Metalcraft Corrugate Commercial Vertical Claddingjan2023
Metalcraft Corrugate Commercial Vertical Claddingjan2023
Metalcraft
Roofing
CVCG www.metalcraftgroup.co.nz
AS PER E2/ASI
SITUATION 1 SITUATION 2 SITUATION 3
1. LOW, MEDIUM, HIGH W IND ZONES, 1. ALL ROOF PITCHES IN VERY HIGH 1. FOR ALL ROOF PITCHES IN EXTRA
W HERE ROOF PITCH ≥ 10° W IND ZONE HIGH W IND ZONES
2. LOW, MEDIUM, HIGH W IND ZONES
W HERE ROOF PITCH ≤ 10°
Z MIN. 50mm (VERTICALLY DOWN FACE - SMOOTH) MIN. 75mm (VERTICALLY DOWN FACE - SMOOTH) CONTINUOUS TIMBER PACKING
MIN. 75mm (VERTICALLY DOWN FACE - PROFILED) MIN. 100mm (VERTICALLY DOWN FACE - PROFILED)
MIN. 5.00°
STOPENDS TO WALL CLADDING
20
15
5 GAP
Z
Z
ALTERNATIVE OPTION
BIRDS BEAK EDGE
METALCRAFT MSS PURLIN
BY ENGINEER PRE-FINISHED SEALED POP RIVET OR
HEMMED EDGE PRE-FINISHED 8g WAFER-TEK SCREW
www.metalcraftgroup.co.nz
the responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailed
as a single line for simplicity and is indicative only. Building paper type and method of installation should
comply with underlay manufacturers recommendations and NZBC regulations.
Reference CVCG Date JAN 2023 Scale 1:2 Sheet F 01 / 18
PERMEABLE WALL
METALCRAFT CORRUGATE UNDERLAY, SHOWN
VERTICAL CLADDING DASHED
SEPARATE BATTEN AND
PRE FINISHED SELF TAPPING CLADDING AS REQUIRED
SCREW WITH NEOPRENE WITH DPC
WASHER
20mm HORIZONTAL CAVITY
CONTINUOUS MEMBRANE BATTEN
DRESSED THROUGH BASE AND
UP SIDES OF OPENING WITH WALL FRAMING
UPPER EDGES SEALED AGAINST
CLADDING. RETURN ALONG BACK 8g WAFER-TEK SCREW
OF RAINWATER HEAD
RAINWATER HEAD
CAVITY CLOSER
SCUPPER
TRUE ROOF LINE BEHIND
50
RAINWATER HEAD
OVERFLOW BELOW
OPENING LEVEL,1.5 x
25
DOWNPIPE DIAMETER
MEMBRANE ON ROOF
RETURN SUBSTRATE
MEMBRANE AT END
OF LIP
PRE FINISHED SELF
TAPPING SCREW WITH
METALCRAFT CORRUGATE
NEOPRENE WASHER
VERTICAL CLADDING
www.metalcraftgroup.co.nz
the responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailed
as a single line for simplicity and is indicative only. Building paper type and method of installation should
comply with underlay manufacturers recommendations and NZBC regulations.
Reference CVCG Date JAN 2023 Scale 1:2 Sheet F 02 / 18
PRE-FINISHED FLAT HEAD WAFER-TEK SCREW PRE-FINISHED
FOR FLASHING FIXED INTO SUBSTRATE SOFFIT FLASHING
SOFFIT LINING
COVER CLADDING
(MIN. 35mm)
INTERNAL CEILING LINING
60mm
SEPARATE BATTEN AND
FLASHING WITH DPC AS
REQUIRED
MIN. 50mm
PRE-FINISHED SELF
DRILLING/TAPPING SCREW
WITH NEOPRENE WASHER
METALCRAFT CORRUGATE
VERTICAL CLADDING
PRE-FINISHED SEALED POP
RIVET OR PRE-FINISHED 8g
WAFER-TEK SCREW 20mm HORIZONTAL CAVITY
BATTEN
www.metalcraftgroup.co.nz
the responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailed
as a single line for simplicity and is indicative only. Building paper type and method of installation should
comply with underlay manufacturers recommendations and NZBC regulations.
Reference CVCG Date JAN 2023 Scale 1:2 Sheet F 03 / 18
METALCRAFT CORRUGATE VERTICAL
CLADDING
EXTRA PERMEABLE WALL UNDERLAY
INTERNAL WALL LINING OVER WINDOW HEAD FLASHING,
SHOWN DASHED
GAP
METALCRAFT MSS PURLINS BY
ENGINEER
5mm
PERMEABLE WALL UNDERLAY
DRESSED INTO OPENING WITH
FLEXIBLE FLASHING TAPE INSTALLED
10mm GAP
OVER WRAP TO CORNERS AT HEAD
WINDOW HEAD
Metalcraft
Roofing
DISCLAIMER:
All details are to be used for indicative purposes only and the designer should consult both the MRM
code of practice version 3.0 / 2022, E2 and all other relevant building codes
Details of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms is
Corrugate Rev. 1.0 COMMERCIAL VERTICAL CLADDING
www.metalcraftgroup.co.nz
the responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailed
as a single line for simplicity and is indicative only. Building paper type and method of installation should
comply with underlay manufacturers recommendations and NZBC regulations.
Reference CVCG Date JAN 2023 Scale 1:2 Sheet F 04 / 18
LINE OF WINDOW JAMB LINE OF JAMB FLASHING BEHIND
LINER BEHIND
5mm GAP
METALCRAFT MSS PURLIN BY
ENGINEER
COVER CLADDING
70mm (MIN. 30mm)
SEPARATE BATTEN AND FLASHING
WITH DPC AS REQUIRED
WINDOW SILL
Metalcraft
Roofing
DISCLAIMER:
All details are to be used for indicative purposes only and the designer should consult both the MRM
code of practice version 3.0 / 2022, E2 and all other relevant building codes
Details of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms is
Corrugate Rev. 1.0 COMMERCIAL VERTICAL CLADDING
www.metalcraftgroup.co.nz
the responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailed
as a single line for simplicity and is indicative only. Building paper type and method of installation should
comply with underlay manufacturers recommendations and NZBC regulations.
Reference CVCG Date JAN 2023 Scale 1:2 Sheet F 05 / 18
INTERNAL WALL LINING
ALTERNATIVE OPTION
PRE-FINISHED SECONDARY
FLASHING IF REQURIED
5mm GAP
METALCRAFT CORRUGATE
VERTICAL CLADDING
MIN. 10mm COVER
PRE-FINISHED SEALED POP RIVET OR PRE- LINE OF HEAD FLASHING ABOVE
FINISHED 8g WAFER-TEK SCREW
MIN. 2 CORRUGATIONS 5mm GAP
WINDOW JAMB
Metalcraft
Roofing
DISCLAIMER:
All details are to be used for indicative purposes only and the designer should consult both the MRM
code of practice version 3.0 / 2022, E2 and all other relevant building codes
Details of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms is
Corrugate Rev. 1.0 COMMERCIAL VERTICAL CLADDING
www.metalcraftgroup.co.nz
the responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailed
as a single line for simplicity and is indicative only. Building paper type and method of installation should
comply with underlay manufacturers recommendations and NZBC regulations.
Reference CVCG Date JAN 2023 Scale 1:2 Sheet F 06 / 18
METALCRAFT CORRUGATE VERTICAL
INTERNAL WALL LINING
CLADDING
SEPARATE BATTEN AND CLADDING AS
EXTRA PERMEABLE WALL UNDERLAY REQUIRED WITH DPC
OVER WINDOW HEAD FLASHING
SHOWN DASHED 20mm HORIZONTAL CAVITY BATTEN
GAP
PERMEABLE WALL UNDERLAY
DRESSED INTO OPENING WITH
5mm
FLEXIBLE FLASHING TAPE INSTALLED
OVER WRAP TO CORNERS AT HEAD
METERBOX HEAD
Metalcraft
Roofing
DISCLAIMER:
All details are to be used for indicative purposes only and the designer should consult both the MRM
code of practice version 3.0 / 2022, E2 and all other relevant building codes
Details of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms is
Corrugate Rev. 1.0 COMMERCIAL VERTICAL CLADDING
www.metalcraftgroup.co.nz
the responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailed
as a single line for simplicity and is indicative only. Building paper type and method of installation should
comply with underlay manufacturers recommendations and NZBC regulations.
Reference CVCG Date JAN 2023 Scale 1:2 Sheet F 07 / 18
INTERNAL WALL LINING
COVER CLADDING
60mm (MIN. 35mm)
STOPENDS TO WALL CLADDING
METERBOX SILL
Metalcraft
Roofing
DISCLAIMER:
All details are to be used for indicative purposes only and the designer should consult both the MRM
code of practice version 3.0 / 2022, E2 and all other relevant building codes
Details of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms is
Corrugate Rev. 1.0 COMMERCIAL VERTICAL CLADDING
www.metalcraftgroup.co.nz
the responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailed
as a single line for simplicity and is indicative only. Building paper type and method of installation should
comply with underlay manufacturers recommendations and NZBC regulations.
Reference CVCG Date JAN 2023 Scale 1:2 Sheet F 08 / 18
INTERNAL WALL LINING METALCRAFT MSS PURLIN
BY ENGINEER
METALCRAFT CORRUGATE
LINE OF HEAD FLASHING ABOVE
VERTICAL CLADDING
METERBOX JAMB
Metalcraft
Roofing
DISCLAIMER:
All details are to be used for indicative purposes only and the designer should consult both the MRM
code of practice version 3.0 / 2022, E2 and all other relevant building codes
Details of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms is
Corrugate Rev. 1.0 COMMERCIAL VERTICAL CLADDING
www.metalcraftgroup.co.nz
the responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailed
as a single line for simplicity and is indicative only. Building paper type and method of installation should
comply with underlay manufacturers recommendations and NZBC regulations.
Reference CVCG Date JAN 2023 Scale 1:2 Sheet F 09 / 18
MIN. 2 CORRUGATIONS
ALTERNATIVE OPTION
METALCRAFT
CORRUGATE VERTICAL
CLADDING
DIMENSION TO SUIT
20mm HORIZONTAL CAVITY
SUGGEST MIN. 100mm BATTEN
PRE-FINISHED INTERNAL
CORNER FLASHING
PERMEABLE WALL
UNDERLAY, SHOWN
DASHED
PRE-FINISHED FLAT
HEAD WAFER-TEK
SCREW WITH EPDM
WASHER
SEPARATE BATTEN AND
FLASHING WITH DPC AS
REQUIRED
5mm GAP
PRE-FINISHED SECONDARY
FLASHING
www.metalcraftgroup.co.nz
the responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailed
as a single line for simplicity and is indicative only. Building paper type and method of installation should
comply with underlay manufacturers recommendations and NZBC regulations.
Reference CVCG Date JAN 2023 Scale 1:2 Sheet F 10 / 18
20mm HORIZONTAL
CAVITY BATTEN
MIN. 2 CORRUGATIONS
PRE-FINISHED EXTERNAL
CORNER FLASHING
5m
m
GA
SEPARATE BATTEN AND
P
FLASHING WITH DPC AS
REQUIRED
PRE-FINISHED
SECONDARY FLASHING
PRE-FINISHED SEALED
POP RIVET OR PRE-
5mm GAP FINISHED 8g WAFER-TEK
10
mm
SCREW
GA
P
PERMEABLE WALL
UNDERLAY, SHOWN
DASHED
METALCRAFT CORRUGATE
VERTICAL CLADDING
EXTERNAL CORNER
Metalcraft
Roofing
DISCLAIMER:
All details are to be used for indicative purposes only and the designer should consult both the MRM
code of practice version 3.0 / 2022, E2 and all other relevant building codes
Details of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms is
Corrugate Rev. 1.0 COMMERCIAL VERTICAL CLADDING
www.metalcraftgroup.co.nz
the responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailed
as a single line for simplicity and is indicative only. Building paper type and method of installation should
comply with underlay manufacturers recommendations and NZBC regulations.
Reference CVCG Date JAN 2023 Scale 1:2 Sheet F 11 / 18
PRE-FINISHED SOAKER METALCRAFT
FLASHING TO LINE UP WITH SOAKER FLASHING ONLY REQUIRED CORRUGATE VERTICAL
WINDOW JAMB ABOVE TO LINE UP WITH WINDOW JAMB CLADDING
ABOVE.
REFER TO MRM CODE OF PRACTICE
VERSION 3.0 /2022 FOR REQUIRMENT.
SOAKER FLASHING
Metalcraft
Roofing
DISCLAIMER:
All details are to be used for indicative purposes only and the designer should consult both the MRM
code of practice version 3.0 / 2022, E2 and all other relevant building codes
Details of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms is
Corrugate Rev. 1.0 COMMERCIAL VERTICAL CLADDING
www.metalcraftgroup.co.nz
the responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailed
as a single line for simplicity and is indicative only. Building paper type and method of installation should
comply with underlay manufacturers recommendations and NZBC regulations.
Reference CVCG Date JAN 2023 Scale 1:2 Sheet F 12 / 18
PRE FINISHED MATERIAL
FLASHING
5mm GAP
PERMEABLE WALL
UNDERLAY, SHOWN DASHED
www.metalcraftgroup.co.nz
the responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailed
as a single line for simplicity and is indicative only. Building paper type and method of installation should
comply with underlay manufacturers recommendations and NZBC regulations.
Reference CVCG Date JAN 2023 Scale 1:2 Sheet F 13 / 18
CONCRETE WALL BY
OTHERS
PRE-FINISHED
ALUMINIUM FLASHING
PRE FINISHED
ALUMINIUM FLASHING
PRE FINISHED
SECONDARY FLASHING
PERMEABLE WALL
UNDERLAY, SHOWN
DASHED
WALL FRAMING
CLADDING ABUTMENT
Metalcraft
Roofing
DISCLAIMER:
All details are to be used for indicative purposes only and the designer should consult both the MRM
code of practice version 3.0 / 2022, E2 and all other relevant building codes
Details of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms is
Corrugate Rev. 1.0 COMMERCIAL VERTICAL CLADDING
www.metalcraftgroup.co.nz
the responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailed
as a single line for simplicity and is indicative only. Building paper type and method of installation should
comply with underlay manufacturers recommendations and NZBC regulations.
Reference CVCG Date JAN 2023 Scale 1:2 Sheet F 14 / 18
PERMEABLE WALL UNDERLAY,
SHOWN DASHED
METALCRAFT CORRUGATE
VERTICAL CLADDING
INTERNAL WALL LINING
3 - 5mm
PROFILED METAL CLADDING AND LARGE FLAT SURFACES
VENTIL
APPLICATION
25mm CLEARANCE AT GARAGE DOOR
SHELTERED AREAS OR CLADDING ABUTTING A
35mm DECK
75mm UNLINED BUILDINGS
LINED BUILDINGS AND DWELLINGS. STONE CHIP
100mm
GROUND SURFACE
150mm KEPT LAWN GROUND SURFACE
175mm PASTURE GROUND SURFACE
www.metalcraftgroup.co.nz
the responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailed
as a single line for simplicity and is indicative only. Building paper type and method of installation should
comply with underlay manufacturers recommendations and NZBC regulations.
Reference CVCG Date JAN 2023 Scale 1:2 Sheet F 15 / 18
INTERNAL WALL LINING
METALCRAFT CORRUGATE
VERTICAL CLADDING
GAP
CONCRETE SLAB
ION
ALTERNATIVE OPTION
ILAT
BIRDS BEAK EDGE
ENT
APPLICATION
25mm CLEARANCE AT GARAGE DOOR
SHELTERED AREAS OR CLADDING ABUTTING A
35mm DECK
75mm UNLINED BUILDINGS
LINED BUILDINGS AND DWELLINGS. STONE CHIP
100mm
GROUND SURFACE
150mm KEPT LAWN GROUND SURFACE
175mm PASTURE GROUND SURFACE
www.metalcraftgroup.co.nz
the responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailed
as a single line for simplicity and is indicative only. Building paper type and method of installation should
comply with underlay manufacturers recommendations and NZBC regulations.
Reference CVCG Date JAN 2023 Scale 1:2 Sheet F 16 / 18
OR
METALCRAF
T
CORRUGAT
E VERTICAL
CLADDING
SECONDARY
DEFENCE SOAKERS
HEAD FLASHING WHEN REQUIRED
ALUMINIUM
WINDOW
JOINERY
JAMB FLASHING
INDICATIVE
SILL FLASHING
3D WINDOW FLASHINGS
Metalcraft
Roofing
DISCLAIMER:
All details are to be used for indicative purposes only and the designer should consult both the MRM
code of practice version 3.0 / 2022, E2 and all other relevant building codes
Details of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms is
Corrugate Rev. 1.0 COMMERCIAL VERTICAL CLADDING
www.metalcraftgroup.co.nz
the responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailed
as a single line for simplicity and is indicative only. Building paper type and method of installation should
comply with underlay manufacturers recommendations and NZBC regulations.
Reference CVCG Date JAN 2023 Scale Sheet F 17 / 18
METALCRAFT CORRUGATE VERTICAL
N CLADDING
MI
mm G
0 IN
20 PEN
O
N
MI E
0 mmR SID
5 HE
EIT
75 mm MIN
OPENING
DOWNPIPE
3D RAINWATER HEAD
Metalcraft
Roofing
DISCLAIMER:
All details are to be used for indicative purposes only and the designer should consult both the MRM
code of practice version 3.0 / 2022, E2 and all other relevant building codes
Details of the supporting mechanisms are indicative only. Compliance of the supporting mechanisms is
Corrugate Rev. 1.0 COMMERCIAL VERTICAL CLADDING
www.metalcraftgroup.co.nz
the responsibility of the designer. Construction detail can vary for wall cladding. The underlay is detailed
as a single line for simplicity and is indicative only. Building paper type and method of installation should
comply with underlay manufacturers recommendations and NZBC regulations.
Reference CVCG Date JAN 2023 Scale Sheet F 18 / 18