Ground Mount CAD Drawings
Ground Mount CAD Drawings
PV MODULE,
BY OTHERS
BY OTHERS
XR1000 RAIL
XR1000 RAIL
IRONRIDGE
IRONRIDGE.COM
2" RAIL CONNECTOR
CONNECTOR
CANTILEVER, CANTILEVER,
800.227.9523
≤40% E-W PIER ≤40% E-W PIER
SPACING SPACING
PV MODULE FRAME
IRONRIDGE MID CLAMP
IRONRIDGE
4 IRONRIDGE MID CLAMP IRONRIDGE RAIL
PROJECT NAME
SYSTEM KW DC
CLIENT NAME
IRONRIDGE RAIL
ADDRESS
PROJECT
IRONRIDGE END CLAMP
PV MODULE FRAME
3-UP - PV SYSTEM PLAN DETAIL PV MODULE FRAME
A IRONRIDGE END CLAMP
Scale: 1/2"=1'-0" IRONRIDGE RAIL
72-CELL, GENERIC
-
-
-
-
EQ.
DETAIL, END CLAMP PLAN DETAIL, END CLAMP FRONT
X. C G H
" MA
EXPOSURE CAT
MODULE W DC
MODULE TYPE
MODULE QTY
RISK CAT
CONCRETE 2" PIPE 1 2" PIPE 1 BY OTHERS, 2" PIPE 1
2" CROSS PIPE 1 FOUNDATION, SPECIFICATIONS
D 2500PSI MIN VARY
EQ.
2" PIER PIPE 1 APPROVAL STATUS
PIER EMBEDMENT =
2/3 FNDN DEPTH
F VARIES
FOUNDATION DEPTH
FOUNDATION DEPTH
FOUNDATION DEPTH
DIAGONAL BRACING, F OR ION
H AS NEEDED T CT
NO TRU
O NS
ENGINEERED C
FOUNDATION
REVISION HISTORY
EXPOSED 7'-6"
ABOVE GRADE
1. SCHEDULE 40 PIPE OR ALLIED MECHANICAL TUBING (12GA WALL THICKNESS) 3-UP 2"
*ADDITIONAL ENGINEERING REQUIRED *ADDITIONAL ENGINEERING REQUIRED
2. URL: IRONRIDGE GROUND MOUNT INSTALL MANUAL JOB NO.
2.09 GM
ISSUE DATE
XX NOV 2015
3. URL: IRONRIDGE GROUND MOUNT ENGINEERING DESIGN GUIDE DRILL/POUR FOUNDATION DRIVEN PIER FOUNDATION HELICAL PILE FOUNDATION
J K L SHEET NO.
IR 1
Scale: 3/4"=1'-0" Scale: 3/4"=1'-0" Scale: 3/4"=1'-0" SHEET SIZE
24X36
PV MODULE,
PV MODULE,
BY OTHERS
BY OTHERS
XR1000 RAIL
XR1000 RAIL
IRONRIDGE
IRONRIDGE.COM
2" RAIL CONNECTOR
≤40% E-W PIER ≤40% E-W PIER CONNECTOR
SPACING SPACING
TOP CAP
E-W PIER SPACING E-W PIER SPACING
RAIL CONNECTOR
800.227.9523
2" PIPE 1 IRONRIDGE
2" TOP CAP
2" PIPE 1
IRONRIDGE
2" TOP CAP
PIPE FITTINGS
PIPE FITTINGSDETAIL
DETAIL PIPE FITTINGS
PIPE FITTINGSDETAIL
DETAIL
C D
3"=1'-0" 3"=1'-0"
7'-6"
PV MODULE FRAME
IRONRIDGE MID CLAMP
IRONRIDGE
4 IRONRIDGE MID CLAMP IRONRIDGE RAIL
PROJECT NAME
SYSTEM KW DC
CLIENT NAME
IRONRIDGE RAIL
ADDRESS
PROJECT
IRONRIDGE END CLAMP
PV MODULE FRAME
4-UP - PV SYSTEM PLAN DETAIL PV MODULE FRAME
A IRONRIDGE END CLAMP
Scale: 1/2"=1'-0" IRONRIDGE RAIL
72-CELL, GENERIC
-
-
-
-
EQ.
DETAIL, END CLAMP PLAN DETAIL, END CLAMP FRONT
X. C G H
" MA
EXPOSURE CAT
MODULE W DC
MODULE TYPE
MODULE QTY
RISK CAT
CONCRETE 2" PIPE 1 2" PIPE 1 BY OTHERS, 2" PIPE 1
2" CROSS PIPE 1 FOUNDATION, SPECIFICATIONS
D 2500PSI MIN VARY
EQ. 2" PIER PIPE 1 APPROVAL STATUS
PIER EMBEDMENT =
F
FOUNDATION DEPTH
FOUNDATION DEPTH
FOUNDATION DEPTH
DIAGONAL BRACING, F OR ION
AS NEEDED T CT
H NO TRU
O NS
ENGINEERED C
FOUNDATION
REVISION HISTORY
EXPOSED 7'-6"
ABOVE GRADE
1. SCHEDULE 40 PIPE OR ALLIED MECHANICAL TUBING (12GA WALL THICKNESS) 4-UP 2"
*ADDITIONAL ENGINEERING REQUIRED *ADDITIONAL ENGINEERING REQUIRED
2. URL: IRONRIDGE GROUND MOUNT INSTALL MANUAL JOB NO.
2.09 GM
ISSUE DATE
XX NOV 2015
3. URL: IRONRIDGE GROUND MOUNT ENGINEERING DESIGN GUIDE DRILL/POUR FOUNDATION DRIVEN PIER FOUNDATION HELICAL PILE FOUNDATION
J K L SHEET NO.
IR 2
Scale: 3/4"=1'-0" Scale: 3/4"=1'-0" Scale: 3/4"=1'-0" SHEET SIZE
24X36
CANTILEVER, CANTILEVER, PV MODULE,
PV MODULE,
≤40% E-W PIER ≤40% E-W PIER BY OTHERS
BY OTHERS
SPACING SPACING XR1000 RAIL
XR1000 RAIL
IRONRIDGE
E-W PIER SPACING E-W PIER SPACING
IRONRIDGE.COM
2" RAIL CONNECTOR
RAIL CONNECTOR CONNECTOR
800.227.9523
2" PIPE 1 IRONRIDGE
2" TOP CAP
2" PIPE 1
IRONRIDGE
2" TOP CAP
PIPE FITTINGS
PIPE FITTINGSDETAIL
DETAIL PIPE FITTINGS
PIPE FITTINGSDETAIL
DETAIL
C D
9'-0" 3"=1'-0" 3"=1'-0"
PV MODULE FRAME
IRONRIDGE MID CLAMP
IRONRIDGE
4 IRONRIDGE MID CLAMP IRONRIDGE RAIL
PROJECT NAME
SYSTEM KW DC
CLIENT NAME
IRONRIDGE RAIL
ADDRESS
PROJECT
IRONRIDGE END CLAMP
PV MODULE FRAME
5-UP - PV SYSTEM PLAN DETAIL PV MODULE FRAME
A IRONRIDGE END CLAMP
Scale: 1/2"=1'-0" IRONRIDGE RAIL
72-CELL, GENERIC
-
-
-
-
EQ.
EXPOSURE CAT
MODULE W DC
MODULE TYPE
MODULE QTY
RISK CAT
1 CONCRETE 2" PIPE 1 2" PIPE 1 BY OTHERS, 2" PIPE 1
2" CROSS PIPE
FOUNDATION, SPECIFICATIONS
D 2500PSI MIN VARY
2" PIER PIPE 1
EQ. APPROVAL STATUS
PIER EMBEDMENT =
2/3 FNDN DEPTH
F DIAGONAL BRACING,
VARIES
FOUNDATION DEPTH
FOUNDATION DEPTH
FOUNDATION DEPTH
AS NEEDED F OR ION
T CT
NO TRU
H ENGINEERED NS
C O
FOUNDATION
REVISION HISTORY
EXPOSED 9'-0"
ABOVE GRADE
1. SCHEDULE 40 PIPE OR ALLIED MECHANICAL TUBING (12GA WALL THICKNESS) 5-UP 2"
*ADDITIONAL ENGINEERING REQUIRED *ADDITIONAL ENGINEERING REQUIRED
2. URL: IRONRIDGE GROUND MOUNT INSTALL MANUAL JOB NO.
2.09 GM
ISSUE DATE
XX NOV 2015
3. URL: IRONRIDGE GROUND MOUNT ENGINEERING DESIGN GUIDE DRILL/POUR FOUNDATION DRIVEN PIER FOUNDATION HELICAL PILE FOUNDATION
J K L SHEET NO.
IR 3
Scale: 3/4"=1'-0" Scale: 3/4"=1'-0" Scale: 3/4"=1'-0" SHEET SIZE
24X36
PV MODULE, PV MODULE,
BY OTHERS BY OTHERS
XR1000 RAIL
XR1000 RAIL
IRONRIDGE
IRONRIDGE
IRONRIDGE.COM
CONNECTOR
CONNECTOR
800.227.9523
CANTILEVER, NOT CANTILEVER, NOT
TO EXCEED 40% OF E-W PIER SPACING TO EXCEED 40% OF TOP CAP 3" PIPE 1 IRONRIDGE
E-W PIER SPACING E-W PIER SPACING RAIL CONNECTOR 3" TOP CAP
3" PIPE 1
IRONRIDGE
3" TOP CAP
PIPE FITTINGS
PIPE FITTINGSDETAIL
DETAIL PIPE FITTINGS
PIPE FITTINGSDETAIL
DETAIL
C D
3"=1'-0" 3"=1'-0"
PV MODULE FRAME
IRONRIDGE MID CLAMP
IRONRIDGE
4 IRONRIDGE MID CLAMP IRONRIDGE RAIL
PROJECT NAME
SYSTEM KW DC
CLIENT NAME
IRONRIDGE RAIL
ADDRESS
PROJECT
IRONRIDGE END CLAMP
PV MODULE FRAME
3-UP - PV SYSTEM PLAN DETAIL PV MODULE FRAME
A IRONRIDGE END CLAMP
Scale: 1/2"=1'-0" IRONRIDGE RAIL
72-CELL, GENERIC
-
-
-
-
EQ.
X. DETAIL, END CLAMP PLAN DETAIL, END CLAMP FRONT
" M A C G H
EXPOSURE CAT
MODULE W DC
MODULE TYPE
MODULE QTY
RISK CAT
CONCRETE 3" PIPE 1 3" PIPE 1 BY OTHERS, 3" PIPE 1
3" CROSS PIPE 1 FOUNDATION, SPECIFICATIONS
D 2500PSI MIN VARY
EQ.
3" PIER PIPE 1 APPROVAL STATUS
PIER EMBEDMENT =
2/3 FNDN DEPTH
F VARIES
FOUNDATION DEPTH
FOUNDATION DEPTH
FOUNDATION DEPTH
H DIAGONAL BRACING, F OR ION
AS NEEDED T CT
NO TRU
O NS
ENGINEERED C
FOUNDATION
REVISION HISTORY
EXPOSED 7'-6"
ABOVE GRADE
1. SCHEDULE 40 PIPE OR ALLIED MECHANICAL TUBING (8GA WALL THICKNESS) 3-UP 3"
*ADDITIONAL ENGINEERING REQUIRED *ADDITIONAL ENGINEERING REQUIRED
2. URL: IRONRIDGE GROUND MOUNT INSTALL MANUAL JOB NO.
2.09 GM
ISSUE DATE
XX NOV 2015
3. URL: IRONRIDGE GROUND MOUNT ENGINEERING DESIGN GUIDE DRILL/POUR FOUNDATION DRIVEN PIER FOUNDATION HELICAL PILE FOUNDATION
J K L SHEET NO.
IR 4
Scale: 3/4"=1'-0" Scale: 3/4"=1'-0" Scale: 3/4"=1'-0" SHEET SIZE
24X36
PV MODULE, PV MODULE,
BY OTHERS BY OTHERS
XR1000 RAIL
XR1000 RAIL
IRONRIDGE
IRONRIDGE
IRONRIDGE.COM
CONNECTOR
CONNECTOR
800.227.9523
3" PIPE 1 IRONRIDGE
3" TOP CAP
3" PIPE 1
IRONRIDGE
3" TOP CAP
PIPE FITTINGS
PIPE FITTINGSDETAIL
DETAIL PIPE FITTINGS
PIPE FITTINGSDETAIL
DETAIL
C D
3"=1'-0" 3"=1'-0"
7'-6"
PV MODULE FRAME
IRONRIDGE MID CLAMP
IRONRIDGE
4 IRONRIDGE MID CLAMP IRONRIDGE RAIL
PROJECT NAME
SYSTEM KW DC
CLIENT NAME
IRONRIDGE RAIL
ADDRESS
PROJECT
IRONRIDGE END CLAMP
PV MODULE FRAME
4-UP - PV SYSTEM PLAN DETAIL PV MODULE FRAME
A IRONRIDGE END CLAMP
Scale: 1/2"=1'-0" IRONRIDGE RAIL
72-CELL, GENERIC
-
-
-
-
EQ.
X. DETAIL, END CLAMP PLAN DETAIL, END CLAMP FRONT
" M A C G H
EXPOSURE CAT
MODULE W DC
MODULE TYPE
MODULE QTY
RISK CAT
CONCRETE 3" PIPE 1 3" PIPE 1 BY OTHERS, 3" PIPE 1
3" CROSS PIPE 1 FOUNDATION, SPECIFICATIONS
D 2500PSI MIN VARY
EQ. 3" PIER PIPE 1 APPROVAL STATUS
PIER EMBEDMENT =
F
FOUNDATION DEPTH
FOUNDATION DEPTH
FOUNDATION DEPTH
DIAGONAL BRACING, F OR ION
AS NEEDED T CT
H NO TRU
O NS
ENGINEERED C
FOUNDATION
REVISION HISTORY
EXPOSED 7'-6"
ABOVE GRADE
1. SCHEDULE 40 PIPE OR ALLIED MECHANICAL TUBING (8GA WALL THICKNESS) 4-UP 3"
*ADDITIONAL ENGINEERING REQUIRED *ADDITIONAL ENGINEERING REQUIRED
2. URL: IRONRIDGE GROUND MOUNT INSTALL MANUAL JOB NO.
2.09 GM
ISSUE DATE
XX NOV 2015
3. URL: IRONRIDGE GROUND MOUNT ENGINEERING DESIGN GUIDE DRILL/POUR FOUNDATION DRIVEN PIER FOUNDATION HELICAL PILE FOUNDATION
J K L SHEET NO.
IR 5
Scale: 3/4"=1'-0" Scale: 3/4"=1'-0" Scale: 3/4"=1'-0" SHEET SIZE
24X36
PV MODULE, PV MODULE,
BY OTHERS BY OTHERS
XR1000 RAIL
XR1000 RAIL
CANTILEVER, NOT CANTILEVER, NOT IRONRIDGE
IRONRIDGE
IRONRIDGE.COM
E-W PIER SPACING E-W PIER SPACING CONNECTOR
RAIL CONNECTOR CONNECTOR
800.227.9523
3" PIPE 1 IRONRIDGE
3" TOP CAP
3" PIPE 1
IRONRIDGE
3" TOP CAP
PIPE FITTINGS
PIPE FITTINGSDETAIL
DETAIL PIPE FITTINGS
PIPE FITTINGSDETAIL
DETAIL
C D
9'-0" 3"=1'-0" 3"=1'-0"
PV MODULE FRAME
IRONRIDGE MID CLAMP
IRONRIDGE
4 IRONRIDGE MID CLAMP IRONRIDGE RAIL
PROJECT NAME
SYSTEM KW DC
CLIENT NAME
IRONRIDGE RAIL
ADDRESS
PROJECT
IRONRIDGE END CLAMP
PV MODULE FRAME
5-UP - PV SYSTEM PLAN DETAIL PV MODULE FRAME
A IRONRIDGE END CLAMP
Scale: 1/2"=1'-0" IRONRIDGE RAIL
72-CELL, GENERIC
EQ.
-
-
-
-
C
M A X. DETAIL, END CLAMP PLAN DETAIL, END CLAMP FRONT
"
17'-0 G H
EXPOSURE CAT
MODULE W DC
MODULE TYPE
MODULE QTY
RISK CAT
CONCRETE 3" PIPE 1 3" PIPE 1 BY OTHERS, 3" PIPE 1
3" CROSS PIPE 1 FOUNDATION, SPECIFICATIONS
2500PSI MIN VARY
EQ. D 3" PIER PIPE 1 APPROVAL STATUS
PIER EMBEDMENT =
2/3 FNDN DEPTH
F
VARIES
FOUNDATION DEPTH
FOUNDATION DEPTH
FOUNDATION DEPTH
DIAGONAL BRACING, OR ION
F
AS NEEDED T CT
NO TRU
H NS
ENGINEERED C O
FOUNDATION
REVISION HISTORY
EXPOSED 9'-0"
ABOVE GRADE
1. SCHEDULE 40 PIPE OR ALLIED MECHANICAL TUBING (8GA WALL THICKNESS) 5-UP 3"
*ADDITIONAL ENGINEERING REQUIRED *ADDITIONAL ENGINEERING REQUIRED
2. URL: IRONRIDGE GROUND MOUNT INSTALL MANUAL JOB NO.
2.09 GM
ISSUE DATE
XX NOV 2015
3. URL: IRONRIDGE GROUND MOUNT ENGINEERING DESIGN GUIDE DRILL/POUR FOUNDATION DRIVEN PIER FOUNDATION HELICAL PILE FOUNDATION
J K L SHEET NO.
IR 6
Scale: 3/4"=1'-0" Scale: 3/4"=1'-0" Scale: 3/4"=1'-0" SHEET SIZE
24X36