School Construction Guide

Uploaded by

pondyseenu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Welcome to this article on `School Construction Cost: A Comprehensive Guide`.

Investing in
education is investing in the future. Behind every success story lies a foundation built on
education. Opening a school isn’t just about bricks and mortar; it’s about laying the
groundwork for generations to come. Investing in education unlocks talents, nurtures
creativity, and shapes minds. Moreover, in this guide, we’ll explore the essential aspects and
cost estimation involved in building a school up to Class 10 in India. By doing so, you can
ensure that your investment in education yields optimal results.
School Construction Cost: A Comprehensive Guide
Starting a school is a significant investment that demands careful consideration of various
factors. Major costs include land, building construction, furnishing, staffing, and other
essentials like power backup and school management software. We’ll primarily discuss the
cost of constructing a secondary school up to Class 10, meeting CBSE and CISCE board
requirements.
The estimate is based on the building construction cost as applicable in the year 2024. This
article is limited to building construction costs only, hence, we may not discuss other
expenses such as furniture, IT infrastructure, library, etc.
Calculating School Construction Cost
Building Construction Area
The total construction area depends on the total number of students the school can
accommodate, also known as the school strength. Before the construction, there is a need to
determine the size of the school. You may find schools with different maximum
enrollment/intake capacities. Generally, there are schools with a maximum intake capacity of
1000-2000 students. However, there are schools with total enrollments of up to 3000-4000
students and even more. Once we decide the maximum size/strength of our school, we
determine the number of classrooms and laboratories needed. For example:
 For a Secondary School with 01 Section/Class accommodating 520 students,
construction could range from 18,000 to 20,000 sq. ft., including administrative areas,
labs, and activity rooms.
 For a Secondary School with 02 Sections/Class accommodating 1,040 students, the
construction area could be around 20,000 to 26,000 sq. ft., considering additional
facilities.
 For a Secondary School with 03 Sections/Class accommodating 1,440 students, the
construction area could range from 35,000 to 40,000 sq. ft., covering all necessary
facilities and additional space.
 For a Secondary School with 04 Sections/Class accommodating 2,080 students, the
construction area could vary from 40,000 to 50,000 sq. ft., including administrative
areas and extra space.
Note: The above calculation is as per the guidelines of the CBSE board that allows a
maximum intake of 40 students per section.
Administrative Setup
Apart from classrooms and activity rooms, administrative areas are vital for smooth school
functioning. This includes reception area, offices, washrooms, and staff rooms, requiring
around 7,600-10,000 sq. ft., customizable based on requirements.
Laboratories and Activity Rooms
Every school needs science labs, libraries, computer labs, and specialized rooms for music,
dance, and art. Allocating approximately 5,400 to 8,000 sq. ft. for these facilities enhances
the learning experience.
Additional Area
Corridors, staircases, and common areas require extra space to ensure smooth movement.
Plan for around 15,000 to 20,000 sq. ft. for these areas, depending on the building design
and total construction area.
School Construction: Cost Estimation Construction costs vary based on factors like
location, material prices, and labor charges. A conservative estimate ranges from INR 1,400
to 1,800 per sq. ft. For instance:
Secondary School with 01 Section/Class (Capacity – 520 students): Estimated total
construction area would be around 18000-20000. The approximate total construction cost
may be around INR 2.5 crores – INR 3.5 crores.
Secondary School with 02 Section/Class (Capacity – 1040 students): Estimated total
construction area would be around 20000-26000 sq. ft. The approximate total construction
cost may be around INR 3.5 – 4.7 crores.
Secondary School with 03 Section/Class (Capacity – 1440 students): Estimated total
construction area would be around 35000-40000 sq. ft. The approximate total construction
cost may be around INR 5.0 crores – 7.2 crores.
Secondary School with 04 Section/Class (Capacity – 2080 students): Estimated total
construction area would be around 40000-50000 sq. ft. The approximate total construction
cost may be around INR 5.5 crores – 9.0 crores.
Please note that the cost of construction depends on multiple factors such as the building
design, construction quality, local factors, prices of building materials, labor cost, etc. The
cost projected above is indicative only. This may provide you with some general idea about
the cost involved in school building construction.
Conclusion: School Construction Cost
This article School Construction Cost: A Comprehensive Guide provides a good idea about
the cost of building a school up to secondary level.
Building a school in India requires meticulous planning and budgeting. Consultation with
architects and builders is crucial for accurate cost estimation. At TFS Consultants, we
specialize in creating future-ready schools. By following our guidelines, you can construct
schools that not only educate but also inspire generations to come. Let’s invest in the future
together.