Crane Load and Design Specifications
Crane Load and Design Specifications
position of
mains power line
HSL
A (HSL) A
sectional drawing
pos. 1: ELK 10 t
>=2790
>=590
pos. 2: ELK 10 t
D
B
palmerha0178_20240815_16563737
1)
15000
C
© ABUS Kransysteme GmbH
>= 75
HL
installations
>= 835
760
10 t 10 t
lower
safety distance
1190 970
>= 9595
8760
1)
49
10000
8200
<= 7905
-1800
71
≈800
center line
1-EFF
R1 R3
1395
RAL 1007
2200
1395
center line mobile control
2-EFF R2 R4
© ABUS Kransysteme GmbH - palmerha0178_20240815_16564166_TM0_TE1
104
crane ELK 10 t x 15000 mm
Ø 125
design basis DIN 15018, H2/B3
hoist + trolley GM 3000.10000 H-202.41.10000.4.E 160.20
FEM group 2m / M5
operation location indoor operation
ambient conditions -5° C up to +40° C, without special requirements
275
mains voltage; admissible voltage swing 3/PE ~50 Hz 400 V (TN-S); -6.5% / +5%
total power consumption 16.6 kW (starting current * cos phi: 94 A) +SKR-F1 = 35 A gG
(16)
skewing force on guide side (coefficient of frictional contact <= 0,3) 17.9 -
horizontal loads from skewing front crane axis in driving direction 3.1 14.9
(guide side/opposite side) back crane axis in driving direction 0.0 0.0
longitudinal loads (kN) mass forces crane travel (max.) 2.5
(per crane runway beam) collision forces (max.) 23.3
1)
maximum hook path of hoist 10 m, actual use according to conditions on site
HL HL
Qc,min,1 Qc,max,1
crane axis Qh,min,1 min. Qh,max,1
Qc,min,2 Qc,max,2
Qh,min,2 Qh,max,2
HB1 crane travel direction HB1
© ABUS Kransysteme GmbH
The drawing shows the crane travel situation for the purpose of generating minimum and maximum loads.
The decisive crane travel situation may vary depending on the crane version (travel direction, trolley position and / or means of guidance).
All load effects constitute characteristic static force components and have to have the corresponding dynamic coefficient φ applied to them.
Crane track tolerances DIN EN 1090-2, tolerance class 2
tolerance of the track centre dimension of the crane rails +/- 5 mm
Loading weights
main girder HT 2874 kg/pc(s).
end carriage FWT 268 kg/pc(s).
hoist GKG 724 kg/pc(s).
total weight GGG 4140 kg/pc(s).
Stiffeners
number per web plate 1 pc(s).
Dimension L 50 mm * 30 mm * 5 mm
arrangement 0.33 / 0.67
Diaphragm
Thickness 4 mm
distance 2000 mm
>= 75
HL
installations
>= 835
760
10 t 10 t
lower
safety distance
1190 970
>= 9595
8760
1)
49
10000
8200
<= 7905
-1800
71
≈800
center line
1-EFF
R1 R3
1395
RAL 1007
2200
1395
center line mobile control
2-EFF R2 R4
© ABUS Kransysteme GmbH - palmerha0178_20240815_16564928_TM0_TE1
104
crane ELK 10 t x 15000 mm
Ø 125
design basis DIN 15018, H2/B3
hoist + trolley GM 3000.10000 H-202.41.10000.4.E 160.20
FEM group 2m / M5
operation location indoor operation
ambient conditions -5° C up to +40° C, without special requirements
275
mains voltage; admissible voltage swing 3/PE ~50 Hz 400 V (TN-S); -6.5% / +5%
total power consumption 16.6 kW (starting current * cos phi: 94 A) +SKR-F1 = 35 A gG
(16)
skewing force on guide side (coefficient of frictional contact <= 0,3) 17.9 -
horizontal loads from skewing front crane axis in driving direction 3.1 14.9
(guide side/opposite side) back crane axis in driving direction 0.0 0.0
longitudinal loads (kN) mass forces crane travel (max.) 2.5
(per crane runway beam) collision forces (max.) 23.3
1)
maximum hook path of hoist 10 m, actual use according to conditions on site
HL HL
Qc,min,1 Qc,max,1
crane axis Qh,min,1 min. Qh,max,1
Qc,min,2 Qc,max,2
Qh,min,2 Qh,max,2
HB1 crane travel direction HB1
© ABUS Kransysteme GmbH
The drawing shows the crane travel situation for the purpose of generating minimum and maximum loads.
The decisive crane travel situation may vary depending on the crane version (travel direction, trolley position and / or means of guidance).
All load effects constitute characteristic static force components and have to have the corresponding dynamic coefficient φ applied to them.
Crane track tolerances DIN EN 1090-2, tolerance class 2
tolerance of the track centre dimension of the crane rails +/- 5 mm