0% found this document useful (0 votes)
36 views178 pages

Architecture Practice Guide

Uploaded by

gailstroam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views178 pages

Architecture Practice Guide

Uploaded by

gailstroam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 178

PROFESSIONAL

PRACTICE
ARPROPR2 : ADMINISTERING THE REGULAR
SERVICES OF THE ARCHITECT)

Ar.Gerald Adane,uap,pia,rmp
PROFESSIONAL PRACTICE

02.
PROFESSIONAL PRACTICE

PROFESSIONAL PRACTICE 3
GLOBAL PRACTICE FOR THE 21ST
CENTURY

PROFESSIONAL PRACTICE 2
ADMINISTERING THE REGULAR
SERVICES OF THE ARCHITECT

PROFESSIONAL PRACTICE 1
(LAWS AFFECTING THE PRACTICE
OF ARCHITECTURE)

ARCHITECTURAL PRACTICE

10.
PROFESSIONAL PRACTICE

COURSE DESCRIPTION
Architecture as a Profession, Ethical Norms
and Office Procedures. The course is
designed to provide the students with
the basic understanding of the practice
of architecture pertaining to the basic
services the architect renders within the
context of professionalism, ethical conduct
and quality service delivery

06.
PROFESSIONAL PRACTICE

COURSE OBJECTIVES
• Define the role of ethics and professionalism in the
practice of architecture

• Delineate the part played by the profession in the


building industry in particular and society in general

• Describe and explain the phases of implementing


the basic services of the architect

• Understand the need for effective organization,


management and operation in delivering the
architect’s services

06.
ASSESSMENT

10% 30%

ATTENDANCE QUIZZES

10% 50%

PARTICIPATION TERM EXAMINATION

FINAL GRADE = MIDTERM (40%) + FINAL (60%)


07.
STANDARDS OF
PROFESSIONAL
PRACTICE
SPP DOCUMENTS “ANNEX A”
ANNEX “A”

GENERAL DEFINITIONS
Promulgated as Part of the IRR of R.A. No. 9266, known as “The
Architecture Act of 2004” and to be known hereinafter as the SPP
Documents (replacing the 1979 UAP Docs. 201 through 209)

06.
ANNEX “A”
GENERAL DEFINITIONS
• State shall refer solely to the National Government of the Republic of the Philippines.
• Standards of Professional Practice (SPP) is a required document under Sec. 41 of R.A. No.
9266 (The Architecture Act of 2004) and its Implementing Rules and Regulations (IRR).
• Commission as used for this SPP and the succeeding SPP documents shall refer only to the
Professional Regulation Commission (PRC), duly created under R.A. No. 8981 (The PRC
Modernization Act of 2000).
• Board as used for this SPP and the succeeding SPP documents shall refer only to the Professional
Regulatory Board of Architecture (PRBoA), duly created under R.A. No. 9266 and its IRR and under
the supervision and administrative control of the Commission.
• Architect as used for this SPP and the succeeding SPP documents shall refer only to a Registered
and Licensed Architect (RLA), a natural person under Philippine law and jurisprudence with a valid
certificate of registration and a valid professional identification card (representing the renewable
3-year license) for the lawful practice of the State-regulated profession of Architecture. Depending
on the SPP, the term Architect may also refer to Architect?of-record (Aor), Architect in charge of
construction (Aicc), Consulting Architect (CA) as provided for under R.A. No. 9266. 06.
ANNEX “A”
GENERAL DEFINITIONS
• Architectural Firm (AF) as used for this SPP and the succeeding SPP documents shall refer only
to a juridical person under Philippine law and jurisprudence, duly registered with the Department
of Trade and Industry (DTI) as a sole proprietorship for individual architectural practice or
registered with the Securities and Exchange Commission (SEC) and with the Professional
Regulation Commission (the PRC or hereafter the Commission) as a professional partnership or as
an architectural corporation for group architectural practice by RLAs, subject to full compliances
with Sec. 37 of R.A. No. 9266 and derivative regulations
• Architect and Architectural Firm (AF) may be used interchangeably for some of the
succeeding SPP.
• Professional/s as used for this SPP and the succeeding SPP documents shall refer only to
Registered and Licensed Professionals (RLPs), all natural persons under Philippine law and
jurisprudence with a valid certificate and a valid professional identification card (representing the
renewable license) for the lawful practice of a State-regulated profession other than Architecture.

06.
ANNEX “A”
GENERAL DEFINITIONS
• Client, Owner and Project Proponent may be used interchangeably for this SPP and some of
the succeeding SPP.
• Contractor and General Contractor shall also mean Constructor or Builder, and may be used
interchangeably for this SPP.
• Bid and Tender shall mean the same.

06.
ANNEX “A”
ACRONYMS
• ADR - Alternative Dispute Resolution
• AF - Architectural Firm
• ADC - Architectural Design Competition
• Aicc - Architect in charge of construction
• Aor - Architect-of-record
• BPO - Business Process Outsourcing
• CA - Consulting Architect
• CEC - Codes of Ethical Conduct
• DoLE - Department of Labor and Employment
• DTI - Department of Trade and Industry
• FPCA - Filipino Professional Consulting Architects
• IAPOA - Integrated and Accredited Professional Organization of Architects
• KPO - Knowledge Process Outsourcing
• MoP - Manual of Procedure
06.
ANNEX “A”
ACRONYMS
• PACS - Professional Architectural Consulting Services
• PCA - Professional Consulting Architect
• PRC - Professional Regulation Commission
• PRBoA - Professional Regulatory Board of Architecture
• SEC - Securities and Exchange Commission
• RLA - Registered and Licensed Architect
• SPP - Standards of Professional Practice
• TSP - Temporary/ Special Permit

06.
ANNEX “A”
GENERAL NOTES ON THE SELECTION OF THE ARCHITECT

METHODS OF SELECTION
• Direct Selection is used when undertaking a relatively small project. The Client selects
his Architect on the basis of:
• Reputation
• Personal or business acquaintance or recommendation of a friend
• Recommendation of the Architect’s former Client
• Recommendation of another Architect.

06.
ANNEX “A”
GENERAL NOTES ON THE SELECTION OF THE ARCHITECT

METHODS OF SELECTION
• Comparative Selection may be conducted by committees representing institutions,
corporations or public agencies. The selection process involves:
⚬ Invitation. The Client issues an invitation which includes the Terms of Reference
(ToR) for the project which is based on the Design Brief prepared by another
Architect. The selection committee established by the Client may consist of
representatives from other State-regulated professions and/or the construction
industry, as well as persons with related expertise.

06.
ANNEX “A”
GENERAL NOTES ON THE SELECTION OF THE ARCHITECT

METHODS OF SELECTION
• Comparative Selection may be conducted by committees representing institutions,
corporations or public agencies. The selection process involves:
⚬ Pre-qualification. Architects and/or PRC-registered Architectural Firms (AFs)
submit information regarding their qualification and expertise.
⚬ Interview. The Architect explains his methodology in translating the plan/design
requirements of the proposed project.
⚬ Verification. The selection committee may visit buildings designed by the
Architects and check references such as former clients and financial institutions.

06.
ANNEX “A”
GENERAL NOTES ON THE SELECTION OF THE ARCHITECT

METHODS OF SELECTION
• An Architectural Design Competition (ADC) is used for civic or monumental projects.
The competition may either be an idea competition, design or design build
competition. Various Architects or architectural firms (AFs) submit plan/design
solutions to a particular design problem and are judged on the basis of comparative
excellence.
⚬ Advantages
■ Opportunities will be open only to all PRC-registered and licensed Architects
(RLAs) or PRC-registered Architectural Firms (AFs).
■ The Client/ Committee will have a wider range of options

06.
ANNEX “A”
GENERAL NOTES ON THE SELECTION OF THE ARCHITECT
METHODS OF SELECTION
• An Architectural Design Competition (ADC) is used for civic or monumental projects.
The competition may either be an idea competition, design or design build
competition. Various Architects or architectural firms (AFs) submit plan/design
solutions to a particular design problem and are judged on the basis of comparative
excellence.
⚬ Disadvantages
■ Process may be expensive and time consuming
■ The time and effort required may discourage qualified firms from participating.
■ Some potentially unscrupulous prospective Clients will seek free services under the guise
of design competition. Architects must always be constantly aware that ownership and
copyright issues under Secs. 20 (4) and 33 of R.A. No. 9266 must be fully addressed under
all architectural competition rules.
06.
ANNEX “A”
GENERAL NOTES ON THE SELECTION OF THE ARCHITECT
METHODS OF SELECTION
• An Architectural Design Competition (ADC) is used for civic or monumental projects.
The competition may either be an idea competition, design or design build
competition. Various Architects or architectural firms (AFs) submit plan/design
solutions to a particular design problem and are judged on the basis of comparative
excellence.
⚬ Procedure. Competitions should be conducted:
■ With the assistance of the integrated and accredited professional organization of
architects (IAPOA) or one of its local chapters, and
■ In accordance with the Architect’s Guidelines.

06.
ANNEX “A”
GENERAL NOTES ON THE SELECTION OF THE ARCHITECT
METHODS OF SELECTION
• An Architectural Design Competition (ADC) is used for civic or monumental projects. The
competition may either be an idea competition, design or design build competition. Various
Architects or architectural firms (AFs) submit plan/design solutions to a particular design
problem and are judged on the basis of comparative excellence.
■ Participants
• Sponsor or Client – a natural or juridical person;
• Competitors – Filipino/ Philippine-Registered and Licensed Architects (RLA) and IAPOA
members in good standing. A foreign architect as a competitor must be registered in
his/her country of origin and must secure a Temporary Special Permit (TSP) from the
Commission (PRC), a work permit form the Department of Labor and Employment
(DoLE) and must work in collaboration with a local/Filipino counterpart RLA who will
assume the requisite professional responsibilities and civil liabilities, in the case of a
design or design-build competition;
06.
ANNEX “A”
GENERAL NOTES ON THE SELECTION OF THE ARCHITECT
METHODS OF SELECTION
• An Architectural Design Competition (ADC) is used for civic or monumental projects. The
competition may either be an idea competition, design or design build competition. Various
Architects or architectural firms (AFs) submit plan/design solutions to a particular design
problem and are judged on the basis of comparative excellence.
■ Participants
• Professional Adviser – Philippine-Registered and Licensed Architects (RLAs) who are
IAPOA members in good standing;
• Jury – Composed of at least five (5) members who are known for their integrity,
objectivity, impartiality and honesty.

06.
TO BE CONTINUED.....
SPP DOCUMENTS 201
SPP DOCUMENTS 201
• INTRODUCTION

• SCOPE OF PRE-DESIGN SERVICES

• MANNER OF PROVIDING SERVICES

• METHOD OF COMPENSATION
• INTRODUCTION

• SCOPE OF PRE-DESIGN SERVICES

• MANNER OF PROVIDING SERVICES

• METHOD OF COMPENSATION
INTRODUCTION


INTRODUCTION

SCOPE OF PRE-DESIGN SERVICES

MANNER OF PROVIDING SERVICES

METHOD OF COMPENSATION
SCOPE OF PRE-DESIGN SERVICES

SCOPE OF PRE-DESIGN SERVICES

SCOPE OF PRE-DESIGN SERVICES
CONSULTATION

SCOPE OF PRE-DESIGN SERVICES
PRE-FEASIBILITY STUDIES

SCOPE OF PRE-DESIGN SERVICES
FEASIBILITY STUDIES

SCOPE OF PRE-DESIGN SERVICES

SITE SELECTION AND ANALYSIS



SCOPE OF PRE-DESIGN SERVICES

SITE UTILIZATION AND LAND-USE


STUDIES

SCOPE OF PRE-DESIGN SERVICES

ARCHITECTURAL RESEARCH

SCOPE OF PRE-DESIGN SERVICES
ARCHITECTURAL
PROGRAMMING

SCOPE OF PRE-DESIGN SERVICES

SPACE PLANNING

SCOPE OF PRE-DESIGN SERVICES

SPACE MANAGEMENT
STUDIES

SCOPE OF PRE-DESIGN SERVICES

VALUE MANAGEMENT

SCOPE OF PRE-DESIGN SERVICES
DESIGN BRIEF
PREPARATION

SCOPE OF PRE-DESIGN SERVICES
PROMOTIONAL SERVICES

INTRODUCTION

SCOPE OF PRE-DESIGN SERVICES

MANNER OF PROVIDING SERVICES

METHOD OF COMPENSATION
MANNER OF PROVIDING SERVICES
• PROMOTIONAL SERVICES
• MANNER OF PAYMENT
• OWNER’S RESPONSIBILITIES
• OTHER CONDITIONS OF SERVICES
MANNER OF PROVIDING SERVICES



INTRODUCTION

SCOPE OF PRE-DESIGN SERVICES

MANNER OF PROVIDING SERVICES

METHOD OF COMPENSATION
METHOD OF COMPENSATION






METHOD OF COMPENSATION


METHOD OF COMPENSATION
METHOD OF COMPENSATION


METHOD OF COMPENSATION


METHOD OF COMPENSATION




METHOD OF COMPENSATION

SPP DOCUMENTS 202
• INTRODUCTION

• SCOPE OF REGULAR DESIGN SERVICES

• MANNER OF PROVIDING SERVICES

• METHOD OF COMPENSATION
• INTRODUCTION

• SCOPE OF PRE-DESIGN SERVICES

• MANNER OF PROVIDING SERVICES

• METHOD OF COMPENSATION
INTRODUCTION
• The Architect’s outputs described / listed under this SPP may be
expanded or increased depending on the requirements of the project
or the Architect’s experience, capabilities and specialization/s.
INTRODUCTION
• In regular practice, the Architect acts as the Owner’s/ Client's/
Proponent’s Adviser and/or Representative. He translates the Owner's
needs and requirements to spaces and forms in the best manner of
professional service.
INTRODUCTION

SCOPE OF PRE-DESIGN SERVICES

MANNER OF PROVIDING SERVICES

METHOD OF COMPENSATION
SCOPE OF PRE-DESIGN SERVICES
• PROJECT DEFINITION PHASE :
• This phase involves the definition of the requirements of the project
by the Owner. The Architect in turn informs the Owner of the
technical requirements of the project and the concomitant
professional fees. In this phase, the Architect:
• Gathers relevant information and data leading to the definition of
the requirements of the project, including the scope of the
Architect’s services
• Prepares an initial statement of probable construction cost.
DESIGN MO

BUDGET NI CLIENT
SCOPE OF PRE-DESIGN SERVICES
• SCHEMATIC DESIGN PHASE :
• This phase consists of the preparation of schematic design studies
derived from the Project Definition Phase, leading to conceptual
plans. The Architect:
• Prepares the initial line drawings representing design studies
leading to a recommended solution, including a general
description of the project for approval by the Owner.
• Submits to the Owner a Statement of the Probable Project
Construction Cost (SPPCC) based on current cost parameters.
AWIT SAYO!

DAMING
REVISIONS!

AFTER MEETING
BUDGET

ELECTRICAL
ARCHITECTURAL
STRUCTURAL
MECHANICAL

PLUMBING
SCOPE OF PRE-DESIGN SERVICES
• DESIGN DEVELOPMENT PHASE :
• Based on approved schematics and conceptual plans, the Architect
prepares:
• The Design Development documents consisting of plans,
elevations, sections and other drawings,
• Outline specifications to fix and illustrate the size and character of
the entire project as to type of materials, type of structural,
electrical, mechanical, sanitary, electronic and communications
systems.
SCOPE OF PRE-DESIGN SERVICES
• CONTRACT DOCUMENT PHASE :
• Based on the approved Design Development Documents, the
Architect:
• Prepares the complete Contract Documents consisting of detailed
designs and construction drawings, setting forth in detail the work
required for the architectural, structural, electrical, plumbing/
sanitary, mechanical, electronic and communication works
prepared by the Architect and the respective professionals
involved.
• Submits to the Owner seven (7) sets of all construction drawings
and technical specifications for purposes of obtaining a building
permit.
SCOPE OF PRE-DESIGN SERVICES
• CONTRACT DOCUMENT PHASE :
• In this phase, the Architect:
• Prepares the Bid Documents such as forms for contract letting,
documents for construction, forms for invitation and instruction to
bidders, forms for bidders’ proposals, general / specific conditions
of contract, etc.
• Assists the Owner from the early stage of establishing a list of
prospective Contractors to awarding of the construction contract.
Nasan na daw
Ready ba kayo tayo sabi ni fore!
Bale tayo maya! Malaki daw
bubuhusan!

Kaya na to!
Tumalab na yung
Cobra
SCOPE OF PRE-DESIGN SERVICES
• CONSTRUCTION PHASE :
• In this phase, the Architect performs the following:
• Makes decisions on all claims of the Owner and Contractors on all
matters relating to the execution and progress of work or the
interpretation of the Contract Documents.
• Prepares change orders, gathers and turns over to the Owner
written guarantees required of the Contractor and Sub-
Contractors.
INTRODUCTION

SCOPE OF PRE-DESIGN SERVICES

MANNER OF PROVIDING SERVICES

METHOD OF COMPENSATION
MANNER OF PROVIDING SERVICES
• There are two ways by which the Architect may enter into
contract with the Owner as the Lead Professional working
with other professionals in the engineering and allied
professions :
• with a single contract between the Architect and Owner,
and sub-consultancy contracts between the Architect and
the other professionals working with the Architect.
• with the Architect and the engineering and allied
professionals executing separate contracts with the
Owner.
MANNER OF PROVIDING SERVICES
• In both cases, the professional responsibilities and civil
liabilities of each State-regulated professional remains
separate. The Architect does not assume any of the
responsibilities and liabilities of the other professionals (RLPs).
INTRODUCTION

SCOPE OF PRE-DESIGN SERVICES

MANNER OF PROVIDING SERVICES

PROJECT CLASSIFICATION
PROJECT CLASSIFICATION
• GROUP 1
PROJECT CLASSIFICATION
• GROUP 2
PROJECT CLASSIFICATION
• GROUP 3
PROJECT CLASSIFICATION
• GROUP 4
PROJECT CLASSIFICATION
• GROUP 5
PROJECT CLASSIFICATION
• GROUP 6
PROJECT CLASSIFICATION
• GROUP 7
PROJECT CLASSIFICATION
• GROUP 8
PROJECT CLASSIFICATION
• GROUP 9
PROJECT CLASSIFICATION
• GROUP 10
METHOD OF COMPENSATION
• PERCENTAGE OF CONSTRUCTION COST:
⚬ The Architect’s Fee based on the PPC shall be detailed in the Architect’s
Guidelines.
METHOD OF COMPENSATION


METHOD OF COMPENSATION
METHOD OF COMPENSATION


METHOD OF COMPENSATION


METHOD OF COMPENSATION




METHOD OF COMPENSATION

INTRODUCTION

SCOPE OF PRE-DESIGN SERVICES

MANNER OF PROVIDING SERVICES

OWNER’S RESPONSIBILITIES
OWNER’S RESPONSIBILITIES
• Provide full information as to his requirements for the Project.

• Promptly examine and render decisions pertaining to documents


submitted by the Architect to avoid unreasonable delay in the progress of
the Architect’s work. The Owner should issue orders to the General
Contractor only through the Architect.

• Promptly pay for architectural and all other engineering and allied services
required for the project.

• If the Owner observes or otherwise becomes aware of anything that may


impair the successful implementation of the project, he shall give prompt
written notice to the Architect.
INTRODUCTION

SCOPE OF PRE-DESIGN SERVICES

MANNER OF PROVIDING SERVICES

OTHER CONDITIONS ON SERVICES


CONDITIONS FOR THE ARCHITECT’S FEE

OTHER SERVICES

PER DIEM AND TRAVELING EXPENSES

EXTRA SETS OF CONTRACT DOCUMENTS

CHANGE/S ORDERED BY THE OWNER

WORK SUSPENDED OR ABANDONED


DIFFERENT PERIODS OF CONSTRUCTION

SERVICES OF SPECIALIST CONSULTANTS

SEPARATE SERVICE

FULL TIME CONSTRUCTION SUPERVISION

ESTIMATES

GOVERNMENT TAXES AND SERVICES

OWNERSHIP OF DOCUMENTS

COST RECORDS

DESIGN AND PLACEMENT OF SIGNS

PROJECT CONSTRUCTION COST


PROJECT DEVELOPMENT COST

SPP DOCUMENTS 203
INTRODUCTION


INTRODUCTION


INTRODUCTION











INTRODUCTION












SPP DOCUMENTS 204a
• INTRODUCTION

• SCOPE OF REGULAR DESIGN SERVICES

• MANNER OF PROVIDING SERVICES

• METHOD OF COMPENSATION
• INTRODUCTION

• SCOPE OF PRE-DESIGN SERVICES

• MANNER OF PROVIDING SERVICES

• METHOD OF COMPENSATION
INTRODUCTION
• For the past 50 years, four principal members were involved in the design and
building construction process:
• The Owner who orders for the implementation of a project;
• The Architect and his Specialist Consultants (SCs) who render plan / design
services and limited inspection work;
• The Contractor who performs the construction work;
• The individual or group of individuals who assist in the supervision and
delivery of the work.
INTRODUCTION
• The Architect-in-charge of construction (Aicc) is directly and professionally
responsible and liable for the construction supervision of the project.

• The Construction Supervision Group (CSG) is normally recommended by the


Architect based on their performance, and hired by the Owner. They are
answerable to both the Owner and Architect.
INTRODUCTION

SCOPE OF PRE-DESIGN SERVICES

MANNER OF PROVIDING SERVICES

METHOD OF COMPENSATION
SCOPE OF FULL TIME SUPERVISION SERVICES
✓ Quality Control
✓ Evaluation of Construction Work
✓ Preparation of Daily Inspection Reports
✓ Filing of documents

The detailed tasks shall be as specified under the Architect’s Guidelines.


INTRODUCTION

SCOPE OF PRE-DESIGN SERVICES

MANNER OF PROVIDING SERVICES

METHOD OF COMPENSATION
MANNER OF PROVIDING SERVICES
• Working in a dual capacity as Architect-of-record and as
Consulting Architect for fulltime supervision services or as the
Construction Supervision Group (CSG). As the Architect-of-record
(Aor) of the project, the Aor is in a better position to interpret his
drawings and documents and to assure conformity by the
Contractor. He can assign his staff to undertake the fulltime
supervisory work to perform the works as enumerated in the
Architect’s Guidelines.

• Working as Consulting Architect for fulltime supervision services


only or as the CSG.
INTRODUCTION

SCOPE OF PRE-DESIGN SERVICES

METHOD OF COMPENSATION

METHOD OF COMPENSATION
METHOD OF COMPENSATION
• The Architect’s compensation is based on the Architect’s / architectural firm’s
talents, skill, experience, imagination, and on the type and level of
professional services provided. Compensation for Regular Design Services
may be based on one or more of the following:
• Percentage (%) of Project Construction Cost (PCC)
• Multiple of Direct Personnel Expenses
• Professional Fee Plus Expenses
• Lump Sum or Fixed Fee
• Per Diem, Honorarium Plus Reimbursable Expenses
• Mixed Methods of Compensation
METHOD OF COMPENSATION
• PERCENTAGE OF CONSTRUCTION COST:
⚬ The Architect’s Fee based on the PPC shall be detailed in the Architect’s
Guidelines.
METHOD OF COMPENSATION


METHOD OF COMPENSATION
METHOD OF COMPENSATION


METHOD OF COMPENSATION


METHOD OF COMPENSATION




METHOD OF COMPENSATION

INTRODUCTION

SCOPE OF PRE-DESIGN SERVICES

LIMITATION OF AUTHORITY

METHOD OF COMPENSATION
LIMITATION OF AUTHORITY
• The Construction Supervision Group (CSG), which may be a qualified architectural
firm, or which the Architect is only part of, shall not assume the responsibility of the
Contractor’s project superintendent.

• The CSG shall not make decisions on matters that are the sole responsibility of
the Architect-of-record (Aor).
INTRODUCTION

SCOPE OF PRE-DESIGN SERVICES

QUALIFICATIONS

METHOD OF COMPENSATION
QUALIFICATIONS
➢ Inspectors of the Construction Supervision Group (CSG) must have the ff:
▪ 7.1 A Bachelor of Science in Architecture (B.S. Arch.) degree
▪ 7.2 Extensive experience in design and building construction and must be very
knowledgeable in building materials and construction detailing
SPP DOCUMENTS 204b
• INTRODUCTION
• FUNCTIONS AND DESCRIPTIONS OF
TASK
• LIMITATION OF AUTHORITY
• LEGAL RESPONSIBILITY
• QUALIFICATIONS
• METHOD OF COMPENSATION
INTRODUCTION
• Due to the increasing complexity of construction projects, there is an upward
demand for more effective cost control and faster project implementation consistent
with high quality of work. Construction Management Services were thus instituted to
fill this need in the construction industry.
• The Construction Manager (CM) could either be:
❑ a member of the staff of the Owner,
❑ an independent individual, or
❑ a firm hired by the Owner to manage the construction of a particular project.
• The Architect can serve as the Construction Manager (CM). His training in the
coordination of various specialties allows him to supervise and assure proper
monitoring of all construction activities with regards to quality, workmanship and
cost.
• FUNCTIONS AND DESCRIPTIONS OF
TASK
FUNCTIONS AND DESCRIPTIONS
• The responsibilities of the Construction Manager (CM) include the functions
of the Construction Supervision Group (CSG). (reference Doc. 204-A and
Architect’s Guidelines)
❑ Coordination and Supervision
❑ Cost and Time Control
❑ Quality Control of Work and
❑ Keeping of Records
• The Construction Manager (CM) may hire the CSG to be under his employ
or may supervise the CSG hired directly by the Owner.
• LIMITATION OF AUTHORITY
LIMITATION OF AUTHORITY
• The Architect as the Construction Manager shall not:
• Involve himself directly with the work of the Contractor such that it may be
constructed that he is assuming the Contractor’s liability as provided for in
Article 1723, etc. of the Civil Code.
• Impose methods, systems or designs that will substantially affect the
construction schedule and impair the design concept of the Architect.
• LEGAL RESPONSIBILITY
LEGAL RESPONSIBILITY
• The Architect as the Construction Manager (CM) is directly responsible to the
Owner on all aspects of the construction work: programming, coordination,
quality and cost control and time management.

• The CM assumes no liability in case equipment fail to function or if a portion of


the building collapses:
▪ due to deficiencies in the plan / design, provided the CM did not participate
in the plan / design review and approval, or
▪ due to the deficiencies in the manner of construction, provided the CM
faithfully discharged his function/s during the construction / project
implementation.
• QUALIFICATIONS
QUALIFICATIONS
• The Construction Manager may be an individual or a firm.
• The individual or the principal of the firm must be a State-regulated
professional, preferably an Architect with managerial capabilities and
extensive experience in the field of construction. The Architect must be a
Registered and Licensed Architects (RLA), with an updated professional
identification card and must be a member in good standing of the Integrated
and Accredited Professional Organization of Architects (IAPOA).
• Architects who are Contractors or who have already been in responsible
charge of construction works are usually capable of becoming Construction
Managers (CMs).
• METHOD OF COMPENSATION
METHOD OF COMPENSATION
• Since construction management is not part of the regular services of the
Architect, the services rendered by the Architect as a Construction Manager
(CM) shall be separately compensated.
SPP DOCUMENTS 205
“POST CONSTRUCTION SERVICES”

Ar.Gerald Adane,uap,pia,rmp
“POST CONSTRUCTION SERVICES”
• INTRODUCTION

• SCOPE OF REGULAR DESIGN SERVICES

• MANNER OF PROVIDING SERVICES

• METHOD OF COMPENSATION
“REGULAR DESIGN SERVICES”
• INTRODUCTION

• SCOPE OF PRE-DESIGN SERVICES

• MANNER OF PROVIDING SERVICES

• METHOD OF COMPENSATION
INTRODUCTION
• Building administration and management goes beyond maintenance and
upkeep functions. It requires the services of a multi-disciplinary professional
who can perform a wide range or functions for the efficient and economical
operation and maintenance of a building, facility or a complex.

• The Architect may be engaged as the Building Administrator and/or Property


Manager of a commercial, industrial, residential or institutional building, facility
or complex to maximize the lifespan of the building/s in order to produce the
maximum economic return.
“POST CONSTRUCTION SERVICES”
INTRODUCTION

SCOPE OF PRE-DESIGN SERVICES

MANNER OF PROVIDING SERVICES

METHOD OF COMPENSATION
BUILDING AND FACILITIES ADMINISTRATION
Building Maintenance. The Architect shall:
a) see to it that the building and all the parts thereof (structure, plumbing,
electrical, partitions, finishes, etc.) are all in good condition.
b) formulate and enforce rules for the proper use of the building and
facility, particularly in the common areas and the emergency/ egress/
exit areas.
c) monitor security services, and
d) monitor maintenance and upkeep services (cleanliness of corridors,
lobbies, stairs and other common areas, exits, parking areas, garbage
collection)
BUILDING AND FACILITIES ADMINISTRATION
Grounds and Landscaping Supervision. The Architect shall:
a) supervise landscape contractors and gardeners for the proper
watering, pruning, trimming and maintenance of the landscape (both
hardscapes and softscapes);
b) maintain orderly entrances, exits and parking areas; and
c) maintain streets i.e. road rights-of–way (RROWs), walkways, and
ramps.
BUILDING AND FACILITIES ADMINISTRATION
Building Equipment Maintenance. The Architect shall:
a) assist the proper third parties in seeing to it that all equipment (air-
conditioning, sprinkler system, generators, transformers,
telecommunications equipment, etc.) are properly maintained and in
good working condition
BUILDING AND FACILITIES ADMINISTRATION
Business Development and Management. The Architect shall:
a) innovate schemes to attain maximum building occupancy
b) bill the tenants for rentals and utilities (electricity, water, telephone,
cable, gas and other/ related dues)
POST CONSTRUCTION EVALUATION
Upon the request of the Owner, the Architect shall:
a) evaluate the initial design program vs. the actual use of the facility;
b) determine the effectiveness of the various building systems and the
materials systems in use;
c) assist the proper third parties in evaluating the functional effectiveness
of the design and construction process undertaken, and
d) study, research, and give solutions to any discovered/ emerging/
evolving defects and failures such as shrinkage, water seepage and
other problems in the building. This is referred to as “forensic
investigation” of the building’s systems (Reference Doc 203).
“POST CONSTRUCTION SERVICES”
INTRODUCTION

SCOPE OF PRE-DESIGN SERVICES

MANNER OF PROVIDING SERVICES

METHOD OF COMPENSATION
MANNER OF PROVIDING SERVICES
The Architect may enter into contract with the Owner in two possible ways:
a) Working in a dual capacity as Architect-of-record and as Consulting
Architect for post construction services.
b) Working as Consulting Architect for post-construction services only.
“POST CONSTRUCTION SERVICES”
INTRODUCTION

SCOPE OF PRE-DESIGN SERVICES

METHOD OF COMPENSATION

METHOD OF COMPENSATION
METHOD OF COMPENSATION
a)Percentage of gross rentals, maintenance and security
fees; and/or
b)Monthly salary/ fee.
SPP DOCUMENTS 206
“COMPREHENSIVE ARCHITECTURAL SERVICES”

Ar.Gerald Adane,uap,pia,rmp
“COMPREHENSIVE ARCHITECTURAL SERVICES”

• INTRODUCTION

• SCOPE OF REGULAR DESIGN SERVICES

• MANNER OF PROVIDING SERVICES

• METHOD OF COMPENSATION
INTRODUCTION
• Comprehensive Architectural Services refers to the range of professional
services that covers Pre-design Services, Regular Design Services,
Specialized Architectural Services, Construction Services and Post-
Construction Services.

• The Architect is not expected to perform all the services. Rather, he is to act
as the agent of the Client in procuring and coordinating the necessary
services required by a project
PROJECT MANAGER (PM)
a) Project Management (PM) involves management activities over and above
the normal architectural and engineering (A&E) services carried out during
the pre-design, design and construction phase. The over-all objective is to
have control over time, cost and quality relative to the construction of a
project.
b) The presence of a Project Manager does not relieve the designers and
contractors of their respective normal duties and responsibilities in the
design and construction of the project. The PM complements the functions
of the Architects, Engineers and Contractors in meeting the broad and
complex requirements of projects.
“COMPREHENSIVE ARCHITECTURAL SERVICES”

• SCOPE OF REGULAR DESIGN SERVICES


SCOPE OF SERVICES
a) Pre-Construction Phase : As early as during the design development
phase, perhaps even concurrently with the Architect’s commission, the
Project Manager (PM) should conduct regular consultations with the Owner
and with the Architects and Engineers (for A&E services) on all aspects of
planning for the project.

b) Construction Phase : If the Project Manager (PM) also serves as the


Construction Manager (CM) to oversee time, cost and quality control during
the construction of the project, he shall provide the services detailed under
SPP Documents 204-A and/or 204-B.
“COMPREHENSIVE ARCHITECTURAL SERVICES”

• MANNER OF PROVIDING SERVICES


COMPREHENSIVE ARCHITECTURAL SERVICES
a) Normally, the Architect enters into a contract with the Owner to perform Comprehensive
Architectural Services. By the very nature of the services, he assumes the dual role of the
Project Manager (PM) and the Construction Manager (CM), or effectively the overall
coordinator whose functions are outlined under this SPP.
b) To perform the variety of services indicated under the Comprehensive Architectural
Services, the Architect must make full use of his own capability as well as of services
offered by other professionals. He may expand his staff by hiring the experts needed, or he
may form a team consisting of professionals such as but not limited to:
1) Architects
2) Engineers
3) Market Analysts
4) Accountants
5) General Contractors
6) Real Estate Consultants
7) Sociologists
8) Planners
9) Bankers
10) Lawyers
PROJECT MANAGEMENT
a) If a Project Manager (PM) is hired by the Owner, it may be the responsibility of the PM to
either hire the Construction Manager (CM) to be paid either by him or directly by the Owner
on salary, or on the basis of percentage of construction cost or to serve as the CM himself.
In like manner, the Fulltime Supervisor can either be a staff member of the PM or hired
directly by the Owner.
b) The Project Manager (PM, whether individual or firm) operates as a member of an Owner-
Architect-Engineer-Contractor Team. In the Team Approach, each member of the team will
have precedence in his own field of operations or expertise. In accordance with this
principle:
1. The Architect and the Specialist Consultants (SCs) will have prime responsibility for the
plan/design of the project.
2. The Engineers will be responsible for their respective engineering plans.
3. The Contractor shall be responsible for his men and equipment and the delivery of the
project.
4. The Owner makes decisions on the project and assures that funds are available to
complete the project.
5. The Project Manager (PM)’s primary responsibility is the exercise of overall cost control.
He will plan, program and monitor the various activities, and will act as an adviser on
material costs and construction methods.
“COMPREHENSIVE ARCHITECTURAL SERVICES”

INTRODUCTION

SCOPE OF PRE-DESIGN SERVICES

METHOD OF COMPENSATION

METHOD OF COMPENSATION
METHOD OF COMPENSATION
a)The Project Manager is compensated on a percentage basis, as
shall be described in the Architect’s Guidelines.

b)If the Architect as Project Manager (PM) performs regular design


services for the same project, he shall be compensated separately
for these services as stipulated in SPP Document 202.