Checlists TAG-NO-010 9
y
2 Ensure insulation ITR is completed and signed off
r
va
3 Check wall, ceiling panels and access hatches complete
ay
4 Check flooring is complete
5 Check hand rails are installed and secured properly tm
6 Check outfitting is complete
in
9 Check fire, smoke and heat detection equipment/fittings are installed, undamaged and as per layout
he
14 Check fire walls, ceiling and fire doors are the correct fire rating
m
15 Check temporary protection for all vulnerable items has been provided
sa
SIGNATURE