As per Estimate
Items Description/Particulars Dimensions
Conc. Strength (psi) QTY. Volume Unit Cost Total Cost
L W THK.
A. FOUNDATIONS
1.) Footings
- XFCS-1A 3000psi @ 28D ORD. 20.35 8.50 0.90 2 311.36 m³
- XFCS-2A 3000psi @ 28D ORD. 20.35 4.10 1.00 1 83.44 m³
- XFCS-3A 3000psi @ 28D ORD. 20.35 4.40 0.90 1 80.59 m³
Sub-total - 1: 499.14 m³
2.) Footing Beams
- XFB-1A 3000psi @ 28D ORD. 20.35 0.60 0.60 2 14.65 m³
- XFB-2A 3000psi @ 28D ORD. 20.35 0.50 0.30 1 3.05 m³
- XFB-3A 3000psi @ 28D ORD. 20.35 0.50 0.20 1 2.04 m³
Sub-total - 2: 20.73 m³
3.) Footing Tie Beams
- XFTB-1A 4000psi @ 28D ORD. 20.35 0.40 0.60 1 4.88
- XFTB-1A 4000psi @ 28D ORD. 25.93 0.40 0.60 2 12.45 m³
Sub-total - 3: 18.20 m³
4.) Septic Tank
- Walls 3000psi @ 28D ORD. 12.00 0.20 2.60 1 6.24 m³
- Top Slab 3000psi @ 28D ORD. 3.30 1.50 0.20 1 0.99 m³
Sub-total - 4: 7.59 m³
B. GROUND FLOOR
1.) Slab on Grade 4000psi @ 28D PCD. 25.93 20.35 0.20 1 105.54 m³
Sub-total - 5: 110.81 m³
2.) Retaining Walls
- RCW-1 4000psi @ 28D PCD. 24.33 1.35 0.15 1 4.93 m³
- RCW-2 4000psi @ 28D PCD. 57.25 8.05 0.15 1 69.13 m³
Sub-total - 6: 77.76 m³
3.) Columns to Second Floor
- XC-1A 4000psi @ 28D PCD. 1.00 0.50 7.15 2 7.15 m³
- XC-2A 4000psi @ 28D PCD. 0.80 0.50 7.15 2 5.72 m³
- XC-3A 4000psi @ 28D PCD. 0.70 0.50 7.15 3 7.51 m³
- XC-4A 4000psi @ 28D PCD. 0.60 0.50 7.15 1 2.15 m³
- XC-5A 4000psi @ 28D PCD. 0.80 0.50 7.15 2 5.72 m³
- XC-6A 4000psi @ 28D PCD. 0.60 0.50 7.15 4 8.58 m³
- XC-7A 4000psi @ 28D PCD. 0.80 0.50 7.15 2 5.72 m³
- XC-9A 4000psi @ 28D PCD. 0.50 0.20 7.15 2 1.43 m³
- XC-10A 4000psi @ 28D PCD. 0.40 0.20 7.15 5 2.86 m³
- XC-11A 4000psi @ 28D PCD. 0.70 0.40 3.35 2 1.88 m³
Sub-total - 7: 51.14 m³
C. SECOND FLOOR
1.) Suspended Beams
- XMLB-1A(Stairs) 4000psi @ 28D PCD. 0.20 0.50 2.90 2 0.58 m³
- X2B-1A @ G.L. E-F 4000psi @ 28D PCD. 0.20 0.60 7.70 1 0.92 m³
- X2B-1A @ G.L. F-G 4000psi @ 28D PCD. 0.20 0.60 7.20 1 0.86 m³
- X2B-2A @ G.L. F-G 4000psi @ 28D PCD. 0.20 0.40 2.90 1 0.23 m³
- X2B-3A @ G.L. F-G 4000psi @ 28D PCD. 0.30 0.70 7.20 1 1.51 m³
- X2B-4A @ G.L. F-G 4000psi @ 28D PCD. 0.30 0.80 7.20 1 1.73 m³
- X2B-5A @ G.L. 1-2 4000psi @ 28D PCD. 0.40 0.80 8.60 1 2.75 m³
- X2B-6A @ G.L. 4-3 4000psi @ 28D PCD. 0.40 0.80 8.60 2 5.50 m³
- X2B-6A @ G.L. 3-2 4000psi @ 28D PCD. 0.40 0.80 9.00 2 5.76 m³
- X2B-6A @ G.L. 2-1 4000psi @ 28D PCD. 0.40 0.80 8.30 2 5.31 m³
- X2B-7A @ G.L. 4-3 4000psi @ 28D PCD. 0.40 0.80 8.60 2 5.50 m³
- X2B-7A @ G.L. 3-2 4000psi @ 28D PCD. 0.40 0.80 9.00 2 5.76 m³
- X2B-8A @ G.L. E-F 4000psi @ 28D PCD. 0.40 0.80 7.70 1 2.46 m³
- X2B-8A @ G.L. F-G 4000psi @ 28D PCD. 0.40 0.70 7.20 1 2.02 m³
- X2B-8A @ G.L. G-H 4000psi @ 28D PCD. 0.40 0.80 5.50 1 1.76 m³
- X2B-9A @ G.L. E-F 4000psi @ 28D PCD. 0.40 0.90 7.70 1 2.77 m³
- X2B-9A @ G.L. F-G 4000psi @ 28D PCD. 0.40 0.80 7.20 1 2.30 m³
- X2B-9A @ G.L. G-H 4000psi @ 28D PCD. 0.40 0.80 5.50 1 1.76 m³
- X2B-10A @ G.L. E-F 4000psi @ 28D PCD. 0.40 0.90 7.70 1 2.77 m³
- X2B-10A @ G.L. F-G 4000psi @ 28D PCD. 0.40 0.90 7.20 1 2.59 m³
- X2B-11A @ G.L. E-F 4000psi @ 28D PCD. 0.40 0.80 7.70 1 2.46 m³
- X2B-11A @ G.L. F-G 4000psi @ 28D PCD. 0.40 0.80 7.20 1 2.30 m³
- X2B-11A @ G.L. G-H 4000psi @ 28D PCD. 0.40 0.60 5.50 1 1.32 m³
- X2B-12A @ G.L. 4-3 4000psi @ 28D PCD. 0.40 0.80 8.60 1 2.75 m³
- X2B-12A @ G.L. 3-2 4000psi @ 28D PCD. 0.40 0.80 9.00 1 2.88 m³
- X2B-12A @ G.L. 2-1 4000psi @ 28D PCD. 0.40 0.80 8.30 1 2.66 m³
- X2B-13A @ G.L. 4-3 4000psi @ 28D PCD. 0.40 0.80 8.60 1 2.75 m³
- X2B-13A @ G.L. 3-2 4000psi @ 28D PCD. 0.40 0.80 9.00 1 2.88 m³
- X2B-13A @ G.L. 2-1 4000psi @ 28D PCD. 0.40 0.80 8.30 1 2.66 m³
- X2B-14A @ G.L. 4-3 4000psi @ 28D PCD. 0.40 0.80 8.60 1 2.75 m³
- X2B-14A @ G.L. 3-2 4000psi @ 28D PCD. 0.40 0.80 9.00 1 2.88 m³
- X2B-14A @ G.L. 2-1 4000psi @ 28D PCD. 0.40 0.80 8.30 1 2.66 m³
- X2B-14A @ G.L. 4-3 4000psi @ 28D PCD. 0.30 0.70 8.60 1 1.81 m³
- X2B-14A @ G.L. 3-2 4000psi @ 28D PCD. 0.30 0.70 9.00 1 1.89 m³
- X2B-14A @ G.L. 2-1 4000psi @ 28D PCD. 0.40 0.80 8.30 1 2.66 m³
Sub-total - 8: 96.78 m³
2.) Suspended Slabs
- XS-1A @ G.L. F-G/1-2 4000psi @ 28D PCD. 7.18 8.28 0.14 1 8.31 m³
- XS-1A @ G.L. G-H/1-2 4000psi @ 28D PCD. 5.50 8.28 0.14 1 6.37 m³
- XS-2A @ G.L. E-F/1-2 4000psi @ 28D PCD. 7.68 8.28 0.14 1 8.89 m³
- XS-2A @ G.L. E-G/2-4 4000psi @ 28D PCD. 14.85 17.65 0.14 1 36.69 m³
- XS-3A @ G.L. F-G/1+ 4000psi @ 28D PCD. 2.93 3.10 0.10 1 0.91 m³
Sub-total - 9: 64.24 m³
3.) Columns to Third Floor
- XC-1A 4000psi @ 28D PCD. 1.00 0.50 4.65 2 4.65 m³
- XC-2A 4000psi @ 28D PCD. 0.80 0.50 4.65 2 3.72 m³
- XC-3A 4000psi @ 28D PCD. 0.70 0.50 4.65 3 4.88 m³
- XC-4A 4000psi @ 28D PCD. 0.50 0.60 4.65 1 1.40 m³
- XC-5A 4000psi @ 28D PCD. 0.80 0.50 4.65 2 3.72 m³
- XC-6A 4000psi @ 28D PCD. 0.50 0.60 4.65 4 5.58 m³
- XC-7A 4000psi @ 28D PCD. 0.50 0.80 4.65 2 3.72 m³
- XC-9A 4000psi @ 28D PCD. 0.50 0.20 4.65 2 0.93 m³
Sub-total - 10: 30.03 m³
4.) Crane Beam Corbels
- XHB-1A 4000psi @ 28D PCD. 0.60 0.50 0.70 16 3.36 m³
Sub-total - 11: 3.53 m³
D. THIRD FLOOR
1.) Suspended Beams
- X3B-1A @ G.L. -G 4000psi @ 28D PCD. 0.20 0.40 2.90 1 0.23 m³
- X3B-2A @ G.L. F-G 4000psi @ 28D PCD. 0.30 0.80 7.20 1 1.73 m³
- X3B-3A @ G.L. F-G 4000psi @ 28D PCD. 0.40 0.80 7.20 1 2.30 m³
- X3B-4A @ G.L. 1-2 4000psi @ 28D PCD. 0.40 0.80 8.60 1 2.75 m³
- X3B-5A @ G.L. 4-3 4000psi @ 28D PCD. 0.40 0.80 8.60 2 5.50 m³
- X3B-5A @ G.L. 3-2 4000psi @ 28D PCD. 0.40 0.80 9.00 2 5.76 m³
- X3B-5A @ G.L. 2-1 4000psi @ 28D PCD. 0.40 0.80 8.30 2 5.31 m³
- X3B-6A @ G.L. 4-3 4000psi @ 28D PCD. 0.40 0.80 8.60 2 5.50 m³
- X3B-6A @ G.L. 3-2 4000psi @ 28D PCD. 0.40 0.80 9.00 2 5.76 m³
- X3B-7A @ G.L. E-F 4000psi @ 28D PCD. 0.40 0.80 7.70 1 2.46 m³
- X3B-7A @ G.L. F-G 4000psi @ 28D PCD. 0.40 0.70 7.20 1 2.02 m³
- X3B-7A @ G.L. G-H 4000psi @ 28D PCD. 0.40 0.80 5.50 1 1.76 m³
- X3B-8A @ G.L. E-F 4000psi @ 28D PCD. 0.50 0.90 7.70 1 3.47 m³
- X3B-8A @ G.L. F-G 4000psi @ 28D PCD. 0.50 0.80 7.20 1 2.88 m³
- X3B-8A @ G.L. G-H 4000psi @ 28D PCD. 0.40 0.80 5.50 1 1.76 m³
- X3B-9A @ G.L. E-F 4000psi @ 28D PCD. 0.60 0.90 7.70 1 4.16 m³
- X3B-9A @ G.L. F-G 4000psi @ 28D PCD. 0.60 0.90 7.20 1 3.89 m³
- X3B-9A @ G.L. G-H 4000psi @ 28D PCD. 0.40 0.60 5.50 1 1.32 m³
- X3B-10A @ G.L. E-F 4000psi @ 28D PCD. 0.40 0.80 7.70 1 2.46 m³
- X3B-10A @ G.L. F-G 4000psi @ 28D PCD. 0.40 0.80 7.20 1 2.30 m³
- X3B-10A @ G.L. G-H 4000psi @ 28D PCD. 0.40 0.60 5.50 1 1.32 m³
- X3B-11A @ G.L. 4-3 4000psi @ 28D PCD. 0.40 0.80 8.60 1 2.75 m³
- X3B-11A @ G.L. 3-2 4000psi @ 28D PCD. 0.40 0.80 9.00 1 2.88 m³
- X3B-11A @ G.L. 2-1 4000psi @ 28D PCD. 0.40 0.80 8.30 1 2.66 m³
- X3B-12A @ G.L. 4-3 4000psi @ 28D PCD. 0.40 0.80 8.60 1 2.75 m³
- X3B-12A @ G.L. 3-2 4000psi @ 28D PCD. 0.40 0.80 9.00 1 2.88 m³
- X3B-12A @ G.L. 2-1 4000psi @ 28D PCD. 0.40 0.80 8.30 1 2.66 m³
- X3B-13A @ G.L. 4-3 4000psi @ 28D PCD. 0.40 0.80 8.60 1 2.75 m³
- X3B-13A @ G.L. 3-2 4000psi @ 28D PCD. 0.40 0.80 9.00 1 2.88 m³
- X3B-13A @ G.L. 2-1 4000psi @ 28D PCD. 0.40 0.80 8.30 1 2.66 m³
- X3B-14A @ G.L. 4-3 4000psi @ 28D PCD. 0.30 0.70 8.60 1 1.81 m³
- X3B-14A @ G.L. 3-2 4000psi @ 28D PCD. 0.30 0.70 9.00 1 1.89 m³
- X3B-14A @ G.L. 2-1 4000psi @ 28D PCD. 0.40 0.80 8.30 1 2.66 m³
Sub-total - 12: 100.66 m³
2.) Suspended Slabs
- XS-3A @ G.L. -G 4000psi @ 28D PCD. 2.93 3.10 0.10 1 0.91 m³
- XS-4A @ G.L. F-G/1-2 4000psi @ 28D PCD. 7.18 8.28 0.15 1 8.91 m³
- XS-4A @ G.L. G-H/1-2 4000psi @ 28D PCD. 5.50 8.28 0.15 1 6.83 m³
- XS-5A @ G.L. E-F/1-2 4000psi @ 28D PCD. 7.68 8.28 0.15 1 9.53 m³
- XS-5A @ G.L. E-G/2-4 4000psi @ 28D PCD. 14.85 17.65 0.15 1 39.32 m³
Sub-total - 13: 68.76 m³
3.) Columns to Roof
- XC-2A 4000psi @ 28D PCD. 0.50 0.50 7.50 2 3.75 m³
- XC-3A 4000psi @ 28D PCD. 0.50 0.50 7.50 3 5.63 m³
- XC-4A 4000psi @ 28D PCD. 0.50 0.50 7.50 1 1.88 m³
- XC-5A 4000psi @ 28D PCD. 0.50 0.50 7.50 2 3.75 m³
- XC-6A 4000psi @ 28D PCD. 0.50 0.50 7.50 4 7.50 m³
- XC-7A 4000psi @ 28D PCD. 0.50 0.50 7.50 2 3.75 m³
- XC-9A 4000psi @ 28D PCD. 0.50 0.20 7.50 2 1.50 m³
Sub-total - 14: 29.14 m³
4.) Mid-Height Beams
- XMB-1A @ G.L. G-H 4000psi @ 28D PCD. 0.20 0.50 5.50 1 0.55 m³
- XMB-2A @ G.L. E-F 4000psi @ 28D PCD. 0.20 0.50 7.70 1 0.77 m³
- XMB-2A @ G.L. F-G 4000psi @ 28D PCD. 0.20 0.50 7.20 1 0.72 m³
- XMB-2A @ G.L. G-H 4000psi @ 28D PCD. 0.20 0.50 5.50 1 0.55 m³
- XMB-3A @ G.L. E-F 4000psi @ 28D PCD. 0.20 0.50 7.70 1 0.77 m³
- XMB-3A @ G.L. F-G 4000psi @ 28D PCD. 0.20 0.50 7.20 1 0.72 m³
- XMB-4A @ G.L. 4-3 4000psi @ 28D PCD. 0.20 0.60 8.60 1 1.03 m³
- XMB-4A @ G.L. 3-2 4000psi @ 28D PCD. 0.20 0.60 9.00 1 1.08 m³
- XMB-4A @ G.L. 2-1 4000psi @ 28D PCD. 0.20 0.60 8.30 1 1.00 m³
- XMB-5A @ G.L. 4-3 4000psi @ 28D PCD. 0.20 0.60 8.60 1 1.03 m³
- XMB-5A @ G.L. 3-2 4000psi @ 28D PCD. 0.20 0.60 9.00 1 1.08 m³
- XMB-6A @ G.L. 2-1 4000psi @ 28D PCD. 0.20 0.60 8.30 1 1.00 m³
Sub-total - 15: 10.81 m³
5.) Roof Beams
- XRB-1A @ G.L. G-H 4000psi @ 28D PCD. 0.30 0.50 5.50 1 0.83 m³
- XRB-2A @ G.L. E-F 4000psi @ 28D PCD. 0.30 0.60 7.70 1 1.39 m³
- XRB-2A @ G.L. F-G 4000psi @ 28D PCD. 0.30 0.60 7.20 1 1.30 m³
- XRB-2A @ G.L. G-H 4000psi @ 28D PCD. 0.30 0.50 5.50 1 0.83 m³
- XRB-3A @ G.L. E-F 4000psi @ 28D PCD. 0.30 0.60 7.70 1 1.39 m³
- XRB-3A @ G.L. F-G 4000psi @ 28D PCD. 0.30 0.60 7.20 1 1.30 m³
- XRB-4A @ G.L. 4-3 4000psi @ 28D PCD. 0.30 0.60 8.60 1 1.55 m³
- XRB-4A @ G.L. 3-2 4000psi @ 28D PCD. 0.30 0.60 9.00 1 1.62 m³
- XRB-4A @ G.L. 2-1 4000psi @ 28D PCD. 0.30 0.60 8.30 1 1.49 m³
- XRB-5A @ G.L. 4-3 4000psi @ 28D PCD. 0.30 0.60 8.60 1 1.55 m³
- XRB-5A @ G.L. 3-2 4000psi @ 28D PCD. 0.30 0.60 9.00 1 1.62 m³
- XRB-6A @ G.L. 2-1 4000psi @ 28D PCD. 0.30 0.60 8.30 1 1.49 m³
- XRB-7A @ G.L. G-H 4000psi @ 28D PCD. 0.30 0.50 5.50 1 0.83 m³
- XRB-8A @ G.L. 4-3 4000psi @ 28D PCD. 0.30 0.60 8.60 1 1.55 m³
- XRB-8A @ G.L. 3-2 4000psi @ 28D PCD. 0.30 0.60 9.00 1 1.62 m³
Sub-total - 16: 21.35 m³
6.) Corbels & Conc. Gutter
- Conc. Gutter 4000psi @ 28D PCD. 20.35 0.60 0.75 1 9.16 m³
- Corbels 4000psi @ 28D PCD. 0.40 0.60 0.50 10 1.20 m³
Sub-total - 17: 10.88 m³
E. EXTERIOR
1.) Sidewalk Development 3000psi @ 28D ORD. 1.20 20.35 0.20 1 4.88 m³
Sub-total - 18: 5.13 m³