NE1-ITP 400KV Cable Trench Construction

trench

Uploaded by

engrrahman3135
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
220 views12 pages

NE1-ITP 400KV Cable Trench Construction

trench

Uploaded by

engrrahman3135
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

Owner

EPC CONTRACTOR EPC SUBCONTRACTOR

PROJECT

NE1 - 700MW CSP + 250MW PV


Hybrid Project

01 12-06-2019 First Issue for Owner Review Kafeel Ahmed

REV DATE DESCRIPTION DONE CHECKED APPROVED

DOCUMENT NUMBER DOCUMENT NAME

NE1-10-QC-SEC-ITP-ACA(C)-00001

SUBCONTRACTOR DOCUMENT NUMBER ITP for 400KV cable trench


construction
NE1-CSC-SEC-ITP-032
Document Name NE1-10-QC-SEC-ITP-ACA(C)-00001
Rev No. 00
ITP for 400KV cable trench construction
Page 1 of 11

INSTRUCTION

Purpose and Scope: This ITP is issued for the work of 400kv cable trench construction.
Notification: Inspection notification shall be given 48 hours prior to the scheduled inspection of witness or hold point.

Code of Inspection Party:

C: Construction Subcontractor
S: EPC Contractor SEGC authorized Quality Control Supervisor
O: Owner or Owner’s authorized representative

Code of Activities Involvement

P: Perform or Submit
A: Approval
H: Holding Point where inspection shall be kept on hold till SEGC/Owner witness. The work shall not proceed without the written agreement or wavier from SEGC or SEGC’s
authorized representative.
W: Witness Point where the inspection notification shall be given to SEGC/Owner and inspection should proceed if SEGC/Owner is not present at the scheduled date.
R: Review of applicable documents or records to ensure compliance with specification.
S: Surveillance Point. Where Subcontractor can proceed the work without notification and SEGC/Owner can check the work and record at any time,
Subcontractor internal inspection record will not be mandatory for quality dossier.

Other Abbreviation:
NA

Part A-Civil Activities


Document Name NE1-10-QC-SEC-ITP-ACA(C)-00001
Rev No. 00
ITP for 400KV cable trench construction
Page 2 of 11

Inspection
Component & Frequency/ Reference Documents/
No. Characteristics Check Acceptance Criteria Format of Record Agency Remark
Operation Stage Standard/ Specification
C S O
1 Documents
As per Approved As per Approved Drawing/
Check Approvals and Equipment/Material
Material Prior to work Drawing/As per OTS & Civil OTS & Civil Works A/ Submittal to
1.1 Correct Revisions Approval Submittal P R
Approval Commences Works Specifications and Specifications and DEWA H consultant approval
Obtained Form
DEWA requirement requirement
Trial Mix
Civil Technical Specs/Local Civil Technical Specs/Local
Concrete Mix Approval of Design Prior to work Reports/Material A/ Submittal to
1.2 Regulations and DEWA Regulations & DEWA P R
Design Mix/Trial Mix Reports Commences Approval Submittal H consultant approval
requirements requirements
Form
Lab Check the Accreditation Prior to work Accreditation A/
1.3 Local Regulations Local Regulations P R If Applicable
Accreditation Certificates Commences Certificates H
Measuring and Check the Calibration Prior to work Calibration
1.4 Local Regulations Local Regulations P R R
Testing Device Certificates Commences Certificates

2 Materials
Mill Test Certificate/ As per approved Drawing As per approved Drawing Equipment/Material W
Material Submittal to
2.1 Certificates of Each Delivery and Technical and Technical Inspection Request P / R
Incomings consultant approval
Compliance Specifications Specifications Form/Certificates R
W
Materials As per As per BS4449/ASTM As per BS4449/ASTM Submittal to
2.2 Samples to be Tested Test Report P / R
Sampling Specifications C140/applicable standard C140/applicable standard consultant approval
R
3 Excavation Work
Setting out of corner Prior to
3.1 Survey Marking As per Approved Drawing As per Approved Drawing Survey Report P H R
coordinates excavation
Measurement of final
3.2 100% As per Approved Drawing 0,-50mm Survey Report P H R
elevation
After
Measurement of width & Excavation Check
3.3 Excavation As per Approved Drawing As per Approved Drawing P H R
Foundation Pit length List
Completion
Formation
After
Inspection Measurement evenness
3.4 Excavation As per Approved Drawing ±50mm Survey Report P H R
of the surface
Completion
Each 500sqm 3rd party Testing
3.5 Compaction Test As per ASTM D 1556/OTS MDD 95% P H R
2 Points Report
4 Blinding Concrete
Survey Marking Setting out and Prior to work Approved Coordinates
4.1 As per Approved Drawing Survey Report P H R
for Blinding Coordinates Commences Layout Drawing
Once and Blinding Concrete
4.2 Formwork Thickness As per Approved Drawing As per Approved Drawing P H R
prior to Check List
Form Work
pouring Blinding Concrete
4.3 Level / Width, Length As per Approved Drawing As per Approved Drawing P H R
concrete Checklist / Survey
Document Name NE1-10-QC-SEC-ITP-ACA(C)-00001
Rev No. 00
ITP for 400KV cable trench construction
Page 3 of 11

Inspection
Component & Frequency/ Reference Documents/
No. Characteristics Check Acceptance Criteria Format of Record Agency Remark
Operation Stage Standard/ Specification
C S O
Report
Blinding After Pouring
4.4 Check the Elevation As per Approved Drawing +-20mm Survey Report P H R
Concrete Level the Concrete
5 Cast in Situ (Joint bay and Trough-cross road section)
Foundations
Setting Out
5.1 Coordinates and Once As per Approved Drawing As per Approved Drawing Survey Report P H R
Elevation
Diameter of rebar/
Lap Lengths and
Rebar Pre-Pouring
5.2 Spacing/ Anchorage Once As per Approved Drawing As per Approved Drawing P H R
Installation Checklist
Lengths/ Extra
Rebar/ Fixing Detail
Formwork Details/
Formwork Physical
5.3 Once As per Approved Drawing As per Approved Drawing P H R
Pre-Pouring
Form Work Condition/ Supports/
Checklist
Concrete Cover/
Horizontal Alignment
5.4 Once As per Approved Drawing +-10mm P H R
and Vertical plumb
As per Approved Design Concrete Pour Log
5.5 Temperature/ Slump Each Truck P S R
Mix and D.N
Cubes Sampling and Each 100 W 3 for 7 days, 3 for 28
As per Approved Design
5.6 Compressive Cubic Meter 6 40MPA After 28 days Test Report P / R days
Fresh Concrete Mix
Cubes R
Pouring Strength Test
Vibrator Needle Should
Vibration and Pouring During the As per Civil Work Concreting
5.7 be Straight and pouring P S R
Sequence Pouring Specifications Checklist
should be layer by layer
Dismantling of Form As per OTS Civil Works After 12 Hours(Vertical Concreting
5.8 Once P W R
Work Specifications elements) Checklist
Cast in Situ Joint 2 Times a Day
bay and Trough with Hessian
As per OTS Civil Works Concreting
5.9 Curing Cloth and 7 Days P S R
Specifications Checklist
Polythene
Sheet
Document Name NE1-10-QC-SEC-ITP-ACA(C)-00001
Rev No. 00
ITP for 400KV cable trench construction
Page 4 of 11

Inspection
Component & Frequency/ Reference Documents/
No. Characteristics Check Acceptance Criteria Format of Record Agency Remark
Operation Stage Standard/ Specification
C S O
Surface Should be free
of Honey Combs, Pin
Post Pour Visual Surface After Removal As per OTS Civil Works Concreting
5.10 Holes, Blow Holes, P H R
Check of Form Work Specifications Checklist
Segregation and
Cracks
Waterproofing
5.11 Bitumen Coating Once As per Approved Drawing 2 Coats P H R
Checklist
5.12 Layer Thickness Each layer As per Approved Drawing 300mm Backfilling Checklist P W R
Backfilling Each
5.13 Compaction Test 1000sqm 2 As per Approved Drawing MDD95% Test Report P W R
Points
6. Precast trough installation
Setting out and Prior to work Approved Coordinates
6.1 Survey Marking As per Approved Drawing Survey Report P H R
Coordinates Commences Layout Drawing
Installation of Measurement evenness
6.2 Once As per Approved Drawing As per Approved Drawing Check list P H R
Precast Trough of the surface

Note: After execution and completion of this ITP, all the related documents, inspection record and testing reports attached herewith in accordance with this ITP shall be verified by
the below party.
Verified by Sub-Contractor EPC Owner's Representative (s)

Company CSCEC SEGC NE1

Name

Signature and Date


700MW CSP + 250 MW PV Hybrid IPP-
DEWA Phase IV

CONCRETING CHECKLIST
Subcontractor China State Construction Engineering Corporation (CSCEC)
Structure / Equipment / Location : CT MSR Foundation Plant: CT
Reference MOS:NE1-40-CN-SEC-MOS-OOO(G)-00047 Revision:
Reference Drawing: NE1-40-EM-EAI-DRW-UW (C)-79260 Revision: 2
Reference ITP:Reference ITP No*: NE1-40-QC-SEC-ITP- UW_(C)-00001 ITP Item Number: 5.1, 5.3, 5.4 Revision: 3
RFI Description : Concrete Pouring for MSR Foundation Marked as per attach Drawing
RFI No.:NE1-40-CSC-UW_(C)-RFI-0172 Revision:
Subcontractor
NO. Characteristics Check YES/NO-N/A Date Remarks
Inspector
1 Pouring

1.2 Verify that Design Mix is Approved P Kafeel 03-07-209

Verify that concrete pouring is as per approved procedure and


1.3 P Kafeel 03-07-209
sequence and proper vibration is done
Verify that temperature and slump of fresh concrete as per
1.4 P Kafeel 03-07-209
Approved Mix Design
1.5 Ensure that free fall hight of concrete is 1.5 P Kafeel 03-07-209

1.6 Verify that cubes sampling has been done. P Kafeel 03-07-209

2 Post Pouring

2.1 Temperature Control Monitoring is as per approved Procedure N/A

2.2 Verify that dismantelling of form work is done as per ITP. N/A

2.3 Verify that final Elevation and Coordinates as per drawing. N/A

Verify that concrete surface is free of cracks , segregation , and


2.4 N/A
honey combing , Pin Holes and Blow Holes

Verify that curing is done as per specifications and proper


2.5 N/A
procedure

Verify that Tie rod Holes and Concrete Surface Repairing work is
2.6 N/A
done as per approved Procedure

Verify that concrete cubes compressive strength meet 7 days


2.7 N/A
and 28 days as per project specifications
Verify that Saw cut joint work has been done as per approved
2.8 N/A
drawing
List of Attachments (If any) :
1 3
2 4
Remarks:

Owner's
Inspected by Sub-Contractor Quality EPC Quality
Representative (s)
Company CSCEC SEGC NE1
Name Kafeel Ahmed

Signature Kafeel Ahmed

Date 2019/7/3

Form Number : CSCEC-CHL-CIVIL-001


700MW CSP + 250 MW PV HYBRID IPP-DEWA
PHASE IV

Chceklist Installation of Precast Trough


Subcontractor China State Construction Engineering Corporation (CSCEC)

Structure / Equipment / Location : Plant:


Reference MOS: Revision:
Reference Drawing: Revision:
Reference ITP: ITP Item Number: Revision:
RFI Description:
RFI No. : Report No.:
YES/NO-
NO. Characteristics Check Subcontractor Inspector Date Remarks
NA

1 Installation of Precast Trough

Verify coordinates and Elevation is as per approved


1.1
Drawing

Ensure that Trough Dimentions are as per Approved


1.2
Drawing

Ensure that Trough Installation is as per Approved


1.3
Drawing

1.4

List of Attachments (If any) :

1 3

2 4
Remarks:

Inspected by Sub-Contractor Quality EPC Quality Owner's Representative (s)

Company CSCEC SEGC NE1

Name

Signature

Date

Form Number : CSCEC-CHL-CIVIL-002


700MW CSP + 250 MW PV HYBRID IPP-DEWA
PHASE IV

CHECKLIST PRE-POURING
Subcontractor China State Construction Engineering Corporation (CSCEC)

Structure / Equipment / Location : Plant:


Reference MOS: Revision:
Reference Drawing: Revision:
Reference ITP: ITP Item Number: Revision:
RFI Description:
RFI No. : Report No.:
YES/NO-
NO. Characteristics Check Subcontractor Inspector Date Remarks
NA

1 Pre Pouring

Verify coordinates and Elevation is as per approved


1.1
Drawing
Verify that diameter , Lap Length , Anchorage Length,
1.2 Shape, Spacing and Fixing Detail as per Approved
Drawing
Verify that formwork meterial is in good condition,
1.3
horizontal alignment and vertical plumb ,

Verify that concrete cover is as per approved drawing


1.4 and formwork supports , props , and tie roads are tight
properly

Verify that all MEP works done as per approved Drawing


1.5
and MEP Clearance is obtained Prior to concrete Pouring

Verify that thermo couples fixed for temperature


1.6
monitering system as per approved Procedure

Verify that all embeded items anchor bolts fixed properly


1.7
as per approved drawing.

1.8 Verify proper cleaning is done

Verify that Approval for Pouring has been Obtained Prior


1.9
to Concrete Casting

List of Attachments (If any) :

1 3

2 4
Remarks:

Owner's Representative
Inspected by Sub-Contractor Quality EPC Quality
(s)
Company CSCEC SEGC NE1

Name

Signature

Date

Form Number : CSCEC-CHL-CIVIL-002


700MW CSP + 250 MW PV HYBRID IPP-
DEWA PHASE IV

BACKFILLING CHECKLIST

Subcontractor China State Construction Engineering Corporation (CSCEC)

Structure / Equipment / Location : Plant:


Reference MOS: Revision:
Reference Drawing: Revision:
Reference ITP: ITP Item Number : Revision:
RFI Description :
RFI No. :
YES/NO- Subcontractor
NO. Characteristics Check Date Remarks
N/A Inspector
Ensure that all required tests for backfilling Material
1
are done and results obtained

2 Ensure that backfilling material is approved.

Ensure that backfilling Materials is free of any


3
Perishable or Organic rubbish
Ensure that in structural backfilling structure surface is
4 clean and waterproofing work is done as per approved
drawings
Ensure that all other inspections
5
[MEP,CIVIL,AUTHORITIES] conducted and approved.

6 Access facilities provided to the Backfilling area

Ensure that all the Layer not exceeded more than


7
acceptable limits as per Project Specification
Ensure that compaction test is done for backfilling
8 work as per approved ITP and required degree of
compaction is achived.
Ensure that in situ CBR Test is conducted for Final
9
Layer.
Ensure that final level and slope checked and
10
approved by consultant/Client
List of Attachments (If any) :

1 4

2 5

3 6
Remarks:

Inspected by Sub-Contractor Quality EPC Quality Owner's Representative (s)

Company CSCEC SEGC NE1

Name

Signature

Date

Form Number : CSCEC-CHL-CIVIL-003


700MW CSP + 250 MW PV HYBRID IPP-
DEWA PHASE IV

BLINDING CONCRETE CHECKLIST

Subcontractor China State Construction Engineering Corporation (CSCEC)

Structure / Equipment / Location : steam turbine foundation Plant:


Reference MOS: N/A Revision:
Reference Drawing: NE1-40-EM-CDI-DRW-UMA(C)-05201 Revision: 4
Reference ITP:NE1-40-QC-SEC-ITP- URC-(C)-00001 ITP Item Number 4.1,4 Revision: 1
RFI Description :Inspection request for steam turbine foundation Lean Concrete setting Out and Form Work Grid Line T1/TG TF TE TD TC TB TA
RFI No. : NE1-40-CSC-UMA_(C)-RFI-0023
Subcontractor
NO. Characteristics Check YES/NO-N/A Date Remarks
Inspector

1 Blinding Concrete

1.1 Setting Out Elevation and Coordinates

Verify Compaction Test done and required Degree of


1.2
Compaction is achived
Ensure that Plate Load test is conducted at formation
level.

1.3 Verify that Design Mix is approved

Verify that Polythene Sheet Placed prior to concrete


1.4
pouring
Verify formwork allignement and total thickness of
1.5
Blinding concrete
1.6 Verify that Blinding Concrete Level is as per Drawing

List of Attachments (If any) :

1 4

2 5

3 6
Remarks:

Inspected by Sub-Contractor Quality EPC Quality Owner's Representative (s)

Company CSCEC SEGC NE1

Name

Signature

Date

Form Number : CSCEC-CHL-CIVIL-004


700MW CSP + 250 MW PV HYBRID IPP-
DEWA PHASE IV

EXCAVATION CHECKLIST

Subcontractor China State Construction Engineering Corporation (CSCEC)

Structure / Equipment / Location : Plant:


Reference MOS: Revision:
Reference Drawing: Revision:
Reference ITP: ITP Item Number : Revision:
RFI Description:
RFI No. :
YES/NO- Subcontractor
NO. Characteristics Check Date Remarks
N/A Inspector
Identification of underground services prior to
1
excavation work
2 Surveyor Marking is done for Excavation Work.
Excavation carried out as per Method statement &
3
Specification
4 Formation level and line as per Approved Drawings

5 Soil Sample taken for testing and tested accordingly

6 Excavated area are free from standing & running water

Excavated Materials are Stored properly away from


7
edges.
Side Slopes are as per approved MOS and
8
Specifications
9 Access facilities provided to the Excavated area

10 Formation Compaction and Plate Load Test Cerried

11 Dewatering system is provided if required.

List of Attachments (If any) :

1 4

2 5

3 6
Remarks:

Inspected by Sub-Contractor Quality EPC Quality Owner's Representative (s)

Company CSCEC SEGC NE1

Name

Signature

Date

Form Number : CSCEC-CHL-CIVIL-006


700MW CSP + 250 MW PV HYBRID IPP-
DEWA PHASE IV

WATERPROOFING CHECKLIST

Subcontractor China State Construction Engineering Corporation (CSCEC)

Structure / Equipment / Location : Plant:


Reference MOS: Revision:
Reference Drawing: Revision:
Reference ITP: ITP Item Number : Revision:
RFI Description:
RFI No. :
Subcontractor
NO. Characteristics Check YES/NO-N/A Date Remarks
Inspector
Ensure that proper curing is done for concrete surface
1
prior to start waterproofing activity
Concrete surface clean and free from loos particles
2
and Dampness

3 All patch work is completed and surface is smooth

4 Ensure that waterproofing material is approved.

Check weather condition as per manfacturer


recommendations prior to start waterproofing work
The rate of application and number of coats and
5
method of application as per manufacturer
The drying period has been followed for the first &
7
subsequent coat as per the manufacture specification.
Ensure that waterproofing membrane fixed properly by
8
skilled worker
Ensure that the laps for waterproofing membrane as
9
per approved drawing.
Ensure that Waterproofing Mortar applied as per
10
Technical Data Sheet of Material.
Ensure that membrane protection board is installed as If applicable as per
11
per drawing drawing
List of Attachments (If any) :

1 4

2 5

3 6
Remarks:

Inspected by Sub-Contractor Quality EPC Quality Owner's Representative (s)

Company CSCEC SEGC NE1

Name

Signature

Date

Form Number : CSCEC-CHL-CIVIL-011