Risk (R) is thus defined as function of possibility of occurrence of hazard (f) and magnitude of its
consequence (D).
Risk (R) = f (Hazard, Probability, Consequence)
In most of the applications, however, risk may be defined as
Risk (R) = Probability (f) * Consequence (D)
2.0 METHODOLOGY
1. All the Raw Materials are listed to identify Hazardous chemicals as per MSIHC Rule –1989 and
PLI Act/ rule.
2. All the Hazardous Chemicals are categorized in two category a) Hazardous chemicals from RM
list of existing facility and b) from RM list of proposed facility.
3. Hazardous chemicals from both the list are further classified as per their potential hazardous
property and physical property.
4. All the hazardous chemicals are assessed for their potential risk, using 3 x 3 Risk Assessment
Matrix. Procedure for risk assessment by 3 x 3 Risk Assessment Matrix is explains at Para 5(B).
5. a. Significant hazard/ risk is identified as “Heavy spillage of liquid chemical with evolution of
toxic gas” or “ Toxic gas release” with Emergency status, in risk assessmentby3 x 3 Risk
Assessment Matrix, n then such hazard/risk are further assessed for Gas Dispersion, using
ALOHA software, approved by EPA-USA. Result of Risk Assessment and Gas dispersion modeling
are taken in to account or RISK MANAGEMENT PLAN(RMP) and
EMERGENCYRESPONSEPLAN(ERP).
5. b. If the potential hazard is identified as “fire” or “explosion”, with Emergency status, in risk
assessment using 3x3 Risk Assessment Matrix, then such situation/hazards are compared with
the risk assessment done by District Crisis group-Bharuch and Local Crisis group-Jhagadia,
Ankleshwar area. Findings of the District Crisis group and Local Crisis group are also taken in to
account for RISK MANAGEMENT PLAN ( RMP)and EMERGENCYRESPONSEPLAN.( ERP).
R-1
Quantitative risk assessment(QRA) is ameansofmakingasystematic analysis of the risks from
hazardousactivities, and forminga rational evaluationoftheirsignificance,in order to provide
inputtoa decision-making process. The term‘quantitativerisk analysis’iswidely
used,butstrictlythisreferstothepurelynumericalanalysisofriskswithoutanyevaluation
oftheirsignificance. The study has been conductedbasedonthe premisesofa traditional
QuantitativeRiskAssessment.ThekeycomponentsofaQRAareexplainedbelow,& illustrated in Figure
1.
System Definition
Hazard Identification
Analysis of Accident
Scenarios
Estimation of Accident
frequencies
Consequence analysis
and modeling
Risk Estimation
R-2
3.0 STORAGE AND HANDLING OF HAZARDOUS CHEMICALS
The properties of the important raw materials and the safety precautions to be taken to prevent an
accident are detailed in ‘Material Safety Data Sheets’( MSDS)
The details of storage of Hazardous chemicals along with measures taken are given in Table 1.
TABLE :1
STORAGE DETAILS OF HAZARDOUS CHEMICALS
Sr.
Name of Hazardous Chemical Type MOC Size KL No Dimension
No.
1 DEG/PEG liquid MS 60 2 5.0 m x 4.0m
2 Sulphuric Acid liquid MS 50 3 4.5 m x 3.8 m
3 Hydrochloric Acid liquid FFFRP / HDPE 20 2 5.3 m x 2.5 m
4 Nitric Acid liquid Aluminum coated tank 10 1 4.0 m x 2.0 m
5 Benzene liquid MS 50 2 4.5 m x 3.8 m
6 Iso Propyl Alcohol liquid MS 20 1 5.3 m x 2.5 m
7 Chloro Benzene liquid MS 20 2 5.3 m x 2.5 m
8 Methanol liquid MS 20 1 5.3 m x 2.5 m
9 EDC liquid SS 304 20 2 5.3 m x 2.5 m
10 Ortho Di Chloro Benzene( ODCB) liquid MS 20 1 5.3 m x 2.5 m
11 Ammonia Liquid MS 20 1 5.3 m x 2.5 m
12 Sodium Hydroxide Lye liquid MS 25 1 5.5 m x 2.5 m
13 m-Dichlorobenzene Liquid MS 75 1 5.5 m x 4.25 m
14 Meta Di Nitro Benzene ( MDNB) Liquid MS 25 KL 3 5.5 m x 2.5 m
Tonner/Pipeline from the
15 Chlorine Gas 900 Kg 5 ----
nearby manufacturer
16 3- Nitro -4- Methyl Benzoic Acid Liquid Drum 200 Liter 10 ----
17 2- Methyl -5- Nitro Phenol Liquid Drum 200 Liter 10 ----
18 Iso Butyl Alcohol Liquid Drum 200 Liter 10 ----
19 Benzene Sulphonyl Chloride Liquid Drum 200 Liter 10 ----
2- Chloro Ethanol (O - Chloro
20 Liquid Drum 200 Liter 10 ----
Ethanol)
21 2,4 – Dichloro Phenol Liquid Drum 200 Liter 10 ----
22 Para Chloro Phenol ( PCP) Liquid Drum 200 Liter 10 ----
23 Dimethyl Sulfate Liquid Drum 200 Liter 10 ------
24 Phenol Liquid Drum 200 Liter 10 ----
25 Nitro Benzene Liquid Drum 200 Liter 10 ----
R-3
Chemical Properties of the Hazardous Chemical
SOLUBILITY VP LD50 LD50
SR. NAME OF THE RAW FP deg BP SP.GR. VD
HAZARD WITH WATER mm Hg LEL% UEL% ORAL DARMAL LC 50 mg/L
NO. MATERIALS C deg C 20 deg C vs air
at 20 deg C 20C mg/kgs mg/kgs
1 Methanol Flammable, Toxic 12 64.7 0.791 1.11 Miscible 128 kPa 6 31 5658 Rat 15800 Rabbit
2 Benzene CAS # 71-43-2 Flammable, Toxic -11 81.1 0.879 2.8 Insoluble -- 1.3 7.9 - -- 83.2 Rat 4hour
3 Sulphuric Acid Corrosive - 100 1.3 3.4 Soluble 2.3 kPa - - 4280 Rat - 24 ml/kg for rat for
2H
4 Chloro Benzene Flammable/Toxic 29.4 132 1.10 3.88 Soluble 8.8 1.3 7.1 10 ppm 2300 ppm -
CAS # 108-90-7
5 Ethylene Dichloride Flammable/Toxic 13 81-85 1.25 3.4 8.7 g/l 65mmHg 6.2 15.9 625 Rat 2800 Rabbit 22,000 ppm Rat
6 Chlorine Toxic - 100 1 0.62 Soluble 17.53 - - - - 28.79 Rat 1h
7 Phenol Flammable 79-84 182 1.057 3.24 Soluble -- 1.7 8.6 317mmg/ 630 mg/kg 1017 ppm
kg [Rat] [Rabbit]
8 Ortho Dichloro Benzene Flammable, Toxic 66 180- 1.3 5.1 Insoluble - 2.2 9.2 -- -- --
(ODCB) 183
CAS # 95-50-1
9 -- 297 1.37 -- Insoluble negligible NA NA 59.5 mg/ 1900 mg/ Kg 8150 mg/m3 for 4H
m- Di chloro Benzene Toxic
Kg Rat
10 Nitric Acid Corrosive/oxidizing -- 121 1.408 2.5 Soluble 6 KPa -- -- -- ---- ---
11 Sodium Hydroxide Corrosive --- 1390 1.48 2.3 Miscible < 2 KPa --- --- --- ---- ---
(hydra
te)
12 Meta Di Nitro Benzene Toxic --- 301 1.368 5.8 Slightly Soluble --- --- ---- 74.4 mg/ --- -----
kg
13 Chloro Benzene Flammable/ Toxic 29.4 132 1.10 3.88 Soluble 8.8 KPa 1.3 7.1 10 ppm 2300 ppm -----
14 Nitro Benzene Flammable/ Toxic 87.78 201.8 1.2 34.25 Slightly Soluble 0.15 KPa 1.8 --- 590 mg/ --- 22000 ppm Rat
Kg
15 30 % Hydrochloric Acid Corrosive -- ----
16 Iso Propyl Alcohol Flammable 12 81-83 0.785 2.1 Miscible 43 mm Hg 2.0 12.0 4396 mg. 12800 mg/ Kg
Kg Rat Rat
R-8
TABLE 2
STORAGE HAZARDOUS AND CONTROLS -- Proposed
Details of all (A) Products (B) Raw materials (C) Intermediates & (D) Bi-products
Sr. Name of the Total Actually Actually Place of its State, Types of Control Measures Provided Emergency
No. material storage stored Stored in the Storage pressure hazards Action
(Mention Cap. MT (total) biggest (Kg/cm2) Possible (Fire,
Concentration MT container & Temp. Explosion,
if any) MT (°C) Toxic Release,
Spill etc.)
1. Meta Di Nitro 25 X 3 tank 75 25 UNIT - 4 Ambient Toxic. 1) Tank, valve, pipeline are checked
Benzene Anupam and maintain, in good condition.
Rasayan 2) All Gaskets are checked
India Ltd. periodically & if found defective are
replaced by new one.
3) Joints are checked regularly to
found any Leakage.
4) PPE is kept to handle the Hazard.
5) Sufficient amount of sand/soil are
kept to control any spillage.
6) Vent line & level indicator
provided.
7) Eye washer cum shower is
provided near tank-farm area.
8) Dyke wall provided.
9) Fire Hydrant system installed.
10) Portable fire extinguisher provided.
11) DCS / PLC control System
installed.
12) Vent line deep in water.
R-9
Sr. Name of the material Total Actually Actually Place of its State, Types of hazards Control Measures Emerge
(Mention storage Cap. stored Stored in the Storage pressure Possible (Fire, Provided ncy
No. Concentration if any) MT (total) MT biggest (Kg/cm2) & Explosion, Toxic Action
container MT Temp. (°C) Release, Spill etc.)
7. Di ethelene glycol 60 X 2 tank 120 60 -DO- Ambient Fire, if spill from (1)to (11)
(DEG) . tank & comes in 12) Proper ear-thing &
contact with bonding provided.
spark. 13) No Smoking board
display.
14) Flame arrester with
breather valve provided.
8. Meta Di Chloro 75 X 1 Tank 75 75 -DO- Ambient Fire, if spill from -DO-
Benzene Tank& comes in
contact with spark
R-10
Sr. Name of the material Total Actually Actually Place of its State, Types of hazards Control Measures Emerge
(Mention storage Cap. stored Stored in the Storage pressure Possible (Fire, Provided ncy
No. Concentration if any) MT (total) MT biggest (Kg/cm2) & Explosion, Toxic Action
container MT Temp. (°C) Release, Spill etc.)
9. Iso Propyl Alcohol 20 X 1 Tank 20 20 -DO- Ambient Fire, if spill from -DO-
Tank& comes in
contact with spark
10. Chloro Benzene 20 X 2 Tank 40 20 -DO- Ambient Fire, if spill from -DO-
Tank& comes in
contact with spark
11. Methanol 20 X 1 Tank 20 20 -DO- Ambient Fire, if spill from -DO-
Tank& comes in
contact with spark
12. EDC 20 X 2 Tank 40 20 -DO- Ambient Fire, if spill from -DO-
Tank& comes in
contact with spark
13. Ortho Di Chloro 20 X 1 Tank 20 20 -DO- Ambient Fire, if spill from -DO-
Benzene (ODCB) Tank& comes in
contact with spark
14. Ammonia 20 X 1 Tank 20 20 -DO- Ambient Toxic (1)to (11)
15. Chlorine 0.9 X 5 4.5 0.9 -DO- Ambient Toxic (1) to (11)
Tonners 12) Chlorine Kit & FRP
hood with scrubbing
system provided
R-11
Sr. Name of the material Total Actually Actually Place of its State, Types of hazards Control Measures Provided Emer
(Mention storage Cap. stored Stored in the Storage pressure Possible (Fire, genc
No. Concentration if any) MT (total) MT biggest (Kg/cm2) & Explosion, Toxic y
container MT Temp. (°C) Release, Spill Actio
etc.) n
16. 3- Nitro -4- Methyl 0.200 X 50 10 0.200 -DO- Ambient Corrosive (1) to (11)
Benzoic Acid Drums
17. 2- Methyl -5- Nitro 0.200 X 50 10 0.200 -DO- Ambient Toxic (1) to (11)
Phenol Drums
18. 2,4 – Dichloro Phenol 0.200 X 50 10 0.200 -DO- Ambient Toxic -DO-
Drums
19. Para Chloro Phenol ( 0.200 X 50 10 0.200 -DO- Ambient Toxic -DO-
PCP) Drums
20. Phenol 0.200 X 50 10 0.200 -DO- Ambient Toxic -DO-
Drums
21. Iso Butyl Alcohol 0.200 X 50 10 0.200 -DO- Ambient Fire, if spill from (1) to (11)
Drums Tank & comes in (12) Separate storage
contact with
spark
22. 2- Chloro Ethanol (O - 0.200 X 50 10 0.200 -DO- Ambient Fire, if spill from -DO-
Chloro Ethanol) Drums Tank & comes in
contact with
spark
23. Nitro Benzene 0.200 X 50 10 0.200 -DO- Ambient Fire, if spill from -DO-
Drums Tank & comes in
contact with
spark
24. Benzene Sulphonyl 0.200 X 50 10 0.200 -DO- Ambient Toxic (1) to (11)
Chloride Drums
25. Dimethyl Sulfate 0.200 X 50 10 0.200 -DO- Ambient Toxic -DO-
Drums
R-12
Sr. Name of the material Total Actually Actually Place of its State, Types of hazards Control Measures Provided Emer
(Mention storage Cap. stored Stored in the Storage pressure Possible (Fire, genc
No. Concentration if any) MT (total) MT biggest (Kg/cm2) & Explosion, Toxic y
container MT Temp. (°C) Release, Spill Actio
etc.) n
26. NSA (By Product) 150 X 1 tank 150 150 -DO- Ambient Toxic, Oxidizer (1) To (12)
27. Dilute Sulphuric Acid 50 X 1 tank 50 50 -DO- Ambient Corrosive & Spill, -DO-
65- 70 % ( By Product) if leak from tank
28. 1-4 Dioxane 50 X 1 Tank 80 50 -DO- Nitrogen Fire, if spill from (1) to (11)
30 X 1 tank Blanketing Drum & comes in 12) Proper ear-thing &
contact with bonding provided.
spark 13) No Smoking board
display.
14) Flame arrester with
breather valve provided.
R-13
PROCESS HAZARDS & CONTROL-- Existing
Sr. Name of the Plant or Name of Materials in Name of Operating Type of Control measures / In charge Person /
No. Place hazardous the process / the vessel parameters hazards provided. Telephone number.
process. operation & its pressure, possible
with their location. temperature
quantity. etc.
1 2 3 4 5 6 7 8 9
1 1,4 Dioxane Plant Dehydration As per raw - Atmospheric Fire, • Adequate quantity of
& material Temperature & Chemical fire extinguishers
distillation details given Pressure Spillage provided.
on Page-13 • Adequate number of
safety shower provided
• PPE has been selected
as per materials and
packaging process
2 Drum filling room Packing & As per raw - Atmospheric Fire, • Shock proof electrical Mr. Jitendra Pawaday
Filling material Temperature & Explosion, equipment provided to . Manager – Works
details given Pressure Toxic Release avoid electrical hazard
on Page-13 • Transfer of material by (O)8238035675
closed circuit only and
by pump using PPE’s
• Earthing bonding
provided to avoid static
charge hazard
• The production areas
provided flame proof
fittings
R-14
PROCESS AND VESSEL HAZARD AND CONTROLS --- Proposed
R-15
1,4 Dioxine DEG GL MS Vessel < 106 ˙C Fire (7) Workers/Supervisors/Officers working on
Atmospheric Spill process are well trained in safe operating
procedures.
4.
(8) All plants are provided with eye washer
cum safety shower.
(9) Fire Hydrant System Installed.
(10) DCS / PLC control System installed.
R-16
PROCESS AND VESSEL HAZARD AND CONTROLS --- Proposed
R-17
TABLE 3
OTHER HAZARDS & CONTROL
Sr. Name of the Its source & reasons Its effect on Place of effects Control Measure
No. possible hazard or (Activity) persons, property
emergency & environment
01 Boiler Boiler-likely to cause Person and Factory Premises Standard and necessary
1. Burning due to temperature property fittings to be provided regular
2. Physical /pressure build up inspection to be carried out.
Injury
3. Explosion
02 Spillage from pipe Pipe line & vessels Person - Do - Regular inspection of pipelines
lines -By not adhering safety and vessels. The damaged
1. Toxic gas release norms and by pipes, flanges to be replaced
2. Fire negligence regular painting of pipe lines
04 Bad House Keeping Bad House Person & Property Factory Premises Regular inspection of plant on
1. Injury Keeping day-to-day basis, Proper
2. Burning placement of materials.
3. Fire
4. Chemical hazards
R-19
Figure -2
Layout of the Plant
R-20
Risk Assessment by 3 x 3 Risk Assessment Matrix
R-21
(2) Flammable liquid
Activity: 1-4 DioxineLoading From Store inStorage Tank to And Transfer By Pump toRoad Tanker.
No Hazard Sub Hazard Status Risk Assessment with consideration Existing
of control measures Control Measure
Severity Probability Risk
1 Leakage from tank Eye contact A Serious Highly Moderate Dyke wall provided. Periodic testing of
cell or valve and unlikely tanks- once in two years, regular
splashing of Inhalation A Moderate Highly Tolerable painting per year. Apron, Hand gloves,
material. of gas unlikely gumboot, goggles & helmet provided.
Skin contact A Moderate Highly Tolerable Good house keeping is maintained. Eye
unlikely washer & shower provided. CCE
approved premises with door having
Slip & fall A Serious Highly Moderate locking arrangement provided. Flame
unlikely proof electrical connection provided.
2 Heavy spillage due Property E Serious Highly Moderate Dyke wall having sufficient size is
to collapse of damage and unlikely provided. Tank’s thickness measured on
storage tank from injury. regular interval. RCC foundation
foundation. provided. Paintings of tanks are done
on regular basis.
3 Leakage in present Fire E Serious Highly Moderate Earthing& bonding on tanks and
of ignition source. unlikely transfer line, flame proof electrical
installation, flame arrester provided.
FFE in sufficient quantity is provided.
Well-trained fire staff with Fire hydrant
system as per TAC guideline installed.
Portable water monitor provided. Foam
solution sufficient quantity provided.
4 Spillage due to Injury and A Moderate Unlikely Moderate Dyke wall having sufficient size is
overflow from material provided. Material can be recovered
Storage tank or loss. from dyke wall. Dry sand is kept in
Road Tanker. sufficient quantity. Level gauge is
provided. Overflow with return line
from Receiver to st. tank is provided.
Apron, Hand gloves, gumboot, goggles
and helmet provided.
5 Escape of vapour Inhalation N Minor Likely Moderate Good ventilation in the area. Vent line
from vent line of vapour provided at sufficient height.
during Un loading.
6 Injury due to Injury N Moderate Unlikely Moderate U- Guards and fan guard is provided.
moving rotating
part of transfer
pump.
7 Injury due to Injury A Serious Highly Moderate Proper enclosure of Electrical
Electrical shock. unlikely equipments with earthing and
ADEQUATE PPE provided.
R-22
(3) Combustible Material
Activity: DEG&PEG:,UNLOADING FROM ROAD TANKER BY PUMP, STORE IN STORAGE TANK AND TRANSFER BY PUMP TO
RECEIVER TANK.
No Hazard Sub Hazard Status Risk Assessment with Existing
consideration of control Control Measure
measures
Severity Probability Risk
1 Leakage from Eye contact A Serious Highly Moderate Dyke wall provided. Periodic testing of
tank cell or valve unlikely tanks- once in two years, regular painting
and splashing of Inhalation A Moderat Highly Tolerable per year. Apron, Hand gloves, gumboot,
material. of gas e unlikely goggles and helmet provided. Good house
keeping is maintained. SBA set, Canister
Skin contact A Moderat Highly Tolerable
mask and airline mask is provided. Eye
e unlikely
washer & shower provided.
Slip & fall A Serious Highly Moderate
unlikely
2 Heavy spillage Property E Serious Highly Moderate Dyke wall having sufficient size is provided.
due to collapse of damage and unlikely Tank’s thickness measured on regular
storage tank from injury. interval. RCC foundation provided.
foundation.
3 Leakage in Fire E Moderat Highly Tolerable Earthing& bonding on tanks and transfer
present of e unlikely line, flame proof electrical installation,
ignition source. flame arrester provided. Fire Extinguisher
in sufficient quantity is provided. Well-
trained fire staff with Fire hydrant system
as per TAC guideline installed.
4 Spillage due to Injury and A Moderat Unlikely Moderate Dyke wall having sufficient size is provided.
overflow from material e Material can be recovered from dyke wall.
Storage tank or loss. Dry sand is kept in sufficient quantity. Level
receiver. gauge is provided. Overflow with return
line from Receiver to st. tank is provided.
Apron, Hand gloves, gumboot, goggles and
helmet provided.
5 Escape of vapour Inhalation N Minor Likely Moderate Good ventilation in the area. Vent line
from vent line of vapour provided at sufficient height.
during Un
loading.
6 Injury due to Injury N Moderat Unlikely Moderate U- Guard and fan guards provided.
moving rotating e
part of transfer
pump.
7 Injury due to Injury A Serious Highly Moderate Proper enclosure of Electrical equipments
Electrical shock. unlikely with earthing and adequate PPE provided.
R-23
(4) Flammable liquid
Activity: Petroleum Class 'B' (Diesel - HSD) Unloading From Road Tanker, Store In Storage Tank And Transfer By Pump To
Receiver Tank.
No Hazard Sub Hazard Status Risk Assessment with consideration Existing
of control measures Control Measure
Severity Probability Risk
1 Leakage from tank Eye contact A Serious Highly Moderate Dyke wall provided. Periodic testing of
cell or valve and unlikely tanks- once in two years, regular
splashing of Inhalation A Moderate Highly Tolerable painting per year. Apron, Hand gloves,
material. of gas unlikely gumboot, goggles & helmet provided.
Skin contact A Moderate Highly Tolerable Good house keeping is maintained. Eye
washer & shower provided. CCE
unlikely
approved premises with door having
Slip & fall A Serious Highly Moderate locking arrangement provided. Flame
unlikely proof electrical connection provided.
2 Heavy spillage due Property E Serious Highly Moderate Dyke wall having sufficient size is
to collapse of damage and unlikely provided. Tank’s thickness measured on
storage tank from injury. regular interval. RCC foundation
foundation. provided. Paintings of tanks are done
on regular basis.
3 Leakage in present Fire E Serious Highly Moderate Earthing& bonding on tanks and
of ignition source. unlikely transfer line, flame proof electrical
installation, flame arrester provided.
FFE in sufficient quantity is provided.
Well-trained fire staff with Fire hydrant
system as per TAC guideline installed.
Portable water monitor provided. Foam
solution sufficient quantity provided.
4 Spillage due to Injury and A Moderate Unlikely Moderate Dyke wall having sufficient size is
overflow from material provided. Material can be recovered
Storage tank or loss. from dyke wall. Dry sand is kept in
receiver. sufficient quantity. Level gauge is
provided. Overflow with return line
from Receiver to st. tank is provided.
Apron, Hand gloves, gumboot, goggles
and helmet provided.
5 Escape of vapour Inhalation N Minor Likely Moderate Good ventilation in the area. Vent line
from vent line of vapour provided at sufficient height.
during Un loading.
6 Injury due to Injury N Moderate Unlikely Moderate U- Guards and fan guard is provided.
moving rotating
part of transfer
pump.
7 Injury due to Injury A Serious Highly Moderate Proper enclosure of Electrical
Electrical shock. unlikely equipments with earthing and
ADEQUATE PPE provided.
R-24
Risk assessment by 3 x 3 Risk Assessment Matrix for proposed facility:
(1) TOXIC RELEASE & CORROSIVE:
Activity: CHLORINE (CL2): Storage Of Chlorine Tonner At Storage Facility And Handling Of Chlorine:
Risk Assessment with
No Hazard Sub Hazard Status consideration of control measures Control Measures will be provided.
Severity Probability Risk
1 Fall of Tonner Body injury and A Serious Highly Moderate FLT will be maintained in good
from FLT. property damage unlikely condition. Train driver will be
Toxic gas release E Serious Highly Moderate employed. Good road condition will
if Tonner valve unlikely be maintained. Tonner will be
breakage. transferred only when Tonner with
Valve protecting cap. SBA sets, Cl2
Emergency Kit, Air line Respirator, All
ADEQUATE PPE etc. Will be provided
as required. FRP hood with alkaline
scrubber will be provided.
Continuous monitoring system for
chlorine will be installed and
maintained. On site Off site
Emergency plan will be revised,
amended and rehearsed on regular
basis.
2 Bursting of Toxic gas release E Serious Highly Moderate Same as above and chlorine will be
Tonner / Valve unlikely stored and used under Shed to
due to storage in protect from direct sun light. Tested
open area. Tonner will only be utilized & CCE
approval will be taken. Hot work will
be performed under safety work
permit only.
3 Leakage from Eye contact A Serious Highly Moderate Chlorine transfer line will be
transfer line. unlikely maintained in good condition. Will be
Skin contact A Moderate Unlikely Moderate checked periodically. Good and
sound material will be used for
Inhalation of gas A Serious Unlikely Significant
transfer line. Apron, Hand gloves,
gumboot, goggles, helmet and
canister mask will be provided
Ammonia torch will be provided.
R-25
Risk Assessment with consideration
No. Hazard Sub hazard Status of control measures Control Measures will be provided.
Severity Probability Risk
2 Heavy spillage due Property E Serious Highly Moderate Dyke wall having sufficient size will
to collapse of loss and unlikely be provided. Tank’s thickness
storage tank from injury. measured on regular interval.
foundation Painting on tanks is done on regular
basis.
3 Broken Railing Fall from A Serious Highly Moderate Railing will be provided, Apron, Hand
and broken steps height. unlikely gloves, gumboot, goggles and helmet
of ladder. will be provided.
4 Leakage from Toxic gas E Moderate Unlikely Moderate Sound guard will be provided on
glass level tube release level indicator and dyke wall will be
provided.
5 Spillage due to Injury and A Serious Highly Moderate Dyke wall having sufficient size is
overflow from material unlikely provided. ADEQUATE PPE as above is
Storage tank or loss. kept and warned. Dry sand is kept in
receiver. sufficient quantity. Level gauge and
level indicator with guard is
provided. Overflow and return line
will be provided on receiver.
6 Moving rotating Injury N Moderate Unlikely Moderate U- Guards and fan guard will be
part of transfer provided.
pump.
7 Electrical shock. Injury A Serious Highly Moderate Proper enclosure of Electrical
unlikely equipments with earthing and
ADEQUATE PPE will be provided.
R-26
No Hazard Sub Hazard Status Risk Assessment with Existing
consideration of control Control Measure
measures
Severity Probability Risk
4 Spillage due to Injury and A Moderate Unlikely Moderate Dyke wall having sufficient size is provided.
overflow from material Material can be recovered from dyke wall.
Storage tank or loss. Dry sand is kept in sufficient quantity. Level
receiver. gauge is provided. Overflow with return line
from Receiver to st. tank is provided. Apron,
Hand gloves, gumboot, goggles and helmet
provided.
5 Escape of vapour Inhalation N Minor Likely Moderate Good ventilation in the area. Vent line
from vent line of vapour provided at sufficient height.
during Un
loading.
6 Injury due to Injury N Moderate Unlikely Moderate U- Guards and fan guard is provided.
moving rotating
part of transfer
pump.
7 Injury due to Injury A Serious Highly Moderate Proper enclosure of Electrical equipments
Electrical shock. unlikely with earthing and ADEQUATE PPE provided.
R-27
Risk Assessment with consideration
N of control measures
Hazard Sub Hazard Status Control Measures will be provided.
o
Severity Probability Risk
3 Rain water getting Over flow & E Moderate Unlikely Moderate Storage tank under CCE approved
inside tank fire in shed, periodic inspection for any
present of leakage, stored in closed system,
heat & flame arrester with birthing valve will
ignition be provided. Tanks will be kept under
source shed. Tank farm area will be
connected to ETP.
4 Static charge Fire E Serious Highly Moderate Earthing& bonding on tanks and
Unlikely transfer line, flameproof electrical
installation, flame arrester with
breather valve will be provided.
5 Implosion of the Heavy E Serious Highly Moderate Bird guard will be provided on vent
tank Spillage Unlikely line. . LEL sensors to be installed.
R-28
No Hazard Sub Hazard Status Risk Assessment with Existing
consideration of control Control Measure
measures
Severity Probability Risk
6 Injury due to Injury N Moderat Unlikely Moderate U- Guard and fan guards provided.
moving rotating e
part of transfer
pump.
7 Injury due to Injury A Serious Highly Moderate Proper enclosure of Electrical equipments
Electrical shock. unlikely with earthing and adequate PPE provided.
R-29
(7) Corrosive Material
Activity: Caustic Soda Lye: Unloading From Road Tanker, Store In Storage Tank And Transfer By Pump To Receiver.
R-30
Risk Assessment with consideration
of control measures Existing
No Hazard Sub hazard Status
Control Measure
Severity Probability Risk
2 Heavy spillage of Property E Serious Highly Moderate Dyke wall having sufficient size is
corrosive loss and unlikely provided. Tank’s thickness measured on
chemicals due to injury. regular interval. Painting on tanks is
collapse of storage done on regular basis.
tank from
foundation.
3 Broken Railing and Injury due A Serious Highly Moderate Railing provided, hand gloves, gumboot,
broken steps of to fall from unlikely goggles, helmet. Ladders having hooks
ladder. height. on top is provided. Step are maintain in
good condition.
4 Spillage due to Injury and A Serious Highly Moderate Dyke wall having sufficient size is
overflow from material unlikely provided. ADEQUATE PPE as above is
Storage tank or loss. kept and warned. Dry sand is kept in
receiver. sufficient quantity. Level gauge and
level indicator with guard is provided.
Overflow and return line is provided on
receiver.
5 Injury due to Injury N Moderate Unlikely Moderate U- Guards and fan guard is provided.
moving rotating
part of transfer
pump.
6 Injury due to Injury A Serious Highly Moderate Proper enclosure of Electrical
Electrical shock. unlikely equipments with earthing and
ADEQUATE PPE provided.
R-31
No Hazard Sub Hazard Status Risk Assessment with consideration Control Measures will be provided
of control measures
Severity Probability Risk
3 Leakage in present Fire E Serious Highly Moderate Earthing& bonding on tanks and
of ignition source. unlikely transfer line, flame proof electrical
installation, flame arrester provided.
FFE in sufficient quantity is provided.
Well-trained fire staff with Fire hydrant
system as per TAC guideline installed.
Portable water monitor provided. Foam
solution sufficient quantity provided.
4 Spillage due to Injury and A Moderate Unlikely Moderate Dyke wall having sufficient size
overflow from material provided. Material can be recovered
Storage tank or loss. from dyke wall. Dry sand is kept in
receiver. sufficient quantity. Level gauge is
provided. Overflow with return line
from Receiver to st. tank is provided.
Apron, Hand gloves, gumboot, goggles
and helmet provided.
5 Escape of vapour Inhalation N Minor Likely Moderate Good ventilation in the area. Vent line
from vent line of vapour provided at sufficient height.
during Un loading.
6 Injury due to Injury N Moderate Unlikely Moderate U- Guards and fan guard is provided.
moving rotating
part of transfer
pump.
7 Injury due to Injury A Serious Highly Moderate Proper enclosure of Electrical
Electrical shock. unlikely equipments with earthing and
ADEQUATE PPE provided.
R-32
Risk Assessment with consideration of
No Hazard Sub hazard Status control measures Control Measures will be provided.
Severity Probability Risk
4 Leakage and Fire E Serious Highly Moderate Flameproof electrical installation.
Ignition source unlikely Fire Extinguisher in sufficient
available quantity will be provided. Well-
trained fire staff with Fire hydrant
system will be installed. Dry sand in
sufficient quantity will be kept. Will
be stored in segregated area and in
Licence premises, approved by CCE.
Activity: Combustible material: Storage Of EDC / DMS / P. Chloro Phenol 2- Methyl -5- Nitro Phenol , 2,4 – Dichloro
Phenol,Phenol, Benzene Sulphonyl Chloride, Storage In Drums & Handling
R-33
Risk Assessment with consideration
No Hazard Sub hazard Status of control measures Control Measures will be provided
Severity Probability Risk
4 Slip and fall Physical injury A Serious Highly Moderate
unlikely
5 Toppling of bags Physical injury A Moderate Unlikely Moderate Good palate condition and proper
from stacking of bags on palate. Good
trolley/forklift road condition will be maintained.
palate
R-34
3.1 TRANSPORTATION OF HAZARDOUS CHEMICALS
Role of Transporter:
“Tremcard” must be obtained from the respective supplier and to be kept on vehicle with driver.
Emergency information panel shall be placed on the front sides and rear.
The Driver must hold valid driving license for HMV.
The driver must possess a certificate for transportation of hazardous goods.
First-aid, Safety and fire appliances shall be kept in vehicle and maintained properly.
In case of emergency, the driver should inform immediately to Colourtex, Transporter, Fire
Brigade, Police and Ambulance.
The tanker driver shall initiate emergency actions as per the TREMCARD.
3.1.2 INCASE OF EMERGENCY, DIAL POLICE (100), FIRE BRIGADE (101) AND AMBULANCE (102)
On being received the emergency call the officer of fire brigade shall rush immediately to
incident site with water tender and adequate fire squad to deal the emergency in case of fire,
spillage as indicated under Tremcard.
Assess the situation on arrival and decide whether the appliances and equipment he has, or will
shortly have, are sufficient to control the fire
Rescue arrangement shall be made for injured persons.
Due to sudden accident, panic situation may be controlled by use of P.A. System.
Other emergency services i.e. police; hospital and local authority are to be informed through
control room for follow up action.
Serious injured person is to be sent immediately to the hospital as soon as possible
Arrangement is to be made to stop leakage from the tanker.
Arrangement is to be made to contain spilled material immediately by with inert materials like
sand or earth.
Stop smoking & other ignition source in vicinity.
Mobilization of vehicles and crowd is to be controlled.
Line of hose is to be laid down to tackle fire if occurs in the spilled or in the tanker.
Stop the engine in case of running.
Name and address of victims, who was rescued / given first-aid / sent to hospital, shall be noted
and written in occurrence book and other copy is to be submitted to the nearest police station.
On completion of operation incidence report is to be submitted to the CFO, Head Quarter.
At the time of emergency, providing quick and adequate medical relief to the victims of
incidence will have to be given on top most priority.
Provide emergency aid at site of incident by special unit equipped.
Make arrangement for adequate stock of antidotes, life saving drugs &medicines.
Make arrangement for ambulance, stretchers, First-aid kits etc.
Get the details from first-aid post, casualty-receiving center & prepare report.
R-35
Role of Police:
Provide the driver with a “TREMCARD” written in Gujarati, Hindi and English language that
explained him emergency actions i.e. what to do in case of fire, spillage and contact telephone
numbers.
Provide the transport route of the carrier to the port. This route must stay constant all the time.
Inform the local authorities along the route of what actions to take if an incident occurs and to
avoid contaminating the area.
If disposal is necessary, follow the disposal procedure as per guidelines of R&H.
Investigate the incident and develop report to prevent recurrence.
“RUSH TO THE INCIDENT SITE IMMEDIATELY AS AND WHEN RECEIVE THE EMERGENCY CALL”
R-36
3.1.3 TRANSPORT EMERGENCY CARD (Road):
R-37
3.1.4 Transportation, Unloading and handling procedure
Toxic release
• Isolate the area
• Isolate the container
• Training will be provided to driver and cleaner
regarding the safe driving, hazard of
Flammable chemicals, emergency handling.
• TREM card will be kept with TL.
• Fire extinguishers will be kept with TL.
• Flame arrestor will be provided to TL exhaust.
• Instructions will be given not to stop road
tanker in populated area.
• Clear Hazard Identification symbol and
emergency telephone number will be
displayed as per HAZCHEM CODE.
• Appropriate PPEs will be kept with TL.
2 Hazardous Leakage& Spillage • Check the source of leakage point.
Chemicals & • Do not touch damaged containers or spilled
Solvents Road material unless wearing appropriate
tanker unloading at protective clothing.
project site. • Stop leak if you can do it without risk.
Toxic release
• Isolate the area
• Isolate the container
• Check the source of leakage point.
R-38
• Spray the water on leakage
• Priority will be given to Tanker to immediately
enter the storage premises at site and will not
be kept waiting near the gate or the main
road.
• Security person will check License, TREM
CARD, Fire extinguisher condition; Antidote
Kit, required PPEs as per SOP laid down.
• Store officer will take sample as per sampling
SOP from sampling point.
• After approval of QC department unloading
procedure will be allowed be started.
R-39
• Dyke wall will be provided to storage tank.
• Level transmitter will be provided with low
level high level auto cut-off provision.
• Vent will be connected to water trap and vent
of water trap will be provided with flame
arrestor.
• Water sprinkler system will be provided to
storage tank.
• Fire hydrant monitor with foam attachment
facility will be provided.
• Dumping / Drain vessel/alternate vessel will be
provided to collect dyke wall spillage material.
• FLP type pump will be provided.
• Nitrogen blanketing will be provided to
storage tank.
• Double static earthing will be provided to
storage tank.
Double Jumper clip will be provided to all Solvent
handling pipeline flanges.
4 Hazardous Leakage& Spillage • Double mechanical seal type FLP type pump
Chemicals & due to Line will be provided.
Solvents transfer rupture, Flange • Double on / off switch will provided at tank
from storage tank Gasket failure, farm and process area near day tank. Pump
to Day tank Fire, Explosion, auto cut off with day tank high level will be
Toxic release. provided.
• Flame arrestor will be provided on day tank
vent.
• Over flow will be provided for additional
safety and it will be connected to main storage
tank.
• NRV will be provided on pump discharge line.
• Double Jumper clip will be provided to all
solvent handling pipeline.
Double static earthing will be provided to day
tank.
5 Hazardous Leakage, Spillage • Gravity transfer.
Chemicals & due to Line • Total quantity of day tank material will be
Solvents transfer rupture, Flange charged in to reactor at a time.
from Day tank to Gasket failure, • Static earthing will be provided to storage
reactor. Fire, Explosion, tank.
Toxic release. • Double Jumpers will be provided to pipeline
flanges.
R-40
4.0 Components of Risk Assessment
4.1 Hazard
Hazard is an inherent property of a substance, agent and source of energy or situation having the
potential to cause undesirable consequence (e.g. properties that can cause adverse effects or
damage to health, the environment or property).
4.1.1 Major Hazards:
1) Fire hazards
2) Toxic gas release hazards
3) Explosion hazards
4) Corrosion hazards
Fire Hazards
When a liquid is used having flash point below the normal ambient temperature, it could, in suitable
circumstances, liberate a sufficient quantity of vapor to give rise to flammable mixtures with air. If
this mixture is then heated further to its ignition point, combustion starts. Similarly, a combustible
gas or vapor mixture burns if it is heated to a sufficiently temperature.
Toxic Hazards
Toxic substances affect in three ways by ingestion, absorption & inhalation. The vapor released may
be toxic. Dispersion is important for predicting the distance necessary for the concentration of
release gas to come down a specified end point.
Corrosion Hazards
Corrosion is a chemical reaction-taking place at the surface of metal. These chemicals have their
typical hazard when it comes in contact with human tissues. Most corrosive substances will produce
chemical burns, while certain chemical produce deep ulceration.
R-41
4.2.1 Physical Hazard
R-42
4.2.5 Psychosocial hazards
Type of work, risks involved in work, monotony, and long working hours, lack of recognition & job
satisfaction, poor man made management, lack of welfare activities, tensions at home & work place.
Major dropped objects hazard due to large number of physical handling steps / operations
involved with crane/ overhead lifting/ hoisting equipment.
Fires in any part of the plant working areas – there is a possibility of rapid escalation if it is not
brought under control quickly.
4.2.6 Biological hazards
Viruses, rickettsiae, bacteria, fungi, protozoa and helminthes transmitted in certain occupations.
5.0 Determining Significance
Determining Significance is evaluation of the significance of the risk estimation and each of the
components of the risk assessment process, including elements of risk perception and cost/benefit
consideration.
6.0 Risk Management
M/s. Anupam Rasayan India Limited will be managed the economical and social aspects of risk.
Improvement in scientific and factual basis for risk assessment is necessary for better risk
management decisions and public creditability of those decisions. However, M/s. Anupam Rasayan
India Limited has done the QRA to be undertaken prior to risk management decisions.
M/s. Anupam Rasayan India Limited will be considered the Risk management strategies including all
the specific activities. First step involves taking a decision about the weather any actions are
necessary and if so, what nature of the action should it be. Industries’ risk management decision
shall be based not only computed risk in terms of fatality probability (fatality/year), but also on
judging the acceptability of the risk – a matter of personal and social value judgment. The risk
management includes implementing the actions, decided upon and evaluating their effects.
The fatality probability is function of:
• Probability of occurrence of hazardous events
• Probability of weather condition, wind direction
• Probability of number of persons exposed which depends on the severity of the consequences
• Lethality factor
• Probability of ignition source
On the basis of risk Assessment, Company has defined its own risk management plan, which is
explained as follow.
R-43
7.0 Safety Precaution
Following measure will be provided, proactively and maintained, to control / reduce the risk
1. Sulphuric Acid/ Nitric Acid
1) Dyke wall- filled with sufficient size is provided.
2) Tank, valve, pipeline are checked and maintain, in good condition.
3) All Gaskets are checked periodically & if new one replaces found defective.
4) Joints are checked regularly to found any Leakage.
5) ADEQUATE PPE is kept to handle the Hazard.
6) ISI Portable fire extinguisher & Hydrant line is provided as per TAC norms.
7) Sufficient amount of sand/soil are kept to control any spillage.
8) Flame proof fitting provided.
9) Eye washer cum shower is provided near tank-farm area.
10) Level indicator provided.
11) Spark arrester are installed on all vehicles in side the premises.
12) SBA set, Canister mask and airline mask is provided.
13) Earthing& bonding on tanks is provided.
14) Vent line provided at sufficient height.
15) Tanks kept on sound foundation.
2. 1-4 Dioxane
1) Dyke wall- filled with sufficient size is provided.
2) Tank, valve, pipeline are checked and maintain, in good condition.
3) All Gaskets are checked periodically & if new one replaces found defective.
4) Joints are checked regularly to found any Leakage.
5) Apron, Hand gloves, gumboot, goggles and helmet provided.
6) ISI Portable fire extinguisher & Hydrant line is provided as per TAC norms.
7) Sufficient amount of sand/soil are kept to control any spillage.
8) Flame proof fitting provided.
9) Eye washer cum shower is provided near tank-farm area.
10) Level indicator provided.
11) Spark arrester are installed on all vehicles in side the premises.
12) SBA set, Canister mask and airline mask is provided.
13) Earthing& bonding on tanks is provided.
R-44
14) Always stored under INERT gas (N2) atmosphere Blanketing
15) Vent line provided at sufficient height.
16) Level indicator provided.
3. DEG / PEG
1) Dyke wall will be provided.
2) Dyke wall- filled with sufficient size is provided.
3) Tank, valve, pipeline are checked and maintain, in good condition.
4) Apron, Hand gloves, gumboot, goggles and helmet will be provided.
5) ISI Portable fire extinguisher & Hydrant line is provided as per TAC norms.
6) Flameproof electrical connection will be provided.
7) Separate storage area will be provided.
8) Sufficient amount of sand/soil are kept to control any spillage.
9) Eye washer cum shower is provided near tank-farm area.
10) Level indicator provided.
11) RCC foundation will be provided
R-45
Following measure will be provided- proactively and maintained, to control / reduce the risk, for
PROPOSED FACILITY:
1. CHLORINE (CL2)
1) CCE approved premises with door having locking arrangement provided.
2) Apron, Hand gloves, gumboot, goggles & helmet provided
3) ISI Portable fire extinguisher & Hydrant line is provided as per TAC norms.
4) Sufficient amount of sand/soil are kept to control any spillage.
5) Flame proof fitting provided.
6) Emergency CL2 kit.
7) Ammonia Torch.
8) FRP Hood with blower with & pack tower with dil. NaOH circulation tank for emergency
scrubbing
9) Sufficient Nos. of SBA sets & 2 No. of Air line mask.
10) Continuous monitoring system.
11) OHT crane for Cylinder handling.
12) Water pit.
13) Wind Cock for wind direction.
14) Preventive maintenance on regular basis.
R-46
10) RCC foundation will be provided.
11) Transfer material to another empty tank/ Vessel.
6. Sulfuric acid / HCL
7. Ethylene Dichloride
R-47
8. Methanol / Benzene
1) Tank, valve, pipeline are checked and maintain, in good condition through preventive
maintenance.
2) Joints are checked regularly to detect any Leakage.
3) ISI Portable fire extinguisher & Fire Hydrant line is provided as per TAC norms.
4) Flame proof electrical fittings / installation provided.
5) Proper Earthing, Bonding & flange-to-flange jump ring is provided.
6) Flame arrester provided on vent line.
7) CCE approved Separate Storage area with door having locking arrangement.
8) Auto & manual sprinkler provided.
9) Spark arrester are installed on all vehicles inside the premises.
10) Apron, Hand gloves, gumboot, goggles and helmet provided.
11) Train operator employed.
12) Eye washer & shower provided.
13) Tank’s thickness measured on regular interval.
14) Good ventilation in the area.
15) Flame arrester with breather valve.
16) Perforated dip pipe in dyke wall will be provided to monitor & detect any leakage from tank.
17) Sump will be made under dyke to recover leakage material from dyke.
18) Tanks will be kept under RCC dyke.
19) Tanks will be kept under shed.
20) All tanks will be connected to ETP.
R-48
6) Flameproof electrical connection will be provided.
7) Separate storage area will be provided.
8) Sufficient amount of sand/soil are kept to control any spillage.
9) Eye washer cum shower is provided near tank-farm area.
10) Level indicator provided.
11) RCC foundation will be provided.
R-49
7) Separate storage area will be provided.
8) Sufficient amount of sand/soil are kept to control any spillage.
9) Eye washer cum shower is provided near tank-farm area.
13. 3- Nitro -4- Methyl Benzoic Acid, Iso Butyl Alcohol, 2- Chloro Ethanol (O - Chloro Ethanol),
NITRO BENZENE Storage In Drums & Handling.
R-50
8.0 Quantitative Risk Assessment
Estimate Consequence
R-51
8.1 Identification of Risk Areas
The procedure for QRA starts with identification of major risk areas in the installation. Operation
carried out in pesticide Industries usually come under certain board, general categories. In M/s.
Anupam Rasayan India Limited, major risk areas will storage tank area, plant area and utility area.
Majority of the major accident hazard in the above operations arise from the flammable property of
the chemicals involved. Therefore, majority of the actual accident events in pesticide plants are fire
and explosion. Where toxic substances such as, EDC and chlorine are used in significant quantities in
M/s. Anupam Rasayan India Limited.
R-52
9.0 CONSEQUENCE ANALYSIS
In a plant handling hazardous chemicals, the main hazard arises due to storage, handling & use of
these chemicals. If these chemicals are released into the atmosphere, they may cause damage due
to resulting fires or vapour clouds.
Operating Parameters
Potential vapour release for the same material depends significantly on the operating conditions.
Especially for any liquefied gas, the operating conditions are very critical to assess the damage
potential.
Inventory
Inventory Analysis is commonly used in understanding the relative hazards and short listing of
release scenarios. Inventory plays an important role in regard to the potential hazard. Larger the
inventory of a vessel or a system, larger the quantity of potential release. The potential vapour
release (source strength) depends upon the quantity of liquid release, the properties of the
materials and the operating conditions (pressure, temperature). If all these influencing parameters
are combined into a matrix and vapour source strength estimated for each release case, a ranking
should become a credible exercise.
Loss of Containment
Plant inventory can get discharged to Environment due to Loss of Containment. Certain features of
materials to be handled at the plant need to the clearly understood to firstly list out all significant
release cases and then to short list release scenarios for a detailed examination. Liquid release can
be either instantaneous or continuous. Failure of a vessel leading to an instantaneous outflow
assumes the sudden appearance of such a major crack that practically all of the contents above the
crack shall be released in a very short time. The more likely event is the case of liquid release from a
hole in a pipe connected to the vessel. The flow rate will depend on the size of the hole as well as on
the pressure, which was present, in front of the hole, prior to the accident. Such pressure is basically
dependent on the pressure in the vessel. The vaporisation of released liquid depends on the vapour
pressure and weather conditions. Such consideration and others have been kept in mind both during
the initial listing as well as during the short-listing procedure. In the study, Maximum Credible Loss
accident methodology is to be used, therefore, the largest potential hazard inventories have been
considered for consequence estimation.
R-53
9.1 DAMAGE CRITERIA
In consequence analysis, use is made of a number of calculation models to estimate the physical
effects of an accident (spill of hazardous material) and to predict the damage (lethality, injury,
material destruction) of the effects. The calculations can roughly be divided in three major groups:
a) Determination of the source strength parameters;
b) Determination of the consequential effects;
c) Determination of the damage or damage distances.
The basic physical effect models consist of the following.
Source strength parameters
Calculation of the outflow of liquid, vapour or gas out of a vessel or a pipe, in case of rupture.
Also two-phase outflow can be calculated.
Calculation, in case of liquid outflow, of the instantaneous flash evaporation and of the
dimensions of the remaining liquid pool.
Calculation of the evaporation rate, as a function of volatility of the material, pool dimensions
and wind velocity.
Source strength equals pump capacities, etc. in some cases.
Consequential effects
Dispersion of gaseous material in the atmosphere as a function of source strength, relative
density of the gas, weather conditions and topographical situation of the surrounding area.
Intensity of heat radiation [in kW/ m2] due to a fire or a BLEVE, as a function of the distance to
the source.
Energy of vapour cloud explosions [in N/m2], as a function of the distance to the distance of the
exploding cloud.
Concentration of gaseous material in the atmosphere, due to the dispersion of evaporated
chemical.
It may be obvious, that the types of models that must be used in a specific risk study strongly
depend upon the type of material involved:
Gas, vapour, liquid, solid
Inflammable, toxic, toxic combustion products
Stored at high/low temperatures or pressure
Controlled outflow (pump capacity) or catastrophic failure?
R-54
Selection of Damage Criteria
The damage criteria give the relation between extent of the physical effects (exposure) and the
percentage of the people that will be killed or injured due to those effects. The knowledge about
these relations depends strongly on the nature of the exposure. For instance, much more is known
about the damage caused by heat radiation, than about the damage due to toxic exposure, and for
these toxic effects, the knowledge differs strongly between different materials.
In Consequence Analysis studies, in principle three types of exposure to hazardous effects are
distinguished:
1. Heat radiation, from a jet, pool fire, a flash fire or a BLEVE.
2. Explosion
3. Toxic effects, from toxic materials or toxic combustion products.
In the next three paragraphs, the chosen damage criteria are given and explained.
The Maximum Credible Loss (MCL) scenarios have been developed for the Facility. The MCL cases
considered, attempt to include the worst “Credible” incidents- what constitutes a credible incident is
always subjective. Nevertheless, guidelines have evolved over the years and based on basic
engineering judgement, the cases have been found to be credible and modelling for assessing
vulnerability zones is prepared accordingly. Only catastrophic cases have been considered and not
partial or small failures (as is the case in Quantitative Risk Assessment where contributions from low
frequency - high outcome effect as well as high frequency - low outcome events are distinguished).
The objective of the study is emergency planning; hence only holistic & conservative assumptions
are used for obvious reasons. Hence though the outcomes may look pessimistic, the planning for
emergency concept should be borne in mind whilst interpreting the results.
R-55
9.3 CONSEQUENCE ANALYSIS CALCULATIONS
The Consequence Analysis has been done for selected scenarios. This has been done for weather
conditions having wind speed 2.03 m/s. In Consequence Analysis, geographical location of the
source of potential release plays an important role. Consideration of a large number of scenarios in
the same geographical location serves little purpose if the dominant scenario has been identified
and duly considered.
DISCHARGE
• Phast requires basic information about storage or process conditions and material
properties in order to perform discharge calculations
• The software comes with an integrated material property database containing more than
1,600 pre-defined pure component chemicals
• Various discharge scenario options have been implemented to represent common process
failures, and model their behavior. These include:
Leaks and line ruptures from long & short pipelines
R-56
Catastrophic ruptures
Relief valve and disc ruptures
Tank roof collapse
Vent from vapour spaces
In building release effects
DISPERSION
The dispersion models within Phast are able to model the following phenomena
• Dispersion of gas, liquid and two-phase releases
• Liquid droplet thermo dynamics calculations and liquid droplet rainout
• Pool spreading and vaporization
• Building wake dispersion effects for vapor releases
FLAMMABLE EFFECTS
For releases of flammable material Phast calculates
• Radiation profiles and contours from a range of fire scenarios including pool fires, flash fires,
jet fires and fire balls, including cross-wind effects on a jet fire
• Vapor Cloud Explosion modeling using industry standards models including the TNO Multi-
energy, Baker Strehlow Tang and TNT Equivalence models
• Overpressure contours from Boiling Liquid Expanding Vapor Explosions
TOXIC EFFECTS
• Graphs of toxic concentration profile
• Indoor and outdoor toxic dose prediction
• Reporting of distance to specific dose and concentration
• Calculated exposure time and use as “averaging time” for passive dispersion effects
PHAST RISK
Phast Risk allows you to combine the flammable and toxic consequences from each scenario in your
QRA model with their likelihood to quantify the risk of fatalities. Phast Risk allows you to take
account of local population distribution, sources of ignition, land usage and local prevailing weather
conditions. It is designed to perform all the analysis, data handling and results presentation
elements of a QRA within a structured framework.
R-57
Phast Risk allows you to quickly identify major risk contributors so that time and efforts can be
directed to mitigating these highest risk activities. Based on effects calculations and population
vulnerabilities, Phast Risk can integrate over all scenarios and weather conditions to estimate the
total risk. The established individual and societal risk indicators are predicted by Phast Risk across
your facility and surrounding area using the classical QRA methodology. Risk ranking reports can be
produced at points of strategic importance to show the relative influence of the various failure
scenarios and their contribution to both the individual and societal risk metrics.
A key benefit of Phast Risk is the ability to identify major risk contributors and differentiate these
from incidents with worst case consequences which might otherwise dominate the safety reviews.
Whilst medium scale incidents have lesser consequences, they may have a higher frequency, which,
when combined with their hazardous effects, generate a higher level of risk. Time and effort
directed to mitigating high consequence but often low frequency events may not be well spent.
Phast Risk helps you direct this effort more effectively.
Phast Risk also provides facilities to help you manage large quantities of input data, including
scenarios, parameters, wind roses, ignition and population, and combine these in many ways. This
is critical when looking at sensitivity analyses and assessing the merits of a range of risk reduction
measures.
Benefits
• Facilitates cost reduction in terms of losses and insurance
• Allows optimization of plant and process design
• Assist in compliance with safety regulators
• Enables quicker response to hazardous incidents
• Improve engineer’s understanding of potential hazards
• Regular software upgrades incorporate industry experience and expertise, and advances in
consequence modeling technology.
Financial Extension
The Financial Consequence extension is used to assess situations which present potential hazards
not only to life but also to the environment, property and business and help quantifying their
severity in financial terms. Phast Financial helps you to estimate the cost of a particular release of a
given material under specified conditions. The Financial Risk extension helps you to calculate the
R-58
broader financial risks associated with accidents and can be used to help manage your business risk
and assess appropriate levels of insurance.
Multi-Component Extension
The multi-component extension to Phast provides greater accuracy for liquid or two-phase mixture
releases compared to the standard pseudo-component approach. The composition of each
component of the mixture is calculated throughout the discharge and dispersion phases of the
release.
2. HAMS-GPS
HAMS-GPS Software Package is a professionally built Window based Software. HAMS-GPS enables
from advanced Training to Research oriented HSE-Management Studies including Risk Assessment
(including FAR, FN-Curve and ISO-Risk), Accident Analysis, ASCLAP-Distribution, Plume, Puff, Spill
Pool evaporation dispersion modeling, Safety Audits, Emergency Management Planning and
Control, PROBIT computations, Percent and Absolute Fatality, Injury computations, Fire (Pool Fires,
Jet Fires) & Explosion (Vapor Cloud, BLEVE, Confined, Unconfined, Mechanical) Modeling, Explosion
Prevention (Inerting, Static Charge development), DOW-Fire & Explosion computations, EIA,
Developing and Establishing an Integrated System on EMS& OHSMS under International Standards,
on Personal Health and Fitness and more.
Comprises of Expert Modules: Dispersion with PROBITS, Fire, Explosion, DOW-Index, Safety-Audit,
ASCLAP, EIA, SMOD, Risk Assessment, EMP Evaluation, Accident Analysis (Database), Dispersion,
PRTOBITs, Fire Analysis (Database), Limits curve, Absolute Fatality/Injury (Dispersions, Explosions
and Fire-Balls), OHSMS- Evaluation against OHSAS-18001 (Database), House Keeping Evaluation,
Unitcon (Unit conversion) and More.
R-59
Other releases: BLEVE, Oil/Gas well blow out scenarios, SWOT analysis, Safety manual review, QRA-
review, Hydraulics, and Industrial Work Hygiene index (Database), HAZOP Study Software and
More.
SMOD
Source Models: Liquid flow through a hole in a tank, Liquid flow through a hole under constant
pressure, Liquid flow through a pipe, Vapor/gas flow through hole, Vapor/gas flow through a pipe,
Flashing liquids stored above atmospheric Boiling Point., pool evaporation by substrate heat
conduction and wind, Tank dimensions, Dyke dimensions, LPG-bund computations. Options for
converting Density, mass, force, latent heat, specific heat, pressure, temperature, computing vapor
density, vol. of vapor from P1T1 to P2 T, and Calculator.
DISPERSION WITH PROBITS MODULE
Plume, Puff, Spill Dispersions with tabular and graphic display with 5-User defined Isopleths in XY-
Slice and Isoelevets in XZ-Plane at Y-Cross wind distance. Full 3-D “CAT-Scan” output possible with
dispersion “Cake slicing in XY (Isopleths) and XZ (Isoelevets) Graphs. Graphics are in color as Custom
color, Default color or BW. It is a complete CAT-Scan with Probits (PROBIT short for Probability Unit,
is the percent Fatality and Injury due to exposure to any hazardous agent). This Advanced Dispersion
provides for Mass and volumes of various concentration zones and concentration zone shells of
Plumes, Puffs and Spill pool evaporation dispersions. Options for Conc. Conversion, computing: mol.
Wt., IDLHTWA & LEL-UEL of mixtures, LEL-UEL at any temperature, LC-50 of man from animal data,
LC/RIC of mixtures, weighted average, Temperature conversion and calculator.
FIRE MODULE
Pool fire, liquid jet fire, Turbulent and diffusion jet fires with PROBITs. Graphics are in color as
Custom color or Default color or BW. Options for density conversion and calculator.
RISK ASSESSMENT
FAR, FN-Curve, ISO-Risk, Individual Risk computations. Graphics are in color as Custom color or
Default color or BW.
SCENARIO DEVELOPER
This module enables development of maximum Credible Loss Scenarios (MCLS) also called Maximum
credible Accident Scenarios (MCAS) for QRA Study conforming to International guidelines under
World bank Technical Ppers-55. This module provides for over 200 Chemicals and select parameters
for Scenario development with options for user defined chemicals and parameter selections.
R-60
9.4 SCENARIOS
TABLE - 4
_______________________________________________________________________
POSSIBLE ACCIDENT SCENARIOS
R-61
DETAILED SUMMARY OF RESULTS:
Detailed Results of the consequence analysis of above-mentioned scenarios have been given below:
Scenario 1: Release of Sulphuric Acid
Spill pool evaporation module for Sulphuric Acid due to Catastrophic Rupture of 50 KL
Storage Tank
Input Data
Stored quantity - 50 KL
Molecular weight -98.08
Wind speed – 2.2 m/s
Failure Mode: Catastrophic failure of 4” bottom nozzle and loss of containment
Density ( Air) – 1840 kg/m3
Release rate: 1000 g/s
Results indicate
LC50 – 510 ppm 38.26 meter
IDLH – 3 ppm 528.56 meter
TLV –1 ppm 792.29 meter
Results:-
R-62
Scenario:
R-63
MITIGATION MEASURES FOR SULPHURIC ACID LEAKAGE:
Isolate the source if possible without risk.
If leakage is small, dilute with water and mop up, or absorb with an inert dry material and
place in an appropriate waste disposal container. If necessary: Neutralize the residue with a
dilute solution of sodium carbonate.
Absorb with DRY earth, sand or other non-combustible material.
Do not get water inside container. Do not touch spilled material. Use water spray curtain to
divert vapor drift.
Use water spray to reduce vapors.
Prevent entry into sewers, basements or confined areas.
Neutralize the residue with a dilute solution of sodium carbonate.
R-64
Scenario: 2 Release of EDC
Catastrophic Rupture
Input Data
Stored quantity - 20 KL
Molecular weight -96.94
Wind speed - 2.2 m/s
Vapor density (air=1)– 3.34
Results indicate
Pool Fire Scenario
Radiation Distance in Effect if IHR at Height of simulation
Level meter
(KW/m2)
4 90.71 This level is sufficient to cause personnel if unable to reach
cover within 20s; however blistering of the skin (second
degree burn) is likely; 0: lethality
12.5 54.94 This level will cause extreme pain within 20 seconds and
movement to a safer place is instinctive. This level indicates
around 6% fatality for 20 seconds exposure.
37.5 32.1 This level of radiation is assumed to give 100% fatality as
outlined above.
Dispersion
Release Rate 1000 gms/sec. (assumption)
Hazard Level Concentration (ppm) Distance (meter)
LC50 1414.2 23.61
IDLH 300 48.93
TWA/ TLV 75 115
SAFETY PRECUASION:
R-65
Release of EDC (Pool Fire Scenario)
R-66
DISPERSION ISOPLETH FOR EDC TANK CATASTROPHIC FAILURE
R-67
Scenario: 3 Release of Chlorine
Catastrophic Rupture
Input Data
Stored quantity - 0.9 MT
Molecular weight -70.90
Wind speed - 2.2 m/s
Density ( Air) – 2.49kg/m3
Results indicate
LC50 – 1017 ppm 210.30
IDLH – 10 ppm 856.39
TWA/TLV – 1 ppm 1619.16
• Evacuate the area in down wind direction: Evacuate area in down wind direction up to 300 meter.
• Do not direct water at spill or source of leak.
• If possible, turn leaking containers so that gas escapes rather than liquid.
• Use Chlorine Emergency Kit to attend the leak.
• Absorb the fumes through Chlorine Hood with blower.
♦ Chlorine Emergency Kit will be procured and kept ready at chlorine shed.
♦ Chlorine Hood with blower will be provided with scrubbing arrangement.
♦ SCBA sets will be kept ready at chlorine handling area.
♦ Safety Shower and eye wash will be provided in Chlorine shed area.
♦ Chlorine absorption system will be provided. In case of chlorine leakage in chlorine shed it will be suck
through blower and it will be scrubbed in Caustic scrubber.
♦ Emergency siren and wind sock will be provided.
♦ Tele Communication system and mobile phone will be used in case of emergency situations for
communication.
♦ First Aid Boxes and Occupational health centre will be made at site.
♦ Emergency organization and team will be prepared as per On site-Off site emergency planning.
♦ Full body protection suite and other PPEs will be kept ready in ECC at site.
♦ Emergency team will be prepared and trained for scenario base emergency. Like Toxic control team, Fire
control team, First aid team, Communication and general administration team, Medical team etc.
R-68
R-69
Scenario: 4 Spill Pool evaporation modules for HCl Storage Tank catastrophic failure
Catastrophic Rupture
Input Data
Stored quantity - 20 KL
Molecular weight - 36.46
Wind speed - 2.2 m/s
Vapor Density ( Air=1) – 1.25
Results indicate
LC50 – 149 ppm 44.69 meter
IDLH – 5 ppm 1532.66 meter
TLV – 5 ppm 2943.00 meter
Results:
LC50 (149 ppm) area up to 44.69 meter, Immediate danger to life and health (5 ppm ) concentration
area up to 1532.66 meter and TLV (5 ppm) area up to 2943 meter. Therefore 1532.66 meter area in
wind direction is considered as evacuation area.
R-70
Scenario: 5 Release of Nitric Acid
Catastrophic Rupture
Input Data
Stored quantity - 10 KL
Molecular weight – 63.01
Wind speed - 2.2 m/s
Density ( Air) – >1
Boiling point - 121 °C
TWA/TLV – 2 ppm
Results indicate
IDLH – 25 ppm 2628 m
R-71
Scenario: 6: Release of Benzene
This scenario considers release of Benzene from Storage Tank:
Results indicate:
Unconfined Pool Fire for Benzene tank catastrophic failure
SCENARIO : UNCONFINED POOL FIRE
Input Data Results of Computations
Stored quantity 50 KL Max. IHR at flame centre height 180 Kw/m2
Pool diameter 25(m) Flame centre height 9.6 meter
Pool liquid depth 0.1 (m) Maximum Flame width 9.59 meter
Wind speed 2.2 m/s Mass burning rate liquid 1.34 kg/
m2/min.
Liquid Density 878 kg/m3 Flame burnout time 58.82 Mims.
Results
R-72
Fire Ball Scenario: Benzene
Fire Ball simulation Benzene Tank catastrophic failure
SCENARIO : FIRE BALL
Input Data Results of Computations
Stored quantity 50 KL Fire Ball radius 14.66 meter
Mass of vapour 184 Kgs. Fire ball Intensity of Heat 243 KW /m 2
Between LEL-UEL% radiation
Heat of combustion 40153 KJ/Kg Fire Ball rate of energy 658492 KJ/ sec.
release
Wind speed 2.2 m/s Fire- Ball total energy 3.9e +006 KJ
release
3
Liquid Density 878 kg/m Fire ball duration 5.98 sec.
Results
♦ In the 30 meter radius area is considered as 100 % fatality in 1 min. and first degree burn in 10
sec.
♦ In the 54 meter radius first degree burn in 10 sec.
♦ In the 94 meter radius area will give pain after 20 seconds. Blistering unlikely.
♦ In the 180 meter radius area is considered as safe area and no discomfort even on long exposure.
R-73
Flash Fire Scenario: Benzene
Flash Fire simulation for Benzene Tank catastrophic failure
SCENARIO : FLASH FIRE
Input Data Results of Computations
Stored quantity 50 KL Visible Flash Fire Height 34.38 meter
Mass of Gas 184 Kgs. Visible Flash Fire Width 17.19meter
Heat of combustion 40153 KJ/kg Duration of Flash-Fire in Sec. 5.99 sec.
Fuel-Air volume ratio 0.600 Radius of fuel-air cloud mixture 14.67 meter
in Flash fire cloud
Stochiometric Fuel-Air 0.133 Total energy release 2622000 KJ
Mixture
Wind speed 2.2 m/s Max. Heat Radiation from 1 m 162 KW/ m2
from Flash Fire
Gas Density 2.7 kg/m3 Combustion efficiency 0.5
Results
♦ In the 30 meter radius area is considered as 100 % fatality in 1 min. and first degree burn in 10
sec.
♦ In the 54 meter radius first degree burn in 10 sec.
♦ In the 93 meter radius area will give pain after 20 seconds. Blistering unlikely.
In the 148 meter radius area is considered as safe area and no discomfort even on long exposure.
R-74
Pool Fire
Fire Ball
R-75
Flash Fire
R-76
Scenario 7: Release of IPA
This scenario considers release of IPA from Storage Tank:
Catastrophic Rupture
Input Data
Stored quantity - 20 KL
Molecular weight - 32.04
Wind speed - 2.2 m/s
Density ( Air) – 785 kg/m3
Results indicate
Pool Fire Scenario
Radiation Level Distance in meter Effect if IHR at Height of simulation
(KW/m2)
4 62.0 This level is sufficient to cause personnel if unable to reach cover
within 20s; however blistering of the skin (second degree burn) is
likely; 0: lethality
12.5 40.0 This level will cause extreme pain within 20 seconds and
movement to a safer place is instinctive. This level indicates
around 6% fatality for 20 seconds exposure.
37.5 22.5 This level of radiation is assumed to give 100% fatality as outlined
above.
Vapor Cloud Explosion
Radial Over Fatality lung Eardrum Rupture Structure Damage Glass Rupture (%)
Distance (m) Pressure Rupture (%) (%) (%)
(psi)
6.50 36.7 100.0 100.0 100.0 100.0
R-77
Fireball Scenario
Fireball Radius: 6.36m
Fireball intensity of Heat Radiation (KW/m2) – 134.186
Fireball rate of Energy release (KJ/Sec)- 68393.6
Fireball total energy released (KJ)- 96888.6
Fireball duration (Sec) – 1.40
Radiation Level (KW/m2) Distance in meter Injury Type
100.20 7.0 100% Fatal
42.09 11.0 100% Fatal
12.5 19.0 1st degree Burn
9.96 23.0 Pain after 20secs.
4.0 35.0 Pain after 20secs.
1.54 59.0 No Injury
R-78
Pool Fire
Fire Ball
R-79
Scenario 8: Release of Chlorobenzene
This scenario considers release of Chlorobenzene from Storage Tank:
Scenario : Catastrophic Rupture of Unloading arm of Chloro Benzene Tanker and Resultant
Pool Fire
Basic Input Data
Release quantity 20 KL
Molecular weight 112.56
Vapor Density (Air=1) 3.9
Wind speed 2.2 m/s
Temperature Room Temperature
Pressure Atmospheric Pressure
Consequence Results
Pool Fire Scenario
Radiation Effects
Radiation Distance (meter) Effect if IHR at Height of simulation
Level (Category 1.5/F)
2
(KW/m )
4 34.1 This level is sufficient to cause personnel if unable to reach
cover within 20s; however blistering of the skin (second
degree burn) is likely; 0: lethality
12.5 16.5 This level will cause extreme pain within 20 seconds and
movement to a safer place is instinctive. This level indicates
around 6% fatality for 20 seconds exposure.
37.5 9.4 This level of radiation is assumed to give 100% fatality as
outlined above.
R-80
Scenario : Flash Fire Envelope Results
Max distance Max Effect if IHR at Height of simulation
up to which distance up
LEL to which LEL
concentration concentratio
reached n reached
4 30 This level is sufficient to cause personnel if unable to
reach cover within 20s; however blistering of the skin
(second degree burn) is likely; 0: lethality
12.5 18 This level will cause extreme pain within 20 seconds and
movement to a safer place is instinctive. This level
indicates around 6% fatality for 20 seconds exposure.
37.5 3.5 This level of radiation is assumed to give 100% fatality as
outlined above.
R-81
Pool Fire
Flash Fire
R-82
Scenario 9: Release of Methanol
This scenario considers release of Methanol from Storage Tank:
Results indicate:
Catastrophic Rupture
Input Data
Stored quantity - 20 KL
Molecular weight -33.05
Wind speed – 2.2 m/s
Density (Air) –0. 810 g/cm3
Results indicate
Pool Fire Scenario
Radiation Distance in meter Effect if IHR at Height of simulation
Level
(KW/m2)
4 38.60 This level is sufficient to cause personnel if unable to reach cover
within 20s; however blistering of the skin (second degree burn) is
likely; 0: lethality
12.5 21.19 This level will cause extreme pain within 20 seconds and
movement to a safer place is instinctive. This level indicates
around 6% fatality for 20 seconds exposure.
37.5 12.81 This level of radiation is assumed to give 100% fatality as outlined
above.
Fireball Scenario
Radiation Level Distance in meter Injury Type
(KW/m2)
4 49 Pain after 20secs.
12.5 29 1st degree Burn
37.5 16 100% Fatal
Flash Fire Scenario
Radiation Level Distance in meter Effect if IHR at Height of simulation
(KW/m2)
4 20 This level is sufficient to cause personnel if
unable to reach cover within 20s; however
blistering of the skin (second degree burn) is
likely; 0: lethality
12.5 12 This level will cause extreme pain within 20
seconds and movement to a safer place is
instinctive. This level indicates around 6%
fatality for 20 seconds exposure.
37.5 6 This level of radiation is assumed to give
100% fatality as outlined above.
R-83
Vapor Cloud Explosion
Radial Over Fatality lung Eardrum Structure Glass Rupture (%)
Distance Pressure Rupture (%) Rupture (%) Damage (%)
(m) (psi)
1.22 37 100.0 100.0 100.0 100.0
2.13 9.0 0.1 82.4 100.0 100.0
7.62 1.0 0.0 2.3 9.5 100.0
In case of Unconfined Vapor Cloud Explosion up to 1.22meter is considered as 100% fatality and
100% ear drum rupture radius.
In case of Unconfined Vapor Cloud Explosion up to 2.13 meter is considered as 100% structure
damage and up to 7.62 meter 100% glass rupture area.
R-84
Pool Fire
Flash Fire
R-85
Scenario 10: Release of ODCB
Catastrophic Rupture
Input Data
Stored quantity - 20 KL
Molecular weight - 147
Wind speed - 2.2 m/s
Vapor density (air=1) – 5.1
Boiling Point – 180 °C
Results indicate
Pool Fire Scenario
Radiation Distance in Effect if IHR at Height of simulation
Level meter
(KW/m2)
4 70.56 Pain after 20 secs. Blistering unlikely.
12.5 32.61 Min. to ignite wood (with flame contact). 1 % fatal in 1
min. 1st deg. burn in 10 sec.
37.5 NR Damage to process equipment. 100 % Fatal in 1 Min. 1 %
fatal in 10 sec.
NR-Not Reached
R-86
Pool Fire
R-87
Scenario 11: Release of Ammonia
R-88
Spill Pool Evaporation
R-89
Scenario 12: Release of Meta Di Nitro Benzene
Catastrophic Rupture
Input Data
Stored quantity - 25 KL
Molecular weight -168.11
Wind speed - 2.2 m/s
Density (Air) –1.049 g/cm3
Results indicate
Pool Fire Scenario
Radiation Distance in meter Effect if IHR at Height of simulation
Level (KW/m2)
4 11.19 This level is sufficient to cause personnel if unable to
reach cover within 20s; however blistering of the skin
(second degree burn) is likely; 0: lethality
12.5 6.98 This level will cause extreme pain within 20 seconds and
movement to a safer place is instinctive. This level
indicates around 6% fatality for 20 seconds exposure.
37.5 3.60 This level of radiation is assumed to give 100% fatality as
outlined above.
R-90
Pool Fire
R-91
Scenario 13: Release of DEG
Catastrophic Rupture
Input Data
Stored quantity - 60 KL
Molecular weight -106.12
Wind speed - 2.2 m/s
Density (Air) –1.049 g/cm3
Results indicate
Pool Fire Scenario
Radiation Distance in meter Effect if IHR at Height of simulation
Level (KW/m2)
4 72.47 This level is sufficient to cause personnel if unable to
reach cover within 20s; however blistering of the skin
(second degree burn) is likely; 0: lethality
12.5 39.26 This level will cause extreme pain within 20 seconds and
movement to a safer place is instinctive. This level
indicates around 6% fatality for 20 seconds exposure.
37.5 NR This level of radiation is assumed to give 100% fatality as
outlined above.
NR – Not Reached
R-92
Pool Fire
R-93
Scenario 14: Unconfined Pool Fire Simulations for Drum Storage Area
Catastrophic Rupture
Input Data
Stored quantity - 10 MT
Wind speed - 2.2 m/s
Density ( Air) – 0.867 g/cm3
Results indicate
Pool Fire Scenario
Radiation Distance in meter Effect if IHR at Height of simulation
Level
(KW/m2)
4 68.2 This level is sufficient to cause personnel if unable to reach
cover within 20s; however blistering of the skin (second
degree burn) is likely; 0: lethality
12.5 45.8 This level will cause extreme pain within 20 seconds and
movement to a safer place is instinctive. This level indicates
around 6% fatality for 20 seconds exposure.
37.5 22.40 This level of radiation is assumed to give 100% fatality as
outlined above.
Fire Ball Scenario
Radiation Level Distance in meter Injury Type
(KW/m2)
4 72.0 Pain after 20secs.
12.5 59.1 1st degree Burn
37.50 24.2 100% Fatal
R-94
Pool Fire
Fire Ball
R-95
Measures to be taken to prevent such accident:
• Priority will be given to Tanker to immediately enter the storage premises at site and will not be
kept waiting near the gate or the main road.
• Security person will check License, TREM CARD, Fire extinguisher condition, Antidote Kit, required
PPEs as per SOP laid down.
• Store officer will take sample as per sampling SOP from sampling point.
• After approval of QC department unloading procedure will be allowed be started.
R-96
• Dyke wall will be provided to all storage tanks, collection pit with valve provision.
• Double drain valve will provided.
• Level gauge will be provided on all storage tanks.
• Safety permit for loading unloading of hazardous material will be prepared and implemented.
• TREM CARD will be provided to all transporters and will be trained for transportation Emergency
of Hazardous chemicals.
• Fire hydrant system with jockey pump as per TAC norms will be installed.
R-97
9.5 EMERGENCY RESPONSE PLAN
The company have prepared and updated on-site / off- site emergency action plan (OEP). Training
for OEP is given to all employees on regular basis. Mock drill on regular basis is also conducted.
Lacking is observed and will be taken care in the next rehearsal. The company is also a member of
Disaster Prevention Management Centre (DPMC), Ankleshwar and actively participated in the mock
drills of respected groups.
As per the defined procedure of emergency organizations, as soon as incident comes to knowledge
of incident controller, he will sound the emergency siren to activate OEP. Immediately quick actions
by all the teams would have been started to control / minimize the affect of emergency and to bring
situation back in normalcy.
R-98
3. Di Ethylene Glycol / PEG
1) Activate On Site / Off Site Emergency Action plan.
2) Action on site as per the emergency preparedness & response procedure.
3) Small leakage covers by sand.
4) Collect dike wall and transfer in other tank / receiver.
5) Evacuate affected plant/areas.
6) Attend and control the fire by Fire fighting team to normalcy.
7) Start water spray.
8) Use respiratory protection while handle emergency.
R-99
4. Ethylene Dichloride
1) Activate On Site / Off Site Emergency Action plan.
2) Safe plant shut down procedures.
3) Training to toxic release controlling team and also to all emergency team.
4) Use respiratory protection while handle emergency.
5. Methanol / Benzene.
1) Activate On Site / Off Site Emergency Action plan.
2) Start water sprinkler.
3) Stop vehicle movement
4) Action on site as per the emergency preparedness & response procedure.
5) Safe plant shutdown done as per established procedure.
6) Evacuate affected plant/areas.
7) Attend and control the fire by Firefighting team.
8) Start foam flooding & water Sprinkler on other tank if required.
6. Chloro Benzene / MDNB / MDCB/ODCB/ Iso Propyl Alcohol,
1) Activate On Site / Off Site Emergency Action plan.
2) Action on site as per the emergency preparedness & response procedure.
3) Safe shutdown as per procedure.
4) Cover spill with dry sand/ dry earth. Send it for incineration. Clean area with plenty of water.
5) Attend and control the fire by Fire fighting team to normalcy.
6) Start water spray.
7) Use respiratory protection while handle emergency.
8) Send ambulance to the site with Methylene Blue and vitamin-C injections.
7. Caustic Soda Lye
1) Activate On Site / Off Site Emergency Action plan.
2) Action on site as per the emergency preparedness & response procedure.
3) Collect in dyke wall &/or transfer in other tank.
Small leakage cover by sand or Wash with large quantity of water.
8. AMMONIA (NH3)
1) Activate On Site / Off Site Emergency Action plan.
2) Safe plant shut down procedures.
3) Training to toxic release controlling team and also to all emergency team.
R-100
4) Training for start water sprinkler system on ammonia tank.
5) Use respiratory protection while handle emergency.
9. Nitro Benzene, DEG, and Phenol
1) Activate On Site / Off Site Emergency Action plan.
2) Start water spray.
3) Stop vehicle movement
4) Action on site as per the emergency preparedness & response procedure.
5) Safe plant shutdown done as per established procedure.
6) Evacuate affected plant/areas.
7) Attend and control the fire by Firefighting team.
8) Cover spill with dry sand/ dry earth. Send it for incineration. Clean area with plenty of water.
10. 3- Nitro -4- Methyl Benzoic Acid, Iso Butyl Alcohol, 2- Chloro Ethanol (O - Chloro Ethanol),
NITRO BENZENE Storage In Drums & Handling.
1) Activate On Site / Off Site Emergency Action plan.
2) Action on site as per the emergency preparedness & response procedure.
3) Small leakage covers by sand.
4) Transfer in other drum through mobile vacuum pump.
5) Evacuate affected plant/areas.
6) Attend and control the fire by Firefighting team to normalcy.
7) Start water spray.
8) Use respiratory protection while handling emergency.
11. 2- Methyl -5- Nitro Phenol , 2,4 – Dichloro Phenol,Para Chloro Phenol ( PCP), Phenol,
Benzene Sulphonyl Chloride, Dimethyl Sulfate Storage In Drums & Handling
1) Activate On Site / Off Site Emergency Action plan.
2) Action on site as per the emergency preparedness & response procedure.
3) Small leakage covers by sand.
4) Transfer in other drum through mobile vacuum pump.
5) Evacuate affected plant/areas.
6) Attend and control the fire by Fire fighting team to normalcy.
7) Start water spray.
8) Use respiratory protection while handle emergency.
R-101
10.0 OCCUPATIONAL HEALTH & SAFETY
For large industries, where multifarious activities are involved during construction, erection, testing,
commissioning, operation and maintenance; the men, materials and machines are the basic inputs.
Along with the boons, industrialization generally brings several problems like occupational health
and safety.
The industrial planner, therefore, has to properly plan and take steps to minimize the impacts of
industrialization and to ensure appropriate occupational health and safety including fire plans. All
these activities again may be classified under construction and erection, and operation and
maintenance.
Health of all the employees in plant area will be regularly monitored by outside physician. If any
abnormality will found necessary treatment will also being given time to time. Necessary history
cards, records will also be maintained which is up-dated time to time.
Occupational health needs attention both during construction & erection and operation &
maintenance phases. However, the problem varies both in magnitude and variety in the above
phases.
R-102
• Welders equipment for eye and face protection;
• Cylindrical type earplug;
• Ear muffs;
• Canister Gas mask;
• Self contained breathing apparatus;
• Leather apron;
• Aluminized fiber glass fix proximity suit with hood and gloves;
• Boiler suit;
• Safety belt/line man's safety belt;
• Leather hand gloves;
• Asbestos hand gloves;
• Acid/Alkali proof rubberized hand gloves;
• Canvas cum leather hand gloves with leather palm;
• Lead hand glove;
• Electrically tested electrical resistance hand gloves; and
• Industrial safety shoes with steel toe.
10.1.3 HOSPITAL FACILITIES
It is proposed that client will make formal agreements with nearby hospital having facilities to
attend fire and toxic effect cases for attending the affected persons in the emergency arising out of
accidents, if any.
R-103
7.Dettol – 210 ml
8.Parraffin Gauze Dressing B.P. (10 CM ×10 CM)--- 20 nos.
9. Absorbent Cotton Wool – 12 nos.
10. Safety Pin – 2 pkt.
11. Kidney Tray
12. Cutter (scissors)
13. Small Cotton Gauze Swab Sterilise Absorbent (sterilized dressings).(5 cm×5 cm × 12 ply × 04 nos.)
14. Medium Cotton Gauze Swab Sterilise Absorbent (sterilized dressings). -- (7.5 cm×7. 5 cm ×12 ply
× 04 nos.)
15. Large Cotton Gauze Swab Sterilise Absorbent (sterilized dressings). -- (10 cm×10 cm ×12 ply ×04
nos.)
16. Sterilised Eye Pad -- 10nos.
17. Triangular Bandage (9 cm×9 cm ×120 cm) –06 nos.
18. 10 nos. of Paracetamol
19. BURNOL
20. SOFRAMYCIN
21. WORKADINE OINTMENT 5 % W/W
22. NETRAPRABHA Eye Drop
23. CIPROXY Eye/Ear Drop
24. RELI SPRAY
25 IODEX
26 MOOV
27 VICKS VAPORUB
28 MILK OF MAGNESIA
29 LIMCEE Tablet
30 METHELEN BLUE INJECTION
31 CASTOR OIL
32 PEG SOLUTION
33. Oxymeter
34. Digital thermometer
35. Medical Oxygen Cylinder
R-104
6. Infra red light for relieving muscular pain
7. Suction machine For cleaning airway
8. Autoclave machine For sterilizing cotton &dressing material
9. Weighing Machine For measuring body weight
10. Sphygmomanometer To measure blood pressure
12. Refrigerator To preserve medicines
10.1.7AMBULANCE VAN
An ambulance van is proposed to be made available 24 hours at Fire Station.
R-105
10.1.9 EMP for the Occupational Safety & Health hazards so that such exposure can be kept within
permissible exposure level (PEL)/Threshold Level value (TLV) so as to protect health of
workers.
1. It is proposed to formulate and implement an EMP for Occupational Safety and Health with
following aims…
• To keep air-borne concentration of toxic and hazardous chemicals below PEL and TLV.
• Protect general health of workers likely to be exposed to such chemicals
• Providing training, guidelines, resources and facilities to concerned department for occupational
health hazards.
• Permanent changes to workplace procedures or work location to be done if it is found necessary
on the basis of findings from workplace Monitoring Plan.
2. It is proposed that this EMP be formulated on the guidelines issued by Bureau of Indian
Standards on OH&S Management Systems: IS 18001:2000 Occupational Health and Safety
Management Systems
3. Proposed EMP will be incorporated in Standard Operating Procedure also.
4. The proposed EMP will also include measure to keep air-born concentration of toxic and
hazardous chemicals below its PEL and TLV, like…
a. Leak Surveys
b. Separate storage for toxic chemicals
c. Exhaust Ventilation
d. Proper illumination
e. On-line detectors toxic chemicals like Chlorine and Bromine
f. Close processes to avoid spills and exposures
g. Atomization of process operations to hazards of manual handling of chemicals
h. Supply of proper PPEs like Air mask, Berating canisters, SCBA sets, On-line breathing
apparatus at the places where there is possibility of presence of toxic chemicals
i. Decontamination procedure for empty drums and carboys.
j. Regular maintenance program for pumps, equipment, instruments handling toxic and
corrosive chemicals
k. Display of warning boards
l. Training to persons handling toxic and corrosive chemicals
R-106
10.1.9 Workplace Monitoring Plan
1. It is proposed that management will device a plan to check and evaluate the exposure
specific health status evaluation of workers
2. Workers will be checked for physical fitness with special reference to the possible health
hazards likely to be present where he/she is being expected to work before being employed
for that purpose. Basic examinations like Liver Function tests, chest x ray, Audiometry,
Spirometry Vision testing (Far & Near vision, color vision and any other ocular defect) ECG,
etc. will be carried out. However, The parameters and frequency of such examination will be
decided in consultation with Factory Medical Officer and Industrial Hygienists.
3. While in work, all the workers will be periodically examined for the health with specific
reference to the hazards which they are likely to be exposed to during work. Health
evaluation will be carried out considering the bodily functions likely to be affected during
work. The parameters and frequency of such examination will be decided in consultation
with Factory Medical Officer and Industrial Hygienists. Plan of monthly and yearly report of
the health status of workers with special reference to Occupational Health and Safety.
R-107
10.1.11 MEDICAL SURVEILLANCE PROGRAM
1. Chest X-ray
2. Audiometry
3. Hematological Examination:- CBC, SGOT, SGPT, Cholesterol, Blood Sugar etc
4. Urine Examination
5. Vision test
6. Colour blindness test
7. Lung function test- Spirometry
R-108
10.1.13 Toxicity of Hazardous Chemicals
R-109
11.0 Chlorine handling facilities and precautions
Storage of Chlorine Cylinder:
Cylinders may be rolled but never dragged.
They may be carried in a suitable carrying device.
They should not strike each other violently.
While returning empty cylinders and not in use, close the valve and put valve protection.
Do not store gas cylinders in sun or excess heat.
Handling and Precaution of Chlorine:
1. Designate area for handling Chlorine and clearly label all containers.
2. Prohibit eating, drinking, smoking and mouth pipetting in room where Chlorine is handled.
3. Provide proper instruction and supervision to workers responsible for chlorine equipment.
4. Handle Chlorine compounds that are potentially volatile or in powder form in ventilated
enclosures.
5. If enhanced containment is necessary, handle volatile compounds in closed systems vented
through suitable traps.
6. Never store combustible or flammable materials near chlorine containers.
7. Never allow any liquid or moisture to enter the chlorine container.Never apply heat directly to a
chlorine container.
8. Never attempt to weld an “empty” chlorine pipe line without purging it with air first.
9. Install safety showers and eye wash stations near chlorine equipment.
10. Never spray water on leaking containers; it can make the leak worse.
11. When entering an equipment area, take shallow breaths until you are sure that there is not a
chlorine gas leak.
12. Rely upon chlorination equipment for direct disposal of chlorine gas.
13. On completing an operation, secure all Chlorine, remove and dispose of protective clothing and
coverings, monitor and decontaminate self and surfaces, wash hands and monitor them again.
Safety Precautions:
The first steps to be taken in providing proper safety precautions at any facility are the selection of
safety equipment to be on hand, the proper location of the equipment, and the training of all
personnel in proper procedures to avoid unnecessary chlorine releases and to deal with releases
that occur.
R-110
Proper respiratory equipment is essential for all facilities regardless of size. For maximum safety, it is
preferable to use air tank type pressure demand masks that have a self contained air supply and,
therefore, are suitable regardless of chlorine concentration.
All respiratory equipment must meet the requirements of the National Institute for Occupational
Safety and Health. Following the respiratory equipment manufacturer’s recommendation regarding
maintenance and periodic testing is essential. This equipment should be stored outside the area
containing chlorine or chlorine equipment in a manner protecting it from damage of any kind and so
as to be readily available.
All personnel with no assigned responsibility for dealing with a chlorine release should be instructed
to leave the area. Those responsible for correcting the situation should don respiratory equipment
before doing so.
Protective clothing is recommended for handling even routine operations involving chlorine. In the
event of a substantial release, protective clothing is required. Anyone desiring further information
on protective clothing should refer to the Chlorine Institute Pamphlet 65, Protective Clothing for
Chlorine.
Safety shoes, hard hats, and safety glasses should be used in accordance with standard plant
practice.
Most leaks will occur in piping, valves, connections, and the pressurized portions of chlorine
equipment. These leaks will usually be eliminated by tightening packing, replacing gaskets, or
repairing the equipment.
Emergency kits (meeting Chlorine Institute requirements) are available that can seal off most leaking
areas of chlorine containers (i.e., valves, fusible plugs, or container wall).
If these are on hand they must be used only by personnel thoroughly familiar with their use. The
chlorine supplier should be contacted immediately for information, assistance and advice on the
disposition of the leaking container. The container should always be repositioned, if possible, so the
leak is gas rather than liquid.
R-111
Emergency Action Plan
• The best emergency plan includes routine practices that are designed to minimize emergencies.
Proper maintenance of all equipment associated with the storage, handling, and use of chlorine
in accordance with the manufacturer’s instructions is essential.
• All equipment and piping containing chlorine under pressure must be tested periodically for
leaks. Since it is not unusual for areas used for chlorine storage and chlorine equipment to be
relatively unattended, it is important for the air in these areas to be monitored continuously with
chlorine detectors, so that warning of leaks is given as early as possible. As with most
emergencies, the earliest detection helps to minimize the damage to equipment and personnel.
In addition to warning of leaks when the areas are unattended, chlorine detectors should warn
of the presence of minor amounts of chlorine that may not be detected by personnel in the area
• Some chlorine leaks are minor but all require immediate attention.
• In the event of a major release of chlorine, there should be no delay in contacting the agency in
the community that is responsible for handling hazardous material releases. Appropriate names
and telephone numbers must be prominently posted.
• The person responsible for making any of the calls listed above must be sure to give the agency
contacted complete details including facility name, address, telephone number, and the
names(s) of personnel to contact for further information. The description of the emergency
should include size of container, corrective action already taken, local weather.
• Conditions, injuries, proximity to populated areas, and directions for easiest access to the site.
• It is vital that the emergency plan include use of the “buddy system”, i.e., no personnel should be
allowed to work alone in an area with a chlorine leak even if the second person.
• It is only standing by. As indicated earlier, all personnel not involved in locating and correcting
the leak should leave the area travelling in a crosswind direction to an area that is upwind above
the leak. Since it may not be possible for all personnel to be equipped with respiratory
equipment, they should be instructed to use a wet cloth or handkerchief over the nose and
mouth while leaving the area.
• Emergency Control Planning Checklist for Chlorine Facilities may be of assistance in preparing the
emergency plan. A Material Safety Data Sheet for Chlorine, available from the Institute or the
supplier, should also be consulted.
R-112
• No emergency plan should be implemented until it is reviewed by the chlorine supplier and the
agency in the community having responsibility for hazardous material handling and disposal.
• If it is apparent that fire will threaten or is present in a chlorine storage area, it is preferable to
remove the containers. If this is not possible, the containers must be protected from the heat of
the fire by spraying them with water. Do not spray water on any leaking container, however,
since water will react with the chlorine, forming acids that will make the leak worse.
12 FIRE FIGHTING SYSTEM
M/s. Anupam Rasayan India Limited management shall take in to consideration fire prevention
measures at the project planning and during plant commissioning stage to avoid any outbreak of
fire. But looking to the hazardous nature of process and the chemicals that shall be handled and
processed, the chance of outbreak of fire cannot be totally ignored. Hence to tackle such a situation
a good well laid fire protection system will be provided in the factory. Details of fire fighting are
given below.
• Fire System: Fire Hydrant fully equipped system in Auto mode.
We have fire hydrant system which is cover all area of plant premises for handling fire & explosion
hazard in case of emergency.
R-113
List of Fire Extinguisher with Location , Name & Capacity
Sr
Number Type Capacity Location
No
1 ADM/CO2/2/01 CO2 Fire extinguisher 4.5 KG ADM block
2 CRP/CO2/4.5/02 CO2 Fire extinguisher 4.5 KG Control Room Panel
3 QC/CO2/4.5/03 CO2 Fire extinguisher 4.5 KG Quality control
4 QC/DCP/06/04 DCP Fire extinguisher 6 KG Quality control
5 MCCO/DCP/06/05 DCP Fire extinguisher 6 KG MCC Room Outside
6 MCC/DCP/06/06 DCP Fire extinguisher 6 KG MCC Room
7 MCC/CO2/22.5/07 CO2 Fire extinguisher 22.5 KG MCC Room
8 MCC/CO2/22.5/08 CO2 Fire extinguisher 22.5 KG MCC Room
9 MCC/CO2/4.5/09 CO2 Fire extinguisher 4.5 KG MCC Room
10 UT/DCP/06/10 DCP Fire extinguisher 6 KG Utility chiller area
11 BOO/DCP/06/11 DCP Fire extinguisher 6 KG Boiler Out side
12 BO/CO2/4.5/12 CO2 Fire extinguisher 4.5 KG Boiler Room
R-114
PFFN/DCP/06/28 DCP Fire extinguisher 6 KG Plant First floor North
28 side staircase
R-115
13. DISASTER MANAGEMENT PLAN
13.1 DEFINING THE NATURE OF EMERGENCY
LEVEL OF EMERGENCY CAN BE CLASSIFIED IN THREE CATEGORIES.
LEVEL - 1:
The incident or emergency which shall be confinable, controllable within the plant premises, which
under normal circumstances does not affect area outside the said plant battery limit and
Controlling does not involve / require external help. This situation is called emergency stand by and
affected unit / plant has to handle emergency.
LEVEL - 2:
When the incident or emergency will not controlled within 10 to 15 minutes or does not come under
control within 10 to 15 minutes, incident controller, site main controller reviews the situation and
decides if situation is worsening.
a) Can affect other section of the same plant and necessitate shutdown of that sections.
b) And or Can affect other nearby plant / sections and necessitate shut down of that area.
c) And / Or affecting whole of premises and not outside the premises.
Then without delay declare On – Site Emergency and activate Siren as per code and give message to
affected area for safe shut down.
LEVEL - 3:
After surveying Off – Site implications of level – 2 emergency if there is a likely hood of chlorine gas
cloud formation and spreading of cloud in down wind direction affecting neighboring population of
industry and villagers and / or in case of following incident IC and SMC are of the opinion that there
will be Off – Site implications.
Raise level – 3 sirens and declare Off – Site emergency and activate as per Off – Site emergency plan.
R-116
13.2 OBSERVER
DUTIES OF OBSERVER
Any person noticing a fire, leakage of chemicals or an unusual occurrence will contact the security
personnel a main gate and Plant Supervisor by:
1. Giving a telephone message
2. Sending message through a messenger
3. Rush personally
While giving the message, he will:
1. Identity himself
2. State briefly type of emergency
3. Location of Incident / accident
4. Severity of emergency
After giving message, he will return to the scene / area of emergency by taking all personnel
protection measures, if possible & awaits instructions from Plant Supervisor (Incident Controller).
He will be Chief Manager in his absence; the Plant Supervisor will be the Chief Controller till any one
of the designated Managers arrives at Site and assumes overall charge of the situation. His task will
be to co-ordinate all internal and external activities from the Emergency Control Center at Main
Security Gate from where all operations will be directed. He shall:
Immediately on being informed of the emergency and its location, will arrive at the scene &
handle the situation.
Relieve the Incident Controller from responsible of the Main Controller.
Co-ordinate to avail services from external agencies like fire brigade, hospitals etc, if called
for, following the declaration of major emergency. If necessary, major installations in the
vicinity may also be informed of the situation.
Exercise direct operational control of the unaffected section of the plant.
In consultation with the advisory team, expedite the shutting down of loading / unloading
operations of tankers and if necessary, instruct the supervisor / security personnel to
evacuate tankers.
R-117
Ensure that all employees are evacuated from the affected area and the casualties, if any,
are given necessary medical attention. Instruct P & A Assistant / Security for rushing
casualties to hospitals if required.
Liaise with fire and police officials, pollution control board officials and other statutory
bodies and advise them of all possible consequence effects outside the premises.
Arrange for relief of personnel when emergency will prolonged.
Issue authorized statement or press release to the news – media.
Ensure preservation of evidence for enquiries to be conducted by statutory authorities.
Authorize the sounding of “All Clear” and “Evacuation Siren”.
Arrange for obtaining the head – count of all personnel within the premises and
crosschecking with the data from records available for no. of persons within the premises.
Nominate a person from advisory team, to maintain chronological log of event during the
entire period of emergency.
R-118
14 STRUCTURE OF EMERGENCY MANAGEMENT SYSTEM
M/s. Anupam Rasayan India Ltd. (Unit-IV) shall develop an emergency management team. The
management structure includes the following personnel’s;
• Chief Emergency Controller
• Incident Controllers and Deputy Incident Controllers
• Site Main Controllers
• Key Personnel’s
• Essential Workers
• Assembly points
• Emergency control center
• Fire control arrangements
• Medical arrangements
• Other arrangements
R-119
6. Ensure that all employees are evacuated from the affected area and the casualties, if any, are
given necessary medical attention. Instruct P & A Assistant / Security for rushing casualties to
hospitals if required.
7. Liaise with fire and police officials, pollution control board officials and other statutory bodies
and advise them of all possible consequence effects outside the premises.
13. Nominate a person from advisory team, to maintain chronological log of event during the
entire period of emergency.
R-120
• After assessing the level of emergency likely to exist, he shall ad emergency. As per the
assessment of risk, if necessary inform concerned Senior Officer to declare major emergency
and active on-site/off site emergency plan accordingly. As Per the situation ensure that Site
Main Controller (SMC) will be informed.
• He will work under the direction of the SMC, but till his arrival he may have to execute
following responsibilities.
• Ensure that all the Key Personnel are called.
• Direct for evacuation of plant and areas likely to be affected by the emergency.
• He shall communicate to the SMC the type of outside help needed.
• He shall direct all emergency operations within the affected area with the following
priorities.
• Personnel safety, including of surrounding community.
• Minimum damage to Plant, Property and Environment.
• Appropriate actions to minimize loss of Production and Material.
• Give information to the head of fire fighting and rescue team and other emergency services.
• Depending on the incident, instruct partial or total shut down, isolations, depressurization,
Nitrogen purging, fire fighting, rescue operations.
• Instruct upstream/downstream units to take emergency shutdown /cutting off supply and
other appropriate actions and emergency evacuation help etc.
• Direct for search of casualties.
• Evacuate non-essential workers/visitors/contractors to safe assembly points.
• Brief site main controller and keep him informed about the developments.
• Pressure evidences. This will be necessary for investigation for cause and concluding
preventive measures.
• Send runners, if telephones are out of order.
14.3 SITE MAIN CONTROLLER
He will have an overall responsibility for directing operations & calling outside help from Emergency
Control Centers. He is required to take decisions after consultation with the Senior Manager
available at site.
R-121
The Shift Engineer of non-affected Plant will act as SMC till arrival of the designated SMC at
Emergency Control Centre (ECC). Until the arrival of SMC, he may have to execute following
responsibilities.
• As soon as he received the information or comes to know about the incident, he shall
proceed to Emergency Control Room (Control Room) and shall take charge of the incident. If
Control Room gets affected due to unfavorable wind direction, Fire Control Room shall be
used as alternate Emergency Control Room.
• He has overall responsibility for directing emergency action, operation and calling outside
help.
• He shall ensure that all the Key Personnel are called.
• He shall assess the gravity of situation with the help of Incident Controller (IC), Plant
Manager and Key Personnel and after quickly assess the situation, shall find out the of
emergency from Incident Controller (l C), and declare the emergency.
• Level-l: Emergency - may be handled within the plant premises.
• Level-2: Emergency - On Site Emergency plant shag be activated.
• Level-3: Emergency - Action to be taken to operate Off-Site Emergency Plan.
• He shed direct all emergency operations within the affected area with the following
priorities.
• Personnel safety, including of surrounding community.
• Minimum damage to Plant, Property and Environment.
• Appropriate actions to minimize loss of Production and Material.
• He shall direct for evacuation of plant and areas likely to be affected by the emergency.
• He shall continuously review and assess possible developments to determine most probable
course of events and actions.
• He shall assess the situation and ensure that whatever resources needed is made available
and utilized in a co-ordinate manner.
• He shall direct the safe shut down of plants in construction with incident controller and Key
Personnel, if necessary.
• He shall check that all non-essential workers, visitors, contractors are evacuated to safe
assembly point sand head count is completed.
• He shall give instructions to the Incident controllers, Fire fighting and Rescue teams.
R-122
• He shall, if necessary arrange for evacuation of neighboring population.
• He shall ensure that search for casualties, within the affected area has been carried out and
arrange for hospitalization of victims and additional medical help, if required.
• He shall ensure that liaison will be made with outside agencies such as Police Services, Fire
Services, Expert on Health and Safety, Meteorological Office, District Emergency Authorities,
Collector and Senior Inspector of Factories. Provide advice on possible effects to areas
outside the factory.
• He shall arrange for up to date records of emergencies.
• He shall advice not to re-start the plants unless it is declared safe to start by competent
authorities.
R-123
6) Movement of equipment, special vehicle and transport to or from the scene of the accident.
7) Search, evacuation, rescue and welfare.
8) The injured is given First Aid.
9) Moving tankers or other vehicles from area of risk.
10) Carrying out atmospheric test and pollution control.
11) Manning of assembly points to record the arrival of evacuated personnel. Manning for outside
shelters and welfare of evacuated persons there.
12) Assistance at causalities reception areas to record details of causalities.
13) Assistance at communication centers to handle out going and incoming calls and to act as
messengers if necessary.
14) Manning of works entrances in liaison with the police to direct emergency vehicles entering the
work, to control traffic leaving the works and to turn away or make alternative safe arrangements
for visitors, contractors and other traffic arriving at the works.
15) Informing surrounding factories and the public as well as directed by the Site Main Controller.
16) Any special help required.
R-124
14.7 EMERGENCY CONTROL CENTER
The Emergency Control Center (ECC) is the place or room from where the operations to handle the
emergency are directed and coordinated. Main Control Room will be earmarked/identified as the
Emergency Control Room. Fire Control Room shall be earmarked/identified as the alternative
Emergency Control Room to be operated in case of unfavorable wind direction. Adequate
Telecommunication System will be available in the Emergency Control Room i.e. Hot Lines, Intercom
& External Phones.
The ECC center shall be equipped with the following facilities.
1. Internal and external telephone including STD facility
2. Telephone directory
3. Telephone nos. of mutual aid centers
4. Factory layout plan
5. Map of the area
6. Employee blood group and their address
7. Messengers / Runners for sending messages
8. Adequate numbers of PPE'S
R-125
C) Fire crew members
1. On hearing fire alarm, emergency siren they shall immediately report to control room and
proceed to the scene of emergency and work under the direction of IC/ Dy IC.
2. The personal availability at the scene of incident to be made optimize.
R-126
• The in-charge of medical arrangements shall prepare first-aid and other required facilities for the
injured.
• The other essential workers shall try to control the emergency as per the instructions given to IC.
• IC would keep SMC informed about the status of control measures being taken at the site and ask
for other requirements e.g. Mutual aid, equipment etc., if he find necessary.
• SMC would co-ordinate with outside agencies regarding control measures being taken, need for
external help, evacuation, medical treatment etc.
14.11COMMMUNICATION SYSTEM
After the assessment of risk & their possible environmental impact and after making an organization
for the preparedness to control the emergency, the next most essential step is to make us ready for
Communication at the time of emergency. Communication System is a Crucial Factor while handling
emergency.
Company will have quick & effective Communication System through which, any situation, which can
lead to emergency, can be informed or known to.
i. All working inside the plant.
ii. Key Personnel outside during normal working hours & during off-duty hours.
iii. Outside emergency services, Statutory and Local Authorities and
iv. Neighboring facilities and public leaving in vicinity.
Each and every section, Plant & Department of the Factory shall be connected by internal
telephones. External Phone at Office and Residence and Mobile shall be also available with Key
Personnel and top executive of the factory. Hot lines shall be provided with mutual aid Partner
through the Emergency Control Center. The Communication System begins with raising the alarm
declaring the emergency, Telephone messages and Procedure to communicate the emergency to
other persons & General Public.
R-127
the security employees shall be trained for operating the siren to announcing the emergency. In
case of power failure, manual bell shall be also provided.
The alarm sound informs the I.C and the S.M.C that an emergency has been created and emergency
organization is to be activated. The I.C. rushes to the site and takes charge of the scene.
14.11.3TELEPHONE MESSAGES
After hearing the emergency alarm and during emergency or even while just receiving the
emergency message on phone, Telephone operator should be precise, sharp, attentive and quick in
receiving and noting the message and subsequently effective in further Communication A form to
record emergency telephone calls shall be available with telephone operator or Person available in
Emergency Control Center, who has to record such calls during emergency. Telephonic messages
shall be given out by the telephone operator to Site main Controller and key personnel as per the
instructions of the Incident Controller. Telephonic messages shall also be given to authorities and
external agencies to describe the type of emergency. All details of emergency shall be
collected/delivered according to this format shall available with the telephone operator.
R-128
14.11.4 COMMUNICATION OF EMERGENCY & STATUTORY INFORMATION
14.11.4.1 COMMUNICATION OF EMERGENCY
An effective system to communicate emergency shall be available.
• Inside the factory i.e. workers including key personnel and essential workers, on duty & inside
during normal working hours.
• To key personnel and essential workers not on duty and outside during normal working hours.
• To the outside emergency services and the Government authorities.
• To the neighboring factory & the General Public in the vicinity.
a) Information to Workers
All personnel inside the factory shall be informed by the sounding of the siren or in case of electricity
by ringing the bell.
b) To key personnel outside during normal working hours
The key personnel outside the factory premises shall be informed as per the need by external
telephones or runners.
R-129
emergency due to effects on their own installations, at the same time, they may be able to provide
assistance as part of a prearranged mutual aid plan. Further responsibilities shall be fixed to inform
the neighboring factories and the General Public leaving in the vicinity.The neighboring units shall be
informed about an emergency through external telephones or runners. The general public shall be
informed about an emergency using loudspeaker on scooter or rickshaw or car. Help from police
shall be sought if required.
R-130
• Check various safety installations located at various plants for proper working
• Check sprinklers, showers, etc. in all plants
• Suggest extra modifications/ requirements to make systems more reliable
• Check presence of toxic gases by the help of dragger tube
Frequency of Internal Safety Survey: Once in a month
R-131
• To maintain record of testing and certificates issued by competent person andmake them
available to Factory Inspector at the time of inspection.
Frequency of Non-Destructive Testing : Once in a year
R-132
14.12.1.8 MOCK-DRILLS
• To conduct minor mock drills to train employees about their role / duties duringemergency
• To refresh training to the employees for fire fighting, spill control, use of personal protective
equipments etc.
• To check whether various members of emergency control committee remember their role /
duties properly and to find out the faults and points of improvement in their performance.
• To check whether the various equipment for emergency control are operatingsatisfactorily
and find and rectify the draw-backs if any.
• To conduct major mock-drills with permission from the authorities
Mock drills shall be regularly conducted in our unit by our Emergency Control Organization and the
findings are compiled to analyze whether employees are familiarized with the emergency control
procedures and what sort of training is required to be given.
R-133
14.12.1.10 PERSONAL PROTECTIVE EQUIPMENT
• To procure adequate number of personal protective equipment (aprons, handgloves, safety
goggles, helmets, nose masks, safety belts, gas cartridges, self-breathing apparatus, safety
shoes etc.) suitable for plant operations and maintain records of use.
• To have proper system for issuing the PPE and disposal of used PPE
• To train the workers about proper use of PPE.
• To check the fresh air blowers provided at confined spaces for fresh air to workers.
14.12.1.11 COMMUNICATION
• To maintain internal/external telephones in working order
• To check alarms / siren / loudspeakers for workability
• To provide manual emergency bells at various location for use during power failure
• To periodically check wind cock for wind direction
• To check lightning arrestors installed at different locations for physical condition and proper
earthling connection.
14.12.1.12 EMERGENCY LIGHTS
• To keep sufficient number of emergency torch/ batteries in ECC as well as at theproduction
site
• To maintain the three DG sets available in the factory as stand-by for power failure. The D.G.
sets are set to start functioning within two minutes of failure of electricity.
14.12.1.13 EMERGENCY CONTROL ROOM
It is necessary to maintain the Emergency Control Room and keep it equipped with all necessary
items, documents, telecommunication systems, PPE etc. required in case of an emergency.
R-134
14.12.1.15 LIAISON WITH STATE AUTHORITIES
• To liaison with civil authorities, local hospitals, Fire-Brigade, Collector, factories Inspector,
Police, etc regarding emergency activities and need for external aid.
• To keep the details regarding name, address & telephone numbers of various govt.
authorities and neighboring units available and update the details from time to time.
• To inform about Mock-drill in advance and if required conduct mock-drill in presence of any
of these authorities.
• To submit report of Mock-drill conducted and the out comings with photograph to Factories
Inspector.
14.12.1.16 HOSPITAL FACILITIES
• To equip Occupational Health Centre with First-Aid and medicines
• To keep Health records (esp. blood-group records) of all employees
• To liaison with hospitals in the area of the unit
• To keep list of blood donors ready for reference
• To update arrangements with neighboring units for emergency first aid.
R-135
14.12.1.19 PROTECTIVE DEVICES & ENGINEERING MAINTENANCE
• Installation of safety valve and pressure gauges on vessels used for high pressure operations.
• Installation of temperature indicators on reactors, temperature switch or alarm at critical
reactors
• Maintenance of cooling water systems and pumps. To keep standby pump at cooling tower.
• Installation of overhead water tank for emergency. To keep it filled and regular cleaning of
the same
• Periodic cleaning of heat transfer surfaces (jacket, reactors, shell& tube heat exchangers,
boilers)
• To keep minimum inventory of hazardous materials with records
• To maintain good housekeeping and ensure safety compliance
R-136
• All vessels and pipeline should be properly earthed to prevent static electricity
• The vent lines of all vessels and tanks holding flammable materials should beprovided with
flame arrestors
• Fire extinguishers shall be provided at all critical locations in the unit
R-137
• He informs mutual aid teams and asks for necessary help.
• He arranges first-aid / hospitalization for the affected persons.
• Fire officer on reaching the site, takes charge of the fire-fighting operations
• Mutual aid teams shall be asked for help in the form of first-aid, transport etc.
• If fire is growing, fire officer informs IC who alerts neighboring units and through SMC gets
more fire-fighting help.
• Fire fighting shall be continued till fire is fully overcome
• After extinguishing fire, fire officer cools the entire area with water spray and checks that no
re-ignition shall be likely. After that, he declares the area safe.
• IC tells essential workers to sound all clear
• The incident shall be recorded
• SMC arranges to inform families / relatives of injured / dead.
• SMC issues authorized statement to press / media.
• SMC informs Factories Inspector about the incident and related information
Control action –
1. Any one who notices the release shall sound emergency alarm.
2. SMC/IC who is at site, shall immediately rush to the scene and assess the situation. For toxic
release from a reactor, he activates the on-site plan as -
• He evacuates all the persons to safe assembly point.
• He calls in DIC (if DIC is not present there) and asks essential workers to wear self-breathing
apparatus and if the reaction is exothermic, start cooling water flow in the reactor jacket and
cool the reactor as soon as possible.
• The essential workers stop all the charging pumps of that reactor and the nearby reactors.
• He informs mutual aid teams and asks for necessary help.
R-138
• He arranges first-aid / hospitalization for the affected persons.
• Mutual aid teams shall be asked for help in the form of first-aid, transport etc.
• When the leak stops and the air shall clear of toxic release, IC tells essential workers to sound
all clear.
• The vessel / rupture disc/gland packing will be attended by maintenance department.
• The incident shall be recorded
• SMC arranges to inform families / relatives of injured / dead.
• SMC issues authorized statement to press / media.
• SMC informs Factories Inspector about the incident and related information
R-139
14.14.7HELP OF EXTERNAL AUTHORIES
Outside authorities such as Police, District Emergency Authority (DEA), Factory Inspector, Disaster
Management Centre, GIDC officer, Industries Association, Regional Pollution Control Board, nearby
hospitals etc. shall be informed of the on-site and off-site emergency plans and called in as per need.
14.14.8 MEDICAL TREATMENT
Injured workers shall be located and given prompt first-aid by essential workers and key personnel.
Those requiring medical treatment shall be taken to the hospital / outside medical center.
14.14.9 ACCOUNTING FOR PERSONNEL
Through daily muster rolls and with the help of shift-in-charge the head count shall be undertaken to
find out whether persons are missing and if so immediate search shall be carried out to locate them.
The list shall include company employees, contract workers as well as visitors. Help from local
authority or fire-brigade shall be taken if required. This list shall be kept with time keeper / security
officer at any time and shall be used to account for personnel. Injured shall be taken to hospitals
and their families/relatives shall be informed Casualties would be identified, their families and local
authority shall be informed.
14.14.10 ACCESS TO RECORDS
In order to inform families/relatives of injured/dead, a up-to-date list of names and addresses of all
the workers is maintained in addition to the muster roll where shift-wise attendance is marked.
Such list includes health records. This list will be available at the ECC and one such copy shall be
available at our head office.
14.14.11 PUBLIC RELATIONS
Our General Manager shall be the only nominated person to issue administrative statement about
the accident or emergency to news/media. No other person shall divulge any information to any
news / media person.
14.15 REHABILITATION
In case of Toxic release or chemical spillage, Senior Fire Brigade Officer would ensure that the
incident area shall be safe and cleaned up of all mess. Then only, he would allow people to re-enter
the location.
In case of fire, the Senior Fire-Brigade Officer shall ensure that the area is cooled down and there are
no chances of re-ignition. IC shall arrange for clean-up of the area and then only people shall be
allowed to re-enter the area for work.
R-140
Even when all clear has been given, great care shall be taken when re-entering affected areas and no
work in connection with the salvage, collection of evidence or start up shall be taken up until a
thorough examination of the area has been carried out. The statutory powers of the Factory
Inspector shall be kept in mind before any evidence is disturbed. Particular care shall be taken to
avoid the introduction of possible sources of ignition, such as diesel engines, hand or power
operated tools, flame cutting equipment, etc. until it has been established that no flammable
materials are present where they could be ignited.
15.0OFF – SITE EMERGENCY PLAN
15.1 NEED OF THE OFF – SITE EMERGENCY PLAN
An off-site emergency plan is prepared to deal with those incidents which have the potential to
harm persons or the environment outside the boundary of the factory premises. A major accident,
major emergency and disaster may affect areas outside the plant. An explosion can scatter debris
over wide areas and its effects of blasts can cover considerable distances. Wind can spread burning
fumes of toxic gases. Thus the events like these described above can affect outside areas and
combating them needs an Off-site Emergency plan.
Envisaging such a rare incident, an off-site emergency plan should be drawn up for the following
purpose.
1. To provide basic information about the risk and environmental impact assessment related to
the unit to local / district authorities, police, fire-brigade, surrounding units, and the general
public. To appraise them of consequences and the protection / prevention measures and
control actions and to seek their help to communicate with public in case of a major
emergency. The information from all industries shall enable district authorities to educate
public about what could go wrong, and to train them of measures to be taken as an
individual.
2. To enable district authorities to prepare the off-site emergency plan (contingency) for the
district or particular area and to organize rehearsals and initiate actions learnt from these
incidents.
Our Emergency Plan shall be made after considering the all possible effects of incidents on the
neighboring population and the remedial measures will be devised in consultation with the local
authorities and emergency services.
R-141
15.2 STRUCTURE OF THE OFF-SITE EMERGENCY PLAN
IC District Authorities Mutual Aid teams, outside
SMC (Collector, Factory services, voluntary
Essential Workers Inspector, Police) organizations
(Implementing Information, Evacuation (Fire-fighting, Gas leak
Action plan, control, First-aid, Shelter,
Informing nearby Hospitalization,
Public) Transportation)
R-142
Familiarize themselves with the location and site of all stages of flammable materials, water
and foam supply points, firefighting equipment.
• Act as observer of an on-site exercise involving only site personnel
R-143
b) If fire is escalating and in turn threatening a store of hazardous material, it is necessary to
evacuate people nearby if time is available; otherwise they should be informed to keep
themselves indoor and shield from the fire.
c) For release of toxic gases, limited evacuation may be appropriate in downwind direction with
windows closed and provides good protection. Toxic gases which are hazardous down to
much lower concentration cover a long distance. This factor must be considered while
deciding upon the need and extent of evacuation.
16. Do’s & Don’t of preventive maintenance, strengthening of HSE, manufacturing utility staff for
safety related measures
DO’s and DON’Ts for Safer Operation
Do’s:
• Use lubricating oil carefully to avoid spillage on ground.
• Use lubricating oil as per requirement.
• Use minimum amount of water wherever it is required as per plant guidelines.
• Waste disposal system for all plants should be separate.
• Use cleaning equipment carefully. (i.e. cotton waste, oil & chemicals)
• Place all the equipments (i.e. Fire Hose, Rubber Pipe and Chisel) at proper place.
• Handling of chemicals should be as per plant guidelines to avoid undesired chemical reaction.
• Safety training and correct use of PPE’s must for all the employees.
• Follow shift in charge’s instructions during loading or unloading of chemicals.
• In case of fire or any accident, immediately inform responsible person,
• In case of emergency, inform operator as well as control room.
• Area of work during excavation, radiography, sand blasting shall be cordoned with warning
tags of "work in progress”, “no entry”, “radiography” in progress' etc.
• Switch off lights and computers when not in use.
• Shut the water cock properly when not in use.
• Always follow safety rule during the plant operation.
R-144
• In case of confined space entry and other cleaning, catalyst removal, sludge removal jobs etc.
which are to be carried out by the process department, vessel entry permit should be issued
to immediate supervising officer/operator by shift in charge. This permit should be renewed
by incoming shift in charge during every shift.
• Hoist, Platform, cages used for lifting persons or to send persons inside vessels by such
means must be of sound construction with wire ropes slings, etc. to avoid failure.
• All steam, condensate, hot water connections should be made tight with clamps.
• All underground sewers shall be flushed, protected from sparks.
• Full PPEs like PVC suits, gum boots, face shield & other required shall be used while draining,
flushing and other reclaiming activities to avoid burn, poisoning etc.
• Wet asbestos cloth/metallic plate should be used to collect flying sparks.
• Water, steam flushing, nitrogen blanketing shall be continued where spontaneous
combustion takes place. Precautions should be taken for pyrophoric nature of material.
• Temporary electrical connections, cords, boards and other electrical fixtures should be of
sound material to prevent electrical shock.
• Proper approach like aluminum ladder should be provided to reach to the platforms of
scaffolding and ladder must be tied.
• All clumps of scaffolding should be tightened properly and planks should be tied at both ends
and supported at proper distances along span to avoid sagging and failure.
• Always use safety belt while working at height of more than 2 meters and ensure tieing the
life line of safety belt with firm support.
• Ensure area cordoning for hot work, X-ray, excavation, hazard material temporary storage.
• Ensure proper tagging of valves, switches etc to prevent its use.
• Ensure proper guidance to workman and make him aware about local area hazards before
start of the job.
• All welding machines should be provided with power isolation switch of suitable rating.
• Portable electrical appliances/tools earthing should be in good working condition. Insulation
portion should be free from damages.
• All electrical cables should be joints free and connection taken by using three pin plugs.
• While inserting fuse all care should be taken so that no one touches conductor to avoid the
shock to the persons.
• During hydro jetting work workers should wear hand gloves, safety helmet goggles and PVC
suit.
Don’ts:
• Do not use fire hydrant water for washing/bath purpose.
• Do not use water for cleaning purpose, use broomstick if possible.
• Do not wash or clean trolley, tractor or trucks which are used for chemical/fertilizer’s
transportation. Wash them at proper place.
• Smoking & carrying matchbox, cigarettes, lighter, bidis etc. are prohibited.
• Photography & carrying cameras/Mobile phones are strictly prohibited in all areas.
R-145
• Do not spill liquid or chemicals in open atmosphere.
• The use of Radio Active Source within the plant shall not be allowed without obtaining valid
permission/work permit and intimation in the form of a circular to all plant persons shall be
given in advance.
• Unauthorized entry into any battery limit of plant is strictly prohibited.
• Sitting or walking on rail tracks, crossing between wagons, taking rest under stabled wagons,
crossing the rail through the openings underneath the stationary wagons are strictly
prohibited.
R-146