Design and Construction of A Portable Ai
Design and Construction of A Portable Ai
ICMIEE-PI-140412
Design and Construction of a portable air cooler
Gopesh Dey , Suvro Deb Sikder , Mohammad Ariful Islam
Department of Mechanical Engineering, Khulna University of Engineering & Technology, Khulna-9203, BANGLADESH
ABSTRACT
Human being wants to live in comfortable condition. Temperature is one of the most important factors for human comfort.
When temperature of air is above the comfort limit then cooling of air is necessary. Air cooler is required to reduce the
temperature of air for comfort. In this project a portable air cooler with evaporative cooling is designed and constructed. It
consists of a fan, a water-wetted pad, a pump to recirculate the water and revolving wheels to move from one place to
another. Room air is drawn through the water-wetted pad and is blown into the room. The cooling system slightly increases
the humidity of the entering air. This type of system is very useful where the environment where temperature is high but the
relative humidity is relatively low. Performance of the constructed air cooler is tested. Results showed that it can be reduced
the temperature about 4 to 6 .
Or,
ICMIEE-PI-140412-2
Total volume Let,
So that it could contain 6 liter water water dropped
Water Height ………………..(xiv)
Time required emptying the tank,
Considering above condition the following size of the
reserve container was selected.
……………………(xii) Length
Where, Width
Height
T=Back up time
3.5 Design of water wetted pad
The function of water wetted pad is to absorb as much
as water for a long period. And it must have the ability
to pass air easily through the pad .It should be insured
that no air will flow through the pad without wetted. For
considering above reason the following size of the water
wetted pad surrounding three sides of the frame was
Or, selected
Length
Let diameter of each hole Width
Number of hole Height= 30.48 cm
So,
3.6 Selection of water pump
The following specification of water pump was selected
Voltage = 12 volt
………………….(xiii)
Current = 6 amp
Or,
Power = 72 watt
3.3 Design of frame
3.7 Cost analysis of the project:
The frame is important component of a portable cooling
system. It carries supply container on top, fan in one ITEMS COST(TK)
side, and pad in three sides. So the length and width of 1) Exhaust Fan 950/-
the frame would be equal to the supply container. And 2) AC Pump 750/-
the height of the frame should be such that fan can be
3) Metal sheet( 5 kg) 750/-
installed at the centroid of those side of the frame.
Considering above condition the following size of the 4) Pipe 50/-
frame was designed. 5) Power Supply 200/-
Length
6) Wheels( 4 pieces) 200/-
Width
Height 7) Wetted Pad 400/-
8) Manufacturing 1000/-
3.4 Design of water reserve container Cost
The size of the water reserve container would be such Total 4300/-
that it could contain the dropped water at the bottom of
the box.
Rate of water evaporated kg/sec
Amount of water evaporated
ICMIEE-PI-140412-3
4. Result and Discussion Table 4.2 Result Sheet For open room
Date Durat Relative Lat Sens Sensi Mass
ion Humidity, ent ible ble Of
4.1.1 Performance Test in open room:- RH Hea Heat Heat Water
(%) t, , Facto Evapora
The cooling system was placed in a room of size r, ted,
5.4m at the door. The wet bulb and dry Inle Ou (kj/ (kj/k G
bulb temperatures were recorded at inlet and outlet of t tlet kg) g) SHF (kg/s)
the cooling system by sling psychometer with different 04- 10.00 79. 96. 0.4 0.89 0.67 0.0001
temperature water. 06- AM - 8 2 339 36 78
14 11.00
AM
Table -4.1: Data Sheet For open room 11.0b 83 92. 0.0 0.55 0.91 0.0000
Date Duratio Water Inlet outlet 0 6 542 85 22
n Temp Condition Condition AM -
eratur DBT WBT DB WBT 12.00
e PM
( ( ) T ( )
05- 10.00 64. 86. 1.4 0.78 0.35 0.0006
( ) (
06- AM - 9 6 645 19
) 11.00
14
04- 10.00- 27 35 31 31 30.5 AM
06- 11.00 11.00 69. 89. 1.3 0.67 0.33 0.0005
14 AM AM- 7 8 560 02 56
11.00 28 34 30 31. 29.5 12.00
AM- 5 PM
12.00 08- 10.00 55. 71. 0.4 0.89 0.67 0.0001
06- - 6 6 339 36 78
PM
14 11.00
05- 10.00- 26 37 31 33. 31.5 AM
06- 11.00 5 11.00 54 62. 0.0 0.55 0.91 0.0000
14 AM AM- 1 542 85 22
11.00 27 36 31 33 31.5 12.00
AM- PM
12.00 09- 10.00 68. 92. 0.5 1.34 0.69 0.0002
PM 06- - 8 5 966 05 45
08- 10.00- 26 38 30 34 29.5 14 11.00
AM
06- 11.00
11.00 68. 92. 0.2 1.11 0.84 0.0000
14 AM AM- 2 5 169 71 89
11.00 28 39 30.5 36. 30 12.00
AM- 5 PM
12.00 10- 10.00 69. 85. 1.6 1.34 0.44 0.0006
PM 06- - 3 5 814 05 89
09- 10.00- 18 34 29 28 27 14 11.00
06- 11.00 AM
14 AM 11.00 71. 85. 1.7 1.22 0.41 0.0007
AM- 8 5 899 88 34
11.00 17 33 28 28 27
12.00
AM- PM
12.00
PM
10- 10.00- 16 35 30 29 27
06- 11.00 4.1.2 Performance Test in closed room:-
14 AM The cooling system was placed in a room of
11.00 17 34.5 30 29 27 size at the door. The wet bulb and dry bulb temperatures
AM- were recorded at inlet and outlet of the cooling system
12.00 by using psychometer with normal and cold water.
PM
ICMIEE-PI-140412-4
AM
ICMIEE-PI-140412-5
outlet temperature was found about 0.5 The main permissibility. So synthetic pad can be used to
difficulties of the constructed portable air cooler was the recover this difficulty.
long distance between the fan and water wetted pad .
For this reason the fan was unable to circulate the air at
desired speed. Another reason may be the jute water REFERENCES
wetted pad that would be rotten in course of time. The
system was unable to provide enough cooling effect [1] Arif Hosain MD. And Mahmud Hasan MD. A
because the relative humidity of the air was already at a thesis report on “Design, construction and testing of an
higher value. evaporative cooling system” Held at KUET, Khulna on
FEBRUARY, 2006.
ICMIEE-PI-140412-6