Quality Plan for Battery Charger

Uploaded by

Hemant Limaye
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Quality Assurance Plan for Battery Charger

By HEMANT at 2:00 pm, Jun 22, 2023


Purchaser Manufacturer: QAP NO: QAP/SEPL/BCO-2379
Growmech Industries Pvt. Ltd. Servilink Engineers Pvt. Ltd. Rev No: REV 00 Date: 22/06/2023
The Affairs Chs Ltd. 988/16/1, GIDC, Makapura, Vadodara.
Office No. 1004, 10th Floor,
Plot No. 09, Sec-17, Society Office,
Sanpada, Navi Mumbai-400705.

PO No. & Date:


GIPL/PARAS/022770/0002204/23-24
DT. 13/16/2023

Item :
110V, 50A Two Float cum boost charger with
integral DCDB

Qty: 01 No.

Sr No. Component & Operations Ref. Doc Characteristics Type of Check Quantum Acceptance Inspecting Agency
of check Norms
sampling
plant
M C/N
1.0. RAW MATERIAL INSPECTION
1.1 MS Sheet As per approved Finish Visual 100% As per approved
GA drg/BOM Sheet thickness Physical 100% GA drg P,W,V R
Material 100%
1.2 Lamination DESIGN Finish Visual 100% General As
DRG Size Physical 100% per drg
P,W,V R
Coating Visual 100%
Continuity 1%
1.3 PCB - (Plain) PO Finish Visual 100% General
Thickness Physical 100% 1.6 mm P,W,V R
Material FRP
1.4 PCB finished DRG/BOM of Stuffing of components Visual 100% General
PCB Value of components Physical 100% DRG/BOM P,W,V R
Test point voltages Electrical 100% DRG/BOM
2.0 BOUGHT OUT ITEM INSPECTION:
2.1 Switches/ MCCB/ MCB/push BOM Rating/Type Visual 100% BOM/Drg
P,W,V V
buttons continuty Electrical 10%
2.2 HRC fuse/Semi conductor BOM Rating/Type Physical
Visual 100% BOM/DRG
continuty Electrical 10% ---- P,W,V V

2.3 Contactor/Relays BOM/Manufactu- Type/Rating Visual 100% BOM/DRG


res Cat. Coil voltage Electrical P,W,V V

2.4 Rectiifier Elements SCR/Diodes BOM Type/Indentification Visual 100% BOM --


Continuty Electrical 100% -- P,W,V V

2.5 Meters BOM Physical Visual 100% General


Scale/Range Electrical 100% BOM P,W,V V
Electrical Parameters 100%
2.6 PVC insulated electric wires, IS 694/ IS13730 size Physical 100% Suplier TC
P,W,V V
enamelled copper Colour Visual 100%
2.7 Transformer Finish Visual 100% Min. 2M ohm,
IR Test Electrical 100% 2.5KV for one min/
H.V. Test Electrical 100% As per design P,W,V V
Ratio Test Electrical 100% Data

2.8 Filter choke DESIGN Finish Visual 100% Min. 2 M ohm,


IR Electrical 100% 2.5 KV for 1 min.
HV ---------- 100% P,W,V V

2.9 Indicating lamps/LED BOM Finish Visual 100% G.A. DRG/BOM


Rating Electrical 100% P,W,V V
Size Physical 100%
2.10. CAPACITOR BOM Finish Physical 100% BOM/
Mfd mfd Electrical 100% Manufacture Cat. P,W,V V
Voltage voltage Electrical 100%

By HEMANT at 2:00 pm, Jun 22, 2023


3.0 - IN PROCESS INSPECTION
By HEMANT at 3:52 pm, Jun 22, 2023
3.1 Fabrication G.A. Drg Finish Dimensions Visual 100% As per G.A. drg
Physical 100%
W,V V

3.2 Assembly As per approved Finish Visual 100% As per approved


GA drg/BOM Dimensions Physical 100% GA drg P,W,V V
Lay out Physical
3.3 Painting Spec. Visual Visual 100% General Asthethio
Paint thickness Physical As per shade card
W,V V
Adhesion Paint >50 Micron
thick
4.0 FINAL INSPECTION WITH TESTS TO BE CARRIED OUT:
4.1 Finished Equipment Client's Spec Finish P,W,V W
App. Drgs Bom IR P,W,V W
H.V. P,W,V W
Noload test General 2 P,W,V W
Full load test KV for one P,W,V W
Efficiency minutes P,W,V W
Visual 10% of
Ripple test As per approved P,W,V W
Electrical Total Qty.
Heat run test drgs/Data P,W,V R/V
Annunciation sheets/Client's P,W,V W
Interlocks as per spec spec P,W,V W
Current limit test P,W,V W
Logic simultation P,W,V W
General Operation test P,W,V W

LEGEND: * RECORDS IDENTIFIED WITH


"TICK" SHALL BE ESSENTIALLY
INCLUDED BY CONTRACTOR IN QA
DOCUMENTATION.
**M: MANUFACTURER / SUB-
CONTRACTOR, C: CONTRACTOR, N:
CLIENT, INDICATE "P" PERFORM "W"
SIGN & STAMP BY MANUFACTURERS WITNESS, "V" VERIFICATION AND "R" APPROVED BY CLIENT
REVIEW.