5G Site Deployment Workplan for Wisma YPR
5G Site Deployment Workplan for Wisma YPR
Project: DNB_NEW_2021_5G_RAN_Phase_1a
Address:
Wisma Ypr, Taman Seputeh, 58000 Kuala Lumpur, Wilayah Persekutuan
Kuala Lumpur
PROJECT : DNB_NEW_2021_5G_RAN_Phase_1a
RESPONSIBILITY /
NO CATEGORY LIST PROPOSED / STATUS
REMARKS
ANTENNA S1 1. PROPOSED NEW KATHREIN (KRE 1012412/1) ANTENNA | LLLL ANTENNA 1. ECM
FOR 700MHz AT HEIGHT:52.8m AGL AZIMUTH:50˚
2. PROPOSED NEW AIR 6419 ANTENNA ANTENNA FOR 3500MHz AT
HEIGHT:54.6 m AGL AZIMUTH:50˚
ANTENNA S2 1. PROPOSED NEW KATHREIN (KRE 1012412/1) ANTENNA | LLLL ANTENNA 1. ECM
FOR 700MHz AT HEIGHT:52.8m AGL AZIMUTH:200˚
2. PROPOSED NEW AIR 6419 ANTENNA ANTENNA FOR 3500MHz AT
HEIGHT:54.6m AGL AZIMUTH:200˚
ANTENNA S3 1. PROPOSED NEW KATHREIN (KRE 1012412/1) ANTENNA | LLLL ANTENNA 1. ECM
FOR 700MHz AT HEIGHT:52.8m AGL AZIMUTH:260˚
2. PROPOSED NEW AIR 6419 ANTENNA ANTENNA FOR 3500MHz AT
HEIGHT:54.6m AGL AZIMUTH:260˚
ANTENNA S4
OIL/FEEDER 1. PROPOSED NEW 1x30m OIL CABLE FOR 700MHz OF SECTOR 1 1. ECM
1 MOBILE
2. PROPOSED NEW 1x70m OIL CABLE FOR 700MHz OF SECTOR 2 2. ECM
3. PROPOSED NEW 1x70m OIL CABLE FOR 700MHz OF SECTOR 3 3. ECM
4. PROPOSED NEW 2x30m OIL CABLE FOR 3500MHz OF SECTOR 1 4. ECM
5. PROPOSED NEW 2x70m OIL CABLE FOR 3500MHz OF SECTOR 2 5. ECM
6. PROPOSED NEW 2x70m OIL CABLE FOR 3500MHz OF SECTOR 3 6. ECM
7. PROPOSED NEW 12x3m JUMPER 7. ECM
POWER SYSTEM 1. PROPOSE NEW BREAKER WITH 1 unit/PCS xPDU C/W 3-PHASE 50A AC 1. MAXIS
BREAKER ALARM TERMINAL AND AUTO RESET BUTTON 2. MAXIS
2. PROPOSED TO TAP AT EXISITNG MAXIS ACPDB. 3. ECM
3. PROPOSED NEW 1x NEW ENCLOSURE 6140 COME WITH RECTIFIER 4. MAXIS
MODULES AND 3 X Battery 6618
4. PROPOSED TO UPGRADE EXISITNG INCOMING TNB METER SUPPLY FROM
63A TO 100A
FILTER
PLINTH / I-BEAM 1. 1. PROPOSE NEW STEEL PLATE 2500mm x 2000mm x 150 mm AS PER 1. MAXIS
EXISTING MAXIS
AC / DC BREAKER 1. PROPOSED New 1x10m DC POWER CABLE 6mm FOR SECTOR 1(700MHz) 1. ECM
AC / DC CABLE 2. PROPOSED New 1x70m DC POWER CABLE 16mm FOR SECTOR 2(700MHz) 2. ECM
3. PROPOSED New 1x70m DC POWER CABLE 16mm FOR SECTOR 3(700MHz) 3. ECM
4. PROPOSED New 1x10m DC POWER CABLE 10mm FOR SECTOR 1(3500MHz) 4. ECM
5. PROPOSED New 1x70m DC POWER CABLE 25mm FOR SECTOR 2(3500MHz) 5. ECM
6. PROPOSED New 1x70m DC POWER CABLE 25mm FOR SECTOR 3(3500MHz) 6. ECM
7. PROPOSE NEW BREAKER WITH 1 unit/PCS x16A DC BREAKER FOR BB 6648 7. ECM
8. PROPOSE NEW BREAKER WITH 1 unit/PCS x10A DC BREAKER FOR ROUTER 8. ECM
9. PROPOSE NEW BREAKER WITH 3 unit/PCS x50A DC BREAKER FOR AIR 6419 9. ECM
10. PROPOSE NEW BREAKER WITH 3 unit/PCS x40A DC BREAKER FOR RRU 10. ECM
4432 B28G 11. ECM
11. PROPOSE NEW 10 m/RUNS xHDG TRUNKING FOR AC CABLE 12. ECM
12. PROPOSE NEW 10 m/RUNS xARMOUR CABLE 4C 16mm2
FEEDER INLET
CABINET SAFETY 1. PROPOSE NEW 1 unit/PCS xLOCK BAR (655X784.5X853)mm FOR 1. ECM
BELT /CAGING ENCLOSURE
2 CME
MGB 1. REUSE EXISITNG 3xMGB C/W STEEL WIRE WALL MOUNT FOR EQUIPMENT 1. N/A
GROUNDING FOR ALL SECTOR. 2. MAXIS
2. PROPOSED NEW 1xMGB C/W STEEL WIRE FOR
EQUIPMENT GROUNDING.
GENSET
OTHERS
CME
1. TNB Power supply from 63Amps to 100 Amps.
2. Make Single sector 3.5m Boom.
NOTE : FOP
1. We need to upgrade the incoming TNB supply from 63Amps to 100Amps.
SITUATION PLAN
PROJECT : DNB_NEW_2021_5G_RAN_Phase_1a
ADDRESS :
Wisma Ypr, Taman Seputeh, 58000 Kuala Lumpur, Wilayah Persekutuan Kuala
Lumpur
SECTOR 2 - 200 TO PROVIDE 5G COVERAGE FOR WISMA YPR, ZELL-V WELLNESS HUB, JALAN TAMAN SEPUTEH LOCAL ROAD & ALL
SURROUNDING NEARBY AREA.
SECTOR 3 - 260 TO PROVIDE 5G COVERAGE FOR WISMA YPR,KINDA BLUE JAZZ CLUB and JALAN SYED PUTRA LOCAL ROAD & ALL
SURROUNDING NEARBY AREA.
SITE INFORMATION
PROJECT : DNB_NEW_2021_5G_RAN_Phase_1a
4.0 Others
4.1 Crane needed (ton) YES
4.2 Skylift needed (m) NO
4.3 4WD Vehicle NO
5.0 Remarks
TRANSMISSION CHECKLIST
TRANMISSION INFORMATION
Digital Nasional Berhad
REGION : CENTRAL
SITE ID : DWKUL0435
LINK ID. :
LINK NAME 1:
TX VENDOR 1:
* Please use existing cabling, ports and VLAN id. IF the Vendor need any new requirement, the
Vendor must provide it by itself except the VLAN & port configurations
COMMENTS :
ANTENNA & RRU SUMMARY
PROJECT DNB_NEW_2021_5G_RAN_Phase_1a
LOCATION ID DWKUL0435
Equipment Table
Quantity Remarks
Antenna
Antenna <2.5mtr 3
Antenna >2.5mtr 3
Total 6
RRU
RRU on ground 0
RRU <8ft 3
RRU >8ft 0
Total 3
Notes: 1.Vendor to fill up details in Table Loading comparison 1.1-1.4 & its automatically reflect in Equipment table at the top
1.0 Loading Comparison
1.1 RF Antenna
Height on Antenna
Dimensions Total
No. Antenna Model Antenna type Sector <2.5mtr >2.5mtr Tower, Weight
(H x W x D) Load (Kg)
AGL (m) (Kg)
1 AIR 6419 ANTENNA 717 x 408 x 140 ACTIVE 1,3 2 0 54.6 25.2 50.4
2 KATHREIN (KRE 1012412/1) ANTENNA | LLLL 2500 x 445 x 130 PASSIVE LOWBAND 1,3 0 2 52.8 36.2 72.4
3
4
5 0
6 0
Total 2 2 122.8
1.2 RRU
Height on RRU
Dimensions Total
No. RRU Sector RRU on ground <8ft >8ft Tower, Weight
(H x W x D) Load (Kg)
AGL (m) (Kg)
1.3 MICROWAVE
Height on
DISH Dimensions RADIO Dimensions Weight Total
No. MICROWAVE RRU on ground <8ft >8ft Tower,
(Diameter) (H x W x D) (Kg) Load (Kg)
AGL (m)
1 0
2 0
3 0
Total 0 0 0 0
REMARKS
PROPOSE CONFIGURATION DATA
PROJECT : DNB_NEW_2021_5G_RAN_Phase_1a
LOCATION ID : DWKUL0435
4.2 Jumper / Feeder / OIL Detail Sector 1 Sector 2 Sector 3 Sector 4 Sector 5 Sector 6
4.2.1 Total no. of jumper / feeder / OIL 1 1 1
4.2.2 Type of feeder OIL CABLE OIL CABLE OIL CABLE
4.2.3 Jumper lengths - Top (m) 4x3m 4x3m 4x3m
4.2.4 Jumper lengths - Bottom (m) N/A N/A N/A
4.2.5 OIL lengths (m) 10 70 70
4.2.6 Feeder lengths (m)
4.2.7 Cable ladder Size (mm) 300 300 300
7.0 Remarks
PROPOSE CONFIGURATION DATA
PROJECT : DNB_NEW_2021_5G_RAN_Phase_1a
LOCATION ID : DWKUL0435
7.0 Antenna Support Detail Sector 1 Sector 2 Sector 3 Sector 4 Sector 5 Sector 6
3.5m BOOM 3.5m BOOM 3.5m BOOM
7.1 Type of antenna support
WITH BRACKET WITH BRACKET WITH BRACKET
7.2 No. of H-boom N/A N/A N/A
7.3 No. of boom 1 1 1
7.4 Length of boom (m) 3.5 3.5 3.5
8.0 Remarks
SITE PHOTOS
PROJECT : DNB_NEW_2021_5G_RAN_Phase_1a
SITE ID : DWKUL0435
PROJECT : DNB_NEW_2021_5G_RAN_Phase_1a
SITE ID : DWKUL0435
PROJECT : DNB_NEW_2021_5G_RAN_Phase_1a
SITE ID : DWKUL0435
UPGRADE EXISITNG INCOMING TNB METER SUPPLY EXISITING MAXIS ACPDB at level 9
FROM 63A TO 100A
PROPOSED Route from ACPDB at level 9 to PROPOSED Route from ACPDB at level 9 to
PDU at level 10 PDU at level 10
SITE PHOTOS
PROJECT : DNB_NEW_2021_5G_RAN_Phase_1a
SITE ID : DWKUL0435
PROPOSED Cable Route to PDU & Enclosure PROPOSED Cable Route to PDU & Enclosure
PROJECT : DNB_NEW_2021_5G_RAN_Phase_1a
SITE ID : DWKUL0435
EXISTING PORT TM FOR BUILDING USED AT LEVEL 8 PROPOSED CRANE PARKING LOCATION
SITE PHOTOS
PROJECT : DNB_NEW_2021_5G_RAN_Phase_1a
SITE ID : DWKUL0435
PROJECT : DNB_NEW_2021_5G_RAN_Phase_1a
SITE ID : DWKUL0435
PROJECT : DNB_NEW_2021_5G_RAN_Phase_1a
SITE ID : DWKUL0435
PROJECT : DNB_NEW_2021_5G_RAN_Phase_1a
SITE ID : DWKUL0435
PROJECT : DNB_NEW_2021_5G_RAN_Phase_1a
SITE ID : DWKUL0435
PROJECT : DNB_NEW_2021_5G_RAN_Phase_1a
SITE ID : DWKUL0435
PROJECT : DNB_NEW_2021_5G_RAN_Phase_1a
SITE ID : DWKUL0435
PROJECT: DNB_NEW_2021_5G_RAN_Phase_1a
SITE ID DWKUL0435
View at direction 0˚ View at direction 30˚ View at direction 60˚ View at direction 90˚
View at direction 120˚ View at direction 150˚ View at direction 180˚ View at direction 210˚
View at direction 240˚ View at direction 270˚ View at direction 300˚ View at direction 330˚
View Sector 1. Degree : 50˚ View Sector 2. Degree : 200˚ View Sector 3. Degree : 260˚
LOCAL MATERIALS
PROJECT : DNB_NEW_2021_5G_RAN_Phase_1a
SITE ID : DWKUL0435
1:70 DNB_NEW_2021_5G_RAN_Phase-1a
DWKUL0435_WSMYPRTMNSEPUTECH
˚ ˚
˚
˚
˚
LEGEND:
1:150 DNB_NEW_2021_5G_RAN_Phase-1a
DWKUL0435_WSMYPRTMNSEPUTECH
SCALE 1:50
ECM/GR/IE_EMUDMUS
DNB_NEW_2021_5G_RAN_Phase-1a
DWKUL0435_WSMYPRTMNSEPUTECH
BOOM & POLE FOR ROFFTOP AS SHOWN 0121 -IPA 458 10834 - UEN 1