5.1 IEC-61363 Short Circuit

Uploaded by

lidula
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
386 views8 pages

5.1 IEC-61363 Short Circuit

Uploaded by

lidula
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

ETAP Workshop Notes

Short Circuit Analysis


Aim: To perform SC calculation by IEC-61363 standard

In order to ensure that an overtly conservative approach is not taken, that could increase
equipment requirements leading to weight and space constraints on mobile or fixed
offshore installations, IEC 61363 standard is also being used for short circuit studies in
shipping and offshore industry as per the title of the IEC 61363 standard which is
‘Electrical installations of ships and mobile and fixed offshore units – Part 1:
Procedures for calculating short-circuit currents in three-phase a.c.’

The IEC 61363 standard is known to evaluate short-circuit currents within sufficient
accuracy that is suitable for practical applications after allowing for generator pre-
loading and appropriate fault current attenuation based on actual data of generator
impedance and time constants.

IEC 60909 is used for both meshed and unmeshed systems whereas IEC 61363 is
applicable only for unmeshed systems.

To start the IEC-61363 calculation in Etap set the briefcase with revised C factor value
which need to be use for IEC 61363 calculations. This is because the current version of
ETAP software for Short Circuit calculation using IEC 61363 is only suited for
unloaded generator fault calculation. For loaded generator cases, the multiplying factor
for voltage behind Xd’’, Xd’ have to be worked out separately and adjusted as a
correction factor (by suitable adjustment of c factor) on the ETAP IEC 61363 results of
Ik’’ (subtransient Id’’& Ipeak) and transient Id’ for evaluating the net peak make short
circuit current and asymmetric break short circuit current.

IEC 61363 calculates and plots of iinst, Iac rrms, idc, idc (%) & ienv at various instants of
time from 0 to selected plot time in the study case editor (as shown below) in the Etap
14 and above version.

Note: In previous versions of Etap the plot time was fixed to 0.1 sec.

Typically 0.1 sec plot time is adequate unless the CB opening time is more than that 0.1
sec. However the plot step is fixed at 1msec.

This document is confidential and proprietary to ETAP / ETAP Automation and may not be reproduced, published
or disclosed to others without written authorization of ETAP / ETAP Automation. All Rights Reserved. Page 11 of 18
ETAP Workshop Notes

Short Circuit Analysis

C factor for ETAP IEC 60909 is taken as maximum value (1.05) as mentioned in IEC
60909 and this also is seen to match with the Ik’’ of ETAP IEC 61363 as seen in the
table above. Results from ETAP IEC-61363 have been multiplied by appropriate
factors to account for appropriate voltages behind Xd’’, Xd’ and Xd with bus/generator
terminal voltage as 1 p.u. This is required because ETAP’s IEC 61363 software module
does not consider change in fault level due to generator loading. No such factors will be
applicable for motor contribution on ETAP IEC 61363 results with the main bus
voltage maintained at 1 p.u. Typically average factor of 1.15 have been consider for
IEC -61363 calculation in this exercise. However this has to be worked out separately.

To achieve this c factor for calculation can be set as 1 and factor of 1.15 need to be
applied on all the SC current results, for the present version of Etap.

This document is confidential and proprietary to ETAP / ETAP Automation and may not be reproduced, published
or disclosed to others without written authorization of ETAP / ETAP Automation. All Rights Reserved. Page 12 of 18
ETAP Workshop Notes

Short Circuit Analysis

16. To see the plots of short circuit currents, run transient short circuit as per standard IEC-
61363.

17. The following window will get pop up.

This document is confidential and proprietary to ETAP / ETAP Automation and may not be reproduced, published
or disclosed to others without written authorization of ETAP / ETAP Automation. All Rights Reserved. Page 13 of 18
ETAP Workshop Notes

Short Circuit Analysis

18. The plots of i, Iac rrms, idc, Idc (%) & I env for bus 1 are as below. This is graphical
representation of the fault currents.

a. i (total fault current)

This document is confidential and proprietary to ETAP / ETAP Automation and may not be reproduced, published
or disclosed to others without written authorization of ETAP / ETAP Automation. All Rights Reserved. Page 14 of 18
ETAP Workshop Notes

Short Circuit Analysis


b. Iac rms (AC component of fault current in rms)

c. Idc (Dc component of fault current)

d. Idc (%) (Percentage dc component of fault current)

This document is confidential and proprietary to ETAP / ETAP Automation and may not be reproduced, published
or disclosed to others without written authorization of ETAP / ETAP Automation. All Rights Reserved. Page 15 of 18
ETAP Workshop Notes

Short Circuit Analysis

e. ienv (Top envelop of fault current)

19. However, to check the tabulated results of above fault currents, go to Report Manager
>> Result >> Short Circuit Report. The below results are shown for bus 1.

This document is confidential and proprietary to ETAP / ETAP Automation and may not be reproduced, published
or disclosed to others without written authorization of ETAP / ETAP Automation. All Rights Reserved. Page 16 of 18
ETAP Workshop Notes

Short Circuit Analysis

This document is confidential and proprietary to ETAP / ETAP Automation and may not be reproduced, published
or disclosed to others without written authorization of ETAP / ETAP Automation. All Rights Reserved. Page 17 of 18
ETAP Workshop Notes

Short Circuit Analysis

This document is confidential and proprietary to ETAP / ETAP Automation and may not be reproduced, published
or disclosed to others without written authorization of ETAP / ETAP Automation. All Rights Reserved. Page 18 of 18