SRC-IPC @ BERTH 1 PIPELINE DEMOLITION
Back
0 28-Nov-24 FOR CONSTRUCTION IH GC NG
THIS DRAWING, DOCUMENT AND ITS ATTACHMENT IS THE PROPERTY OF PLANT GENERAL SERVICES PTE LTD (PGS) AND THE A 28-Nov-24 PRELIMINARY FOR INFORMATION IH GC SRC
INFORMATION HEREIN SHALL NOT BE USED, DISTRIBUTED OR COPIED IN ANY MANNER WITHOUT WRITTEN PERMISSION OF PGS. REV. DATE DESCRIPTION BY CHKD. APPD.
BUILDER : CLIENT :
PLANT GENERAL SINGAPORE REFINING CO
SERVICES PTE LTD
Notes: TITLE :
1. The scaffold consist of 48.6mm *2.4thk steel pipes
2. Materials and construction of the scaffold shall comply with WSH (scaffold) Regulations. SRC-IPC @ BERTH 1 PIPELINE DEMOLITION
3. Diagonal bracings and lateral supports according to MOM requirements (or its equivalent)
are to be provided. For clarify reasons, they are not shown in the drawings to ease readings.
PROJECT SRC IPC
DATE REV SCALE
DRAWING No. PGS_SRC_PED_227 28-Nov-24 0 NOT TO SCALE
D:\work\PGS_SRC_PED_227 - Berth 1 pipeline demolition.xlsxPGS_SRC_PED_227 - Berth 1 pipeline demolition.xlsx
[Restricted] Page 1 of 1