Wa0005.
Wa0005.
A
ABB India Ltd. A
C C
SWITCHGEAR BASIC DATA
STANDARD IEC 62271-200 INTERNAL ARC CLASSIFICATION (IAC) TYPE AFLR
PRODUCT 702 UniGear ZS2 INTERNAL ARC CLASSIFICATION (IAC) CURRENT 706 31.5 kA
SYSTEM VOLTAGE 707 33 kV INTERNAL ARC CLASSIFICATION (IAC) TIME 703 1s
BUSBAR CURRENT 703 1250A DEGREE OF PROTECTION IP 4X
SHORT TIME CURRENT 706 31.5 kA DEGREE OF PROTECTION - INTERNAL IP 2X
D D
SHORT TIME CURRENT DURATION 702 3 second MV PHASE DESIGNATION R,Y,B
FREQUENCY 701 50 Hz ALTITUDE <1000 Meter
BUS BAR MATERIAL 702 COPPER AUXILIARY CONTROL VOLTAGE 704 110VDC
BASIC INSULATION LEVEL(BIL) 706 70/170 kVp MOTOR CONTROL VOLTAGE 711 230VAC
AMBIENT 701 40 Deg. C AC CONTROL VOLTAGE 703 230VAC
CIRCUIT BREAKER MOUNTING 702 FRCB PANEL TOTAL QUANTITY 1
E E
BUS BAR INSULATING MATERIAL 703 HONGSHANG MAKE SLEEVE
FACTORY AS-BUILT
MAIN SYSTEM 3 PHASE; 3 WIRE; AC
INSTALLATION INDOOR
MIMIC 708 33kV, OLIVE GREEN PAINT MIMIC
21.08.2024
F During the installation, commissioning period and the time of operation, client is obliged to follow all instructions and recommendation given by manufacturers of individual instruments installed inside supplied equipment F
Based on Prepared MSP Date 16/4/2024 Title Order No = HA00
COMMON DRAWINGS
Customer:SLATHIA CONSTRUCTION WORKS Checked KM Approved SR 4202889447-01 +
Project name PROJECT TITLE PAGE DCC Code & EFA Lang.
Contractor: 33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2 Doc. No. Page A01
Rev. Code Date Name India Ltd., Nashik, ELDS YN1V300010-HA-ML
YN1V300013-HA-SLD Pages 3
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
E) LABEL
GENERAL INFORMATION
© Copyright 2012 ABB. All rights reserved.
D) FERRULE MARKING
D.C. CIRCUIT +VE, TRIPPING BUS K1
E4) LAMP/PUSH BUTTON (Ø22.5mm) LABEL
D.C. CIRCUIT -VE, TRIPPING BUS K2
D.C. CIRCUIT +VE, CLOSING BUS K3
D.C. CIRCUIT -VE, CLOSING BUS K4
MAIN DC, +VE J1
MAIN DC, -VE J2
A.C. CIRCUIT Ph H1
E A.C. CIRCUIT N H2 E
D.C. CIRCUIT APPARATUS TO APPARATUS MARKING ODD FERRULE (K5,K7..K97)
A.C. CIRCUIT APPARATUS TO APPARATUS MARKING ODD FERRULE (H5,H7...H97)
FACTORY AS-BUILT
CURRENT CIRCUIT, METERING D
CURRENT CIRCUIT, PROTECTION C
VOLTAGE CIRCUIT E
INDICATION CIRCUIT L
MOTOR CIRCUIT M
SPARE CONTACTS U
21.08.2024
F F
Based on Prepared MSP Date 16/4/2024 Title Order No = HA00
COMMON DRAWINGS
Customer:SLATHIA CONSTRUCTION WORKS Checked KM Approved SR 4202889447-01 +
Project name GEN. SPECIFICATION OF SWGR. DCC Code &EFS Lang.
Contractor: 33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2 Doc. No. Page C01
Rev. Code Date Name India Ltd., Nashik, ELDS YN1V300013-HA-SLD Pages 3
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved.
E E
A A
NOTE SHEET
1) CT’s adequacy (selection of VA Burden, ALF & ISF) is a part of System Study.
B B
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk
C C
D D
E E
INCOMING CABLE
-PGA1 DIGITAL AMMETER DIGI. AMMETER
OUTGOING CABLE
M -PJ1 HOOTER
N
-SFS1 T C
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk
L R
-SFS2 LOCAL-REMOTE SWITCH
-PGM12
-PGM12 12 WINDOW ANNUNCIATOR 12W
D D
P2
E E
E E
B B
51 IDMT. OVER CURRENT PROTECTION
C 86 MASTER TRIP C
D D
E E
SPECIFICATION OF HV SWITCHBOARD
1) ABBREVIATIONS:
A A
A : AMPERE
AC : ALTERNATING CURRENT ENCLOSURE AND PROTECTION:
CT : CURRENT TRANSFORMER 4.1) THE HIGH VOLTAGE SWITCHBOARD METAL-ENCLOSED AND COMPRISE OF STANDARD PREFABRICATED, ALU-ZINC, ASSEMBLED TO FORM A
DC : DIRECT CURRENT RIGID, FREESTANDING. WHEREVER REQUIRED, STIFFENERS SHALL BE PROVIDED TO INCREASE STIFFNESS OF LARGE SIZE DOORS AND COVERS.
HV : HIGH VOLTAGE AS AN ALTERNATIVE ALUZINC/PRE-GALVANISED SHEET STEEL CAN ALSO BE PROVIDED FOR INTERNAL INTER-PANEL PARTITIONS ONLY.
Hz : HERTZ HOWEVER, ALL EXTERNAL SURFACE OF ALU-ZINC WITHOUT PAINT.
IAC : INTERNAL ARC CLASSIFICATION
IEC : INTERNATIONAL ELECTRO-TECHNICAL COMMISSION 4.2) VERTICAL PANELS ASSEMBLED TO FORM A CONTINUOUS LINE-UP OF UNIFORM HEIGHT BOTH FOR HV CHAMBER AS WELL AS CONTROL CHAMBER.
IP : INGRESS PROTECTION REAR EXTENSION PANELS FULL HEIGHT, IF APPLICABLE. HOWEVER, HV CHAMBER HEIGHT DIFFERENT FROM CONTROL CHAMBER HEIGHT.
kV : Kilo Volt
kW : Kilo Watt
kWH : Kilo Watt Hour 4.3) THE SWITCHBOARDS TOTALLY ENCLOSED AND VERMIN-PROOF IF NECESSARY, OPENINGS FOR NATURAL VENTILATION PROVIDED
LED : LIGHT EMITTING DIODE THESE SHALL BE LOUVERED AND PROVIDED WITH WIRE MESH HAVING OPENING LESS THAN 1 MM. DESIGN OF LOUVERS/ OPENING SHALL BE SUCH
LSC : LOSS OF SERVICE CONTINUITY THAT THE ARC DOES NOT COME OUT IN CASE OF INTERNAL ARC. THE ENCLOSURE HAVE COMPLETE PROTECTION AGAINST APPROACH TO LIVE PARTS OR
B MCB : MINIATURE CIRCUIT BREAKER CONTACT WITH INTERNAL MOVING PARTS (IP-4X) AS PER IS/IEC: 60529. B
NO : NORMALLY OPEN CONTACT
NC : NORMALLY CLOSE CONTACT 4.4) ALL OPENINGS DOORS PROVIDED WITH SUITABLE GASKETS AROUND THE PERIMETER
PO : PURCHASE ORDER TO MAKE THE SWITCHBOARD DUST AND VERMIN PROOF WHENEVER APPLICABLE
PT : POTENTIAL TRANSFORMER
p.u. : PER UNIT 4.5) EACH UNIT OF THE SWITCHGEAR HAVE NECESSARY INTERNAL SHEET METAL BARRIERS TO FORM SEPARATE COMPARTMENTS FOR CIRCUIT BREAKER,
PVC : POLY VINYL CHLORIDE BUSBARS, INSTRUMENTS AND RELAYS, CABLE CONNECTIONS ETC. COMPARTMENTS FOR CABLE CONNECTIONS ALLOW CABLE TERMINATION
SWG : STANDARD WIRE GUAGE AND CONNECTION WORK WITH THE SWITCHGEAR ENERGISED. NOT APPLICABLE FOR INCOMING CUM OUTGOING FEEDER
VCB : VACUUM CIRCUIT BREAKER
VT : VOLTAGE TRANSFORMER 4.6) THE PANEL INTERNAL ARC TESTED AS PER IS/IEC 62271-200
XLPE : CROSS LINKED POLY ETHYLENE
4.7) SAFETY BARRIERS / SHUTTERS PROVIDED TO PERMIT PERSONNEL TO WORK SAFELY WITHIN AN EMPTY COMPARTMENT WITH THE BUS BARS
ENERGISED. LOSS OF SERVICE CONTINUITY (LSC) CATEGORY OF THE SWITCHGEAR LSC2B AS PER IS/IEC-62271-200
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk
4.8) THE DRAWOUT CARRIAGE ON THE SWITCHBOARD HAVE THREE POSITIONS: "SERVICE", "TEST" AND "DRAWOUT/ISOLATED" VIZ:
C - "FULL IN" OR "SERVICE" POSITION - IN THIS POSITION BOTH POWER AND CONTROL CIRCUITS CONNECTED. THIS IS THE NORMAL OPERATING POSITION OF
C
2) CODES AND STANDARDS:
THE CIRCUIT BREAKER
2.1) FOLLOWING STANDARDS UNLESS OTHERWISE SPECIFIED: - "TEST" POSITION - THE POWER CONTACTS DISCONNECTED IN THIS POSITION BUT THE CONTROL CONNECTIONS SHALL NOT BE DISTURBED, IT SHALL
BE POSSIBLE TO CLOSE AND TRIP THE BREAKERS IN THIS POSITION BASED ON FEEDER-WISE OPERATION TO FULFILL THE CIRCUIT.
IS: 1248 : DIRECT ACTING INDICATING ANALOGUE ELECTRICAL MEASURING INSTRUMENTS AND THEIR ACCESSORIES
- "DRAW OUT/ISOLATED" POSITION - BOTH POWER AND CONTROL CIRCUITS DISCONNECTED IN THIS POSITION.
IS: 2705 : CURRENT TRANSFORMERS
CIRCUIT BREAKER OPERATION POSSIBLE ONLY IN "SERVICE" AND "TEST" POSITIONS. THE CIRCUIT
IS: 5082 : WROUGHT ALUMINIUM AND ALUMINIUM ALLOY BARS, RODS, TUBES AND SECTIONS FOR ELECTRICAL PURPOSES
BREAKER LOCKABLE IN "TEST" / "SERVICE" POSITIONS. AUTOMATIC SAFETY SHUTTERS PROVIDED TO ENSURE THE INACCESSIBILITY OF ALL LIVE
IS: 5578 : GUIDE FOR MARKING OF INSULATED CONDUCTORS
PARTS AFTER THE CARRIAGE IS DRAWN OUT. SEPARATE DOOR FOR THE BREAKER COMPARTMENT, WHICH CLOSED WITH THE CARRIAGE IN DRAWOUT
IS: 6005 : CODE OF PRACTICE FOR PHOSPHATING OF IRON AND STEEL
POSITION AND LOCKABLE TYPE.
IS: 11353 : GUIDE FOR UNIFORM SYSTEM OF MARKING AND IDENTIFICATION OF CONDUCTORS & APPARATUS TERMINALS
IS: 13703 : LOW VOLTAGE FUSES FOR VOLTAGES NOT EXCEEDING 1000V AC OR 1500V DC
IEC 60282-1 : HIGH VOLTAGE FUSES — CURRENT LIMITING FUSES 5) INTERLOCK:
IS/ IEC 60529: DEGREE OF PROTECTION PROVIDED BY ENCLOSURE
IEC 62271 : HIGH VOLTAGE SWITCHGEAR AND CONTROLGEAR 5.1) ALL CIRCUIT BREAKER MODULES OF THE SAME RATING INTER-CHANGEABLE.
SUITABLE INTERLOCKS PROVIDED TO PREVENT THE FOLLOWING OPERATIONS:
D -"PLUGGING IN" OR "DRAWING OUT" OF A CLOSED BREAKER. D
"PLUGGING IN" A BREAKER WITH THE EARTHING SWITCH/ISOLATOR CLOSED.
"CLOSING" OF THE EARTHING SWITCH/ISOLATOR WITH THE BREAKER "PLUGGED IN".
-PULLING OUT THE AUXILIARY CIRCUIT PLUG WITH THE BREAKER IN THE SERVICE POSITION.
PUSHING IN THE BREAKER TO THE SERVICE POSITION, WITH THE AUXILIARY CIRCUIT PLUG NOT IN POSITION.
ALL OPERATIONS SUCH AS BREAKER RACK-IN, BREAKER RACK-OUT, BREAKER ON/OFF, SPRING CHARGING, EARTH SWITCH ON/OFF ETC.
POSSIBLE ONLY WITH PANEL DOOR CLOSED.
3) SITE CONDITIONS:
3.1) THE SWITCHBOARDS SUITABLE FOR INSTALLATION AND SATISFACTORY OPERATION
IN AN AIR CONDITIONED/ PRESSURISED SUB-STATION OR IN A SUBSTATION WITH RESTRICTED
NATURAL AIR VENTILATION OR IN A COVERED SHED/ ENCLOSED ELECTRICAL ROOM (E-ROOM)
E IN A TROPICAL, HUMID AND CORROSIVE ATMOSPHERE. E
3.2) THE SWITCHBOARDS DESIGNED TO OPERATE UNDER SITE CONDITIONS. IF NOT SPECIFICALLY MENTIONED THEREIN,
FACTORY AS-BUILT
A DESIGN AMBIENT TEMPERATURE OF 701 40 Deg. C AND AN ALTITUDE NOT EXCEEDING 1000 METRES ABOVE MEAN SEA LEVEL SHALL BE CONSIDERED.
...................
3.3) ALL EQUIPMENTS DESCRIBED IN THIS SPECIFICATION ARE INTENDED FOR CONTINUOUS DUTY OPERATION,
AS PER NAMEPLATE RATING UNDER THE SPECIFIED AMBIENT CONDITIONS, UNLESS INDICATED OTHERWISE.
21.08.2024
F F
Based on Prepared MSP Date 16/4/2024 Title Order No = HA00
COMMON DRAWINGS
Customer:SLATHIA CONSTRUCTION WORKS Checked KM Approved SR 4202889447-01 + SLD
Project name SWITCHGEAR SPECIFICATION DCC Code &EFS Lang.
Contractor: 33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2 Doc. No. Page A06
Rev. Code Date Name India Ltd., Nashik, ELDS YN1V300013-HA-SLD Pages 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
6) ACCESSIBILITY
© Copyright 2012 ABB. All rights reserved.
6.1) ALL RELAYS, METERING, AND CONTROL COMPONENTS MOUNTED ON THE PANEL FRONT.
HOWEVER, AUXILIARY CONTACT MULTIPLIER RELAYS WITH AUTO RESET MOUNTED INSIDE THE PANEL.
6.2) THE SWITCHGEAR ACCESSIBLE TO AUTHORIZED PERSONNEL HAVING ACCESS ALL AROUND AND TESTED
A FOR FOLLOWING TYPE OF ACCESSIBILITY AS PER IS/IEC 62271-200: A
TYPE OF ACCESSIBILITY AFLR WHERE
ACCESSIBILITY TYPE A : RESTRICTED TO AUTHORISED PERSONNEL ONLY
F : FOR FRONT SIDE
L : FOR LATERAL SIDE
R : FOR REAR SIDE
7) BUSBAR ( IF APPLICABLE )
7.1) THE SWITCHBOARD COMPRISES OF 3-PHASE BUS BARS WHICH EXTEND THROUGH ALL UNITS OF THE SWITCHGEAR LINE-UP.
THE MAIN BUS BARS HAVE UNIFORM CROSS-SECTION THROUGHOUT THEIR LENGTH AND
TO CARRY CONTINUOUSLY THE RATED CURRENT.
7.5) BUS BARS MARKED WITH RED, YELLOW AND BLUE COLOUR STICKERS FOR EASY PHASE IDENTIFICATION
7.6) THE HOT SPOT TEMPERATURE OF BUSBARS, INCLUDING JOINTS, AT DESIGN AMBIENT TEMPERATURE FOR SILVER PLATED JOINTS ALLOWABLE
MAXIMUM TEMPERATURE 115°C IN LINE WITH IS/IEC-62271-1.
8.1) MINIMUM OF 10% SPARE TERMINALS PROVIDED ON TOTAL QUANTITY OF TERMINAL BLOCK
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk
SPARE CONTACTS WILL BE WIRED ACCORDING TO THE SPACE AVAILABILITY IN METERING (LOW VOLTAGE) COMPARTMENT.
C 8.2) EACH WIRE IDENTIFIED AT BOTH ENDS BY CORRECTLY SIZED SLEEVE TYPE FERRULES, C
DISCONNECTING TYPE TERMINAL BLOCK PROVIDED FOR ALL CT TERMINALS AS APPLICABLE
8.3) UNLESS OTHERWISE SPECIFIED, ALL CONTROL CABLES ENTER THE SWITCHBOARD FROM THE BOTTOM.
9) SPACE HEATER:
9.1) THE PANELS PROVIDED WITH SPACE HEATERS TO PREVENT MOISTURE CONDENSATION,
AND MAINTAIN CUBICLE TEMPERATURE 1°C ABOVE THE AMBIENT
10) PAINTING:
10.1) ALUZINC / PRE-GALVANISED SHEET, WHEREVER PROVIDED, WITHOUT PAINTED
D D
E E
A * A
CB ACCESSORIES==> R4 RL2 110VDC SUPPLY
BASIC PANEL PARAMETER TI4 Trip Coil-110VDC-INST.
-QAB 709 RED FERRULE FOR CB TRIP CKT.
VD4 CB, (1250A) 707 33 kV
703 1250A JR4 CIRCUIT_BREAKER_RATING
M FRCB
1VYN400989-MH 706 31.5 kA / 702 3 second
701 50 Hz
701 40 Deg. C AMBIENT TEMP.
702 COPPER BUSBAR
703 HONGSHANG MAKE SLEEVE
TEMP RISE: IEC 62271-1(2017)
P2 -BCT(CT)
CTR:150-300/1-1A
B CORE 1: 5VA CL:0.5,ISF<=10 * B
MOTOR CONTROL VOLTAGE 711 230VAC
CORE 2: Vk>=(16)*(Rct+4)Vk>96V,RCT<=2 Ohm FOR 150/1A
Imag<=30mA@Vk/2
STC:31.5kA /3Sec,
P1 BIL: 36kV/70kVrms/170kVpeak.
**ARC SENSOR
DESCRIPTION ARTICEL NO QTY.NO. COMPARTMENT
1RX3CX240mm² 1RX3CX240mm²
XLPE XLPE
D D
PANEL HA01
METERING FUNCT.RLY NA
E COMMUNICATION IEC 61850 PROTOCOL WITH ONE RJ45 PORT ON REAR SIDE E
-PFR1 -PFG1 -PFA1 -PFW1 -PFB1 -PFG2 -PFR2 -PFR3 -PFY3 -PFB3
-PGA1
DIGI. AMMETER
-PGV1
-KFE1
POWER PACK
-PGM1
EPB
FACTORY AS-BUILT
-SFO1 -PFF1 -PFF3 -PFF5 -PFF7
63
X/Y
49
X/Y
49O
X/Y
-PJ1
49OL
X/Y
-PGM12
12W
-SFS1 SFS2
T
N
C L R
21.08.2024
NOTE:
ABB INTERNAL USE
*
###
*
F DIGI. VOLTMETER MFM
F
Based on Prepared MSP Date 16/4/2024 Title Order No = HA00
COMMON DRAWINGS
Customer:SLATHIA CONSTRUCTION WORKS Checked KM Approved SR 4202889447-01 + SLD
Project name TYPICAL SLD ICOG DCC Code &EFA Lang.
Contractor: 33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2 Doc. No. Page A08
Rev. Code Date Name India Ltd., Nashik, ELDS YN1V300013-HA-SLD Pages 8
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. Bill Of Material
DT Function text Manufacturer Description ERP number Mounting 1 Page Total
site HA01 total
ICOG
A EB2 SPACE HEATER (CABLE COMP.) GIRISHEGO GIRISHEGO ALUMINUM SPACE HEATERS CAPACITY 1VYN434059-407 CAB 1 1 1 A
:200W, 220-250VAC MODEL: SAL, 200W HEATER
LENGTH-270mm, C-C FIXING HOLD=236mm +/- 2mm,
EB3 SPACE HEATER (CABLE COMP.) GIRISHEGO GIRISHEGO ALUMINUM SPACE HEATERS CAPACITY 1VYN434059-407 CAB 1 1 1
:200W, 220-250VAC MODEL: SAL, 200W HEATER
LENGTH-270mm, C-C FIXING HOLD=236mm +/- 2mm,
EB4 SPACE HEATER (CABLE COMP.) GIRISHEGO GIRISHEGO ALUMINUM SPACE HEATERS CAPACITY 1VYN434059-407 CAB 1 1 1
:200W, 220-250VAC MODEL: SAL, 200W HEATER
LENGTH-270mm, C-C FIXING HOLD=236mm +/- 2mm,
EB1 SPACE HEATER (CB COMP.) GIRISHEGO MAKE: GIRISHEGO, ALUMINUM SPACE HEATERS 1VYN434059-406 CB 1 1 1
CAPACITY :100W-220-250VAC, MODEL: SAL, 100W
HEATER LENGTH-250mm, C-C FIXING HOLD=236mm
B +/- 2mm B
CT_B1 CURRENT TRANSFORMER B-PH AS PER SLD MAKE CTR:150-300/1-1A CORE 1: 5VA CL:0.5,ISF<=10 CORE 4202889447.3001 CT 1 1 1
LIST 2: Vk>=(16)*(Rct+4)Vk>96V,RCT<=2 Ohm FOR 150/1A
Imag<=30mA@Vk/2 STC:31.5kA /3Sec, BIL:
36kV/70kVrms/170kVpeak
CT_R1 CURRENT TRANSFORMER R-PH AS PER SLD MAKE CTR:150-300/1-1A CORE 1: 5VA CL:0.5,ISF<=10 CORE 4202889447.3001 CT 1 1 1
LIST 2: Vk>=(16)*(Rct+4)Vk>96V,RCT<=2 Ohm FOR 150/1A
Imag<=30mA@Vk/2 STC:31.5kA /3Sec, BIL:
36kV/70kVrms/170kVpeak
CT_Y1 CURRENT TRANSFORMER Y-PH AS PER SLD MAKE CTR:150-300/1-1A CORE 1: 5VA CL:0.5,ISF<=10 CORE 4202889447.3001 CT 1 1 1
LIST 2: Vk>=(16)*(Rct+4)Vk>96V,RCT<=2 Ohm FOR 150/1A
Imag<=30mA@Vk/2 STC:31.5kA /3Sec, BIL:
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk
36kV/70kVrms/170kVpeak
C C
BCF1-BPA2 ARC SENSOR-BREAKER ABB lens type arc-protection sensor with optical fiber and 1MRS120534-3 LV 1 1 1
COMPARTMENT DNP-connector , 3m length ,
BCF1-BPA1 ARC SENSOR-CABLE COMPARTMENT ABB 1MRS120534-5 lens type arc-protection sensor with 1MRS120534-5 LV 1 1 1
optical fiber and DNP-connector 5m length
BCF1-BPA3 ARC SENSOR-BUS-BAR COMPARTMENT ABB 1MRS120534-5 lens type arc-protection sensor with 1MRS120534-5 LV 1 1 1
optical fiber and DNP-connector 5m length
KFA1 PSU6(52X) CB CONTACT MULTIPLIER ABB-MANEJA PSU6n_X (Breaker Contact Multiplier)(52X) 1MYN563617-DAF LVA 1 1 1
RELAY Contacts:3NO+3NC Aux Voltage:110VDC Electrically
Reset Type Relay, Projection Mounted on Plug in Base.
EA1 ILUMINATION LAMP CRAFTTECH 3W LED Tube Light with fixture Model / Part No : 1VYN434059-092 LVA 1 1 1
CR-LTL-230-A-3W, Input Voltage : 230V AC +/- 10%
D 50/60Hz Dimension (mm) :125 X 22 X 36mm. D
FCD38 FUSE,ANN,+VE EATON MAKE:EATON NSD2--2A, FUSELINK CLIP ON TYPE, 1VYN434066-111 LVA 1 1 1
FCD39 FUSE,ANN,-VE EATON MAKE:EATON NSD2--2A, FUSELINK CLIP ON TYPE, 1VYN434066-111 LVA 1 1 1
FCD5 FUSE FOR CLOSING CKT + EATON MAKE:EATON NSD4--4A,, FUSELINK,, CLIP ON TYPE , 1VYN434066-112 LVA 1 1 1
FCD6 FUSE FOR CLOSING CKT - EATON MAKE:EATON NSD4--4A,, FUSELINK,, CLIP ON TYPE , 1VYN434066-112 LVA 1 1 1
FCD13 FUSE,PT SEC,R-PH EATON MAKE:EATON NSD4--4A,, FUSELINK,, CLIP ON TYPE , 1VYN434066-112 LVA 1 1 1
FCD14 FUSE,PT SEC,Y-PH EATON MAKE:EATON NSD4--4A,, FUSELINK,, CLIP ON TYPE , 1VYN434066-112 LVA 1 1 1
FCD15 FUSE,PT SEC,B-PH EATON MAKE:EATON NSD4--4A,, FUSELINK,, CLIP ON TYPE , 1VYN434066-112 LVA 1 1 1
FCD5 FUSE FOR CLOSING CKT + EATON MAKE:EATON , FA20 FUSE FITTING (BASE),, FOR CLIP 1VYN434066-121 LVA 1 1 1
ON FITTING (BASE).
E FCD6 FUSE FOR CLOSING CKT - EATON MAKE:EATON , FA20 FUSE FITTING (BASE),, FOR CLIP 1VYN434066-121 LVA 1 1 1 E
ON FITTING (BASE).
FCD13 FUSE,PT SEC,R-PH EATON MAKE:EATON , FA20 FUSE FITTING (BASE),, FOR CLIP 1VYN434066-121 LVA 1 1 1
FACTORY AS-BUILT
ON FITTING (BASE).
FCD14 FUSE,PT SEC,Y-PH EATON MAKE:EATON , FA20 FUSE FITTING (BASE),, FOR CLIP 1VYN434066-121 LVA 1 1 1
ON FITTING (BASE).
FCD15 FUSE,PT SEC,B-PH EATON MAKE:EATON , FA20 FUSE FITTING (BASE),, FOR CLIP 1VYN434066-121 LVA 1 1 1
ON FITTING (BASE).
FCD38 FUSE,ANN,+VE EATON MAKE:EATON , FA20 FUSE FITTING (BASE),, FOR CLIP 1VYN434066-121 LVA 1 1 1
ON FITTING (BASE).
21.08.2024
F F
Based on Prepared MSP Date 16/4/2024 Title Order No = HA00
COMMON DRAWINGS
Customer:SLATHIA CONSTRUCTION WORKS Checked KM Approved SR 4202889447-01 + BOM
Project name Bill of material DCC Code Lang.
Contractor: 33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2 Doc. No. Page A01
Rev. Code Date Name India Ltd., Nashik, ELDS YN1V300011-HA-BOM Pages 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. Bill Of Material
DT Function text Manufacturer Description ERP number Mounting 1 Page Total
site HA01 total
ICOG
A FCD39 FUSE,ANN,-VE EATON MAKE:EATON , FA20 FUSE FITTING (BASE),, FOR CLIP 1VYN434066-121 LVA 1 1 1 A
ON FITTING (BASE).
SFC6 TOGGLE SWITCH (SPACE HEATER) SWITRON MAKE:SWITRON, ST121B Toggle Switch 10A 240V AC. 1VYN452150-362 LVA 1 1 1
XDS1 POWER SUPPLY 3PIN SOCKET Anchor 3 Pin Socket,6/16A,240VAC, Color:- White Cat no:- 1VYN452150-734 LVA 1 1 1
39996(PENTA S.S) SOCKET OUTLET WITH SWITCH &
COMPLETE ASSLY COMBINE WITH BOX, 2 FIXING HOLES
SFC1 DOOR INTERLOCK SWITCH SURAJ Door Interlock Switch Ratings:250 VAC +/-10%, 2A, 1VYN452305-003 LVA 1 1 1
Range :Push to OFF Screw Type Terminal.
RAR1 RESISTOR FOR TCS1 CIRCUIT OMEGA MO Resistor 22K/10W 5% With Bakelite 1VYN452328-001 LVA 1 1 1
(1MYN531601-004)(110VDC)
RAR4 LOAD RESISTOR T.E Load Resistor 150 ohms 250W, IN55160006-3 LVA 1 1 1
B FCM2 FOR PANEL DC SUPPLY ABB Product ID:1SYS252067R0064, Poles:2P,,Characteristic:C 1SYS252067R0064 LVB 1 1 1 B
Product description: 2P, C-Curve, 6A, 6kA Product
type:SB202-C6DC.
FCM1 SPRING CHARGING MOTOR ABB Product ID:1SYS272012R0024 Poles:2P,,Characteristic:C, 1SYS272012R0024 LVB 1 1 1
Product description: 2P, C-Curve, 2A, 10kA Product
type:SB202M-C2 System Voltage:Suitable upto 415 V AC
Maximum Maximum,,60 V DC
FCM3 PANEL AC SUPPLY ABB Product ID:1SYS272012R0064, Poles:2P,,Characteristic:C, 1SYS272012R0064 LVB 1 1 1
Product description: 2P, C-Curve, 6A, 10kA Product type:
SB202M-C6 System Voltage:Suitable upto 415 V AC
Maximum,,60 V DC.
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk
BER1 CRM4(95) TCS HEALTHY ABB-PEENYA TYPE: CR-M110DC4 ORDERING 1VYN401056-004 LVB 1 1 1
C CODE:1SVR405613R8000, (1VYN401056-004), C
Contacts:4C/O SR, Plug-in Relay, Aux.Voltage:110VDC ,
KFA5 CRM4(30SX) CB IN SERVICE ABB-PEENYA TYPE: CR-M110DC4 ORDERING 1VYN401056-004 LVB 1 1 1
CODE:1SVR405613R8000, (1VYN401056-004),
Contacts:4C/O SR, Plug-in Relay, Aux.Voltage:110VDC ,
KFA7 CRM4(SCX) SPRING CHARGING ABB-PEENYA TYPE: CR-M110DC4 ORDERING 1VYN401056-004 LVB 1 1 1
CODE:1SVR405613R8000, (1VYN401056-004),
Contacts:4C/O SR, Plug-in Relay, Aux.Voltage:110VDC ,
KFL1 MULTIPLIER LOCKOUT RELAY ABB-PEENYA TYPE: CR-M110DC4 ORDERING 1VYN401056-004 LVB 1 1 1
CODE:1SVR405613R8000, (1VYN401056-004),
Contacts:4C/O SR, Plug-in Relay, Aux.Voltage:110VDC ,
KFN1 ANTIPUMPING RELAY ABB-PEENYA TYPE: CR-M110DC4 ORDERING 1VYN401056-004 LVB 1 1 1
D CODE:1SVR405613R8000, (1VYN401056-004), D
Contacts:4C/O SR, Plug-in Relay, Aux.Voltage:110VDC ,
BER1 CRM4(95) TCS HEALTHY ABB SOCKET ,CR-M4SS, FOR-2/4-C/O STD/SCREW , 1VYN401056-009 LVB 1 1 1
1SVR405651R3000. BASE FOR, CR-M4SS RELAY, ABB
KFA5 CRM4(30SX) CB IN SERVICE ABB SOCKET ,CR-M4SS, FOR-2/4-C/O STD/SCREW , 1VYN401056-009 LVB 1 1 1
1SVR405651R3000. BASE FOR, CR-M4SS RELAY, ABB
KFA7 CRM4(SCX) SPRING CHARGING ABB SOCKET ,CR-M4SS, FOR-2/4-C/O STD/SCREW , 1VYN401056-009 LVB 1 1 1
1SVR405651R3000. BASE FOR, CR-M4SS RELAY, ABB
KFL1 MULTIPLIER LOCKOUT RELAY ABB SOCKET ,CR-M4SS, FOR-2/4-C/O STD/SCREW , 1VYN401056-009 LVB 1 1 1
1SVR405651R3000. BASE FOR, CR-M4SS RELAY, ABB
KFN1 ANTIPUMPING RELAY ABB SOCKET ,CR-M4SS, FOR-2/4-C/O STD/SCREW , 1VYN401056-009 LVB 1 1 1
1SVR405651R3000. BASE FOR, CR-M4SS RELAY, ABB
E E
BER1 CRM4(95) TCS HEALTHY ABB Holding clamp, for CRM relays, CR-MH1, Metal holder ,for 1VYN401056-021 LVB 1 1 1
CR-M sockets, 1SVR405659R1100. ABB.
FACTORY AS-BUILT
KFA5 CRM4(30SX) CB IN SERVICE ABB Holding clamp, for CRM relays, CR-MH1, Metal holder ,for 1VYN401056-021 LVB 1 1 1
CR-M sockets, 1SVR405659R1100. ABB.
KFA7 CRM4(SCX) SPRING CHARGING ABB Holding clamp, for CRM relays, CR-MH1, Metal holder ,for 1VYN401056-021 LVB 1 1 1
CR-M sockets, 1SVR405659R1100. ABB.
KFL1 MULTIPLIER LOCKOUT RELAY ABB Holding clamp, for CRM relays, CR-MH1, Metal holder ,for 1VYN401056-021 LVB 1 1 1
CR-M sockets, 1SVR405659R1100. ABB.
KFN1 ANTIPUMPING RELAY ABB Holding clamp, for CRM relays, CR-MH1, Metal holder ,for
CR-M sockets, 1SVR405659R1100. ABB.
1VYN401056-021 LVB
21.08.2024
1 1 1
F F
Based on Prepared MSP Date 16/4/2024 Title Order No = HA00
COMMON DRAWINGS
Customer:SLATHIA CONSTRUCTION WORKS Checked KM Approved SR 4202889447-01 + BOM
Project name Bill of material DCC Code Lang.
Contractor: 33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2 Doc. No. Page A02
Rev. Code Date Name India Ltd., Nashik, ELDS YN1V300011-HA-BOM Pages 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. Bill Of Material
DT Function text Manufacturer Description ERP number Mounting 1 Page Total
site HA01 total
ICOG
A BT1 THERMOSTAT (SPACE HEATER) GIRISHEGO MAKE: GIRISHEGO, DLX MODEL THERMOSTAT WITH 1VYN434059-408 LVB 1 1 1 A
FIXING BRACKET 7" LONG RANGE : 25 TO 85 Deg.C
15AMP 250VAC, MODEL NO : DLX -7 LB,
QBL25 PT SEC LINK EATON MAKE:EATON, F1 25A NEUTRAL LINK , 1VYN434066-119 LVB 1 1 1
QBL25 PT SEC LINK EATON MAKE:EATON , FA20 FUSE FITTING (BASE),, FOR CLIP 1VYN434066-121 LVB 1 1 1
ON FITTING (BASE).
PFF1 CV2D2J(63X/Y) BUCHHOLZ ABB-MANEJA TRANSFORMER FAULT RELAY, ARTICLE NO.: 1MYN563627-DBB LVD 1 1 1
ALARM/TRIP 1MYN563627-DBB CV2D2J,Aux Relay, Flush Mounting
Case Size:1/2 Contacts:4NO SR with HR flag Aux
Voltage:110VDC'.
PFF3 CV2D2J(49X/Y) WDG TEMP HIGH ABB-MANEJA TRANSFORMER FAULT RELAY, ARTICLE NO.: 1MYN563627-DBB LVD 1 1 1
ALARM/TRIP 1MYN563627-DBB CV2D2J,Aux Relay, Flush Mounting
B Case Size:1/2 Contacts:4NO SR with HR flag Aux B
Voltage:110VDC'.
PFF5 CV2D2J(49OX/Y) OIL TEMP HIGH ABB-MANEJA TRANSFORMER FAULT RELAY, ARTICLE NO.: 1MYN563627-DBB LVD 1 1 1
ALARM/TRIP 1MYN563627-DBB CV2D2J,Aux Relay, Flush Mounting
Case Size:1/2 Contacts:4NO SR with HR flag Aux
Voltage:110VDC'.
PFF7 CV2D2J(49OLX/Y) MOG ALARM/PRV ABB-MANEJA TRANSFORMER FAULT RELAY, ARTICLE NO.: 1MYN563627-DBB LVD 1 1 1
TRIP 1MYN563627-DBB CV2D2J,Aux Relay, Flush Mounting
Case Size:1/2 Contacts:4NO SR with HR flag Aux
Voltage:110VDC'.
PFW1 CB TRIP CIRCUIT HEALTHY TEKNIC MAKE:TEKNIC, 3EPLBR1L(S)110VDC, LED Lamp Plastic 1VYN452291-229 LVD 1 1 1
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk
FACTORY AS-BUILT
PFB3 INDICATION. B-PH HEALTHY TEKNIC MAKE:TEKNIC, 3EPLBR6L63.5VAC, LED Lamp Plastic 1VYN452291-261 LVD 1 1 1
Range Label:BLUE, WITH LOW GLOW PROTECTION
(LVGP START FROM 10%), Diameter:22.5mm Suitable
for 63.5V AC
PJ1 HOOTER ALAN Two tone electronic hooter Model:ARH-02 1VYN452293-001 LVD 1 1 1
Aux.Supply:18-285VAC/DC
21.08.2024
F F
Based on Prepared MSP Date 16/4/2024 Title Order No = HA00
COMMON DRAWINGS
Customer:SLATHIA CONSTRUCTION WORKS Checked KM Approved SR 4202889447-01 + BOM
Project name Bill of material DCC Code Lang.
Contractor: 33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2 Doc. No. Page A03
Rev. Code Date Name India Ltd., Nashik, ELDS YN1V300011-HA-BOM Pages 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. Bill Of Material
DT Function text Manufacturer Description ERP number Mounting 1 Page Total
site HA01 total
ICOG
A SFO1 EMERGENCY TRIP TEKNIC EMERGENCY TRIP STAY PUT TYPE MUSHROOM RED 1VYN452401-011 LVD 1 1 1 A
COLOUR KNOB PUSH BUTTON, PUSH TO TRIP TURN TO
RELEASE AC15/A600 415VAC 4A, DC13/Q600 220VDC
0.5A, Contacts:2NO+2NC,CUT OUT:22.5MM, MODEL
NO.-P2AML4, Push Button Label:EMERGENCY TRIP
SFO1 EMERGENCY TRIP TEKNIC MAKE:TEKNIC EMERGENCY PUSH BUTTON YELLOW 1VYN452401-015 LVD 1 1 1
SHROUD, SUITABLE FOR 1VYN452401-011 PART CODE
EMERGENCY STOP PUSH BUTTON MODEL: 2ESS2
PGM12 12 WINDOW ANNUNCIATOR ALAN ALAN ORDERING CODE: ANN-MD03-00083-A0 MODEL ANN-MD03-00083-A0 LVD 1 1 1
CODE: 2D2B10SP0000H DESCRIPTION: 2 MLD, 12
WINDOW:2BIG, 10SMALL, BUILT-IN MEMBRANE PUSH
BUTTON, WITHOUT RS485, WITHOUT AC, DC FAIL &
WITHOUT STANDBY POWER SUPPLY, INPUT SUPPLY:
B 88V~285 VAC/DC, FAULT CONTACT:NO, FLUSH WITH PB B
FOR ACCEPT/RESET/OP.TEST/SILENCE ALARM
CONT.FOR TRIP/NON-TRIP, OPEARTIONAL SEQUENCE:
N ( MANUAL RESET & REPEAT ALARM/AUTO RESET)
BEZEL SIZE: 144MM(H) X 144MM(W), PANEL CUT-OUT:
138MM(H) X 138MM(W).
PGA DIGITAL AMMETER SECURE Digital Ammeter CL-0.5 System: 3-PH,4-WIRE DPM96I300-2 LVD 1 1 1
(Programmable) CT Primary & Secondary :
Programmable Aux. Voltage Input: 40-300V AC/DC Built
in Selector switch SIZE: 96X96sqmm Cut Out:
92X92sqmm,
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk
PGV DIGITAL VOLTMETER SECURE Digital VOLTMETER, CL-0.5 System: 3-PH,4-WIRE DPM96V300-2 LVD 1 1 1
(Programmable) PT Primary & Secondary : Programmable
C Aux. Voltage Input:40-300V AC/DC Built in Selector
C
switch SIZE: 96X96sqmm Cut Out: 92X92sqmm DIGITAL
VOLTMETER-CL-0.5-96X96 ,
BCF1 RET615_H : PROTECTION RELAY ABB Transformer differential with voltage protection & HBTHBCADNBA1BBN11G LVD 1 1 1
POWER SUPPLY measurements and high imp. restricted EF on MV side 7I
(Io 1/5A) + 5U , 12BI+10BO Communication (Serial):
None Communication (Ethernet): Ethernet 100Base TX
(RJ45) Communication (Protocol): IEC 61850 Language:
English Front Panel: Large LCD with Single Line Diagram
(SLD) Option 1: Arc Protection Option 2: None Power
Supply: 48-250 Vdc; 100-240 Vac Version: 5.0 FP1
SFS1 TNC SELECTOR SWITCH SWITRON Model NO: SBC32P244R4, Breaker Control Switch Non- SBC32P244R LVD 1 1 1
Lockable at Neutral Position Label:TRIP-NEUTRAL-CLOSE,
D D
3 Position 4 contacts Spring Return to Neutral Pistol grip
handle Angular movement:45+45 deg Size:75 X75 mm
Contacts: 2C 2T .
PGM1 DIGITAL MFM SECURE MULTIFUNCTION METER, ELITE :443 WITH RS485 SML-EL443-0.5s-H LVD 1 1 1
Accuracy CLASS 0.5s 3-PH 4-WIRE CT & PT Primary &
Secondary : Programmable AUX.SUPPLY: 80-300V
AC/DC,OVERALL SIZE:96x96mm CUT-OUT:92x92mm,,
NON-DRAWOUT FLUSH MOUNTING Parameters :Current
Voltage PF Freq. Active Reactive & Apperent Power,,
Active Reactive & Apperent Energy THD I V & KW RPM
Power ON/OFF Hours LoadON/OFF Hours Feeder
Interruption count,, Phase Angle, Average THD
measurement for voltage, current and power, up to 31st
E harmonic E
SFS3 L/R SELECTOR SWITCH SWITRON Model No: SPC32P249R/W, LOCAL-REMOTE Switch. SPC32P249R-W LVD 1 1 1
FACTORY AS-BUILT
32A,Rotary switch. Stayput, wing type Knob. 2 contacts
to close in each position. Lockable in both position. SIZE:
75X75mm. Lable : LOCAL-REMOTE .
QAB VD4 CB, (1250A) FRCB ABB VD4, VACUUM CIRCUIT BREAKER, PS. VD4 36.12.32, 1VYN400989-MH PLG 1 1 1
21.08.2024
F F
Based on Prepared MSP Date 16/4/2024 Title Order No = HA00
COMMON DRAWINGS
Customer:SLATHIA CONSTRUCTION WORKS Checked KM Approved SR 4202889447-01 + BOM
Project name Bill of material DCC Code Lang.
Contractor: 33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2 Doc. No. Page A04
Rev. Code Date Name India Ltd., Nashik, ELDS YN1V300011-HA-BOM Pages 5
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved. Bill Of Material
DT Function text Manufacturer Description ERP number Mounting 1 Page Total
site HA01 total
ICOG
A KFE1 POWER PACK ALAN POWER PACK WITH RECTIFIER UNIT POWER PACK ALPP230110 TOP 1 1 1 A
WITH BATTERY BACK MODEL NO: APP230110
INPUT:230V AC,OUTPUT:110V DC 1 Amp CONTINUOUS
LOAD:100W IMPULSE LOAD:450W SHORT TIME FOR
240mSEC SUITABLE FOR ATLEAST 5 TRIPPING
OPERATIONS W/O RECHARGING WITH SUITABLE
RATING PLATE ,
VT_B1 B-PHASE POTENTIAL TRANSFORMER AS PER SLD MAKE CAST RESIN DRAWOUT TYPE PT 4202889447.2001 VT 1 1 1
LIST PTR:33KV/V3/110/V3/110/3V-110V/V3 CORE 1: 50VA
CL:1.0 (Star) CORE 2: 50VA CL:3P (Open Delta)
BIL:36kV/70kVrms/170kVpeak FREQ: 50Hz
VT_R1 R- PHASE POTENTIAL TRANSFORMER AS PER SLD MAKE CAST RESIN DRAWOUT TYPE PT 4202889447.2001 VT 1 1 1
LIST PTR:33KV/V3/110/V3/110/3V-110V/V3 CORE 1: 50VA
B CL:1.0 (Star) CORE 2: 50VA CL:3P (Open Delta) B
BIL:36kV/70kVrms/170kVpeak FREQ: 50Hz
VT_Y1 Y-PHASE POTENTIAL TRANSFORMER AS PER SLD MAKE CAST RESIN DRAWOUT TYPE PT 4202889447.2001 VT 1 1 1
LIST PTR:33KV/V3/110/V3/110/3V-110V/V3 CORE 1: 50VA
CL:1.0 (Star) CORE 2: 50VA CL:3P (Open Delta)
BIL:36kV/70kVrms/170kVpeak FREQ: 50Hz
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk
C C
D D
E E
SHEET INDEX
A PAGE PAGE NAME REVISION A
=HA01+LV/1(A00) SHEET INDEX
=HA01+LV/2(A01) SINGLE LINE SCHEME A
=HA01+LV/3(A02) CB INTERLOCK LOGIC SHEET A
=HA01+LV/4(A03) CLOSING LOGIC SHEET A
=HA01+LV/5(A04) TRIPPING LOGIC SHEET A
=HA01+LV/6(S01) CURRENT TRANSFORMER CORE 1 A
=HA01+LV/7(S02) CURRENT TRANSFORMER CORE 2 A
B =HA01+LV/8(S03) POWER CIRCUIT A B
=HA01+LV/9(S04) METERING CIRCUIT A
=HA01+LV/10(S05) VOLTAGE TRANSFORMER (Y-D) A
=HA01+LV/11(S05) VOLTAGE TRANSFORMER (Y-D)
=HA01+LV/11(S06) RELAY VTG CHANEL CIRCUIT A
=HA01+LV/12(G01) AC SUPPLY CIRCUITS A
=HA01+LV/13(G02) DC SUPPLY CIRCUITS A
=HA01+LV/14(M01) VD4 INTERNAL WIRING A
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk
E E
A A
B B
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk
C C
NOTE:
1. WHEREVER POSSIBLE ALL APPARATUS ARE SHOWN IN DE-ENERGISED CONDITION
2. DEVICE TAG's/PART NUMBER TO BE REFERRED FROM PART LIST/BOM DRG. YN1V300011
3. DETAILS OF TERMINAL BLOCK TAG USED IN SCHEMATIC ARE AS BELOW:
-XDA = CURRENT TRANSFORMER CIRCUIT : DISCONNECTING TERMINAL 1
-XDV = VOLTAGE TRANSFORMER CIRCUIT : DISCONNECTING TERMINAL 1
ON
-XDX3 = PANEL DC CIRCUIT : DISCONNECTING TERMINAL 1
D -XDX4 = AC CIRCUIT : DISCONNECTING TERMINAL 1 D
-XDCA = REMOTE CURRENT TRANSFORMER CIRCUIT : DISCONNECTING TERMINAL 1
-XDX13 = TERMINAL BLOCK FOR SPARE : DISCONNECTING TERMINAL 1
OFF
FACTORY AS-BUILT
-XDX5 = IED RELAY CIRCUIT : NON-DISCONNECTING TERMINAL 1
-XDX6 = SPARE : NON-DISCONNECTING TERMINAL 1
-XDX10 = TCS CIRCUIT : NON-DISCONNECTING TERMINAL 1
-XDX14 = TERMINAL BLOCK FOR SPARE : NON-DISCONNECTING TERMINAL 1
21.08.2024
F 4. SPARE CONTACTS WILL BE WIRED ACCORDING TO THE SPACE AVAILABILITY IN LV COMPARTMENT. F
Based on Prepared MSP Date 16/4/2024 Title Order No = HA01
SO-01_HA01_ICOG-PNL-01
Customer:SLATHIA CONSTRUCTION WORKS Checked KM Approved SR 4202889447-01 + LV
Project name SINGLE LINE SCHEME DCC Code &EFS Lang.
Contractor: 33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2 Doc. No. Page 2(A01)
Rev. Code Date Name India Ltd., Nashik, ELDS YN1V300013-HA01-ICOG Pages 28
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CB ELECTRO-MECHANICAL INTERLOCK
© Copyright 2012 ABB. All rights reserved.
& &
DC AUXILLARY SUPPLY HEALTHY * CB OFF
RACK IN/OUT LOCKING
CB OFF MAGNET (RL2) CB DRAW OUT PLUG INSERTED
CB DRAW OUT PLUG INSERTED
CB IN TEST >1
CB IN SERVICE ELECTRICAL/MECHANICAL
B CB CLOSING B
&
DC AUXILLARY SUPPLY HEALTHY
>1
C C
DOOR CLOSE MECHANICAL INTERLOCK
***
- DOOR SHALL BE OPEN ONLY WHEN CB IS IN TEST POSITION
- CLOSING OF CB & CB DOOR OPENING WILL NOT POSSIBLE WHEN CB IS IN
IN-BETWEEN CONDITION (NEITHER IN SERVICE NOR IN TEST)
D D
E E
NOTE:
T
OR GATE
ON DELAY
TIMER
FACTORY AS-BUILT 21.08.2024
F F
Based on Prepared MSP Date 16/4/2024 Title Order No = HA01
SO-01_HA01_ICOG-PNL-01
Customer:SLATHIA CONSTRUCTION WORKS Checked KM Approved SR 4202889447-01 + LV
Project name CB INTERLOCK LOGIC SHEET DCC Code &EFS Lang.
Contractor: 33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2 Doc. No. Page 3(A02)
Rev. Code Date Name India Ltd., Nashik, ELDS YN1V300013-HA01-ICOG Pages 28
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
C C
&
CB IN TEST
L/R IN LOCAL B
D D
TNC CLOSE
FACTORY AS-BUILT
## CLOSING COMMAND
>1
CB SPRING CHARGED TO CB CLOSE COIL
OR GATE
##
** INPUT FROM RELAY INTERNAL CB OFF
## CB INTERNAL CONTACT ##
>1
CB IN TEST POSITION
& AND GATE ##
21.08.2024
CB IN SERVICE POSITION
F F
Based on Prepared MSP Date 16/4/2024 Title Order No = HA01
SO-01_HA01_ICOG-PNL-01
Customer:SLATHIA CONSTRUCTION WORKS Checked KM Approved SR 4202889447-01 + LV
Project name CLOSING LOGIC SHEET DCC Code &EFS Lang.
Contractor: 33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2 Doc. No. Page 4(A03)
Rev. Code Date Name India Ltd., Nashik, ELDS YN1V300013-HA01-ICOG Pages 28
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
>1
** LOCKOUT
50 OPERATED >1
** LOCKOUT (86) PROTECTION TRIP TNC TRIP
51 OPERATED X100-SO1 OPERATED LOCKOUT RELAY TRIP TRIP COMMAND
** 86X
50N OPERATED TO CB TRIP COIL
** EMERGENCY TRIP PB PRESSED
51N OPERATED
X110-BI4
B BUCHHOLZ TRIP REMOTE OPEN B
X110-BI5
WDG TEMP HIGH TRIP REMOTE TRIPPING (IF ANY)
X110-BI6
OIL TEMP HIGH TRIP REMOTE TRIPPING (IF ANY)
X110-BI7
PRV TRIP UNDERVOLTAGE TRIP E
CABLE COMP.ARC SENSOR OPTD **
C C
UNDERVOLTAGE TRIP
D D
** &
VT FUSE HEALTHY
X100-PO3
T E
**
27 OPERATED ON DELAY
TIMER
E E
NOTE:
FACTORY AS-BUILT
>1 OR GATE
** INPUT FROM RELAY INTERNAL
## CB INTERNAL CONTACT
& AND GATE T ON DELAY
TIMER 21.08.2024
F F
Based on Prepared MSP Date 16/4/2024 Title Order No = HA01
SO-01_HA01_ICOG-PNL-01
Customer:SLATHIA CONSTRUCTION WORKS Checked KM Approved SR 4202889447-01 + LV
Project name TRIPPING LOGIC SHEET DCC Code &EFS Lang.
Contractor: 33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2 Doc. No. Page 5(A04)
Rev. Code Date Name India Ltd., Nashik, ELDS YN1V300013-HA01-ICOG Pages 28
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved.
A A
-BCT(CT)
D12 -XDA ON
D70
1S3
D70
D32 -XDA ON
4
METERING CORE-1
1S3
D70
1S2 D30 -XDA ON
-CT_Y1
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk
5
1S1
C C
D31 -XDA ON D31 TO METERING CIRCUIT
6
YCT1 9(S04)/1D
D70
D52 -XDA ON
7
D70
1S3
POSITIVE
CURRENT
DIRECTION
E R_V 10(S05)/3A
TO VT PRIMARY E
Y_V 10(S05)/4A
B_V 10(S05)/5A
A70
2S3 1/5A
-BCF1 1 AI1
2S2 A10 -XDA ON
RET615
-CT_R1
12 19(N01)/2C
2S1
B CT1 B
A11 -XDA A11
A70
CT4
A32 -XDA ON
14
-X120: 8 A ON B A36 -X120: 3
N
2S3 1/5A
A70
AI4 2 AI2
2S2 A30 -XDA ON
-CT_Y1
15
2S1 CT2
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk
A76
C A31 -XDA ON A31 -X120: 9
1/5A C
16 AI5 A76
CT INPUT FROM -X120: 4
A70
N
DOWNSTREAM AI2
A70
CT5
A76
A52 -XDA ON
17 -XDCA
A70 -X120: 10 A56
A70
N A ON B B -X120: 5
2S3 1/5A
AI5 3 -XDA 22
ON
AI3
A50 -XDA
A70
2S2 ON
-CT_B1 A
18
2S1 CT3
A76
A51 -XDA ON A51 B -X120: 11
1/5A -XDCA
D 19 -XDA 21
ON
AI6 A ON B A76 A76 -X120: 6
N
D
A 4 AI3
CT6
A70
E E
6(S01)/1A
R3
6(S01)/2A
Y3
6(S01)/2A
B3
FACTORY AS-BUILT 21.08.2024
F F
Based on Prepared MSP Date 16/4/2024 Title Order No = HA01
SO-01_HA01_ICOG-PNL-01
Customer:SLATHIA CONSTRUCTION WORKS Checked KM Approved SR 4202889447-01 + LV
Project name CURRENT TRANSFORMER CORE 2 DCC Code &EFS Lang.
Contractor: 33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2 Doc. No. Page 7(S02)
Rev. Code Date Name India Ltd., Nashik, ELDS YN1V300013-HA01-ICOG Pages 28
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved.
A A
-QAB
B B
M
C C
POSITIVE
CURRENT
D D
DIRECTION
POSITIVE
CURRENT
DIRECTION
E E
-PGV
© Copyright 2012 ABB. All rights reserved.
DIGITAL VOLTMETER
A E11 E11 A
-RV1 Vr L/+ 17(M04)/7C
110V DC
10(S05)/1D
E31 E31 SUPPLY
VT INPUT -YV1 Vy N/- 17(M04)/7C
10(S05)/1D
E51 E51
-BV1 Vb
10(S05)/2D
E71
-NV1
10(S05)/1D -XG
E
E94 PE -PGA
DIGITAL AMMETER
B R1 L/+ 17(M04)/6C
110V DC
B
SUPPLY
Y1 N/- 17(M04)/6C
B1
R2
PE
E
C I1 -WGS C
2C SHIELDED CABLE
D70
COMM. PORT
1 6(S01)/6D NCT1
+ RS3
RS485
D13 R-S2 25(X01)/6C
I1-S2
2
- RS4
25(X01)/7C
D31
CT INPUT YCT1 Y-S1
Y
CURRENT INPUTS
6(S01)/6C I2-S1
I2
D D
D33 Y-S2
I2-S2
+/P 17(M04)/8C
D51
SUPPLY
POWER
+/P 110V DC
BCT1 B-S1
B SUPPLY
6(S01)/6D I3-S1
-/N 17(M04)/8C
I3 -/N
D53 I3-S2
B-S2
E E
E11 VR
V1
FACTORY AS-BUILT
VOLTAGE INPUTS
E31 VY
V2
E51 B
V3
VN
N
DIGITAL MFM
21.08.2024
F F
Based on Prepared MSP Date 16/4/2024 Title Order No = HA01
SO-01_HA01_ICOG-PNL-01
Customer:SLATHIA CONSTRUCTION WORKS Checked KM Approved SR 4202889447-01 + LV
Project name METERING CIRCUIT DCC Code &EFS Lang.
Contractor: 33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2 Doc. No. Page 9(S04)
Rev. Code Date Name India Ltd., Nashik, ELDS YN1V300013-HA01-ICOG Pages 28
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
-XG
E92
B
© Copyright 2012 ABB. All rights reserved.
E82
BAT-1-2-3
A A
PLUG/SOCKET BODY EARTH 40
L1 L2 L3
PE
1 1 1
B 1a 1n 2a 2d 2n 1a 1n 2a 2d 2n 1a 1n 2a 2d 2n B
E77
E78
E77
E70
E78
E76
E76
E70 E70
E79
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk
C C
E10
E30
E50
E70
-XDU1 1 3 5 7 10 16
E10
E30
E50
E70
PT SUPPLY TO METER
E76
E79
B B B B V.T. WIRING x1 x2
9(S04)/1B 9(S04)/1A9(S04)/1A 9(S04)/1A -XDV 1
ON
2
ON
3
ON
4
ON -XDV
-NV1 -RV1 -YV1 -BV1 A A A A E70 A ON B E90 PE 150 ohms 250W
LOAD RESISTOR
E10
E30
E50
E70
E76
E79
5
1 1 1 -XG -RAR4
D B B D
2 2 2 -XDV 6 -XDV 7 -XDV
E71-QBL25
F1,25A, NEUTRAL LINK
-XG
E11-FCD13
NSD4--4A
E31-FCD14
NSD4--4A
E51-FCD15
NSD4--4A
ON ON
A A E79 A ON B E91 PE
8
E76
E79
E71
E11
E31
E51
E11
E31
E51
E71 TO RELAY
E E
x1 x1 x1
E11
E31
E51
E71
FACTORY AS-BUILT
-PFR3 x2 -PFY3 x2 -PFB3 x2
63.5VAC, 63.5VAC, 63.5VAC,
11(S06)/2B
DESIGNATION DESCRIPTION
11(S06)/2C
E71 E71
INDICATION.
R-PH HEALTHY
-VR1
INDICATION.
Y-PH HEALTHY
INDICATION.
B-PH HEALTHY
BAT-1-2-3 POTENTIAL
-FCF1,2,3 MV FUSES TRANSFORMER
-VY1 -VB1-VN1
21.08.2024
F PT SUPPLY TO PROTECTION RELAY F
Based on Prepared MSP Date 16/4/2024 Title Order No = HA01
SO-01_HA01_ICOG-PNL-01
Customer:SLATHIA CONSTRUCTION WORKS Checked KM Approved SR 4202889447-01 + LV
Project name VOLTAGE TRANSFORMER (Y-D) DCC Code &EFS Lang.
Contractor: 33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2 Doc. No. Page 10(S05)
Rev. Code Date Name India Ltd., Nashik, ELDS YN1V300013-HA01-ICOG Pages 28
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved.
A A
59N
59N2
10(S05)/6E
10(S05)/2F VR1
E11
B B
110V AC
PT SUPPLY
C 10(S05)/3F VN1
E71 C
E76
E79
-XDV
D E71 E71 B ON A E71 D
10
E71
E71
-X130: 11 12 13 14 15 16 -X130: 17 18
-BCF1 -BCF1
RET615 U1 VT2 N U2 VT3 N U3 VT4 N
RET615 Uo VT5 N
19(N01)/3C 19(N01)/3C
POWER SUPPLY
© Copyright 2012 ABB. All rights reserved.
SPACE HEATER SPACE HEATER SPACE HEATER SPACE HEATER 3PIN SOCKET
SPRING CHARGING ILLUMINATION POWER PACK
CB CABLE CABLE CABLE
MOTOR VOLTAGE SUPPLY CIRCUIT
COMPARTMENT COMPARTMENT COMPARTMENT COMPARTMENT
A 230V AC SUPPLY A
25(X01)/1F 25(X01)/1F
230(PH) 230(N)
H1
H2
B B
H1
H2
H1
H2
3 1
-FCM3
3 1 2P, C-Curve, 4 2
6A
H3
4 2 PANEL
-FCM1 AC SUPPLY H4
2P, C-Curve, 2A, 10kA
SPRING
CHARGING H3 H3 H3
MOTOR
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk
M1
C 13
C
H3
-SFC6
-XDB 25
M2
ST121B,10A,240VAC 14
TOGGLE SWITCH
M1
13 (SPACE HEATER)
-SFC1
H7
14(M01)/1B PH N
240 VAC,0.25A 14
QAB -XB 25 DOOR INTERLOCK -KFE1
11 230VAC/110VDC
SWITCH
-BT1 POWER PACK
-BS1 THERMOSTAT 12 + -
THERMOSTAT
(SPACE HEATER)
J2
H9
J1
-MS
H9 H9 H9
D M 1 D
H5
-XDS1
SWITCH
ON/OFF
H9
H9
H9
H9
3
TO 110V PANEL DC H90 PE
M2
H4
H4
H4
H4
FACTORY AS-BUILT
H4 H4 H4 H4 H4
NOTE-
ALWAYS MAINTAIN THE SETTING OF THERMOSTAT 5°C ABOVE THE AMBIENT TEMPERATURE .
ENSURE THE SUPPLY TO SPACEHEATER IN THE
SWITCHGEAR PANEL IS CONTINUOSLY ON INCLUDING DURING NO LOAD CONDITION. 21.08.2024
F F
Based on Prepared MSP Date 16/4/2024 Title Order No = HA01
SO-01_HA01_ICOG-PNL-01
Customer:SLATHIA CONSTRUCTION WORKS Checked KM Approved SR 4202889447-01 + LV
Project name AC SUPPLY CIRCUITS DCC Code &EFS Lang.
Contractor: 33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2 Doc. No. Page 12(G01)
Rev. Code Date Name India Ltd., Nashik, ELDS YN1V300013-HA01-ICOG Pages 28
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved.
TRIPPING CIRCUIT
VOLTAGE SUPPLY
CLOSING CIRCUIT INDICATION CIRCUIT
A VOLTAGE SUPPLY VOLTAGE SUPPLY A
110V DC SUPPLY
FROM POWER PACK
12(G01)/5D 12(G01)/6D
110(+) 110(-)
J2
J1
B B B
B
-XDX3 1
ON
-XDX3 2
ON
A A
J2
J1
3 1
-FCM2
2 POLE, 6A 4 2
FOR PANEL
DC SUPPLY
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk
C C
K1
K2
K1
D K2 D
1 1
-FCD5 -FCD6
K1
K2
NSD4--4A NSD4--4A
2 2
FUSE FOR FUSE FOR
CLOSING CKT + CLOSING CKT -
K3
K4
-XDX3
K3 A ON B L1
3
-XDX3
K4 A ON B L2
E 4 E
K3
K4
17(M04)/1A 17(M04)/1E
T+VE T-VE
FACTORY AS-BUILT 15(M02)/1A
C+VE
15(M02)/1E
C-VE
23(Q01)/1A
I+VE
21.08.2024
23(Q01)/1E
I-VE
F F
Based on Prepared MSP Date 16/4/2024 Title Order No = HA01
SO-01_HA01_ICOG-PNL-01
Customer:SLATHIA CONSTRUCTION WORKS Checked KM Approved SR 4202889447-01 + LV
Project name DC SUPPLY CIRCUITS DCC Code &EFS Lang.
Contractor: 33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2 Doc. No. Page 13(G02)
Rev. Code Date Name India Ltd., Nashik, ELDS YN1V300013-HA01-ICOG Pages 28
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A
VD4 BREAKER -XG4
A
K90
K92
16(M03)/2D
16(M03)/3D
16(M03)/4D
15(M02)/6C
16(M03)/7C
15(M02)/8C
17(M04)/5C
15(M02)/2A
17(M04)/3B
17(M04)/4B
17(M04)/5B
23(Q01)/2B
23(Q01)/1B
23(Q01)/7B
12(G01)/1C
26(X02)/7D
26(X02)/8D
26(X02)/8D
21(N03)/2B
-XDB
26(X02)/5B
26(X02)/6B
26(X02)/7B
26(X02)/8B
26(X02)/7B
-XDB
1 40
K90
K92
-QAB
-XB 26 25 45 4 31 41 3 8 5 23 28 7 6 29 9 50 11 32 12 1 40 55 47 37 57 24
CB DISCHARGED
CB CHARGED
B 1 B
-BGB1
-BS2
-BS1
2 2
-BT2
-BT2
-BT2
-BGB1
-BGB1
-BGB1
-BGB1
-BGB1
-BGB1
-BGB1
-BGB1
-BGB1
-BGB1
-BGB1
-BGB1
-BGB1
1 24 43 13 33
-BS2
INTERLOCK IF ANY
INTERLOCK IF ANY
INTERLOCK IF ANY
INTERLOCK IF ANY
-MS
9 34 3 5 7 13 11 17 21 19 15 25 27 31 44 14 34
M P
-BT1
-BT1
-BT1
-BT1
10 4 6 8 14 12 18 22 20 16 26 28 32
POSITION
SERVICE
33 23 53 13
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk
34 24 54 14
C -RL2 -MC -MO1 C
POSITION
43 23
TEST
-BT2
-BT1
44 24
-XB 36 35 46 14 30 2 15 33 38 17 16 39 19 51 22 21 42 13 56 48 27 58 52 34 54
17(M04)/3C
12(G01)/1D
16(M03)/2E
15(M02)/6E
16(M03)/3E
26(X02)/5C
26(X02)/7E
23(Q01)/2C
21(N03)/2C
16(M03)/7C
15(M02)/8D
26(X02)/8E
26(X02)/7C
26(X02)/8E
17(M04)/5D
17(M04)/5D
23(Q01)/1C
26(X02)/8C
26(X02)/7B
17(M04)/4C
17(M04)/5B
15(M02)/2B
15(M02)/3B
23(Q01)/7C
23(Q01)/7C
D D
DESIGNAT. DESCRIPTION
-MS MOTOR FOR THE CLOSING SPRING CHARGING
-BS1 LIMIT SWITCH OF THE SPRING CHARGING MOTOR
-BS2 LIMIT SWITCH SIGNALLING CLOSING SPRING CHARGE OR DISCHARGE
-RL2 LOCKING MAGNET, IF DE-ENERGIZED IT PREVENTS THE CB RACKING-IN AND RACKING-OUT MECHANICALLY
21.08.2024
F F
Based on Prepared MSP Date 16/4/2024 Title Order No = HA01
SO-01_HA01_ICOG-PNL-01
Customer:SLATHIA CONSTRUCTION WORKS Checked KM Approved SR 4202889447-01 + LV
Project name VD4 INTERNAL WIRING DCC Code &EFS Lang.
Contractor: 33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2 Doc. No. Page 14(M01)
Rev. Code Date Name India Ltd., Nashik, ELDS YN1V300013-HA01-ICOG Pages 28
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved.
K3
14(M01)/8B
QAB
CB IN TEST POSITION
-XB
CB IN SERVICE POSITION
57 5
1 2
-SFS3
28(X04)/6A 6
53 13
-BT1 -BT2 L/R-LOCAL
K25
L/R SWITCH
54 14
-SFS1 7
-XB 58 52 -XDX5 1 28(X04)/3A
TNC SWITCH
K15
14(M01)/8D 14(M01)/8D 8
TNC CLOSE
B B
-X100: 6
K13
K5
-BCF1
K21
-XDB 58 -XDB 52
19(N01)/4C
K21
K21 K21
K13
K15
1 5
K5
1-1
-KFN1
15(M02)/8E
-XDB 6
9
-SFO1 1-2 (94)
K27
K21
28(X04)/2C ANTIPUMPING
K5
K17
K27
28(X04)/6A 28(X04)/6A
K23
2 4
L/R-LOCAL L/R-REMOTE
L/R SWITCH L/R SWITCH 14(M01)/3B 15
-XDX5 2
2-1
-BGB1
QAB -XB 4
K11
16
K7
-SFO1 1 6 2
K17
2-2
28(X04)/2C -BGB1 -KFN1
EMERGENCY TRIP 15(M02)/8E 10 -XB 16
PB NOT PRESSED 2 (94)
-XDC 1 -XDC 3 -XDC 5 14(M01)/5D
3 24 ANTIPUMPING
-BS2 RELAY
-SFS1
K29
INTERLOCKING
INTERLOCKING
28(X04)/3A 4 34
K29
REMOTE
(IF ANY)
(IF ANY)
D TNC SWITCH D
CLOSE
-XDB
TS1
TS2
TNC CLOSE 16
-MC
K29
43 23
-BT2
-BT1
K9
-XB 14 110VDC A2
14(M01)/3D ANTIPUMPING RELAY
K9
K4
E E
-XDB 14
C-VE K4 K4
FACTORY AS-BUILT
13(G02)/5E
110VDC 5
1 9 15(M02)/6C
6
2 10 15(M02)/7D
7
NOTE:
*TS- TEMPERARY SHORTING REMOVE SHORTING AFTER CONNECTING REMOTE CIRCUIT
21.08.2024 3
8
11
4 12
F F
Based on Prepared MSP Date 16/4/2024 Title Order No = HA01
SO-01_HA01_ICOG-PNL-01
Customer:SLATHIA CONSTRUCTION WORKS Checked KM Approved SR 4202889447-01 + LV
Project name CLOSING CIRCUIT DCC Code &EFS Lang.
Contractor: 33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2 Doc. No. Page 15(M02)
Rev. Code Date Name India Ltd., Nashik, ELDS YN1V300013-HA01-ICOG Pages 28
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
RACK IN/OUT
CB TRIP LOCKOUT EMERGENCY TRIP REMOTE REMOTE TRIPPING REMOTE TRIP CIRCUIT
LOCKING MAGNET TNC TRIP
© Copyright 2012 ABB. All rights reserved.
COIL RELAY TRIP PB PRESSED OPEN (IF ANY) TRIPPING (IF ANY) SUPERVISION +UV TRIP
FOR CB TEST/SERVICE
-XDX10
TCS+VE K1 K1 -XDX10 1 K701 K701 K701 K701 K701 K701 K701 5 K701
22(N04)/6A
A 1-3 -XDX5 3 A
110VDC
K701
-XDC 9 -XDC 11 -XDC 13
-SFO1 1-4
K701
28(X04)/2C
INTERLOCK IF ANY
-XDC 7 1 EMERGENCY TRIP
1 5
(IF ANY)
REMOTE
REMOTE
PB PRESSED
-SFS1
OPEN
-KFL1
K711
-X100: 16 15
28(X04)/3A 2 17(M04)/1E
TNC SWITCH
9 -BCF1
86X
TNC TRIP 2-3
TS3
19(N01)/5C
-SFO1 2-4
28(X04)/3C -XDC 10 -XDC 12 -XDC 14
EMERGENCY TRIP
B B
K703
PB PRESSED
-XDC 8
TRIP CIRCUIT
SUPERVISION
K703
K709
+UV TRIP
14(M01)/5B
K703
-X100: 19
QAB -XB 7 +
-BCF1
19 19(N01)/5C TCS
-BGB1
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk
~
C 20
C
K195
TCS1
-X100: 18
-RAR1 x1 -XB 17
K707
22kOhm 10W 14(M01)/5D
-XDB 45
RESISTOR FOR
K707
TCS1 CIRCUIT x2
-XDX5 4
K195
K707
K705
-XDB 17 -XDX10
K707 K707 6
14(M01)/2B
-XDX10 3 -XDX10 4
QAB -XB 45
K703
D K705 D
9 -XDB 31 -XDB 41
K703
K705
-BGB1
10
14(M01)/3B 14(M01)/4B
QAB -XB 31 41
-RL2 3 5
-BGB1 -BGB1
4 6
-XB 46
E 14(M01)/2D E
-MO1
FACTORY AS-BUILT
K2
-XB 30
14(M01)/3D
-XDB 46
K702
-XDB 30 NOTE:
TCS-VE
22(N04)/6F
K2 K2 -XDX10 2 K702
21.08.2024
*TS- TEMPERARY SHORTING REMOVE SHORTING AFTER CONNECTING REMOTE CIRCUIT
110VDC
F F
Based on Prepared MSP Date 16/4/2024 Title Order No = HA01
SO-01_HA01_ICOG-PNL-01
Customer:SLATHIA CONSTRUCTION WORKS Checked KM Approved SR 4202889447-01 + LV
Project name TRIPPING CIRCUIT DCC Code &EFS Lang.
Contractor: 33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2 Doc. No. Page 16(M03)
Rev. Code Date Name India Ltd., Nashik, ELDS YN1V300013-HA01-ICOG Pages 28
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved.
A A
DIGITAL DIGITAL DIGITAL MFM
BISTABLE CB MULTIPLIER VOLTMETER
LOCKOUT MULTIPLIER MULTIPLIER MULTIPLIER ANNUNCIATOR VOLTMETER POWER SUPPLY
IN SERVICE POSITION POWER SUPPLY
PROTECTION TRIP TCS HEALTHY SPRING CHARGING CB IN SERVICE SUPPLY POWER SUPPLY
T+VE K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 T+VE
13(G02)/3E 18(M05)/1A
110VDC
-XDB 37
K1
14(M01)/8B
CB IN SERVICE POSITION
QAB -XB 37
B -XDX5 6
-XDB 26 23 B
-XDX5 7
-XDB 47 -BT1
K1
24
K1
K1
K1
14(M01)/1B
-X100: 11 12 14(M01)/7B -XB 27
CB IN SERVICE POSITION
QAB -XB 26
QAB
-BCF1 -X100: 14 -XB 47 14(M01)/8D
19(N01)/4C -BCF1
-BS2
K43
33
-BT1
19(N01)/5C
SO1 34 -XDB 27
-PGM1 +/P
K43
-X100: 10 L/+
-PGA L/+ -PGV
SO2 -XB 36 9(S04)/4C
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk
PROTECTION -X100: 13
14(M01)/1D
-XB 48 9(S04)/7B 9(S04)/5A
OPERATED 14(M01)/7D -XDB 11
C TCS HEALTHY C
K43
K33
K35
K37
ANN_(+)
K31
14(M01)/6B
-XDB 36 24(Q02)/8B
N/- -/N
-XDX5 8
11 -XB QAB N/-
-XDB 48
27 25
-BGB1 -BGB1
28 26
-XDX5 5 24(Q02)/8B
ANN_(-)
21 22 -XB
14(M01)/6D 14(M01)/6D
K35
D D
K33
K39
K41
K37 -XDB 21 -XDB 22
K31
K39
K41
110V DC
(+)1 (+)3
110VDC
110VDC 110VDC 110VDC
A1
-KFL1
A1 A1 A1 -KFA1
110VDC A2
-BER1 -KFA7 -KFA5 (-)a (-)c
110VDC A2 110VDC A2 110VDC A2 PSU6
MULTIPLIER
LOCKOUT RELAY CRM4(95) CRM4(SCX) CRM4(30SX) PSU6(52X)
TCS HEALTHY SPRING CHARGING CB IN SERVICE CB CONTACT
E MULTIPLIER RELAY E
T-VE K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 K2 T-VE
FACTORY AS-BUILT
13(G02)/3E 18(M05)/1E
110VDC
5 NO NC
5 5 5
1 9 16(M03)/4A 7 8 25(X01)/2B 5 6 25(X01)/2B
1 9 24(Q02)/1D 1 9 23(Q01)/6B 1 9 21(N03)/2C
6 11 12 27(X03)/4B 9 10 27(X03)/5B
6 6 6
15 16 27(X03)/5B 13 14 27(X03)/6B
2 10 24(Q02)/1D
7 2 10 23(Q01)/4C 2 10 25(X01)/5B 2 10 25(X01)/3B
7 7 7
3
8
11 23(Q01)/3D
3
8
11 25(X01)/6B 3
8
11 27(X03)/1B 3
8
11 27(X03)/4B 21.08.2024
4 12 25(X01)/4B
F 4 12 27(X03)/2B 4 12 21(N03)/3C 4 12 27(X03)/3B F
Based on Prepared MSP Date 16/4/2024 Title Order No = HA01
SO-01_HA01_ICOG-PNL-01
Customer:SLATHIA CONSTRUCTION WORKS Checked KM Approved SR 4202889447-01 + LV
Project name AUXILIARY RELAY CIRCUIT DCC Code &EFS Lang.
Contractor: 33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2 Doc. No. Page 17(M04)
Rev. Code Date Name India Ltd., Nashik, ELDS YN1V300013-HA01-ICOG Pages 28
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved.
A A
T+VE K1 K1 T+VE
17(M04)/8A 21(N03)/1A
110V DC
BUCHHOLZ BUCHHOLZ WDG TEMP WDG TEMP OIL TEMP OIL TEMP MOG ALARM PRV TRIP
ALARM TRIP HIGH ALARM HIGH TRIP HIGH ALARM HIGH TRIP
COMMON
B -XDC 15 B
C C
K45
K47
K49
K51
K53
K55
K57
K59
D D
E E
T-VE K2 K2 K2 K2 K2 K2 K2 K2 K2
FACTORY AS-BUILT
17(M04)/8E
110V DC T-VE
21(N03)/1F
1 2 24(Q02)/3D 1 2 24(Q02)/3D 1 2 24(Q02)/3D 1 2 24(Q02)/3E
3 4 27(X03)/6B 3 4 27(X03)/7B 3 4 27(X03)/7B 3 4 27(X03)/8B
11 12 24(Q02)/4D 11 12 24(Q02)/4D 11 12 24(Q02)/4E 11 12 24(Q02)/5E
13 14 21(N03)/3B 13 14 21(N03)/4B 13 14 21(N03)/4B 13 14 21(N03)/5B
21.08.2024
F F
Based on Prepared MSP Date 16/4/2024 Title Order No = HA01
SO-01_HA01_ICOG-PNL-01
Customer:SLATHIA CONSTRUCTION WORKS Checked KM Approved SR 4202889447-01 + LV
Project name AUXILIARY RELAY CIRCUIT DCC Code &EFS Lang.
Contractor: 33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2 Doc. No. Page 18(M05)
Rev. Code Date Name India Ltd., Nashik, ELDS YN1V300013-HA01-ICOG Pages 28
1 2 3 4 5 6 7 8
F
E
B
C
A
D
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk © Copyright 2012 ABB. All rights reserved.
Rev. Code
1
1
-BCF1
Date
RET615_H
CONFIGURATION H
Configuration H
N 7(S02)/8B 2 N
Name
IL2_B 7(S02)/8C 3 1/5A
7(S02)/8C N
IL2_B
N 4
7(S02)/8D 1/5A
Based on
IL3_B 5
7(S02)/8D N
IL3_B
N 6
IL1_A 7(S02)/5B 7 1/5A
7(S02)/5C N
IL1_A
N 8
Contractor:
IL2_A 7(S02)/5C 9 1/5A
2
2
7(S02)/5D N
IL2_A
N 10
IL3_A 7(S02)/5D 11 1/5A
7(S02)/5D N
IL3_A
N 12
13 1/5A
N
Io_A
14
60-
-X130: 9 210V
N
NOT IN USE
10
11(S06)/3D 60-
U1 11 210V
11(S06)/4D N
U1
N 12
11(S06)/4D 60-
U2 13
3
3
U3 15 210V
11(S06)/6D N
U3
N 16
11(S06)/7D 60-
Uo 17 210V
11(S06)/7D N
Uo
N 18
Project name
Checked KM
Prepared MSP
GND 21(N03)/7D GND
4
4
Date
BKR ARC SENSOR 25(X01)/8C 9
17(M04)/1C 10
17(M04)/1B
SO1
PROTECTION OPERATED 11
17(M04)/2B 12
Approved SR
17(M04)/2C 13
TCS HEALTHY 17(M04)/2C
SO2
14
16(M03)/8B 16 PO3
RET615_H : TRANSFORMER PROTECTION AND CONTROL
16/4/2024
33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2
16(M03)/8B 17
16(M03)/8B 15
TRIP CIRCUIT 16(M03)/8C 19
SUPERVISION +UV TRIP TCS1
5
5
16(M03)/8C 18 TCS1
26(X02)/3B 20
Title
26(X02)/3C 22
26(X02)/3B
PO4
21
SPARE 26(X02)/3C 23
TCS2 TCS2
26(X02)/3C 24
24(Q02)/2D 14
-X110:
O/C OPERATED 24(Q02)/2C 16 SO1
24(Q02)/2C 15
26(X02)/4C 17
SPARE 26(X02)/4B 19 SO2
21.08.2024
26(X02)/4B 18
6
6
26(X02)/2B 20
SPARE 26(X02)/2B 22 SO3
26(X02)/2B 21
SO-01_HA01_ICOG-PNL-01
24(Q02)/2D 23
E/F OPERATED 24(Q02)/2C
SO4
24
India Ltd., Nashik, ELDS
Doc. No.
Order No
7
7
27 OPERATED
50N/51N OPERATED
50/51 OPERATED
YN1V300013-HA01-ICOG
+ LV
= HA01
LED 9
LED 8
LED 7
LED 6
LED 5
LED 4
LED 3
LED 2
LED 1
LED 11
LED 10
8
8
HMI LEDs
Lang.
Pages
RET615
FACTORY AS-BUILT
28
Page 19(N01)
F
E
B
C
A
D
1 2 3 4 5 6 7 8
“NOTE-ABB Numerical relay binary inputs are not suitable for AC power frequency Voltage.”
© Copyright 2012 ABB. All rights reserved.
A -BCF1 A
RET615_H : TRANSFORMER PROTECTION AND CONTROL
ARC SENSORS
BI1
BI2
BI3
BI4
BI5
BI6
BI7
BI8
BI1
BI2
BI3
BI4
B B
-BPA1
ARC SENSOR-CABLE COMPARTMENT
1MRS120534-5
10
11
12
13
1
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
CABLE
COMP
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk
-X110:
-X130:
-BPA2
C C
RET615_H
21(N03)/2D
21(N03)/3D
21(N03)/3D
21(N03)/4D
21(N03)/4D
21(N03)/5D
21(N03)/5D
22(N04)/2D
22(N04)/2D
22(N04)/3D
22(N04)/3D
21(N03)/2E
21(N03)/2E
21(N03)/3E
21(N03)/4E
21(N03)/5E
22(N04)/2E
22(N04)/2E
22(N04)/3E
22(N04)/3E
BREAKER
COMP
-BPA3
CB SPRING CHARGED
CB IN SERVICE
BUCHHOLZ TRIP
OIL TEMP
HIGH TRIP
SPARE
CB OFF
PRV TRIP
SPARE
SPARE
SPARE
WDG TEMP
HIGH TRIP
SPARE
D BUSBAR D
COMP
E E
F F
Based on Prepared MSP Date 16/4/2024 Title Order No = HA01
SO-01_HA01_ICOG-PNL-01
Customer:SLATHIA CONSTRUCTION WORKS Checked KM Approved SR 4202889447-01 + LV
Project name RET615_H - A I + Binary I/O BoardDCC Code &EFS Lang.
Contractor: 33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2 Doc. No. Page 20(N02)
Rev. Code Date Name India Ltd., Nashik, ELDS YN1V300013-HA01-ICOG Pages 28
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
“NOTE-ABB Numerical relay binary inputs are not suitable for AC power frequency Voltage.”
WDG TEMP OIL TEMP
CB IN
© Copyright 2012 ABB. All rights reserved.
CB OFF CB SPRING BUCHHOLZ HIGH TRIP PRV TRIP SPARE
HIGH TRIP
SERVICE CHARGED TRIP
13
13
B -XDB 28 -PFF1 B
18(M05)/2D
-PFF5
14
18(M05)/5D
K1
BUCHHOLZ TRIP 14
OIL TEMP 13
14(M01)/5B
13
HIGH TRIP -PFF7
QAB -XB 28 18(M05)/6D 14
-PFF3 PRV TRIP
18(M05)/3D 14
21 WDG TEMP
-BGB1 HIGH TRIP
22
5 1
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk
-XB 38
C 14(M01)/5D -KFA5 9 C
17(M04)/4E
K67
K61
K71
CRM4(30SX)
K73
K69
-XDB 38
4 8
-KFA7
17(M04)/3E
K63
12
CRM4(SCX)
-XDX5
K61
12
K65
K94
-XDX5
K75
14
D D
-XG
K1
-X110: 1 3 5 7 8 10 11 13
-BCF1 -X100: 1
GND
-BCF1
20(N02)/1C
+
+
19(N01)/4C +
- - - - - - - -
U
-
K2
K2
K2
K2 K2
FACTORY AS-BUILT
-XDX5 9 -XDX5 10 -XDX5 11 -XDX5 15
T-VE K2 K2 K2 K2 K2 T-VE
18(M05)/8E 22(N04)/1F
110VDC
21.08.2024
F F
Based on Prepared MSP Date 16/4/2024 Title Order No = HA01
SO-01_HA01_ICOG-PNL-01
Customer:SLATHIA CONSTRUCTION WORKS Checked KM Approved SR 4202889447-01 + LV
Project name RET615_H - Binary Input DCC Code &EFS Lang.
Contractor: 33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2 Doc. No. Page 21(N03)
Rev. Code Date Name India Ltd., Nashik, ELDS YN1V300013-HA01-ICOG Pages 28
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
SPARE SPARE SPARE SPARE
“NOTE-ABB Numerical relay binary inputs are not suitable for AC power frequency Voltage.”
© Copyright 2012 ABB. All rights reserved.
A A
T+VE K1 K1 K1 TCS+VE
21(N03)/8A 16(M03)/1A
110VDC 110VDC
-XDX5 18 -XDX5 22
B B
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk
C C
K79
K81
K83
-X130: 1 3 5 7
-BCF1
20(N02)/3C
+
- - - -
K2
K2 K2
FACTORY AS-BUILT
-XDX5 17 -XDX5 21
T-VE K2 K2 K2 TCS-VE
21(N03)/8F 16(M03)/1F
110VDC 110VDC
21.08.2024
F F
Based on Prepared MSP Date 16/4/2024 Title Order No = HA01
SO-01_HA01_ICOG-PNL-01
Customer:SLATHIA CONSTRUCTION WORKS Checked KM Approved SR 4202889447-01 + LV
Project name RET615_H - Binary Input DCC Code &EFS Lang.
Contractor: 33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2 Doc. No. Page 22(N04)
Rev. Code Date Name India Ltd., Nashik, ELDS YN1V300013-HA01-ICOG Pages 28
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved.
-XDB 24
-XDB 32 -XDB 23
L1
L1
L1
14(M01)/8B
14(M01)/6B 14(M01)/5B QAB
CB IN TEST POSITION
-XB
CB IN SERVICE POSITION
24
B QAB -XB 32 QAB -XB 23 B
13 33
31 17 -BT1 -BT2
-BGB1 -BGB1
1 5 14 34
32 18 -KFA7
6 2 17(M04)/3E 9
-BER1 CRM4(SCX) -XB 34 54
-XB 42 -XB 33 17(M04)/2E 14(M01)/8D 14(M01)/8D
10
14(M01)/6D 14(M01)/5D (95)
L15
L13
L5
L3
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk
L5
3 7
-KFL1
17(M04)/1E 11
86X
D D
L11
L13
L15
L9
L7
L5
E E
FACTORY AS-BUILT
I-VE L2 L2 L2 L2 L2 L2 L2
13(G02)/6E
110VDC
21.08.2024
F F
Based on Prepared MSP Date 16/4/2024 Title Order No = HA01
SO-01_HA01_ICOG-PNL-01
Customer:SLATHIA CONSTRUCTION WORKS Checked KM Approved SR 4202889447-01 + LV
Project name INDICATION CIRCUIT DCC Code &EFS Lang.
Contractor: 33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2 Doc. No. Page 23(Q01)
Rev. Code Date Name India Ltd., Nashik, ELDS YN1V300013-HA01-ICOG Pages 28
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved.
A ANNUNCIATOR A
FROM 110VDC
PANEL SUPPLY
17(M04)/6C
ANN_(+) 17(M04)/6D
ANN_(-)
B B
IP
M
IP
AR
AR
HY
TR
TR
AL
M
AL
LT
IP
GH
AR
GH
GH
A
TR
GH
HI
AL
HE
HI
D
HI
D
K1
K2
HI
LZ
M
UN
P
LZ
TE
IP
AT
M
AR
HO
P
AT
M
P
HO
TE
RA
TR
T
TE
R
AL
R
TE
CH
CK
PE
TE
CH
PE
PE
DG
V
IL
G
BU
O
PR
DG
IP
O
BU
IL
O
W
C
TR
M
86
O
EF
W
O
K87 K87 K87 K87 K87 K87 K87 K87 K87 K87 K87
1
2
25 -XDX5
-XDX5
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk
26
-FCD38
NSD2--2A
1
C C
K87
K87
K87
2
O/C OPERATED
-FCD39
NSD2--2A
-X110: 16 15 -X110: 24
-XDC 24
K111
-BCF1 -BCF1
19(N01)/6C
2 6 19(N01)/6C
-KFL1
17(M04)/1E 10
SO1 SO4
-X110: 14 -X110: 23
E/F OPERATED 1
K111
-PJ1
K91
5 1 2 HOOTER
11
K93
-PFF1
K113
D 1 -PFF1 1 D
18(M05)/2D
-BER1 9 -XDX5 24
BUCHHOLZ 18(M05)/2D 12
17(M04)/2E ALARM -PFF3 2
1 BUCHHOLZ
TCS(95) T1 5
18(M05)/3D TRIP K115
K87
-XDX5 27 WDG TEMP -PFF5 2
11
HIGH ALARM 18(M05)/5D
CC 6 K117
K85
HIGH TRIP
-PFF5
K103
K89
18(M05)/6D 2
11
K97
K93
K113
K117
K101
PRV TRIP
K107
K109
E E
-PGM12
12 WINDOW
ANNUNCIATOR
W1 W2 W3 W4 W5 W6 W7
21.08.2024
12W ANNUNCIATOR
O R A C
---
CONTACTS TO REMOTE
BUS BAR/CABEL/BKR ARC
A CB ON & CB OFF & CB IN LOCKOUT CB SPRING CB TRIP CIRCUIT RS485 LOOPING SENSOR A
COMMON L/R IN REMOTE
IN SERVICE IN SERVICE SERVICE RELAY OPERATED CHARGED HEALTHY FOR MFM
K137
-XDX5 28
K137
D290
6 2 7 2 6
4 8 7 3 -X100: 8
7 5 1 2
B -KFA5 -SFS3 -KFA7 -BCF1 B
-KFA1 -KFA1 17(M04)/4E
-KFL1 17(M04)/3E
-BER1
10 28(X04)/6A 8 10
17(M04)/5E 17(M04)/5E 17(M04)/1E 12 17(M04)/2E 11 -XDC
K121
D170
D171
PSU6(52X) PSU6(52X)
D290
L/R SWITCH
K127
K133
K129
K135
K131
K123
K125
PE
-XG PO2
-X100: 9
RS3 BUS BAR/CABEL/
RS4
K139
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk
K139
-XDC 37
230V AC SUPPLY
FROM REMOTE
230V PANEL
D AC SUPPLY D
B B
-XDX4 1
ON
-XDX4 2
ON
A A
E E
H1
H2
230(PH) 230(N)
12(G01)/2A 12(G01)/2A
FACTORY AS-BUILT 21.08.2024
F F
Based on Prepared MSP Date 16/4/2024 Title Order No = HA01
SO-01_HA01_ICOG-PNL-01
Customer:SLATHIA CONSTRUCTION WORKS Checked KM Approved SR 4202889447-01 + LV
Project name CONTACTS TO REMOTE DCC Code &EFS Lang.
Contractor: 33kV,1250A,31.5kA/3Sec,VCB,SWGR,ZS2 Doc. No. Page 25(X01)
Rev. Code Date Name India Ltd., Nashik, ELDS YN1V300013-HA01-ICOG Pages 28
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
© Copyright 2012 ABB. All rights reserved.
A A
32 -XDX5 35 -XDX5
-XDX5 30 -XDX5 33 -XDX5 36 -XDX5 38 40 -XDX5 -XDB 3 -XDB 8 -XDB 55 -XDB 9 -XDB 12
K153
K165
K169
K175
K179
K187
K153
K145
K151
K141
K147
14(M01)/4B 14(M01)/4B 14(M01)/7B 14(M01)/6B 14(M01)/7B
QAB QAB QAB -XB QAB -XB
K159
CB IN TEST POSITION
-X100: 4 5 -X110: 22 21 -XB 3 8 -XB 55 9 12
K163
-X100: 21 20
-BCF1 -BCF1 -BCF1
INTERLOCK
INTERLOCK
B 43 B
-BT2
IF ANY
IF ANY
19(N01)/4C 19(N01)/6C 19(N01)/5C
8 14
44
IRF SO3 -X110: 19 18
-X100: 3 -X110: 20 -BCF1
SPARE -XB 56
IRF HEALTHY 14(M01)/7D -XB 19 -XB 13
PO4 19(N01)/6C -XB 2 14(M01)/6D 14(M01)/7D
-X100: 22 14(M01)/4D
K177
SPARE
K155
SO2
K181
K189
-X110: 17
K143
K149
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk
K167
C -X100: 23
SPARE C
+
-BCF1 -XDB 56 -XDB 19 -XDB 13
-XDB 2
K161
19(N01)/5C TCS
~
K183
-XDX5
K157
39
K171
K191
14(M01)/5B
14(M01)/6B
-XDX5 37 QAB -XB 29
D 14(M01)/4B QAB -XB 50 D
QAB -XB 5
INTERLOCK
INTERLOCK
11
-BGB1
IF ANY
IF ANY
12
-XB 15 -XB 51
14(M01)/4D
-XB 39
14(M01)/5D 14(M01)/6D
K193
K185
K173
E E
-XDB 51
-XDB 39
-XDB 15
IN SERVICE POSITION
U25
U17
U29
U37
U41
U45
U13
U21
U33
U1
U5
U9
15
11 13
7 3 9 -KFA1 3 3 3
3 7 8 4 8 4 -KFA1 17(M04)/5E
-KFA1 3
-KFA5 17(M04)/5E -KFA1 16
17(M04)/5E -PFF3
-KFA7 -BER1 -KFA5 17(M04)/4E
12 PSU6(52X) 14
-PFF1 -PFF5 -PFF7
11 PSU6(52X) 17(M04)/5E 10 PSU6(52X) 18(M05)/3D 4 4 4
17(M04)/3E 11 17(M04)/2E 17(M04)/4E 4 18(M05)/5D 18(M05)/6D
12 12 CRM4(30SX) PSU6(52X) 18(M05)/2D WDG TEMP
B CRM4(SCX) (95) CRM4(30SX) OIL TEMP MOG ALARM B
BUCHHOLZ HIGH ALARM HIGH ALARM
ALARM
U27
U19
U31
U11
U15
U23
U39
U43
U47
U35
U3
U7
-XDX6 6
-XDX6 8 -XDX6 10 -XDX6 12 -XDX6 14 -XDX6 16 -XDX6 18 -XDX6 20 -XDX6 22 -XDX6 24
-XDX6 2 -XDX6 4
F:\EPL\Project\2024\ZS2\4202889447-01_SLATHIA CONSTRUCTION WORKS_33kV_ZS2.elk
C C
D D
E E
15(M02)/1D
16(M03)/3A
15(M02)/6B
15(M02)/1C
15(M02)/2C
15(M02)/6A
25(X01)/5B
A SELECTOR SWITCH TNC SELECTOR SWITCH
SELECTOR SWITCH L/R SELECTOR SWITCH A
2
1 3 1 3 5 7
1 2 1 3 5 7
T N C L R
2 4 6 8 2 4 6 8
-SFO1
15(M02)/5C
16(M03)/5A
15(M02)/5C
C C
1-1 1-3 2-1 2-3
1 NO
2 NC
D D
E E
TERMINALS:
© Copyright 2012 ABB. All rights reserved.
=HA01 NOTE:
SO-01_HA01_ICOG-PNL-01
A FIRST TERMINAL OF LAST TERMINAL OF A
STRIP TOTAL QTY. TERMINAL FUNCTION
TAG TERMINAL DIAGRAM TERMINAL DIAGRAM DISCONNECTING TERMINAL BLOCK
TOP SIDE
-XDA 1 22 22 CURRENT TRANSFORMER CIRCUIT : DISCONNECTING TERMINAL
-
-XDB 1 58 51 CIRCUIT BREAKER CIRCUIT : NON-DISCONNECTING TERMINAL
B B
-XDCA 1 4 4 REMOTE CURRENT TRANSFORMER CIRCUIT : DISCONNECTING TERMINAL
BOTTOM SIDE
-XDH 1 8 8 TERMINAL BLOCK IN HEATER CIRCUIT : NON-DISCONNECTING TERMINAL
C C
-
-XDX4 1 2 2 AC CIRCUIT : DISCONNECTING TERMINAL
D D
-XDX13 1 4 4 TERMINAL BLOCK FOR SPARE : DISCONNECTING TERMINAL
E E