0% found this document useful (0 votes)
25 views5 pages

NEA Second Paper Syllabus

Uploaded by

umeshgautam.nea
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views5 pages

NEA Second Paper Syllabus

Uploaded by

umeshgautam.nea
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

l;len-(, pk k|aGws, kf7\oqmd cBfjlws ldltM @)&(÷)%÷)^

g]kfn ljB't k|flws/0f


k|fljlws ;]jf, l;len ;d'x, l;len pk;d"x, tx–( pk k|aGws kbsf]
v'nf tyf cfGtl/s k|ltof]lutfTds lnlvt k/LIffsf] kf7\\oqmd
låQLo kqM ;]jf ;DaGwL lj:t[t 1fg -!)) k'0ff{Í_
k|Zg k|lt k|Zg
kq ljifo k'0ff{Í pQL0ff{Í v08 k/LIff k|0ffnL ;+Vof cÍef/ ;do
nfdf] pQ/÷
s @ !%
ljZn]if0ffTds ;ldIff
ljZn]if0ffTds ! @)
;]jf ;DaGwL ;ldIff÷;d:of ;dfwfg
låQLo -lj:t[t 1fg_ !)) $) # 306f
nfdf] pQ/÷ @ !%
v ljZn]if0ffTds ;ldIff
ljZn]if0ffTds ! @)
;ldIff÷;d:of ;dfwfg

v08 -s_ (२x१५=३०, १x२०=२०) – cÍ %)


1. Overview of Hydrology and Sedimentology
2. Project Engineering:
2.1. Power market survey
2.2. Load demand forecast and determination of capacity requirement
2.3. Site selection
2.4. Different stages of project studies
2.5. Field investigations:
2.5.1. Reconnaissance survey
2.5.2. Topographical survey
2.5.3. Hydrological investigation
2.5.4. Sedimentological investigation
2.5.5. Geological investigations
2.5.6. Sub-surface exploration
2.5.7. Seismological studies
2.5.8. Material investigation
2.5.9. Landslide hazard mapping
2.6. Different stages of Project Development.
2.7. Types of Hydropower Projects (Run-off-River (RoR), Peaking Run-off- River (PRoR) and
Reservoir).
2.8. Knowledge of DoED Guideline for study of Hydropower Projects, 2018

3. Optimization Study:
3.1. Optimization of installed capacity
3.2. Determination of load factor, utilization factor and plant capacity factor

1
l;len-(, pk k|aGws, kf7\oqmd cBfjlws ldltM @)&(÷)%÷)^

3.3. Firm energy and secondary energy


3.4. Reservoir and PRoR Schemes and their importance for run-off-river schemes

4. Overall Design of Hydro-Electric Projects:


4.1. General layout of Hydropower Project from Headworks to Power House and Hydraulics
Structures
4.2. Overview of Water Conveyance Structures
4.3. Selection of surface structures and underground structures
4.4. General arrangement of electrical and mechanical installations
4.5. Output and capacity of the plant
4.6. Optimization of water conveyance system
4.7. Economic Diameter of Penstock
4.8. Overview of Power House
4.9. Power House Design and planning
4.10. Relationship between Dam and Adjacent Power House
4.11. Reservoirs
4.12. Downstream water release.
4.13. Fish passage facilities
4.14. Cascade development
4.15. Knowledge of DoED Power House Design Guidelines for Hydropower Projects, 2018
4.16. Knowledge of DoED Design Guidelines for water conveyance system of Hydropower
Projects
4.17. Knowledge of DoED Design Guidelines for Headworks of Hydropower Projects

5. Design of Dams and its Structures:


5.1. Overview and design of different Types of dams
Design of Embankment Dam, Concrete Dam, Roller Compacted Concrete (RCC) Dam,
Rock – Filled Concrete (RFC) Dam
5.2. Factor affecting on selection of economic dam site
5.3. Factors affecting on design & constructions in different types of dams
5.4. Floods and their economic aspects
5.5. Spillway capacity
5.6. Economic height of dam
5.8. Stability Analysis of Embankment dams, Concrete Dams, RCC Dams and RFC Dams

6. Flood:
6.1. Types of Floods and their analysis
6.2. Flood estimate and their effect on Hydropower Projects
6.3. PMF and its significance
6.3. Pre-monsoon flood
6.4. Landslide Dam outburst flood (LDOF)
6.5. Glacier Lake outburst flood (GOLF)

2
l;len-(, pk k|aGws, kf7\oqmd cBfjlws ldltM @)&(÷)%÷)^

7. Cost of electric Power:


7.1. Optimization of size and cost of Hydro, solar and wind projects based on cost and
revenue
7.2. Effect of operation and management costs
7.3. Unproductive capital and its effect on the cost of Power
7.4. Different annual cost associated for effective operation of electric projects
7.5. Factors affecting cost of electric power
7.6. Levelized cost of electricity
8. Engineering Economics:
8.1. Disbursement schedule, Cash flow analysis, Time value of money
8.2. Project evaluation indicators, IRR, RoE, Payback period, EIRR, FIRR and others
Criterion, Selection of best alternative
8.3. Incremental Analysis, Sensitivity & breakeven analysis
8.4. Risk analysis, Inflation & price change
8.5. Taxation system in Nepal
8.6. Energy tariff schemes and regulatory issues

v08 -v_ (२x१५=३०, १x२०=२०) – cÍ %)


9. Multi-Purpose Hydropower Projects:
9.1. Multi-purpose hydropower projects and their planning
9.2. Benefits of Multipurpose Hydropower Projects
9.3. Benefits of river basin development

10. Storage and Related Economic Problems:


10.1. Storage cost
10.2. Minimum flow analysis
10.3. Consequences of short supplies
10.4. Downstream regulation Dam and its cost

11. Reservoirs - Problems of Sedimentation:


11.1. Management of Sedimentation in Reservoir
11.2. Evaluation and effect of Sedimentation on Power Production.
11.3. Influence of forest on rainfall.
11.4. Evaporation.
11.5. Sources of sedimentation on Reservoir.
11.6. Effects of deforestation on soil erosion.
11.7. Soil conservation.
11.8. Effect of dams on river regime.
11.9. Mechanism of reservoir silting.
11.10. Function silting basin.
11.11. Disaster Management Plan.

3
l;len-(, pk k|aGws, kf7\oqmd cBfjlws ldltM @)&(÷)%÷)^

12. Safety Engineering:


12.1. Safety rules and regulations
12.2. Storage and handling of explosives, compressed gases and inflammable substances
12.3. Safety precautions in handling electrical installations in construction premises, Earthing
and shielding techniques
12.4. Fire hazards, firefighting techniques and equipment
12.5. Noise hazards, its sources, effect on health and control
12.6. First aid requirements in Project site
12.7. Field instrumentation and warning systems

13. Contract management:


13.1. Familiarization with Public Procurement Acts, Regulation and guidelines as well as
standards of World Bank, Asian Development Bank and Asian Infrastructure
Investment Bank
13.2. Preparation of contract documents, specifications, condition of contract and other
contractual procedures.
13.3. International Standard Bidding Document, National Standard Bidding Document
13.4. Arbitration and Mediation

14. Project Scheduling of Planning:


14.1. Concept of Project Scheduling
14.2. Resource Planning & Management
14.3. Analysis of Critical Path, CPM & PERT

15. Quality Control:

15.1. Need of Quality Control


15.2. Mechanism of Quality Control
15.3. Technical Auditing
15.4. Quality Control Management
15.5. Quality Assurance Plan

16. Social Aspect & its Management:

16.1. Social Issues in Hydropower Project


16.2. Grievance Mechanism
16.3. Importance & Process of CSR

17. International Treaty and Conventions:

17.1. Koshi Agreement, 1954/1966


17.2. Gandak Agreement, 1959
17.3. Electricity Exchange 1961
17.4. Treaty between the Government of Nepal and Government of India concerning the
integrated development of Mahakali River including Sarada Barrage, Tanakpur Barrage
and Pancheswar Project.

4
l;len-(, pk k|aGws, kf7\oqmd cBfjlws ldltM @)&(÷)%÷)^

18. Service-Related Manuals:


18.1. The Environment Protection Act and Regulation 2019
18.2. Manual for public Involvement in Environmental Impact Assessment (EIA) process of
Hydropower Projects
18.3. Manual for preparing Terms of Reference (TOR) for environmental Impact Assessment
(EIA) of Hydropower Projects
18.4. Manual for preparing Environmental Management Plan (EPM) for Hydropower Projects
18.5. National Environmental Impact Assessment Guidelines, 1993
18.6 Safety Guidelines and standards for Generation, Transmission and Distribution of
Hydro Electricity.