DOL-0000-GSP-00001 - A15 - Technical Documentation Numbering Specification

Dolphin Standard 3

Uploaded by

piyush4cctech
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views29 pages

DOL-0000-GSP-00001 - A15 - Technical Documentation Numbering Specification

Dolphin Standard 3

Uploaded by

piyush4cctech
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 29

DOL-0000-GSP-00001 REV A15

Document No. DOL-0000-GSP-00001

Area: DOL

Discipline: GENERAL

Document Type: SPECIFICATION

Commitment Number: NOT APPLICABLE

Title

TECHNICAL DOCUMENTATION NUMBERING SPECIFICATION

Rev. Issue Date Purpose/Description of Revision Prepared Reviewed Approved Company

A15 21/02/05 Added Umbilicals & K. Wottge F. Galhardo Ph.Beron Ph.Beron


Geoscience & Misc

© This document is the property of Dolphin Energy Ltd. No part of this document may be reproduced or transmitted in any form or by any means, or
used for any purpose other than that which it is specifically furnished without the written consent of Dolphin Energy Ltd.
DOL-0000-GSP-00001 REV A15

REVISION HISTORY

REV DATE DESCRIPTION


A01 21-12-01 Draft for common review with FW-S
R02 07-01-02 Draft for internal & external (FW-S) review
A03 24-01-02 Draft for review and approval – Modification in title
A04 30-01-02 For Approval – Final comments received from FWS
A05 05-03-02 Updated to address process numbering requirements,
Approved for Use
A06 05-05-02 Minor updates including area definitions. For review by
Mid-stream contractor
A07 21-05-02 Area Code Definitions PLO & PLG revised
A08 21-05-02 Holds removed from section 9.0
A09 21-07-02 Specification Ref No. Changed. Section 9.0
Downstream Pipeline codes added
A10 4-11-02 Downstream Pipeline codes amended Unit codes
updated. References for midstream riser removed.
Special revisions for upstream use added.
A11 26-02-03 Additional unit numbers for Ras Laffan. Fire zone
consolidation. Additional midstream pipeline code.
A12 13-05-03 Wellhead and Production platforms combined. Drawing
Codes updated.
A13 27-08-03 Unit codes updated
A14 21/10/03 Minor Revisions to appendix 4 – Drawing types
A15 21/02/05 Added Umbilicals, Geoscience, Misc Doc Types and
Appendix 8 for Geoscience Inclusive of Well Numbering

NOTES:
A revision line in the right hand margin denotes revisions.

2 of 10
DOL-0000-GSP-00001 REV A15

CONTENTS

1 PURPOSE
2 SCOPE
3 DEFINITIONS AND PROJECT IDENTIFICATION
3.1 Technical Documentation
3.2 Contractor
3.3 Project Identification
3.4 Drawings
3.5 Documents

4 RESPONSIBILITIES
5 DRAWING NUMBERING
5.1 General
5.2 Typical example of general drawing number, including Process and Instrument
Diagrams (P&ID’s)
6 DOCUMENT NUMBERING
6.1 General
6.2 Typical example of document number
7 REVISION NUMBERING
7.1 Special revision numbers for upstream feed only

8 ALLOCATION OF SEQUENCE NUMBERS


9 OTHER TECHNICAL DOCUMENTATION

9.1 Fabrication documentation


9.2 Vendor Documentation
9.3 Third party & Technical Audits, Verification and Reviews

APPENDICES

1 AREA CODES
2 LOCATION CODES
3 DISCIPLINE CODES
4 DOCUMENT TYPES / DRAWING TYPES
5 DRAWING TITLE BLOCK
6 DOCUMENT COVER SHEET
7 BLOCK ALLOCATION OF SEQUENCE NUMBERS
8 GEOSCIENCE INCLUSIVE OF WELL NUMBERING

3 of 10
DOL-0000-GSP-00001 REV A15

1 PURPOSE

The purpose of this specification is to define the requirements for the numbering of Technical
Documentation.

2 SCOPE

Note that within technical documentation:


• Engineering documentation, including Process Licensors documentation
• Fabrication documentation,
• Vendor documentation,
• 3rd Party and audit documentation,
are treated as different document classes; each class has specific (and different) document
management requirements.
This means each class has different attributes required in the electronic document
management system.

In its current revision, this specification describes the method by which Engineering
Documentation shall be identified and numbered. Future revision will cover also numbering
of other types of technical documentation.

Additional attributes are required to be maintained for population of COMPANY Document


Management Systems. The definition of these additional attributes is not the purpose of this
specification.

By application of the above, the present revision excludes:

a. Shop fabrication drawings and related documentation which are numbered in


accordance with the Fabricator's own standard procedures (to be defined).

b. Vendor documentation which shall be numbered in accordance with the Dolphin


Energy Vendor data and Documentation Requirements specification Number;
DOL-0000-QSP-01133
The format of this number will be made of:
• Purchase order number reference,
• Document type code, consistent with the Vendor Document Requirement List
• Sequence number,
• Revision index.

However Vendor PID’s related to tagged items of major equipment (packages) and
of Process Licensors shall be:
• Numbered in accordance with Section 5.2 of this specification,
• Established with the same drawing format (e.g. using the same drawing title
block) and the same drafting conventions and symbols as the P&IDs produced
by main engineering contractors.

4 of 10
DOL-0000-GSP-00001 REV A15

3 DEFINITIONS AND PROJECT IDENTIFICATION

3.1 Technical Documentation

The term "technical documentation" as used in the context of this specification encompasses
engineering drawings, calculations and text based material, i.e. technical specifications,
study reports, philosophies, manuals and procedures, including maintenance and operation
manuals, assessments (e.g. EIA), G&G documents, etc…

It does not include management system procedures and manuals, which are not of a
technical nature and not subject to the document numbering system defined herein.
3.2 Contractor

The person or entity who is party to a contract with Company for supply of work/services
and/or associated materials and equipment.

3.3 Project Identification

Project Designation: “Dolphin Gas Project"

The projects consist of the following constituent parts:

Upstream:
Dolphin Wellhead/Production Platform 1
Dolphin Wellhead/Production Platform 2
Upstream Subsea Pipelines and Umbilicals
Ras Laffan onshore treatment plant, and utilities
Ras Laffan offsites (Harbour area, etc..)
Ras Laffan base camp

Midstream :
Ras Laffan Export compression and metering facilities (located within the fence of the
onshore treatment plant)
Gas export pipeline
Taweelah receiving and custody transfer facilities
Taweelah to GASCO tie-in point

Downstream:
Downstream Pipeline Al Ain to Fujairah
Jebel Ali receiving and custody transfer facilities

The above classifications will be used to identify each specific area, where appropriate
(see Appendix 1).

5 of 10
DOL-0000-GSP-00001 REV A15

3.4 Drawings

All drawings to contain within their title block in a clear and concise manner the following
details:

Reservation for the Dolphin Energy Ltd corporate logo


Dolphin Energy Ltd (in Arabic and in English)
Dolphin Energy Ltd Contract Number
Contractor's logo and name.

For typical example refer to Appendix 5.

3.5 Documents

All documents to contain on their front cover sheet in a clear and concise manner the
following details:

Reservation for a potential Dolphin Energy Ltd corporate logo (not available now)
Dolphin Energy Ltd (in Arabic and in English)
The appropriate constituent part as referred to in Section 3.3.
Dolphin Energy Ltd Contract Number.
Contractor's logo and name.

For typical example refer to Appendix 6.

4 RESPONSIBILITIES

a. The Contractor is responsible for ensuring that technical documentation prepared by


them, or by sub parties/contractors, such as Process Licensors, meet the
requirements of this specification.

b. Dolphin Energy shall ensure that technical documentation for the Project complies
with this specification.

5 DRAWING NUMBERING

5.1 General

The numbering system consists of utilising the following identifiers.

Area Code (Three Character Alpha Code or Alpha numeric)

Defines the area/facility to which the drawings refer. (Refer to Appendix 1).

6 of 10
DOL-0000-GSP-00001 REV A15

Location Code (Four Character Alpha and/or Numeric Code)

Designed to divide the area/facility into easily definable locations. (Refer to Appendix 2)

Note: As a general principle, for the onshore facilities, the location code is made of the three
digits of the unit number plus one digit related to the train number.

Discipline Code (Single Alpha Character)

Identifies the discipline responsible for producing the drawing. (Refer to Appendix 3)

Document Type (Two Character Alpha Code)

Defines the drawing type or content. These are identified in Appendix 4.

Sequential Number (Five Digits)

5 digit numbers ranging from 00001 to 99999 These can be applied to each different
combination of AREA – LOCATION – DISCIPLINE & DOCUMENT TYPE;

The drawing number (with any sheet number) shall never be used twice to identify a second
drawing, even if the first drawing has been deleted, cancelled or voided.

Multiple Sheet Drawings (Two Digits)

If two or more sheets are required to complete any particular drawing a sheet number facility
is available; this shall also be utilised to group common drawings (e.g. Cause & Effect
Matrices, P&ID's related to one specific process system number).

Each unique sequence number shall commence with a sheet number default of .01 . Not
necessary if only one sheet is used

For typical example refer to Section 5.2.

5.2 Typical example of general drawing number, including Process and Instrument
Diagrams (P&ID’s)

RLP-1010-PPI-20204.01

Area (Appendix 1)

Location (Appendix 2) Sheet Number (Section 5.1)


(if required)
Discipline (Appendix 3)
Sequence Number (5 digits)
Document Type (Appendix 4)

When quoting drawing numbers, the number shall be followed by the revision identifier
(refer section 7).

7 of 10
DOL-0000-GSP-00001 REV A15

6 DOCUMENT NUMBERING

6.1 General

The numbering system consists of utilising the following identifiers.

Area Code (Three Character Alpha Code)

Defines the actual area/facility to which the documents refer. (Refer to Appendix 1)

Location Code (Four Character Alpha or Numeric Code)

Designed to divide the area/facility into easily definable locations. (Refer to Appendix 2)

Note: As a general principle, for the onshore facilities, the location code is made of the three
digits of the unit number plus one digit related to the train number.

Discipline Code (Single Alpha Character)

Identifies the discipline responsible for producing the document. (Refer to Appendix 3)

Document Type (Two Character Alpha Code)

Identifies the document type. These are identified in Appendix 4.

Sequential Number (Five Digits)

5 digit sequential numbers ranging from 00001 to 99999 These can be applied to each
different combination of AREA – LOCATION – DISCIPLINE & DOCUMENT TYPE

The document number shall never be used twice to identify a second document, even if the
first document has been deleted, cancelled or voided.

Where a document exists (ie as produced during FEED or earlier contract) the number shall
be retained with the document up revised. It will not be renumbered.

6.2 Typical example of document number

RLP-1010-PMA-10004.01

Area (Appendix 1) Volume identifier, when


required (optional)
Location (Appendix 2) Sequence Number (5 digits)

Discipline (Appendix 3) Document Type (Appendix 4)

When quoting document numbers, the number shall be followed by the revision identifier
(refer section 7).

8 of 10
DOL-0000-GSP-00001 REV A15

7 REVISION NUMBERING

Code Description

A** FOR APPROVAL (This revision corresponds to the usual acronym IFA – Issued
For Approval)
B** APPROVED FOR BID/ENQUIRY REVISIONS/TECHNICAL BID EVALUATION
C** APPROVED FOR CONSTRUCTION (This revision corresponds to the usual
acronym AFC – Approved For Construction)
D** APPROVED FOR DESIGN / DESIGN REVISIONS (This revision corresponds
to the usual acronym AFD – Approved for Design)
I** INFORMATION ISSUE
P** ISSUED FOR PURCHASE
R** FOR REVIEW (This revision corresponds to then usual acronym IFR – Issue for
Review)
S** SUPERSEDED REVISION (information contained within a document that can
now be found on another) Note the new document number shall be identified.
V** VOID/CANCELLED REVISION (information contained within a document that is
no longer valid)
Z** AS-BUILT REVISIONS

** Number field commencing at 01 which will increase by one at each subsequent


revision (irrespective of change in the alpha character).

7.1 SPECIAL REVISION NUMBERS FOR UPSTREAM FEED ONLY

M** FOR APPROVAL (Documents issued by special task force Team 2)


N** APPROVED FOR BID/ENQUIRY REVISIONS/TECHNICAL BID EVAL
(Documents issued by special task force Team 2)

8 ALLOCATION OF SEQUENCE NUMBERS

Sequential number shall be allocated on a block basis by Contract to allow internal control
and allocation by Contractor without duplication of a specific number.
Details of block numbers allocated are as are outlined in Appendix 7

9 OTHER TECHNICAL DOCUMENTATION:

9.1 Fabrication documentation:

To be agreed with the Fabrication Contractor

9.2 Vendor documentation:

Refer to DEL specification number: DOL-0000-QSP-01133 - Vendor Data and


documentation requirements.

9 of 10
DOL-0000-GSP-00001 REV A15

9.3 Third party & Technical audits, Verification and Reviews

Third party documentation is Technical documentation related to facilities out with the DEL
area of operation but relevant to DEL activity (i.e. With interface to downstream delivery
points)
Technical Audits etc., relevant to DEL facilities shall follow numbering defined in Section 6.

10 of 10
DOL-0000-GSP-00001 REV A15

APPENDIX 1

AREA CODES

Code Description
DOL MULTI AREA (Multi area documentation related to more than one facility)
SYS INTEGRATED CONTROL AND SAFETY SYSTEM (ICSS)
MULTI AREA WELLHEAD / PRODUCTION PLATFORM (Multi area documentation
DP0
related to the wellhead/production platforms only)
DP1 DOLPHIN WELLHEAD / PRODUCTION PLATFORM 1
DP2 DOLPHIN WELLHEAD / PRODUCTION PLATFORM 2
NFR NORTH FIELD RESERVOIR
MULTI AREA RAS LAFFAN (Multi area documentation related to the onshore
RL0
facilities only)
RLH RAS LAFFAN HARBOUR AREA
RLP RAS LAFFAN TREATMENT PLANT (Except compression facilities)
RLE RAS LAFFAN EXPORT COMPRESSION FACILITIES
RLC RAS LAFFAN BASE CAMP (if any)
PLG MULTI AREA EXPORT PIPELINE DOCUMENTATION
PL0 UPSTREAM PIPELINES GENERAL DOCUMENTATION
PL1 UPSTREAM PIPELINE DP1 TO RAS LAFFAN
PL2 UPSTREAM PIPELINE DP2 TO RAS LAFFAN
PLM MIDSTREAM PIPELINE RAS LAFFAN TO TAWEELAH
PLT MIDSTREAM PIPELINE TO TAWEELAH TO GASCO TIE-IN POINT
PLA DOWNSTREAM PIPELINE TO AL AIN (Spur from Bureimi)
PLD DOWNSTREAM PIPELINE GENERAL DOCUMENT
PLC PIPELINES COMMON
PLF DOWNSTREAM PIPELINE TO FAJAIRAH
MULTI AREA RECEIVING FACILITIES (Multi area documentation related to the
RF0
receiving facilities only)
RFA AL AIN RECEIVING FACILITIES
RFB BUREIMI RECEIVING FACILITIES (Pig Trap at Oman / UAE Border)
RFQ QIDFA RECEIVING FACILITIES
RFT TAWEELAH RECEIVING FACILITIES
RFJ JEBEL ALI RECEIVING FACILITIES
UMT UMBILICALS TELECOMS ( Umbilicals from Ras Laffan to DP1 and DP2 Platforms

1 OF 1 Appendix 1
DOL-0000-GSP-00001 REV A15

APPENDIX 2

LOCATION CODES

General Non-Geographic Codes

Code Description
0000 Drawings that encompass more than one system and cannot be geographically
located.

WELLHEAD / PRODUCTION PLATFORMS

Non-Geographic Codes

Unit Number Unit Description


002 MEG injection
006 Wellhead platform export, including process system on the platform and the
subsea lines down to the inlet flange of the first onshore ESDV (isolation
valve).
010 Wellheads
011 Gas separation
012 Free water knock out
013 Oily water treatment
020 Power generation
022 Fuel gas
023 Instrument and Utility air
024 Nitrogen
031 Diesel storage and distribution
032 Fresh water storage and distribution
040 Relief and blowdown
041 Drains
046 Chemical storage
047 Methanol
063 Handling system
064 Safety facilities
065 Building
066 HVAC
071 PCS/PSD
072 ESD/USS/HIPS
073 FGS

1 OF 8 Appendix 2
DOL-0000-GSP-00001 REV A15

Unit Number Unit Description


074 Telecom
075 IT system

Specific Geographic Codes

Drawing Code (*) Description


0000 General / Common
PP00 Wellhead / Production Platform Common
PPJ0 Wellhead / Production Platform Jacket
PPD0 Wellhead / Production Platform Decks (Topsides)
PPD1 Wellhead / Production Platform ESDV Deck
PPD2 Wellhead / Production Platform Lower Deck
PPD3 Wellhead / Production Platform Mezzanine deck
PPD4 Wellhead / Production Platform Upper deck
PPD5 Wellhead / Production Platform Helideck
PPDT Wellhead/Production Platform Temporary Deck
BP00 Bridge Platform Common
BPJ0 Bridge Platform Jacket
BPD0 Bridge Platform Deck
FP00 Flare Platform Common
FPJ0 Flare Platform Jacket
FPD0 Flare Platform Deck
BRG0 Bridges Common
BRG1 Bridge Wellhead / Production Platform <–> Bridge Platform
BRG2 Bridge Platform <–> Flare Platform
PEQR Wellhead / Production Platform Equipment Room
PSTR Wellhead / Production Platform Shelter
DRLx Drilling Derrick / Area, zone x (to be defined)

2 OF 8 Appendix 2
DOL-0000-GSP-00001 REV A15

UPSTREAM SUBSEA PIPELINES

Specific Geographic Codes

Drawing Code (*) Description


GAS0 Gas line

3 OF 8 Appendix 2
DOL-0000-GSP-00001 REV A15

RAS LAFFAN TREATMENT PLANT

Non-Geographic Codes

(*) The digit noted x in the following table shall be:


• 0 for general purpose, and document applicable to all trains
• 1 for document specific to train No1
• 2 for document specific to train No2 etc.
• 8 for facilities common to the first two trains only
• 9 for facilities common to the last two trains

Drawing Code (*) Description


100x Reception facilities (from the first inlet ESDV)
101x Acid Gas Removal
102x (cancelled)
103x Condensate stabilisation
104x Dehydration and mercury guard
105x Ethane recovery
106x (Cancelled)
107x NGL fractionation
108x Sulphur recovery and tail gas clean-up
109x Sour water stripping
110x (Cancelled)
111x Propane refrigeration
112x Acid gas enrichment
114x Propane treatment and drying
115x Butane treatment and drying
116x Ethane treatment and drying
117x DSO treatment
118x Condensate treatment
120x Electrical generation and distribution
121x Steam generation
122x Fuel gas
123x Instrument and service air
124x Nitrogen
125x Seawater intake and outfall
126x Seawater desalination
127x Water polishing
128x Potable water
129x Waste effluents disposal
130x Fire water

4 OF 8 Appendix 2
DOL-0000-GSP-00001 REV A15

Drawing Code (*) Description


131x Diesel
133x Tempered water
134x Water Injection Well
140x Flares and blowdown
143x Condensate storage and export
144x Sulphur storage and solidification
145x Propane storage (for refrigeration cycle)
146x Chemicals storage
147x Deleted
148x Deleted
149x Propane loading facilities
150x Butane loading facilities
151x DSO and Off-spec Condensate storage
152x Sulphur silo and loading facilities
153x Firewater storage and distribution – Condensate storage area
154x Emergency generation – Condensate storage area
159x Condensate Loading facilities
160x Interconnecting within plant
161x Control Building
162x Laboratory
163x Fire fighting building & Medical Centre
164x Workshop and Warehouse & Maintenance and Technical Building
165x Operation building and Canteen
166x HVAC
170x Interconnecting off-sites
171x PCS/PSD
172x ESD/USS/HIPS
173x FGS
174x Telecom

5 OF 8 Appendix 2
DOL-0000-GSP-00001 REV A15

Drawing Code (*) Description


175x IT system
182x Instrument and service Air – Condensate storage Area
999x General facilities

MIDSTREAM PIPELINES

Non-Geographic Codes

Drawing Code (*) Description


200x Export Gas Compression, Metering and pipeline and fuel gas compression
266x HVAC
267x Electrical distribution
271x PCS/PSD
272x ESD
273x FGS
274X Telecom

6 OF 8 Appendix 2
DOL-0000-GSP-00001 REV A15

TAWEELAH RECEIVING FACILITIES

Non-Geographic Codes

Unit Code Unit Description


400x Inlet metering
401x Heating
402x Export metering
422x Fuel Gas
423x Instrument Utility Air
424x Nitrogen
430x Fire water
431x Diesel
440x Flare and blowdown
441x Drains
471x PCS/PSD
472x ESD/HIPS
473x FGS
474x Telecom
475x IT System

7 OF 8 Appendix 2
DOL-0000-GSP-00001 REV A15

DOWNSTREAM PIPELINE

Non-Geographic Codes

Drawing Code (*) Description


500x Metering
510x Pipeline
5101 linepipe
5102 Blockvalve
5103 Instrumentation
5104 Civils
5105 Scada
5106 Electrical
5107 Coating
5108 CP design
5109 Commissioning
520x Third Party
5201 Interface
5202 Landowner
5203 Planning Authorities

8 OF 8 Appendix 2
DOL-0000-GSP-00001 REV A15

APPENDIX 3

DISCIPLINE CODES

Code Description

A ADMINISTRATION, NON TECHNICAL, but related to Engineering


B BUILDING / ARCHITECTURAL
C CIVIL / EARTHWORK
D DRILLING
E ELECTRICAL
F SAFETY AND ENVIRONMENT
G GENERAL (non-specific/multi-discipline), but technical
H HVAC
I (Not to be used)
J INSTRUMENT
K CONTROLS (ICSS)
L PIPING / LAYOUT
M MECHANICAL (Vessels, Heaters, Coolers, etc..)
N NAVAL ARCHITECTURE
O OPERATIONS
P PROCESS (incl. Operations)
Q PROCUREMENT
R ROTATING EQUIPMENT
S STRUCTURAL (incl. Weight Control)
T TELECOMS
U HOOK-UP (Installation)
V SURVEY
W MATERIALS ENGINEERING/COATINGS
X GEOSCIENCE INCLUSIVE OF WELL NUMBERING
Y COMMISSIONING
Z PIPELINES, RISERS AND CAISSONS

1 OF 1 Appendix 3
DOL-0000-GSP-00001 REV A15

APPENDIX 4

DOCUMENT TYPES

" AC (for Activity) is reserved as a document code not to be used. It will correspond to activities not
directly linked to the production of a specific document. This code should be used when the
engineering progress monitoring system is based on the Master Document Register."

Code Description

CA CALCULATION
DB DATA BOOK
DS DATASHEET
GL GUIDELINE
IQ INQUIRY PACKAGE
MA MANUAL
MR MATERIAL REQUISITION
MT MATERIAL TAKE OFF'S
PG PROGRAMME/PLAN (Schemes ETC)
PR PROCEDURE
PY PHILOSOPHY / DESIGN BRIEF
RP REPORT
SC SCHEDULE (indexes/lists etc.)
SP SPECIFICATON
SQ SUBCONTRACTS
ST STANDARD DOCUMENT
SY STUDY
TB TECHNICAL BID EVALUATION

1 of 2 Appendix 4
DOL-0000-GSP-00001 REV A15

DRAWING TYPES
" AC (for Activity) is reserved as a document code not to be used. It will correspond to activities not
directly linked to the production of a specific document. This code should be used when the
engineering progress monitoring system is based on the Master Document Register."

Code Description

BD BLOCK DIAGRAM
DT DETAIL DRAWING
GA GENERAL ARRANGEMENT
IS ISOMETRIC, SPOOLING DRWG
LD LOOP DIAGRAM
LN LOGIC NETWORK, LOGIC DIAGRAM
LY LAYOUT
MB HEAT AND MASS BALANCE
NP NAME PLATE/SIGN/ENGRAVING
PF PROCESS (AND UTILITY) FLOW DIAGRAM
PI PIPING AND INSTRUMENT DIAGRAM
PP PLOT PLAN
SD STANDARDS DRAWING
SL SINGLE LINE DIAGRAM
SM SCHEMATIC DIAGRAM
WD WIRING DIAGRAM

2 of 2 Appendix 4
DOL-0000-GSP-00001 REV A15

APPENDIX 5

Authorised Space for Licensor’s Title Block


(Include Subcontractor if any)
25 mm deep

1 of 1 Appendix 5
DOL-0000-GSP-00001 REV A15

APPENDIX 6

Insert
Contractor’s
logo here

Document No. (Refer section 6.2)

Area: (Refer Appendix 1)

Discipline: (Refer Appendix 3)

Document Type:(Refer Appendix 4)

Commitment Number:(Dolphin Energy Ltd Commitment Number)

Title

THIS IS THE MASTER COVERSHEET


TO BE USED FOR
ALL PROJECT TECHNICAL DOCUMENTS
(Always Page One)

Rev. Issue Purpose/Description of Revision Prepared Reviewed Approved Company


Date

(Name) (Name) (Name) (Name)


(Signature) (Signature) (Signature) (Signature)

© This document is the property of Dolphin Energy Ltd. No part of this document may be reproduced or transmitted in any form or by any
means, or used for any purpose other than that which it is specifically furnished without the written consent of Dolphin Energy Ltd.

1 of 1 Appendix 6
DOL-0000-GSP-00001 REV A15

APPENDIX 7

BLOCK NUMBER ALLOCATIONS

BLOCK ALLOCATED TO: CONTRACT No.

00000-09999 UPSTREAM & COMPRESSION UCE01-01


10000-14999 MIDSTREAM MCE01-01
15000-15499 SURVEY INCLUDING ENVIRONMENTAL SURVEY MCE02-01
16000-17999 DOWNSTREAM PIPELINES DCE01-01
18000-18199 OFFSHORE VALUE ENGINEERING

1 of 1 Appendix 8
DOL-0000-GSP-00001 REV A15

APPENDIX 8 - GEOSCIENCE
GEOSCIENCE AND OFFSHORE WELL NUMBERING

NOTE : THIS APPENDIX REFERS SPECIFICALLY TO THE GEOSCIENCE TECHNICAL DOCUMENT CODING. THIS
CODING IS IN COMPLIANCE WITH THIS OVERALL SPECIFICATION . FOR CONVENIENCE A BRIEF EXPLANATION OF
THIS CODING IS PROVIDED IN THIS APPENDIX. THE OVERALL DOCUMENT HAS BEEN UPDATED TO INCLUDE THE
VARIOUS DISCIPLINES ADDED VIA THIS APPENDIX.

TECHNICAL DOCUMENT CODING FOR GEOSCIENCE :

TYPICAL EXAMPLE :

NFR-0000-XSY-GP-SEISA-0000

AREA (APPENDIX 1) UNIQUE DOCUMENT NUMBER

GEO-SCIENCE DISCIPLINE AND SUB TOPIC


LOCATION (APPENDIX 2)

DISCIPLINE (APPENDIX 3) DOCUMENT TYPE (APPENDIX 4)

THIS IS CONSISTENT WITH THE PROJECT TEAM TECHNICAL DOCUMENT NUMBERING SPECIFICATION THROUGH –
XSY-, WITH THE GP-SEISA-0000 APPENDIX SPECIFIC TO GEO-SCIENCE.

DISCIPLINE AND SUB TOPIC CODES

GEOPHYSICS (GP)
• GEN: GENERAL
• SEISD: SEISMIC DATA
• SEISA: SEISMIC ACQUISITION
• SEISP: SEISMIC PROCESSING
• INV: SEISMIC INVERSION
• STRU: STRUCTURAL INTERPRETATION AND MAPPING
• OVB: OVERBURDEN (SHALLOW DRILLING HAZARDS, ETC.)
GEOLOGY (GE)
• GEN: GENERAL
• 3MOD: 3D GEOLOGIC MODEL
• PROG: WELL PROGNOSES & FINAL WELL REPORTS
• SEDIM: SEDIMENTOLOGY
• STRU: STRUCTURAL
• DIAG: DIAGENESIS
RESERVOIR ENGINEERING (RE)
• GEN: GENERAL
• SIM: RESERVOIR SIMULATION
• PVT: PVT AND EQUATION OF STATE
• WTR: WELL TEST REPORTS AND ANALYSIS
• RP: RELATIVE PERMEABILITY

1 of 1 Appendix 8
DOL-0000-GSP-00001 REV A15

• RM: RESERVOIR MECHANISMS


• INFLW: INFLOW PERFORMANCE, TUBING CURVES, ETC.
PETROPHYSICS (PE)
• LOGM: LOG MODEL
• LOGA: LOG ANALYSIS
• COR: CORE ANALYSIS AND CORE STUDIES
• CAP: CAPILLARY PRESSURE MEASUREMENTS AND ANALYSIS

FIELD DEVELOPMENT (FD)


• COMP: WELL COMPLETION PLANS (PERF & STIM)
• RM: RESERVOIR MANAGEMENT AND SURVEILLANCE
• PRA: PRODUCTION ALLOCATION SYSTEM
• DEVW: DEVELOPMENT WELLS
• DATW: DATA WELLS, PRE-DEVELOPMENT WELLS, APPRAISAL WELLS
• MDR: MULTI DISCIPLINE REPORT

ARCHIVE REPORTS (AR)

DOCUMENT TYPES

Code Description
CA CALCULATION
DB DATA BOOK
DS DATASHEET
GL GUIDELINE
IQ INQUIRY PACKAGE
MA MANUAL
MR MATERIAL REQUISITION
MT MATERIAL TAKE OFF'S
PG PROGRAMME/PLAN (Schemes ETC)
PR PROCEDURE
PY PHILOSOPHY / DESIGN BRIEF
RP REPORT
SC SCHEDULE (indexes/lists etc.)
SP SPECIFICATION
SQ SUBCONTRACTS
ST STANDARD DOCUMENT
SY STUDY
TB TECHNICAL BID EVALUATION

WELL NUMBERING

WFLD-----Field Wide Report or Study related to Subsurface


W001------NFD-1B
W002------NFD-2A, NFD2-01

1 of 1 Appendix 8
DOL-0000-GSP-00001 REV A15

W003------NFD1-01
W004------NFD1-02
W005------NFD1-03
W006------NFD1-04
W007------NFD1-05
W008------NFD1-06
W009------NFD1-07
W010------NFD1-08
W011------NFD1-09
W012------NFD1-10
W013------NFD1-11
W014------NFD1-12
W015------NFD2-01
W016------NFD2-02
W017------NFD2-03
W018------NFD2-04
W019------NFD2-05
W020------NFD2-06
W021------NFD2-07
W022------NFD2-08
W023------NFD2-09
W024------NFD2-10
W025------NFD2-11
W026------NFD2-12
W027
W028
--
--
---
---
---
W100------NFB-1
W101-----NFB-2
W102-----NFB-3
W103-----NFB-4
W104-----NFB-6
W105-----NFB-7
W106-----NFB-8
W107-----NFB-9
W108-----NFB-10
W109-----NFB-11
W110-----NFB-12
W111-----NFB-15A
W112-----NFB-15B
W113-----NFB-16
W114-----NFB-17
W114-----NFB-18
W115-----NFB-19
W116-----NFB-20A
W117-----NFB-23
W118-----NFB-26
W119-----NFB-30
W120-----NFA-1
W121-----NFA-2A

1 of 1 Appendix 8
DOL-0000-GSP-00001 REV A15

W122-----NFA-3
W123-----NFA-4A
W124-----NFA-6A
W125-----NFA-7A
W126-----NFA-8
W127-----NFA-9
W128-----NFA-10
W129-----NFA-11
W130-----NFA-12
W131-----NFA-13
W132-----NFA-15
W133-----NFA-16
W134-----NF-1
W135-----NWD-1
W136-----NWD-2
W137-----NWD-3
W138-----NWD-4
W139-----NWD-5
W140-----NWD-6
W141-----QMB-1
W142-----QMD-1A
W143-----QME-1
W144-----RQ-1
W145-----RUH-1
W146-----UG-1
W147-----UISE-1
W148-----PB-2
W149-----MK-2
W150-----NHA-3A

1 of 1 Appendix 8