CLIENT HULIOT HULIOT CLIENT
SCOPE SCOPE SCOPE SCOPE
SEWAGE
INCOMING BL BL
(P-03) (T-08)
DT-02
(T-01) Re-Circulation Line TREATED WATER
G FOR REUSE
(T-02)
BATTERY LIMIT
MBR
MODULE
BL AG-01 BL
(T-03) (T-04) (AB-01 A & B) (T-05) (T-06) (P-01) (P-02 A & B) (T-07)
BATTERY LIMIT
BL
(P-04) (T-09)
Basket Centriifuge
LIST OF PROPOSED MECHANICAL EQUIPMENTS DETAILS OF PROPOSED STP
TAG NO. DESCRIPTION NOS. TAG NO. NAME OF UNITS NOS. OF UNIT
P-01 SLUDGE RE-CIRCULATION PUMP 1 T-01 SCREEN CHAMBER 1
P-02 A & B PERMEATE PUMPS 2 T-02 OIL AND GREASE TRAP 1
P-03 BACKWASH PUMP 1 T-03 COLLECTION TANK 1
P-04 SLUDGE FEED PUMP 1 T-04 ANOXIC TANK 1
DP-01 A&B POLY. DOSING PUMPS FOR DT-01 2 T-05 AEROBIC TANK 1
AB-01 A&B AIR BLOWERS 2 T-06 MBR TANK 1
Project :
AG-01 AGITATOR FOR ANOXIC TANK 1 T-07 TREATED WATER TANK 1 MBR TYPE
AG-02 AGITATOR FOR POLY. DOSING 1 T-08 BACK WASH TANK 1 SEWAGE TREATMENT PLANT
T-09 SLUDGE HOLDING TANK 1 Title :
PROCESS FLOW DIAGRAM