95
SECTION II: - INFORMATION TO CONSULTANTS (ITC)
2.1 Introduction
2.1.1 The Client named the Appendix to “ITC” will select a firm among those invited to
submit a proposal, in accordance with the method of selection detailed in the
appendix. The method of selection shall be as indicated by the procuring entity in
the Appendix.
2.1.2 The consultants are invited to submit a Technical Proposal and a Financial
Proposal, or a Technical Proposal only, as specified in the Appendix “ITC” for
consulting services required for the assignment named in the said Appendix. A
Technical Proposal only may be submitted in assignments where the Client intends
to apply standard conditions of engagement and scales of fees for professional
services which are regulated as is the case with Building and Civil Engineering
Consulting services. In such a case the highest ranked firm of the technical
proposal shall be invited to negotiate a contract on the basis of scale fees. The
proposal will be the basis for Contract negotiations and ultimately for a signed
Contract with the selected firm.
2.1.3 The consultants must familiarize themselves with local conditions and take them
into account in preparing their proposals. To obtain first hand information on the
assignment and on the local conditions, consultants are encouraged to liase with
the Client regarding any information that they may require before submitting a
proposal and to attend a pre-proposal conference where applicable. Consultants
should contact the officials named in the Appendix “ITC” to arrange for any visit
or to obtain additional information on the pre-proposal conference. Consultants
should ensure that these officials are advised of the visit in adequate time to allow
them to make appropriate arrangements.
2.1.4 The Procuring entity will provide the inputs specified in the Appendix “ITC”,
assist the firm in obtaining licenses and permits needed to carry out the services
and make available relevant project data and reports.
2.1.5 Please note that (i) the costs of preparing the proposal and of negotiating the
Contract, including any visit to the Client are not reimbursable as a direct cost of
the assignment; and (ii) the Client is not bound to accept any of the proposals
submitted.
Page 6 of 95
2.1.6 The procuring entity’s employees, committee members, board members and their
relative (spouse and children) are not eligible to participate.
2.1.7 The procuring entity shall allow the tenderer to review the tender document free of
charge before purchase.
2.2.2 At any time before the submission of proposals, the Client may for any reason,
whether at his own initiative or in response to a clarification requested by an
invited firm, amend the RFP. Any amendment shall be issued in writing through
addenda. Addenda shall be sent by mail, cable, telex or facsimile to all invited
consultants and will be binding on them. The Client may at his discretion extend
the deadline for the submission of proposals.
2.3 Site Visit will be held from 22nd February to 23rd February 2018 at 10.00 a.m.
2.3.1 The Tenderer shall be required to visit the sites to acquaint him/herself with the
requirements of each. The Tenderer shall obtain for himself on his own
responsibility, all information that may be necessary for preparing the tender and
entering into a contract. The costs of visiting the site(s) shall be the tenderers own
responsibility.
Page 7 of 95
2.4 Joint Ventures and Local Participation
(i) The tender, and in case of a successful tender, the Form of Agreement, shall
be signed so as to be legally binding on all partners.
(ii) One of the partners shall be nominated as being in charge; and this
authorization shall be evidenced by submitting a power of attorney signed by
legally authorized signatories of all the partners.
(iii) The partner in charge shall be authorized to incur liabilities and receive
instructions for and on behalf of any and all partners of the joint venture and
the entire execution of the Contract including payment shall be done
exclusively with the partner in charge.
(iv) All partners of the joint venture shall be liable jointly and severally for the
execution of the Contract in accordance with the Contract terms, and a
relevant statement to this effect shall be included in the authorization
mentioned under (b) above as well as in the Form of Tender and the Form of
Agreement (in case of a successful tender).
(v) A copy of the agreement entered into by the joint venture partners shall be
submitted with the tender.
(vi) Firms incorporated in Kenya must demonstrate that citizens of Kenya hold a
minimum 51% shareholding to qualify for local firms.
2.5.2 In preparing the Technical Proposal, consultants are expected to examine the
documents constituting this RFP in detail. Material deficiencies in providing the
information requested may result in rejection of a proposal.
Page 8 of 95
2.5.3 While preparing the Technical Proposal, consultants must give particular attention
to the following:
(i) If a firm considers that it does not have all the expertise for the assignment,
it may obtain a full range of expertise by associating with individual
consultant(s) and/or other firms or entities in a joint venture or sub-
consultancy as appropriate. Consultants shall not associate with the other
consultants invited for this assignment. Any firms associating in
contravention of this requirement shall automatically be disqualified.
(iii) It is desirable that the majority of the key professional staff proposed be
permanent employees of the firm or have an extended and stable working
relationship with it.
(v) Alternative professional staff shall not be proposed and only one Curriculum
Vitae (CV) may be submitted for each position.
2.5.4 The Technical Proposal shall provide the following information using the attached
Standard Forms;
(iii) A description of the methodology and work plan for performing the
assignment.
Page 9 of 95
(iv) The list of the proposed staff team by specialty, the tasks that would be
assigned to each staff team member and their timing.
(v) CVs recently signed by the proposed professional staff and the authorized
representative submitting the proposal. Key information should include
number of years working for the firm/entity and degree of responsibility held
in various assignments during the last ten (10) years.
(vi) Estimates of the total staff input (professional and support staff staff-time)
needed to carry out the assignment supported by bar chart diagrams showing
the time proposed for each professional staff team member.
2.5.5 The Technical Proposal shall not include any financial information.
2.6.2 The Financial Proposal should clearly identify as a separate amount, the local
taxes, duties, fees, levies and other charges imposed under the law on the
consultants, the sub-consultants and their personnel, unless Appendix “A” specifies
otherwise.
2.6.3 Consultants shall express the price of their services in Kenya Shillings.
Page 10 of 95
2.6.4 Commissions and gratuities, if any, paid or to be paid by consultants and related to
the assignment will be listed in the Financial Proposal submission Form.
2.6.5 The Proposal must remain valid for 60 days after the submission date. During this
period, the consultant is expected to keep available, at his own cost, the
professional staff proposed for the assignment. The Client will make his best
effort to complete negotiations within this period. If the Client wishes to extend
the validity period of the proposals, the consultants shall agree to the extension.
2.7.1 The original proposal (Technical Proposal and, if required, Financial Proposal; see
para. 1.2) shall be prepared in indelible ink. It shall contain no interlineation or
overwriting, except as necessary to correct errors made by the firm itself. Any
such corrections must be initialed by the persons or person authorised to sign the
proposals.
2.7.2 For each proposal, the consultants shall prepare the number of copies indicated in
Appendix “A”. Each Technical Proposal and Financial Proposal shall be marked
“ORIGINAL” or “COPY” as appropriate. If there are any discrepancies between
the original and the copies of the proposal, the original shall govern.
2.7.3 The original and all copies of the Technical Proposal shall be placed in a sealed
envelope clearly marked “TECHNICAL PROPOSAL,” and the original and all
copies of the Financial Proposal in a sealed envelope clearly marked
“FINANCIAL PROPOSAL” and warning: “DO NOT OPEN WITH THE
TECHNICAL PROPOSAL”. Both envelopes shall be placed into an outer
envelope and sealed. This outer envelope shall bear the submission address and
other information indicated in the Appendix “ITC” and be clearly marked, “DO
NOT OPEN, EXCEPT IN PRESENCE OF THE OPENING COMMITTEE.”
2.7.4 The completed Technical and Financial Proposals must be delivered at the
submission address on or before the time and date stated in the Appendix “ITC”.
Any proposal received after the closing time for submission of proposals shall be
returned to the respective consultant unopened.
2.7.5 After the deadline for submission of proposals, the Technical Proposal shall be
opened immediately by the opening committee. The Financial Proposal shall
Page 11 of 95
remain sealed and deposited with a responsible officer of the client department up
to the time for public opening of financial proposals.
2.8.1 From the time the bids are opened to the time the Contract is awarded, if any
consultant wishes to contact the Client on any matter related to his proposal, he
should do so in writing at the address indicated in the Appendix “ITC”. Any effort
by the firm to influence the Client in the proposal evaluation, proposal comparison
or Contract award decisions shall result in the rejection of the consultant’s
proposal.
2.8.2 Evaluators of Technical Proposals shall have no access to the Financial Proposals
until the technical evaluation is concluded.
Page 12 of 95
2.9 Evaluation of Technical Proposal
2.9.1 The evaluation committee appointed by the Client shall evaluate the proposals on
the basis of their responsiveness to the Terms of Reference, applying the
evaluation criteria as follows;
Awarded
No. Evaluation Criteria Score
Score
a) Specific experience of the Consultant related to the Max 35
assignment that includes but not limited to:
i. Experience of firm(s) (Individually or cumulatively for
Joint Ventures) during the last 10 years for LPG
Storage facilities of cumulative capacities of 15,000
tons or more out of which the minimum storage
capacity per project should be 1000 tons in the
following areas; (Provide a list and reference letters for
projects done including the names and addresses of
clients and duration of the task as per the attached
form)
a. Engineering Design 15
i. Five (5) or more projects. 10
ii. Three (3) to four (4) projects. 7
iii. One (1) to two (2) projects. 0
iv. Zero (0).
b. Construction supervision 10
i. Five (5) or more projects. 7
ii. Three (3) to four (4) projects. 5
iii. One (1) to two (2) projects. 0
iv. Zero (0).
c. Project management
Experience in contract management and timely
delivery of similar projects. Attach completion
certificates/ discharge certificates for projects
completed. Marks shall be awarded based on
number of years in contract management 10
i. Five (5) or more projects. 3
ii. Three (3) to four (4) projects. 1
iii. One (1) to two (2) projects. 0
Page 13 of 95
Awarded
No. Evaluation Criteria Score
Score
iv. Zero (0).
b) Adequacy of the proposed Technical approach to the
work plan and the methodology in responding to the Max
terms of reference 20
i. Preliminary Engineering Design 7
ii. Construction Supervision Management 3
iii. Quality Assurance/ Quality Control 5
iv. HSE Management 3
v. Organization and Staffing Plan 2
c) Qualifications and competence of the key staff for the Max
assignment as in Appendix to ITC and CV. 15 years for 30
Project Manager and 10 years’ relevant experience for
other disciplines: The person must have a degree in the
relevant discipline.
1) Project Manager
a) Degree in Engineering – 1 mark
b) Experience in at least four (4) similar Projects
Project management – 3 marks
Construction supervision – 2 marks
2) Mechanical Engineer
a) Degree in Mechanical Engineering – 1 Mark
b) Experience in at least two (2) similar Projects
Engineering Design – 2 Marks
Construction – 2 Marks
3) Process Engineer
a) Degree in Mechanical Engineering (or equivalent) –
1 Mark
b) Experience in at least two (2) similar Projects
Engineering Design – 2 Mark
Construction – 2 Mark
4) Civil Engineer
a) Degree in Civil Engineering – 1 Mark
b) Experience in at least two (2) similar Projects
Engineering Design – 1 Mark
Construction – 1 Mark
5) Electrical Engineer
a) Degree in Electrical Engineering – 1 Mark
b) Experience in at least two (2) similar Projects
Page 14 of 95
Awarded
No. Evaluation Criteria Score
Score
Engineering Design – 1 Mark
Construction – 1 Mark
6) Instrumentation & Controls Engineer
a) Degree in Instrumentation/Telecom/Controls
Engineering (or equivalent) – 1 Mark
b) Experience in at least two (2) similar Projects
Engineering Design – 1 Mark
Construction – 1 Mark
7) HSE Engineer
a) Degree in Engineering – 1 Mark
b) Experience in at least two (2) similar Projects – 1
Mark
8) QA/QC Engineer (NDT Inspector)
a) Degree in Engineering – 1 Mark
b) Experience in at least two (3) similar Projects – 2
d) Firms capability Max
Average Annual Turnover (AAT) of the firm (Total of 15
the firms in case of JV and consortiums) in million
USD for the last five consecutive fiscal years.
Minimum AAT should be more than 10 million USD
individually OR cumulative in case of consortium.
i. >11 million
10
ii. 8 - 11 million
7
iii. 5 – 7 million
5
iv. < 5 million
2
Resources individually OR cumulative in case of
consortium
i. Permanent & contract Employees more than 100 Nos 5
ii. Permanent & contract Employees between 50 and 4
100 Nos.
iii. Permanent & contract Employees less than 50 Nos. 3
Total Points 100
Page 15 of 95
o An alternative formula for determining the financial scores is: None.
2.9.2 Each responsive proposal will be given a technical score (St). A proposal shall be
rejected at this stage if it does not respond to important aspects of the Terms of
Reference or if it fails to achieve the minimum technical score indicated in the
Appendix “ITC”.
2.8.1 After Technical Proposal evaluation, the Client shall notify those consultants
whose proposals did not meet the minimum qualifying mark or were considered
non-responsive to the RFP and Terms of Reference, indicating that their Financial
Proposals will be returned after completing the selection process. The Client shall
simultaneously notify the consultants who have secured the minimum qualifying
mark, indicating the date and time set for opening the Financial Proposals and
stating that the opening ceremony is open to those consultants who choose to
attend. The opening date shall not be sooner than seven (7) days after the
notification date. The notification may be sent by registered letter, cable, telex,
facsimile or electronic mail.
2.8.2 The Financial Proposals shall be opened publicly in the presence of the
consultants’ representatives who choose to attend. The name of the consultant, the
technical. Scores and the proposed prices shall be read aloud and recorded when
the Financial Proposals are opened. The Client shall prepare minutes of the public
opening.
2.8.3 The evaluation committee will determine whether the financial proposals are
complete The cost of any unpriced items shall be assumed to be included in other
costs in the proposal. In all cases, the total price of the Financial Proposal as
submitted shall prevail.
2.8.4 While comparing proposal prices between local and foreign firms participating in a
selection process in financial evaluation of Proposals, firms incorporated in Kenya
where indigenous Kenyans own 51% or more of the share capital shall be allowed
a 20% preferential bias in proposal prices. However, there shall be no such
Page 16 of 95
preference in the technical evaluation of the tenders. Proof of local incorporation
and citizenship shall be required before the provisions of this sub-clause are
applied. Details of such proof shall be attached by the Consultant in the financial
proposal.
2.8.5 The formulae for determining the Financial Score (Sf) shall, unless an alternative
formulae is indicated in the Appendix “ITC”, be as follows:-
Sf = 100 X FM/F where Sf is the financial score; Fm is the lowest priced financial
proposal and F is the price of the proposal under consideration. Proposals will be
ranked according to their combined technical (St) and financial (Sf) scores using
the weights (T=the weight given to the Technical Proposal: P = the weight given
to the Financial Proposal; T + p = I) indicated in the Appendix. The combined
technical and financial score, S, is calculated as follows:- S = St x T % + Sf x P %.
The firm achieving the highest combined technical and financial score will be
invited for negotiations.
2.8.6 The tender evaluation committee shall evaluate the tender within 30 days of from
the date of opening the tender.
2.8.7 Contract price variations shall not be allowed for contracts not exceeding one year
(12 months) and such variation shall not be considered in the first 12 months from
the date of signing the contract
2.8.8 Where contract price variation is allowed, the variation shall not exceed15% of the
original contract price
2.8.9 Price variation requests shall be processed by the procuring entity within 30 days
of receiving the request.
2.9 Negotiations
2.9.1 Negotiations will be held at the same address as “address to send information to
the Client” indicated in the Appendix “ITC”. The aim is to reach agreement on all
points and sign a contract.
2.9.2 Negotiations will include a discussion of the Technical Proposal, the proposed
methodology (work plan), staffing and any suggestions made by the firm to
improve the Terms of Reference. The Client and firm will then work out final
Page 17 of 95
Terms of Reference, staffing and bar charts indicating activities, staff periods in
the field and in the head office, staff-months, logistics and reporting. The agreed
work plan and final Terms of Reference will then be incorporated in the
“Description of Services” and form part of the Contract. Special attention will be
paid to getting the most the firm can offer within the available budget and to
clearly defining the inputs required from the Client to ensure satisfactory
implementation of the assignment.
2.9.3 Unless there are exceptional reasons, the financial negotiations will not involve the
remuneration rates for staff (no breakdown of fees).
2.9.4 Having selected the firm on the basis of, among other things, an evaluation of
proposed key professional staff, the Client expects to negotiate a contract on the
basis of the experts named in the proposal. Before contract negotiations, the Client
will require assurances that the experts will be actually available. The Client will
not consider substitutions during contract negotiations unless both parties agree
that undue delay in the selection process makes such substitution unavoidable or
that such changes are critical to meet the objectives of the assignment. If this is not
the case and if it is established that key staff were offered in the proposal without
confirming their availability, the firm may be disqualified.
2.9.5 The negotiations will conclude with a review of the draft form of the Contract. To
complete negotiations the Client and the selected firm will initial the agreed
Contract. If negotiations fail, the Client will invite the firm whose proposal
received the second highest score to negotiate a contract.
2.9.6 The procuring entity shall appoint a team for the purpose of the negotiations.
2.10.2The selected firm is expected to commence the assignment on the date and at
the location specified in Appendix “A”.
2.10.3 The parties to the contract shall have it signed within 30 days from the date of
notification of contract award unless there is an administrative review request.
Page 18 of 95
2.10.4 The procuring entity may at any time terminate procurement proceedings before
contract award and shall not be liable to any person for the termination.
2.10.5 The procuring entity shall give prompt notice of the termination to the tenderers
and on request give its reasons for termination within 14 days of receiving the
request from any tenderer.
2.10.6 To qualify for contract awards, the tenderer shall have the following:
(a) Necessary qualifications, capability experience, services, equipment and
facilities to provide what is being procured.
(b) Legal capacity to enter into a contract for procurement
(c) Shall not be insolvent, in receivership, bankrupt or in the process of being
wound up and is not the subject of legal proceedings relating to the foregoing.
(d) Shall not be debarred from participating in public procurement.
2.11 Confidentiality
2.12.1The procuring entity requires that the consultants observe the highest standards of
ethics during the selection and award of the consultancy contract and also during
the performance of the assignment. The tenderer shall sign a declaration that he has
not and will not be involved in corrupt or fraudulent practices.
2.12.2 The procuring entity will reject a proposal for award if it determines that the
consultant recommended for award has engaged in corrupt or fraudulent practices
in competing for the contract in question.
Page 19 of 95
Appendix to Information to Consultants
Clause Reference
2.1 The name of the Client is: Kenya Pipeline Company Limited
The name, objectives, and description of the assignment are: as stated in the tender
document
Page 20 of 95
(iv) The minimum required experience of proposed professional staff is:[Insert
title, number of years of professional experience, specific expertise]
__________________________________________________________________
_______(see tender document )
____________________________________________
2.5.2 Consultants must submit an original and two (2 ) additional Two (2 ) copies of
each proposal: yes
2.5.3 The proposal submission address is below. Information on the outer envelope
should also include: __
2.5.4 Proposals must be submitted no later than the following date and time:___10:00
am 2nd March 2018
Page 21 of 95
2.7.1Alternative formulae for determining the financial scores is the following:
Page 22 of 95
SECTION III: - TECHNICAL PROPOSAL
3.1 In preparing the technical proposals the consultant is expected to examine all terms
and information included in the RFP. Failure to provide all requested information
shall be at the consultants own risk and may result in rejection of the consultant’s
proposal.
3.2 The technical proposal shall provide all required information and any necessary
additional information and shall be prepared using the standard forms provided in
this Section.
3.3 The Technical proposal shall not include any financial information unless it is
allowed in the Appendix to information to the consultants or the Special
Conditions of contract.
Page 23 of 95
SECTION III - TECHNICAL PROPOSAL
Table of Contents
Page
1. Technical proposal submission form
2. Firms references
Page 24 of 95
1. TECHNICAL PROPOSAL SUBMISSION FORM
[_______________ Date]
Ladies/Gentlemen:
We, the undersigned, offer to provide the consulting services for __________________
_______________________________[Title of consulting services] in accordance with
your Request for Proposal dated ______________________[Date] and our Proposal. We
are hereby submitting our Proposal, which includes this Technical Proposal, [and a
Financial Proposal sealed under a separate envelope-where applicable].
We understand you are not bound to accept any Proposal that you receive.
We remain,
Yours sincerely,
_______________________________[Authorized Signature]:
Page 25 of 95
2. FIRM’S REFERENCES
Using the format below, provide information on each assignment for which your firm either
individually, as a corporate entity or in association, was legally contracted.
Firm/Entity(profiles):
Name of Client: Clients contact person for the assignment.
Address:
No of Staff-Months; Duration of
Assignment:
Start Date (Month/Year): Completion Date Approx. Value of Services (Kshs)
(Month/Year):
Page 26 of 95
3. COMMENTS AND SUGGESTIONS OF CONSULTANTS ON THE TERMS
OF REFERENCE AND ON DATA, SERVICES AND FACILITIES TO BE
PROVIDED BY THE CLIENT.
1.
2.
3.
4.
5.
1.
2.
3.
4.
5.
Page 27 of 95
14. DESCRIPTION OF THE METHODOLOGY AND WORK PLAN FOR
PERFORMING THE ASSIGNMENT
Page 28 of 95
5. TEAM COMPOSITION AND TASK ASSIGNMENTS
1. Technical/Managerial Staff
2. Support Staff
Page 29 of 95
6. FORMAT OF CURRICULUM VITAE (CV) FOR PROPOSED
PROFESSIONAL STAFF
Proposed Position:
_____________________________________________________________
Name of Firm:
_________________________________________________________________
Name of Staff:
__________________________________________________________________
Profession:
_____________________________________________________________________
Date of Birth:
__________________________________________________________________
Key Qualifications:
[Give an outline of staff member’s experience and training most pertinent to tasks on
assignment. Describe degree of responsibility held by staff member on relevant previous
assignments and give dates and locations].
Education:
Page 30 of 95
[Summarize college/university and other specialized education of staff member, giving
names of schools, dates attended and degree[s] obtained.]
Employment Record:
[Starting with present position, list in reverse order every employment held. List all
positions held by staff member since graduation, giving dates, names of employing
organizations, titles of positions held, and locations of assignments.]
Certification:
I, the undersigned, certify that these data correctly describe me, my qualifications, and
my experience.
_________________________________________________________ Date:
________________
[Signature of staff member]
___________________________________________________________________
Date; ______________
[Signature of authorised representative of the firm]
Page 31 of 95
7. TIME SCHEDULE FOR PROFESSIONAL PERSONNEL
Signature: ________________________
(Authorized representative)
Title: ______________________________
Address: ___________________________
Page 32 of 95
8. ACTIVITY (WORK) SCHEDULE
Activity (Work)
Reports Date
i. Inception Report 30 days from commencement date
Every 4th day of the following month for
ii. Progress Reports during design stage
progress reports.
iii. Draft Report on Preliminary Design 60 days from commencement date
iv. Final Report on Preliminary Design 90 days from commencement date
v. Draft Tender documents including
90 days from commencement date
functional specifications
105 days from commencement date and
vi. Final Tender Documents
inclusive of 14 days for Client Review
vii. Monthly progress Reports During Every 4th day of the following month for
Construction Period progress reports.
viii. Project Completion Report 28 days after end of defects liability period
ix. Asset Classification Report 28 days after end of defects liability period
Page 33 of 95
SECTION IV: - FINANCIAL PROPOSAL
4.1 The Financial proposal prepared by the consultant should list the costs associated
with the assignment. These costs normally cover remuneration for staff,
subsistence, transportation, services and equipment, printing of documents, surveys
etc as may be applicable. The costs should be broken done to be clearly
understood by the procuring entity.
4.2 The financial proposal shall be in Kenya Shillings or any other currency allowed in
the request for proposal and shall take into account the tax liability and cost of
insurances specified in the request for proposal.
4.3 The financial proposal should be prepared using the Standard forms provided in
this part
Page 34 of 95
SECTION IV - FINANCIAL PROPOSAL STANDARD FORMS
Table of Contents
Page
1. Financial proposal submission Form
2. Summary of costs
6. Miscellaneous expenses
Page 35 of 95
1. FINANCIAL PROPOSAL SUBMISSION FORM
________________[ Date]
To: ______________________________________
______________________________________
______________________________________
[Name and address of Client]
Ladies/Gentlemen:
We, the undersigned, offer to provide the consulting services for (____________) [Title
of consulting services] in accordance with your Request for Proposal dated
(__________________) [Date] and our Proposal. Our attached Financial Proposal is for
the sum of
(_________________________________________________________________)
[Amount in words and figures] inclusive of all the taxes.
We remain,
Yours sincerely,
_____________________________[Authorized Signature]
:
_____________________ [Name and Title of Signatory]:
______________________ [Address]
Page 36 of 95
2. SUMMARY OF COSTS
Page 37 of 95
3. BREAKDOWN OF PRICE PER ACTIVITY
Remuneration
Reimbursables
Miscellaneous Expenses
Subtotal _______________________________
Page 38 of 95
4. BREAKDOWN OF REMUNERATION PER ACTIVITY
Regular staff
1.
2.
3.
4.
5.
6.
Consultants
1.
2.
3.
Grand Total
Φ In addition to the staff salary, the rate should include where applicable any overtime,
local & overseas allowances, accommodation, paid vacation, sick leave, statutory
deductions and firms overheads & profits.
Page 39 of 95
5. REIMBURSABLES PER ACTIVITY
(ii). International LS
2 Road travel LS
3. Rail travel LS
4. Subsistence LS
Allowance
5. Offices cost¥ LS
Grand Total
¥Offices cost includes office consumables, clerical staff, messenger and driver(s).
Furnished site offices will be provided by the Client under the Contractor’s Contract
only during construction period; at Mombasa and Nairobi.
Page 40 of 95
6. MISCELLANEOUS EXPENSES
2. Drafting, reproduction of LS
reports
4. Software LS
Grand Total
Page 41 of 95
SECTION V: - TERMS OF REFERENCE
5.1 Terms of Reference are the initial statement to the consultant of the services to be
performed and should therefore be clear and precise and should contain the
following sections:
4. TRAINING .........................................................................................47
5.2 This Section should be prepared very carefully by the procuring entity to ensure
that the consultancy assignment is well understood by the consultants.
Page 42 of 95
5.3 TERMS OF REFERENCE FOR CONSULTANCY SERVICES FOR
PRELIMINARY ENGINEERING DESIGN, TENDER DOCUMENTATION AND
CONSTRUCTION SUPERVISION FOR THE PROPOSED LIQUEFIED
PETROLEUM GAS FACILITIES DEVELOPMENT IN MOMBASA AND
NAIROBI.
In Kenya, LPG is increasingly used as a source of fuel. Indeed, LPG usage is being
encouraged by the government to replace non-sustainable sources of biomass,
particularly in rural areas. 87% of Kenyans use solid fuels as their primary fuel
source for cooking while 5% use kerosene as a primary fuel. The heavy reliance on
inefficient traditional biomass sources exacerbates forest degradation and climate
change, and has detrimental impacts on health and poverty in Kenya.
To counter the above, the Kenya Pipeline Company intends to construct Large LPG
storage facilities in Nairobi and Mombasa to facilitate importation of large volumes of
LPG and thereby reduce the cost of LPG in the country and the region.
a) Design a 25,000 tons capacity LPG depot in Mombasa, with a provision for
expanding to 50,000 tons in future. The design is to cover the provision for LPG
marine offloading, pipeline transportation, storage, and truck and rail loading
facilities.
c) Design a 10,000 tons LPG depot in Nairobi. The design is to cover the provision
for LPG truck and rail offloading/loading, storage, and bottling facilities.
Page 43 of 95
5.4 SCOPE OF SERVICES
5.4.1 Preamble
a) The scope of work envisaged is the preparation of a design package and cost
estimate for a 50,000 tons LPG Offloading, Transportation, Storage and Loading
Facilities at Mombasa and 10,000 tons LPG Offloading, Storage, Loading Facilities
and Bottling plant in NAIROBI.
b) Develop engineering design packages that can be used to bid a lump sum for
Engineering, Procurement and Construction (EPC) scope.
c) Develop the design package with reference to “Basis of Design (BOD)” document,
“Study on Demand of LPG in the East African Region and Preliminary Design of
the required infrastructure within Kenya to meet the Demand – 2005” document
and “Feasibility study for Inland Bulk Liquefied Petroleum Gas Storage and
Bottling Facilities – 2013” document.
d) Carry out Hazard and Operability (HAZOP) Study for the project.
e) Prepare a ‘Project Risk Matrix’ with possible mitigation measures.
f) Offer supervisory services to the EPC contractor during execution of the projects.
g) Prepare cost estimates and provide sufficient level of detail such that EPC
contractor can be mobilized for the execution of the project.
h) Address Environmental and regulatory aspects through risk evaluations and
environmental screenings for health, safety and environmental (HSE) aspects, and
identification of legislative and environmental requirements and devise
environmental programmes comprising all necessary steps for obtaining approvals
and permits.
a) Data collection
The Consultant shall collect any necessary additional data and information for
undertaking the services outlined in the terms of reference.
Page 44 of 95
The Consultant shall undertake topographical survey, soil investigations,
inspection of existing facilities and liaison with the relevant institutions to
obtain sufficient details for the assignment.
The design must adhere to all the relevant international and local standards,
and applicable local legislations. Based on the information collected above, the
Consultant shall undertake the following:
i. Preliminary engineering design for the proposed LPG facilities and import
pipeline.
ii. Hydraulic design of the import pipeline profile taking into consideration
the operational philosophy and minimum/maximum allowable system
pressures to meet the projected unconstrained demand for the next ten
(10) years.
iii. Carry out a technical and financial evaluation to determine the optimal
tankage size for Mombasa and Nairobi Depots considering the limitations
at the Mombasa harbor and rail/road constraints.
v. Preliminary cost estimates for the entire facility based on the above
design using the current market rates.
The Consultant shall prepare a ‘Project Risk Matrix’ with possible mitigation
measures for discussion and adoption by the Client before approval of the
detailed engineering design.
Page 45 of 95
d) Contractor’s general obligations
f) Schedules
b) Specifications.
d) Equipment Datasheets.
e) Tender Evaluation
During the tendering process, the Consultant will prepare responses to all
requests for clarifications from the bidders for distribution by the Client.
Subsequently the submitted bids will be evaluated by the Client in accordance
with The Public Procurement and Disposal Act 2015
Page 46 of 95
f) Construction Supervision
The Consultant will supervise the construction of both the Nairobi and
Mombasa LPG depots and the LPG import pipeline between Kipevu and
Changamwe and all related works up to completion and attend to issues
arising during the defects liability period as below: -
g) Cost estimates
The Consultant shall provide a cost estimate breakdown for the entire project
based on the above design using the current market rates.
5.5 TRAINING
To enhance staff skills for optimal and efficient operation and maintenance of the
system, the Consultant shall undertake, oversee and coordinate training of KPC
staff for the purposes of capacity building, technology and knowledge transfer in
the following key areas:-
KPC shall second staff to the project who shall receive certification training on the
above. The Consultant shall facilitate and allow KPC staff to participate and attend
to facility designs in their offices, equipment production, factory tests, trainings
offered by equipment manufacturers, construction and commissioning. Training
Page 47 of 95
shall subsequently be provided to both operations and maintenance staff who will
be operating and maintaining the system.
a) Inception Report
The inception report shall be submitted to the Client, one month after
commencement date, in three (3) hardcopies and in soft copy (CD Rom or Flash
disc). The report shall contain the work programme detailing all steps of the
execution of the assignment. The report should also contain summary of the
findings from the review of available documents and the site inspection.
Page 48 of 95
f) Monthly Progress Report During Implementation
Monthly progress reports shall be submitted to the Client in three (3)
hardcopies and in soft copy (CD Rom or Flash disc) after commencement of
construction up to submission of final completion report. The report will
outline the progress achieved during the month and the overall progress,
delays, cash flow. The report will be submitted by the 4thday of each following
month.
The final project completion report shall be submitted fifty six (56) days after
end of defects liability period upon incorporation of the Clients comments.
The final asset classification report will be submitted fifty six (56) days after
the end of defects liability period upon incorporation of the Clients comments.
The asset classification report will include and not limited to the following:
i. Asset/ tag no. Manufacturing date, manufacturer, Country, year of
manufacturer, cost.
The Client will provide the information, facilities and assistance specified in
this request for proposal.
Page 50 of 95
SECTION VI:
NOTES
Page 51 of 95
ANNEX I
REPUBLIC OF KENYA
FOR
CONSULTING SERVICES
Large Assignments
(Lump- Sum payment)
CONTENTS
Special notes……………………………………………………………………………
iii
I Form of Contract………………………………………………………………..
v-vi
1. General Provisions…………………………………………………………
vii-viii
1.1 Definitions…………………………………………………….……
viii
1.2 Law Governing the Contract………………………………….. viii
1.3 Language…………………………………………………………..
viii
Page 52 of 95
1.4 Notices………………………………………………………………
viii
1.5 Location…………………………………………………………….
viii
1.6 Authorized Representatives…………………………………… viii
1.7 Taxes and Duties…………………………………………………
ix
3.3 Confidentiality……………………………………………….
xiii
Page 54 of 95
(i)
4 Consultant’s Personnel…………………………………………… xv
4.1 Description of Personnel…………………………… xv
4.2 Removal and/or Replacement of Personnel…… xv
IV Appendices………………………………………………………………………
xxi
Appendix A – Description of the Services………………………………… xxi
Appendix B – Reporting Requirements…………………………………… xxi
Appendix C – Key Personnel and Subconsultants………………………xxi
Appendix D – Breakdown of Contract Price in Foreign Currency……xxi
Appendix E – Breakdown of Contract Price in Local Currency………xxi
Appendix F – Services and Facilities Provided by the Client………… xxii
Page 55 of 95
(ii)
Special Notes
2. The Contract includes four parts: Form of Contract, the General Conditions of
Contract, the Special Conditions of Contract and the Appendices. The Client using
this standard contract should not alter the General Conditions. Any adjustment to
meet any specific project features should be made only in the Special Conditions.
Page 56 of 95
(iii)
Page 57 of 95
(iv)
I. FORM OF CONTRACT
This Agreement (hereinafter called the “Contract”) is made the ________)day of the month of
_______________[month], [year], between ___________________________________, [name of
client] of [or whose registered office is situated at
]_________________________________________[location of office] (hereinafter called the “Client”)
of the one part AND
WHEREAS
(a) the Client has requested the Consultant to provide certain consulting services as defined
in the General Conditions of Contract attached to this Contract (hereinafter called the
“Services”);
(b) the Consultant, having presented to the Client that he has the required professional skills
and personnel and technical resources, have agreed to provide the Services on the terms
and conditions set forth in this Contract;
1. The following documents attached hereto shall be deemed to form an integral part of this
Contract:
Page 58 of 95
(v)
2. The mutual rights and obligations of the Client and the Consultants shall be as set forth in the
Contract; in particular:
(a) The Consultant shall carry out the Services in accordance with the provisions of the
Contract; and
(b) the Client shall make payments to the Consultant in accordance with the provisions of the
Contract.
IN WITNESS WHEREOF, the Parties hereto have caused this Contract to be signed in their respective
names as of the day and year first above written.
[title]________________________________________________
[signature]___________________________________________
[date]________________________________________________
[title]______________________________________________
[signature]_________________________________________
[date]_______________________________________________
Page 59 of 95
(vi)
1. GENERAL PROVISIONS
1.1 Definitions Unless the context otherwise requires, the following terms
whenever used in this Contract shall have the following
meanings:
(vii)
1.2 Law Governing This Contract, its meaning and interpretation and the
the Contract relationship between the Parties shall be governed by the Laws
of Kenya.
1.3 Language This Contract has been executed in English language which
shall be the binding and controlling language for all matters
relating to the meaning or interpretation of this Contract.
1.4 Notices Any notice, request, or consent made pursuant to this Contract
shall be in writing and shall be deemed to have been made
when delivered in person to an authorized representative of the
Page 61 of 95
Party to whom the communication is addressed or when sent by
registered mail, telex, telegram or facsimile to such Party at the
address specified in the SC.
(viii)
1.7 Taxes and The Consultant, Sub consultant[s] and their personnel
Duties shall pay such taxes, duties, fees and other impositions as may
be levied under the Laws of Kenya, the amount of which is
deemed to have been included in the Contract Price.
2.1 Effectiveness of This Contract shall come into effect on the date the
Contract Contract is signed by both Parties or such other later date as
may be stated in the SC.
2.2 Commencement The Consultant shall begin carrying out the Services
of Services thirty (30) days after the date the Contract becomes effective or
at such other date as may be specified in the SC.
Page 62 of 95
2.4 Modification Modification of the terms and Conditions of this Contract,
including any modification of the scope of the Services or the
Contract Price, may only be made by written agreement
between the Parties.
2.5.1 Definition For the purposes of this Contract, “Force Majeure” means
an event which is beyond the reasonable control of a Party and
which makes a Party’s performance of its obligations under the
Contract impossible or so impractical as to be considered
impossible under the circumstances.
2.5.2 No Breach The failure of a Party to fulfill any of its obligations under
of Contract the Contract shall not be considered to be a breach of, or default
under, this Contract insofar as such inability arises from an
event of Force Majeure, provided that the Party affected by
such an event (a) has taken all reasonable precautions, due care
and reasonable alternative measures in order to carry out the
terms and conditions of this Contract, and (b) has informed the
other Party as soon as possible about the occurrence of such an
event.
(ix)
2.5.3 Extension Any period within which a Party shall, pursuant to this
Of Time Contract complete any action or task shall be extended for a
period equal to the time during which such Party was unable to
perform such action as a result of Force Majeure.
2.6.1 By the The Client may terminate this Contract by not less than
Client thirty (30) days’ written notice of termination to the Consultant,
to be given after the occurrence of any of the events specified in
this Clause;
Page 63 of 95
(a) if the Consultant does not remedy a failure in the
performance of his obligations under the Contract within
thirty (30) days after being notified or within any further
period as the Client may have subsequently approved in
writing;
(x)
Page 64 of 95
2.6.2 By the The Consultant may terminate this Contract by not less
Consultant than thirty (30) days’ written notice to the Client, such notice to
be given after the occurrence of any of the following events;
(a) if the Client fails to pay any monies due to the Consultant
pursuant to this Contract and not subject to dispute
pursuant to Clause 7 within sixty (60) days after
receiving written notice from the Consultant that such
payment is overdue; or
(xi)
3.2 Conflict of
Interests
Page 66 of 95
(xii)
3.2.2 Consultant The Consultant agrees that, during the term of this
and Contract and after its termination, the Consultant
Affiliates and his affiliates, as well as any Subconsultant
Not to be and any of his affiliates, shall be disqualified from
Otherwise providing goods, works or services (other than the
Interested in Services and any continuation thereof) for any
Project project resulting from or closely related to the
Services.
3.4 Insurance to be The Consultant (a) shall take out and maintain
Taken Out by the and shall cause any subconsultant[s] to take out
Consultant and maintain, at his (or the subconsultants’, as the case
may be) own cost but on terms and conditions approved
by the Client, insurance against the risks and for the
coverage, as shall be specified in the SC; and (b) at the
Client’s request, shall provide evidence to the Client
showing that such insurance has been taken out and
maintained and that the current premiums have been
paid.
(xiii)
3.6 Reporting The Consultants shall submit to the Client the reports
Obligations and documents specified in Appendix A in the form, in
the numbers, and within the periods set forth in the said
Appendix.
Page 68 of 95
of the ClientContract, deliver all such documents and software to the Client
together with a detailed inventory thereof. The Consultant
shall not use these documents for purposes unrelated to this
Contract without the prior approval of the other Party.
4. CONSULTANT’S PERSONNEL
4.2 Removal (a) Except as the Client may otherwise agree, no changes
and/or shall be made in the Key Personnel. If for any reason
Replacement beyond the reasonable control of the Consultant, it
Of Personnel becomes necessary to replace any of the Key
Personnel, the Consultant shall provide as a
replacement a person of equivalent or better
qualifications.
(xiv)
5.1 Assistance and The Client shall use his best efforts to ensure that
Exemptions he provides the Consultant such assistance
and exemptions as may be necessary for due
performance of this Contract.
5.2 Change in the If after the date of this Contract, there is any
Applicable Law change in the Laws of Kenya with respect to taxes
and duties which increases or decreases the cost of the
Services rendered by the Consultant, then the
remuneration and reimbursable expenses otherwise
payable to the Consultant under this Contract shall be
increased or decreased accordingly by agreement
between the Parties and corresponding adjustments shall
be made to the amounts referred to in Clause 6.2 (a) or
(b), as the case may be.
5.3 Services and Facilities The Client shall make available to the Consultant the
Services and Facilities listed under Appendix F.
(xv)
7. SETTLEMENT OF DISPUTES
7.1 Amicable Settlement The Parties shall use their best efforts to settle
amicably all disputes arising out of or in connection with
this Contract or its interpretation.
(xvi)
Page 71 of 95
7.2 Dispute Settlement Any dispute between the Parties as to matters
arising pursuant to this Contract that cannot be settled
amicably within thirty (30) days after receipt by one
Party of the other Party’s request for such amicable
settlement may be referred by either Party to the
arbitration and final decision of a person to
be agreed between the Parties. Failing agreement to
concur in the appointment of an Arbitrator, the
Arbitrator shall be appointed by the Chairman of the
Chartered Institute of Arbitrators, Kenya Branch, on the
request of the applying party.
Page 72 of 95
(xvii)
Client:
_____________________________________________
Attention:
_____________________________________________
Telephone:
_____________________________________________ Telex;
_____________________________________________
Facsimile:
_____________________________________________
Consultant:
_____________________________________________
Attention:
_____________________________________________
Telephone;
_____________________________________________
Telex:
_____________________________________________
Facsimile:
_____________________________________________
Page 73 of 95
For the Client:
_____________________________________________
For the
Consultant:__________________________________________
2.1 The date on which this Contract shall come into effect
is(_________________) [date].
Note: Fill in the period, eg, twenty-four (24) months or such other
period as the Parties may agree in writing.
(xviii)
Page 74 of 95
Note: (a) This sample Clause should be specifically drafted for each
Contract and the following installments are indicative only; (b) if the
payment of foreign currency and of local currency does not follow the
same schedule, add a separate schedule for payment in local
currency; and (c) if applicable, detail further the nature of the report
evidencing performance, as may be required, e.g., submission of study
or specific phase of study, survey, drawings, draft bidding documents,
etc., as listed in Appendix B, Reporting Requirements. In the example
provided, the bank guarantee for the repayment is released when the
payments have reached 50 percent of the lump-sum price, because it
is assumed that at that point, the advance has been entirely set off
against the performance of services.
(xix)
Page 75 of 95
IV. Appendices
Give detailed descriptions of the Services to be provided, dates for completion of various
tasks, place of performance for different tasks, specific tasks to be approved by Client,
etc.
List format, frequency, and contents of reports; persons to receive them; dates of
submission; etc. If no reports are to be submitted, state here “Not applicable.”
List under: C-1 Titles [and names, if already available], detailed job descriptions
and minimum qualifications of Personnel and staff-months for each.
List here the elements of cost used to arrive at the breakdown of the lump-sum price –
foreign currency portion:
2. Reimbursable expenditures.
This appendix will exclusively be used for determining remuneration for additional
services.
List here the elements of cost used to arrive at the breakdown of the lump-sum
price – local currency portion.
(xx)
This appendix will exclusively be used for determining remuneration for additional
services.
Page 77 of 95
(xxi)
ANNEX II
LARGE ASSIGNMENTS
AND
Small Assignments
Time-Based Payments
Page 78 of 95
SAMPLE CONTRACT FOR CONSULTING SEVICES
SMALL ASSIGNMENTS
TIME-BASED PAYMENTS
CONTRACT
This Agreement [hereinafter called “the Contract”) is entered into this _____________
[Insert starting date of assignment], by and between
___________________________________________________
[Insert Client’s name] of [or whose registered office is situated at]
__________________________________________________[insert Client’s
address](hereinafter called “the Client”) of the one part AND
WHEREAS, the Client wishes to have the Consultant perform the Services [hereinafter
referred to as “the Services”, and
2. Term The Consultant shall perform the Services during the period
commencing __________________[Insert start date] and continuing
through to________________[Insert completion date] or any other
period(s) as may be subsequently agreed by the parties in writing.
Page 79 of 95
3. Payment A. Ceiling
(i)
B. Remuneration
The Client shall pay the Consultant for Services rendered at the
rate(s) per man/month spent (or per day spent or per hour spent,
subject to a maximum of eight hours per day) in accordance
with the rates agreed and specified in Appendix C, “Cost
Estimate of Services, List of Personnel and Schedule of Rates”.
C. Reimbursables
D. Payment Conditions.
Page 80 of 95
Payment shall be made in Kenya shillings unless otherwise
specified not later than thirty {30} days following submission
of invoices in duplicate to the Coordinator designated in Clause
4 herebelow. If the Client has delayed payments beyond thirty
(30) days after the date hereof, simple interest shall be paid to
the Consultant for each day of delay at a rate three percentage
points above the prevailing Central Bank of Kenya’s average
rate for base lending.
The parties shall use their best efforts to settle amicably all
disputes arising out of or in connection with this Contract or its
interpretation.
4. Project A. Coordinator
Administration
The Client designates _______________________
[Insert name] as Client’s Coordinator; the Coordinator shall be
responsible for the coordination of activities under the Contract,
for receiving and approving invoices
(ii)
for payment and for acceptance of the deliverables by the
Client.
B. Timesheets.
During the course of their work under this Contract, including
field work, the Consultant’s employees
6. Confidentiality The Consultant shall not, during the term of this Contract and
within two years after its expiration, disclose any proprietary or
confidential information relating to the Services, this Contract
or the Client’s business or operations without the prior written
consent of the Client.
8. Consultant Not The Consultant agrees that during the term of this
to be Engaged Contract and after its termination, the Consultant and
in Certain any entity affiliated with the Consultant shall be
Activities disqualified from providing goods, works or services (other than
the Services or any continuation thereof) for any project
resulting from or closely related to the Services.
9. Insurance The Consultant will be responsible for taking out any
appropriate insurance coverage.
(iii)
10. Assignment The Consultant shall not assign this Contract or Subcontract
any portion thereof without the Client’s prior written consent.
11. Law Governing The Contract shall be governed by the Laws of Kenya and
Contract and the language of the Contract shall be English Language.
Language
12. Dispute Any dispute arising out of this Contract which cannot be
Resolution amicably settled between the parties, shall be referred by either
party to the arbitration and final decision of a person to be
agreed between the parties. Failing agreement to concur in the
Page 82 of 95
appointment of an Arbitrator, the Arbitrator shall be appointed
by the chairman of the Chartered Institute of Arbitrators, Kenya
branch, on the request of the applying party.
Signature;________________________
Signature;______________________
Date;____________________________
Date;___________________________
Page 83 of 95
(iv)
LIST OF APPENDICES
Page 84 of 95
(v)
APPENDIX C
Rate Time
(per spent(number
month/day/hour in of month/day/ Total
Name currency) hour) (currency)
(a) Team Leader
(b)
(c)
Sub-Total (1)
(2) Reimbursables
Page 85 of 95
(vi)
ANNEX III
Small Assignments
Lump-sum payments
Page 86 of 95
SAMPLE CONTRACT FOR CONSULTING SERVICES
SMALL ASSIGNMENTS
LUMP-SUM PAYMENTS
CONTRACT
WHEREAS the Client wishes to have the Consultant perform the services [hereinafter
referred to as “the Services”, and
(iii) The Consultant shall submit to the Client the reports in the form
and within the time periods specified in Appendix C,
“Consultant’s Reporting Obligations.”
2. Term The Consultant shall perform the Services during the period
commencing on_____________ [Insert starting date] and continuing
through to_____________ [Insert completion date], or any other
period(s) as may be subsequently agreed by the parties in writing.
(i)
Page 87 of 95
3. Payment A. Ceiling
For Services rendered pursuant to Appendix A, the Client shall
pay the Consultant an amount not to exceed___
_____________ [Insert amount]. This amount has been
established based on the understanding that it includes all of the
Consultant’s costs and profits as well as any tax obligation that
may be imposed on the Consultant.
B. Schedule of Payments
Kshs______________________ Total
C. Payment Conditions
4. Project A. Coordinator.
Administration
The Client designates __________________[insert name] as
Client’s Coordinator; the Coordinator will be responsible for
Page 88 of 95
the coordination of activities under this Contract, for acceptance
and approval of the reports and of other deliverables by the
Client and for receiving and approving invoices for payment.
B. Reports.
6. Confidentiality The Consultant shall not, during the term of this Contract and
within two years after its expiration, disclose any proprietary or
confidential information relating to the Services, this Contract
or the Client’s business or operations without the prior written
consent of the Client.
8. Consultant Not The Consultant agrees that during the term of this
to be Engaged Contract and after its termination the Consultant and
in certain any entity affiliated with the Consultant shall be
Activities disqualified from providing goods, works or services (other
than the Services and any continuation thereof) for any project
resulting from or closely related to the Services.
11. Law Governing The Contract shall be governed by the laws of Kenya and
Contract and the language of the Contract shall be English Language.
Language
12. Dispute
Resolution
Dispute If, after thirty (30) days from the commencement of such
Settlement informal negotiations both parties have been unable to
resolve amicably a contract dispute, both parties can seek
for further redress under the law of Kenya – High Court
of Kenya.
(iii)
Title: ____________________________________Title:
____________________________
Signature;_______________________________Signature;____________________
Date;____________________________________Date;_________________________
Page 90 of 95
(iv)LIST OF APPENDICES
Page 91 of 95
(v)
Tender Name
This is to notify that the contract/s stated below under the above mentioned tender have
been awarded to you.
2. The contract/contracts shall be signed by the parties within 30 days of the date of
this letter but not earlier than 14 days from the date of the letter.
3. You may contact the officer(s) whose particulars appear below on the subject
matter of this letter of notification of award.
(FULL PARTICULARS)
APPLICATION NO…………….OF……….….20……...
BETWEEN
…………………………………………….APPLICANT
AND
Request for review of the decision of the…………… (Name of the Procuring Entity) of
……………dated the…day of ………….20……….in the matter of Tender
No………..…of …………..20…
REQUEST FOR REVIEW
I/We……………………………,the above named Applicant(s), of address: Physical
address…………….Fax No……Tel. No……..Email ……………, hereby request the
Public Procurement Administrative Review Board to review the whole/part of the above
mentioned decision on the following grounds , namely:-
1.
2.
etc.
By this memorandum, the Applicant requests the Board for an order/orders that: -
1.
2.
Page 93 of 95
etc
SIGNED ……………….(Applicant)
Dated on…………….day of ……………/…20…
SIGNED
Board Secretary
Page 94 of 95
DECLARATION FORM
To: Date:
……………………..
The Managing Director,
Kenya Pipeline Company Ltd,
KenPipe Plaza
Sekondi Rd, off Nanyuki Rd, Industrial Area
P. O. Box 73442–00200
Nairobi, Kenya.
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………
b) Has not been convicted or involved in and will not be involved in corrupt
and fraudulent practices.
……………………………………………………………………………
Name Signature Date
Page 95 of 95