0% found this document useful (0 votes)
106 views6 pages

Ground Mount CAD Drawings

Uploaded by

t.caidelec
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
106 views6 pages

Ground Mount CAD Drawings

Uploaded by

t.caidelec
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

PV MODULE,

PV MODULE,
BY OTHERS
BY OTHERS
XR1000 RAIL
XR1000 RAIL
IRONRIDGE

1495 ZEPHYR AVE, HAYWARD, CA 94544


IRONRIDGE 2" RAIL

IRONRIDGE.COM
2" RAIL CONNECTOR
CONNECTOR

CANTILEVER, CANTILEVER,

800.227.9523
≤40% E-W PIER ≤40% E-W PIER
SPACING SPACING

TOP CAP 2" PIPE 1 IRONRIDGE


E-W PIER SPACING E-W PIER SPACING 2" TOP CAP
RAIL CONNECTOR
2" PIPE 1
IRONRIDGE
2" TOP CAP
PIPE FITTINGS
PIPE FITTINGSDETAIL
DETAIL PIPE FITTINGS
PIPE FITTINGSDETAIL
DETAIL
C D
3"=1'-0" 3"=1'-0"

PV MODULE FRAME
IRONRIDGE MID CLAMP

GROUND MOUNT SYSTEM


7'-6" PV MODULE FRAME
1"

IRONRIDGE
4 IRONRIDGE MID CLAMP IRONRIDGE RAIL

DETAIL, MID CLAMP PLAN DETAIL, MID CLAMP FRONT


E F
B 6"=1'-0" 6"=1'-0"
2" CROSS PIPE LENGTH

PROJECT NAME

SYSTEM KW DC
CLIENT NAME
IRONRIDGE RAIL

ADDRESS
PROJECT
IRONRIDGE END CLAMP
PV MODULE FRAME
3-UP - PV SYSTEM PLAN DETAIL PV MODULE FRAME
A IRONRIDGE END CLAMP
Scale: 1/2"=1'-0" IRONRIDGE RAIL

72-CELL, GENERIC
-
-
-
-
EQ.
DETAIL, END CLAMP PLAN DETAIL, END CLAMP FRONT
X. C G H
" MA

WIND SPEED, MPH


SNOW LOAD, PSF
11'-0 6"=1'-0" 6"=1'-0"

EXPOSURE CAT

MODULE W DC
MODULE TYPE

MODULE QTY
RISK CAT
CONCRETE 2" PIPE 1 2" PIPE 1 BY OTHERS, 2" PIPE 1
2" CROSS PIPE 1 FOUNDATION, SPECIFICATIONS
D 2500PSI MIN VARY
EQ.
2" PIER PIPE 1 APPROVAL STATUS

PIER EMBEDMENT =
2/3 FNDN DEPTH
F VARIES

FOUNDATION DEPTH

FOUNDATION DEPTH

FOUNDATION DEPTH
DIAGONAL BRACING, F OR ION
H AS NEEDED T CT
NO TRU
O NS
ENGINEERED C
FOUNDATION
REVISION HISTORY

2'-6" MAX. REV DESCRIPTION DATE

EXPOSED 7'-6"
ABOVE GRADE

3-UP - PV SYSTEM SIDE SECTION


B SHEET NAME

Scale: 3/4"=1'-0" PV SYSTEM


DETAILS
SHEET NOTES

1. SCHEDULE 40 PIPE OR ALLIED MECHANICAL TUBING (12GA WALL THICKNESS) 3-UP 2"
*ADDITIONAL ENGINEERING REQUIRED *ADDITIONAL ENGINEERING REQUIRED
2. URL: IRONRIDGE GROUND MOUNT INSTALL MANUAL JOB NO.
2.09 GM
ISSUE DATE
XX NOV 2015
3. URL: IRONRIDGE GROUND MOUNT ENGINEERING DESIGN GUIDE DRILL/POUR FOUNDATION DRIVEN PIER FOUNDATION HELICAL PILE FOUNDATION
J K L SHEET NO.

IR 1
Scale: 3/4"=1'-0" Scale: 3/4"=1'-0" Scale: 3/4"=1'-0" SHEET SIZE
24X36
PV MODULE,
PV MODULE,
BY OTHERS
BY OTHERS
XR1000 RAIL
XR1000 RAIL
IRONRIDGE

1495 ZEPHYR AVE, HAYWARD, CA 94544


IRONRIDGE 2" RAIL
CANTILEVER, CANTILEVER,

IRONRIDGE.COM
2" RAIL CONNECTOR
≤40% E-W PIER ≤40% E-W PIER CONNECTOR
SPACING SPACING

TOP CAP
E-W PIER SPACING E-W PIER SPACING
RAIL CONNECTOR

800.227.9523
2" PIPE 1 IRONRIDGE
2" TOP CAP
2" PIPE 1
IRONRIDGE
2" TOP CAP
PIPE FITTINGS
PIPE FITTINGSDETAIL
DETAIL PIPE FITTINGS
PIPE FITTINGSDETAIL
DETAIL
C D
3"=1'-0" 3"=1'-0"

7'-6"
PV MODULE FRAME
IRONRIDGE MID CLAMP

GROUND MOUNT SYSTEM


PV MODULE FRAME
1"

IRONRIDGE
4 IRONRIDGE MID CLAMP IRONRIDGE RAIL

DETAIL, MID CLAMP PLAN DETAIL, MID CLAMP FRONT


E F
B 6"=1'-0" 6"=1'-0"
2" CROSS PIPE LENGTH

PROJECT NAME

SYSTEM KW DC
CLIENT NAME
IRONRIDGE RAIL

ADDRESS
PROJECT
IRONRIDGE END CLAMP
PV MODULE FRAME
4-UP - PV SYSTEM PLAN DETAIL PV MODULE FRAME
A IRONRIDGE END CLAMP
Scale: 1/2"=1'-0" IRONRIDGE RAIL

72-CELL, GENERIC
-
-
-
-
EQ.
DETAIL, END CLAMP PLAN DETAIL, END CLAMP FRONT
X. C G H
" MA

WIND SPEED, MPH


SNOW LOAD, PSF
14'-0 6"=1'-0" 6"=1'-0"

EXPOSURE CAT

MODULE W DC
MODULE TYPE

MODULE QTY
RISK CAT
CONCRETE 2" PIPE 1 2" PIPE 1 BY OTHERS, 2" PIPE 1
2" CROSS PIPE 1 FOUNDATION, SPECIFICATIONS
D 2500PSI MIN VARY
EQ. 2" PIER PIPE 1 APPROVAL STATUS

PIER EMBEDMENT =
F

2/3 FNDN DEPTH


VARIES

FOUNDATION DEPTH

FOUNDATION DEPTH

FOUNDATION DEPTH
DIAGONAL BRACING, F OR ION
AS NEEDED T CT
H NO TRU
O NS
ENGINEERED C
FOUNDATION
REVISION HISTORY

2'-6" MAX. REV DESCRIPTION DATE

EXPOSED 7'-6"
ABOVE GRADE

4-UP - PV SYSTEM SIDE SECTION


B SHEET NAME

Scale: 3/4"=1'-0" PV SYSTEM


DETAILS
SHEET NOTES

1. SCHEDULE 40 PIPE OR ALLIED MECHANICAL TUBING (12GA WALL THICKNESS) 4-UP 2"
*ADDITIONAL ENGINEERING REQUIRED *ADDITIONAL ENGINEERING REQUIRED
2. URL: IRONRIDGE GROUND MOUNT INSTALL MANUAL JOB NO.
2.09 GM
ISSUE DATE
XX NOV 2015
3. URL: IRONRIDGE GROUND MOUNT ENGINEERING DESIGN GUIDE DRILL/POUR FOUNDATION DRIVEN PIER FOUNDATION HELICAL PILE FOUNDATION
J K L SHEET NO.

IR 2
Scale: 3/4"=1'-0" Scale: 3/4"=1'-0" Scale: 3/4"=1'-0" SHEET SIZE
24X36
CANTILEVER, CANTILEVER, PV MODULE,
PV MODULE,
≤40% E-W PIER ≤40% E-W PIER BY OTHERS
BY OTHERS
SPACING SPACING XR1000 RAIL
XR1000 RAIL
IRONRIDGE
E-W PIER SPACING E-W PIER SPACING

1495 ZEPHYR AVE, HAYWARD, CA 94544


IRONRIDGE 2" RAIL
TOP CAP

IRONRIDGE.COM
2" RAIL CONNECTOR
RAIL CONNECTOR CONNECTOR

800.227.9523
2" PIPE 1 IRONRIDGE
2" TOP CAP
2" PIPE 1
IRONRIDGE
2" TOP CAP
PIPE FITTINGS
PIPE FITTINGSDETAIL
DETAIL PIPE FITTINGS
PIPE FITTINGSDETAIL
DETAIL
C D
9'-0" 3"=1'-0" 3"=1'-0"

PV MODULE FRAME
IRONRIDGE MID CLAMP

GROUND MOUNT SYSTEM


PV MODULE FRAME
1"

IRONRIDGE
4 IRONRIDGE MID CLAMP IRONRIDGE RAIL

DETAIL, MID CLAMP PLAN DETAIL, MID CLAMP FRONT


E F
B 6"=1'-0" 6"=1'-0"
2" CROSS PIPE LENGTH

PROJECT NAME

SYSTEM KW DC
CLIENT NAME
IRONRIDGE RAIL

ADDRESS
PROJECT
IRONRIDGE END CLAMP
PV MODULE FRAME
5-UP - PV SYSTEM PLAN DETAIL PV MODULE FRAME
A IRONRIDGE END CLAMP
Scale: 1/2"=1'-0" IRONRIDGE RAIL

72-CELL, GENERIC
-
-
-
-
EQ.

X. C DETAIL, END CLAMP PLAN DETAIL, END CLAMP FRONT


7 ' -0 " MA G H

WIND SPEED, MPH


1

SNOW LOAD, PSF


6"=1'-0" 6"=1'-0"

EXPOSURE CAT

MODULE W DC
MODULE TYPE

MODULE QTY
RISK CAT
1 CONCRETE 2" PIPE 1 2" PIPE 1 BY OTHERS, 2" PIPE 1
2" CROSS PIPE
FOUNDATION, SPECIFICATIONS
D 2500PSI MIN VARY
2" PIER PIPE 1
EQ. APPROVAL STATUS

PIER EMBEDMENT =
2/3 FNDN DEPTH
F DIAGONAL BRACING,
VARIES

FOUNDATION DEPTH

FOUNDATION DEPTH

FOUNDATION DEPTH
AS NEEDED F OR ION
T CT
NO TRU
H ENGINEERED NS
C O
FOUNDATION
REVISION HISTORY

2'-6" MAX. REV DESCRIPTION DATE

EXPOSED 9'-0"
ABOVE GRADE

5-UP - PV SYSTEM SIDE SECTION


B SHEET NAME

Scale: 3/4"=1'-0" PV SYSTEM


DETAILS
SHEET NOTES

1. SCHEDULE 40 PIPE OR ALLIED MECHANICAL TUBING (12GA WALL THICKNESS) 5-UP 2"
*ADDITIONAL ENGINEERING REQUIRED *ADDITIONAL ENGINEERING REQUIRED
2. URL: IRONRIDGE GROUND MOUNT INSTALL MANUAL JOB NO.
2.09 GM
ISSUE DATE
XX NOV 2015
3. URL: IRONRIDGE GROUND MOUNT ENGINEERING DESIGN GUIDE DRILL/POUR FOUNDATION DRIVEN PIER FOUNDATION HELICAL PILE FOUNDATION
J K L SHEET NO.

IR 3
Scale: 3/4"=1'-0" Scale: 3/4"=1'-0" Scale: 3/4"=1'-0" SHEET SIZE
24X36
PV MODULE, PV MODULE,
BY OTHERS BY OTHERS
XR1000 RAIL
XR1000 RAIL
IRONRIDGE
IRONRIDGE

1495 ZEPHYR AVE, HAYWARD, CA 94544


3" RAIL
3" RAIL

IRONRIDGE.COM
CONNECTOR
CONNECTOR

800.227.9523
CANTILEVER, NOT CANTILEVER, NOT
TO EXCEED 40% OF E-W PIER SPACING TO EXCEED 40% OF TOP CAP 3" PIPE 1 IRONRIDGE
E-W PIER SPACING E-W PIER SPACING RAIL CONNECTOR 3" TOP CAP
3" PIPE 1
IRONRIDGE
3" TOP CAP
PIPE FITTINGS
PIPE FITTINGSDETAIL
DETAIL PIPE FITTINGS
PIPE FITTINGSDETAIL
DETAIL
C D
3"=1'-0" 3"=1'-0"

PV MODULE FRAME
IRONRIDGE MID CLAMP

GROUND MOUNT SYSTEM


7'-6" PV MODULE FRAME
1"

IRONRIDGE
4 IRONRIDGE MID CLAMP IRONRIDGE RAIL

DETAIL, MID CLAMP PLAN DETAIL, MID CLAMP FRONT


E F
B 6"=1'-0" 6"=1'-0"
3" CROSS PIPE LENGTH

PROJECT NAME

SYSTEM KW DC
CLIENT NAME
IRONRIDGE RAIL

ADDRESS
PROJECT
IRONRIDGE END CLAMP
PV MODULE FRAME
3-UP - PV SYSTEM PLAN DETAIL PV MODULE FRAME
A IRONRIDGE END CLAMP
Scale: 1/2"=1'-0" IRONRIDGE RAIL

72-CELL, GENERIC
-
-
-
-
EQ.
X. DETAIL, END CLAMP PLAN DETAIL, END CLAMP FRONT
" M A C G H

WIND SPEED, MPH


11'-0

SNOW LOAD, PSF


6"=1'-0" 6"=1'-0"

EXPOSURE CAT

MODULE W DC
MODULE TYPE

MODULE QTY
RISK CAT
CONCRETE 3" PIPE 1 3" PIPE 1 BY OTHERS, 3" PIPE 1
3" CROSS PIPE 1 FOUNDATION, SPECIFICATIONS
D 2500PSI MIN VARY
EQ.
3" PIER PIPE 1 APPROVAL STATUS

PIER EMBEDMENT =
2/3 FNDN DEPTH
F VARIES

FOUNDATION DEPTH

FOUNDATION DEPTH

FOUNDATION DEPTH
H DIAGONAL BRACING, F OR ION
AS NEEDED T CT
NO TRU
O NS
ENGINEERED C
FOUNDATION
REVISION HISTORY

2'-6" MAX. REV DESCRIPTION DATE

EXPOSED 7'-6"
ABOVE GRADE

3-UP - PV SYSTEM SIDE SECTION


B SHEET NAME

Scale: 3/4"=1'-0" PV SYSTEM


DETAILS
SHEET NOTES

1. SCHEDULE 40 PIPE OR ALLIED MECHANICAL TUBING (8GA WALL THICKNESS) 3-UP 3"
*ADDITIONAL ENGINEERING REQUIRED *ADDITIONAL ENGINEERING REQUIRED
2. URL: IRONRIDGE GROUND MOUNT INSTALL MANUAL JOB NO.
2.09 GM
ISSUE DATE
XX NOV 2015
3. URL: IRONRIDGE GROUND MOUNT ENGINEERING DESIGN GUIDE DRILL/POUR FOUNDATION DRIVEN PIER FOUNDATION HELICAL PILE FOUNDATION
J K L SHEET NO.

IR 4
Scale: 3/4"=1'-0" Scale: 3/4"=1'-0" Scale: 3/4"=1'-0" SHEET SIZE
24X36
PV MODULE, PV MODULE,
BY OTHERS BY OTHERS
XR1000 RAIL
XR1000 RAIL
IRONRIDGE
IRONRIDGE

1495 ZEPHYR AVE, HAYWARD, CA 94544


3" RAIL
3" RAIL

IRONRIDGE.COM
CONNECTOR
CONNECTOR

CANTILEVER, NOT CANTILEVER, NOT TOP CAP


TO EXCEED 40% OF E-W PIER SPACING TO EXCEED 40% OF
RAIL CONNECTOR
E-W PIER SPACING E-W PIER SPACING

800.227.9523
3" PIPE 1 IRONRIDGE
3" TOP CAP
3" PIPE 1
IRONRIDGE
3" TOP CAP
PIPE FITTINGS
PIPE FITTINGSDETAIL
DETAIL PIPE FITTINGS
PIPE FITTINGSDETAIL
DETAIL
C D
3"=1'-0" 3"=1'-0"

7'-6"
PV MODULE FRAME
IRONRIDGE MID CLAMP

GROUND MOUNT SYSTEM


PV MODULE FRAME
1"

IRONRIDGE
4 IRONRIDGE MID CLAMP IRONRIDGE RAIL

DETAIL, MID CLAMP PLAN DETAIL, MID CLAMP FRONT


E F
B 6"=1'-0" 6"=1'-0"
3" CROSS PIPE LENGTH

PROJECT NAME

SYSTEM KW DC
CLIENT NAME
IRONRIDGE RAIL

ADDRESS
PROJECT
IRONRIDGE END CLAMP
PV MODULE FRAME
4-UP - PV SYSTEM PLAN DETAIL PV MODULE FRAME
A IRONRIDGE END CLAMP
Scale: 1/2"=1'-0" IRONRIDGE RAIL

72-CELL, GENERIC
-
-
-
-
EQ.
X. DETAIL, END CLAMP PLAN DETAIL, END CLAMP FRONT
" M A C G H

WIND SPEED, MPH


14'-0

SNOW LOAD, PSF


6"=1'-0" 6"=1'-0"

EXPOSURE CAT

MODULE W DC
MODULE TYPE

MODULE QTY
RISK CAT
CONCRETE 3" PIPE 1 3" PIPE 1 BY OTHERS, 3" PIPE 1
3" CROSS PIPE 1 FOUNDATION, SPECIFICATIONS
D 2500PSI MIN VARY
EQ. 3" PIER PIPE 1 APPROVAL STATUS

PIER EMBEDMENT =
F

2/3 FNDN DEPTH


VARIES

FOUNDATION DEPTH

FOUNDATION DEPTH

FOUNDATION DEPTH
DIAGONAL BRACING, F OR ION
AS NEEDED T CT
H NO TRU
O NS
ENGINEERED C
FOUNDATION
REVISION HISTORY

2'-6" MAX. REV DESCRIPTION DATE

EXPOSED 7'-6"
ABOVE GRADE

4-UP - PV SYSTEM SIDE SECTION


B SHEET NAME

Scale: 3/4"=1'-0" PV SYSTEM


DETAILS
SHEET NOTES

1. SCHEDULE 40 PIPE OR ALLIED MECHANICAL TUBING (8GA WALL THICKNESS) 4-UP 3"
*ADDITIONAL ENGINEERING REQUIRED *ADDITIONAL ENGINEERING REQUIRED
2. URL: IRONRIDGE GROUND MOUNT INSTALL MANUAL JOB NO.
2.09 GM
ISSUE DATE
XX NOV 2015
3. URL: IRONRIDGE GROUND MOUNT ENGINEERING DESIGN GUIDE DRILL/POUR FOUNDATION DRIVEN PIER FOUNDATION HELICAL PILE FOUNDATION
J K L SHEET NO.

IR 5
Scale: 3/4"=1'-0" Scale: 3/4"=1'-0" Scale: 3/4"=1'-0" SHEET SIZE
24X36
PV MODULE, PV MODULE,
BY OTHERS BY OTHERS
XR1000 RAIL
XR1000 RAIL
CANTILEVER, NOT CANTILEVER, NOT IRONRIDGE
IRONRIDGE

1495 ZEPHYR AVE, HAYWARD, CA 94544


TO EXCEED 40% OF E-W PIER SPACING TO EXCEED 40% OF 3" RAIL
TOP CAP 3" RAIL

IRONRIDGE.COM
E-W PIER SPACING E-W PIER SPACING CONNECTOR
RAIL CONNECTOR CONNECTOR

800.227.9523
3" PIPE 1 IRONRIDGE
3" TOP CAP
3" PIPE 1
IRONRIDGE
3" TOP CAP
PIPE FITTINGS
PIPE FITTINGSDETAIL
DETAIL PIPE FITTINGS
PIPE FITTINGSDETAIL
DETAIL
C D
9'-0" 3"=1'-0" 3"=1'-0"

PV MODULE FRAME
IRONRIDGE MID CLAMP

GROUND MOUNT SYSTEM


PV MODULE FRAME
1"

IRONRIDGE
4 IRONRIDGE MID CLAMP IRONRIDGE RAIL

DETAIL, MID CLAMP PLAN DETAIL, MID CLAMP FRONT


E F
B 6"=1'-0" 6"=1'-0"
3" CROSS PIPE LENGTH

PROJECT NAME

SYSTEM KW DC
CLIENT NAME
IRONRIDGE RAIL

ADDRESS
PROJECT
IRONRIDGE END CLAMP
PV MODULE FRAME
5-UP - PV SYSTEM PLAN DETAIL PV MODULE FRAME
A IRONRIDGE END CLAMP
Scale: 1/2"=1'-0" IRONRIDGE RAIL

72-CELL, GENERIC
EQ.

-
-
-
-
C
M A X. DETAIL, END CLAMP PLAN DETAIL, END CLAMP FRONT
"
17'-0 G H

WIND SPEED, MPH


SNOW LOAD, PSF
6"=1'-0" 6"=1'-0"

EXPOSURE CAT

MODULE W DC
MODULE TYPE

MODULE QTY
RISK CAT
CONCRETE 3" PIPE 1 3" PIPE 1 BY OTHERS, 3" PIPE 1
3" CROSS PIPE 1 FOUNDATION, SPECIFICATIONS
2500PSI MIN VARY
EQ. D 3" PIER PIPE 1 APPROVAL STATUS

PIER EMBEDMENT =
2/3 FNDN DEPTH
F
VARIES

FOUNDATION DEPTH

FOUNDATION DEPTH

FOUNDATION DEPTH
DIAGONAL BRACING, OR ION
F
AS NEEDED T CT
NO TRU
H NS
ENGINEERED C O
FOUNDATION
REVISION HISTORY

2'-6" MAX. REV DESCRIPTION DATE

EXPOSED 9'-0"
ABOVE GRADE

5-UP - PV SYSTEM SIDE SECTION


B SHEET NAME

Scale: 3/4"=1'-0" PV SYSTEM


DETAILS
SHEET NOTES

1. SCHEDULE 40 PIPE OR ALLIED MECHANICAL TUBING (8GA WALL THICKNESS) 5-UP 3"
*ADDITIONAL ENGINEERING REQUIRED *ADDITIONAL ENGINEERING REQUIRED
2. URL: IRONRIDGE GROUND MOUNT INSTALL MANUAL JOB NO.
2.09 GM
ISSUE DATE
XX NOV 2015
3. URL: IRONRIDGE GROUND MOUNT ENGINEERING DESIGN GUIDE DRILL/POUR FOUNDATION DRIVEN PIER FOUNDATION HELICAL PILE FOUNDATION
J K L SHEET NO.

IR 6
Scale: 3/4"=1'-0" Scale: 3/4"=1'-0" Scale: 3/4"=1'-0" SHEET SIZE
24X36

You might also like