TEST REPORT Page 1 of 3
Name and Address of the : MOHINDER SINGH Report No. : A202207230012
Customer CONTRACTOR Date of Sample
A-26/102 LOHIA ENCLAVE Receipt : 11/11/2024
GORAKHPUR U P 273016
Date of Testing Start : 11/11/2024
Date of Completion : 19/11/2024
Reference No. & Date : MSC/11-24/870 Date 11/11/2024 Date of Report issue : 19/11/2024
Up-gradation of Rampur Ghat Nawada to Khoran Wala road Km. 0/000 to
5/400 (SH:-ROFD, protection works, cross drainage works, FDR, BC,
Panelled cement concrete, paver block, dumping site and road furniture and
Name of Work :
five years routine maintenance) Under PMGSY-III (Batch-I) (2023-24)
Package No. HP-10-285.”
Description & Identification
: JOB MIX FOR FDR
of Item Tested
1.Grading & Proportioning:-
Total weight of sample =45470 gm
Sieve Analysis Weight retained Cumulative wt Weight %of Weight of Wt% of
retained retained passing permissible limit
53mm 0 0 100.00 100 100
37.5mm 240 240 0.53 99.47 95-100
19 mm 9620 9860 21.68 78.32 45-100
9.5 mm 7890 17750 39.04 60.96 35-100
4.75 mm 12356 30106 66.21 33.79 25-100
0.6 mm 3792 33898 74.55 25.45 8-65
0.3 mm 1160 35058 77.10 22.90 5-40
0.075 mm 9688 44746 98.41 1.59 0-10
Pan 645
Total weight of sample =43903 gm
Sieve Analysis Weight retained Cumulative wt Weight %of Weight of Wt% of
retained retained passing permissible limit
53mm 0 0 100.00 100 100
37.5mm 680 680 1.55 98.45 95-100
19 mm 8957 9637 21.95 78.05 45-100
9.5 mm 6920 16557 37.71 62.29 35-100
4.75 mm 11670 28227 64.29 35.71 25-100
0.6 mm 4369 32596 74.25 25.75 8-65
0.3 mm 2395 34991 79.70 20.30 5-40
0.075 mm 6249 41240 93.93 6.07 0-10
Pan 2450
TEST REPORT Page 2 of 3
Name and Address of the : MOHINDER SINGH Report No. : A202207230012
Customer CONTRACTOR Date of Sample
A-26/102 LOHIA ENCLAVE Receipt : 11/11/2024
GORAKHPUR U P 273016
Date of Testing Start : 11/11/2024
Date of Completion : 19/11/2024
Reference No. & Date : MSC/11-24/870 Date 11/11/2024 Date of Report issue : 19/11/2024
Up-gradation of Rampur Ghat Nawada to Khoran Wala road Km. 0/000 to
5/400 (SH:-ROFD, protection works, cross drainage works, FDR, BC,
Panelled cement concrete, paver block, dumping site and road furniture and
Name of Work :
five years routine maintenance) Under PMGSY-III (Batch-I) (2023-24)
Package No. HP-10-285.”
Description & Identification JOB MIX FOR FDR
:
of Item Tested
Sr. Parameters Test-Value Requirement Method of Test
No. Ref. To:-
1. Aggregate Impact value 22.0 40 Max IS:2386 (P-IV)
2. Liquid limit, % 14.13 25 Max. IS:2720 (P-V)
3. Plastic limit, % Non-Plastic IS:2720 (P-V)
4. Plasticity Index, % Non-Plastic 6 Max. IS:2720 (P-V)
5. C.B.R 98% dry density 59 30 Min. IS:2720(P-XVI)
6. Water Absorption, % 1.88 2.0 Max IS:2386 (P-III)
7. Maximum Dry Density gm/cc 2.210 IS:2720 Part VII
8. Optimum Moisture Content % 8.60 IS:2720 Part VII
TEST REPORT Page 3 of 3
Name and Address of the : MOHINDER SINGH Report No. : A202207230012
Customer CONTRACTOR Date of Sample
A-26/102 LOHIA ENCLAVE Receipt : 11/11/2024
GORAKHPUR U P 273016
Date of Testing Start : 11/11/2024
Date of Completion : 19/11/2024
Reference No. & Date : MSC/11-24/870 Date 11/11/2024 Date of Report issue : 19/11/2024
Up-gradation of Rampur Ghat Nawada to Khoran Wala road Km. 0/000 to
5/400 (SH:-ROFD, protection works, cross drainage works, FDR, BC,
Panelled cement concrete, paver block, dumping site and road furniture and
Name of Work :
five years routine maintenance) Under PMGSY-III (Batch-I) (2023-24)
Package No. HP-10-285.”
Description & Identification JOB MIX FOR FDR
:
of Item Tested
UN – CONFINED COMPRESSIVE STRENGTH (UCS) 7 DAYS
SAMPLE 1
Geopave % Cement % Date Of Weight Breaking Area UCS (MPa)
Sample Testing Load
Cube 18/11/2024 7.811 104.6 22.5 4.64
Cube 4% 4.25% 7.869 109.5 22.5 4.86
Cube 7.541 109.8 22.5 4.88
4.79
SAMPLE 2
Sample Geopave % Cement % Date Of Weight Breaking Area UCS (MPa)
Testing Load
Cube 18/11/2024 7.649 88.6 22.5 3.93
Cube 4% 4% 7.421 91.7 22.5 4.07
Cube 7.793 78.8 22.5 3.50
3.83
SAMPLE 3
Sample Geopave % Cement % Date Of Weight Breaking Area UCS (MPa)
Testing Load
Cube 18/11/2024 7.655 118.8 22.5 5.28
Cube 4% 4.5% 7.419 112.6 22.5 5.004
Cube 7.718 108.7 22.5 4.83
5.036
Final UCS value are 4.79 m/pa at 7days .