COATING NON-CONFORMANCE REPORT
Sinai Field – Inspection Division
Rejected painting of Filters 3C
Ref. №: 2020-083-Pai-NCR Subject: Date: 30/09/2020
& 4A at Water Injection Plant
Dual Media Filters 3C & 4A at Water
Location:
Injection Plant
Mu Abdessalam
Inspector:
Rina Coating Inspector
Eni Spec.
20000.VAR.PAI.FUN.
№:
F. MAIN GEN.MGR / ONSHORE
To:
MAINT.DIV. MGR.
F.PROD.GEN.MGR.
CC:
WI.DIV.MGR
From: INSP. DIV. MGR.
Introduction
• Existing paints for both subject filters applied by APM without offer for INS.DIV. to carry out routine inspection
such as salt test, surface preparation, paint application & etc.
• Filter № 3C
- The subject vessel offered for coatings internal inspection on 04-Sep-2020.
- Required inspection completed & report № 2020-069-IIR issued on 05-Sep-2020.
- APM completed painting activity without offer to INSP. DIV. for monitoring and inspection.
- The filter offered for inspection prior to box-up.
• Filter № 4A
- Not offered for coating internal inspection.
- APM completed external painting & internal coating not completed so far as per Control Room at Water
Injection Plant.
- APM carried out painting activity without offer to INSP. DIV. for monitoring and inspection.
- The filter offered for inspection prior to box-up.
Inspection Findings
• All following recorded defects due to poor application techniques, lack of quality control.
• Filter № 3C Interior:
- Paint coatings with visible cracks which may penetrate down to the substrate.
- The dried paint film has the appearance of a dried-out mud bath.
- Exhibited a form of adhesion failure where paint literally flakes from the substrate.
• Filter № 3C Exterior:
- The surface has not been suitably prepared or used incorrect coating specification.
- Loss of adhesion between coats of paint.
- Over application of topcoat paint, excessive use of thinner, poor workmanship causing runs & sags.
Inspector: Rina Coating Inspector Petrobel: INSP. DIV. MGR.
Signed: Mu Abdessalam Date: 30/09/20 Signed: Ettokhy Alasswad Date: 30/09/20
PTB-Sinai-Insp-Pai-NCR - Page 1 of 5
COATING NON-CONFORMANCE REPORT
Sinai Field – Inspection Division
Rejected painting of Filters 3C
Ref. №: 2020-083-Pai-NCR Subject: Date: 30/09/2020
& 4A at Water Injection Plant
• Filter № 4A Interior:
- The paint was sticky during inspection time prevented entry.
• Filter № 4A Exterior:
- Paint applied without full blasting with unknown number of layers, it looks to be only one topcoat applied on
swept area, the paint exhibited various defects such as adhesion failure, flaking & cracks.
- Exhibited misses / skips / holidays.
- Runs & sags displayed.
Recommendations
• Full coating renovation to be carry out for internal & external surfaces as per Eni specifications
27595.ENG.CPI.STD – Rev1 & 20000.ENG.CPI.STD – Rev5 respectively:
Interior Exterior
Required paint system № 003-PV 004
Type and level of preparation SSPC-SP1 / SSPC-SP5 SSPC-SP1 / SSPC-SP10
50 - 85 µm ISO 8503-5 or Medium
Surface profile 75 - 100 µm
G ISO 8503-2
Level of total water-soluble salts ≤ 20 mg/m² ≤ 50 mg/m²
Steel and welding imperfections Grade P3 - ISO 8501-3 Grade P2 - ISO 8501-3
Primer 60 µm Zinc Rich Epoxy Primer
Intermediate Multi-layers of novolac tank lining 200 µm Epoxy Undercoat
as per manufacturer
Topcoat recommendations 70 µm Polyurethane Topcoat
Total Nominal Dry Film Thickness 330 µm
• Decorative colors & identification colors for piping should be as per 20000.ENG.CPI.STD Appendix C.
• If above mentioned defects offered to APM coating inspector, then he should be terminated.
Follow Up Remedial Action
• INS. DIV. MUST monitor and check the specific characteristics of any coating process as per Eni Specifications
for cost optimization to avoid time/money consuming.
Inspector: Rina Coating Inspector Petrobel: INSP. DIV. MGR.
Signed: Mu Abdessalam Date: 30/09/20 Signed: Ettokhy Alasswad Date: 30/09/20
PTB-Sinai-Insp-Pai-NCR - Page 2 of 5
COATING NON-CONFORMANCE REPORT
Sinai Field – Inspection Division
Rejected painting of Filters 3C
Ref. №: 2020-083-Pai-NCR Subject: Date: 30/09/2020
& 4A at Water Injection Plant
Photographic Record – Filter № 3C Interior
Paint coatings with visible cracks may penetrate down to the The dried paint film has the appearance of a dried-out mud
substrate bath
Paint deterioration begun to appear Poor application techniques
A form of adhesion failure where paint literally flakes from the APM did not protect the anodes prior to apply which nullified
substrate its purpose
Inspector: Rina Coating Inspector Petrobel: INSP. DIV. MGR.
Signed: Mu Abdessalam Date: 30/09/20 Signed: Ettokhy Alasswad Date: 30/09/20
PTB-Sinai-Insp-Pai-NCR - Page 3 of 5
COATING NON-CONFORMANCE REPORT
Sinai Field – Inspection Division
Rejected painting of Filters 3C
Ref. №: 2020-083-Pai-NCR Subject: Date: 30/09/2020
& 4A at Water Injection Plant
Photographic Record – Filter № 3C Exterior
Paint applied without full blasting with unknown number of
Exhibited misses / skips / holidays
layers
Misses at davit arm Over application of topcoat paint
Paint applied without full blasting with unknown number
Poor workmanship causing runs & sags
of layers
Inspector: Rina Coating Inspector Petrobel: INSP. DIV. MGR.
Signed: Mu Abdessalam Date: 30/09/20 Signed: Ettokhy Alasswad Date: 30/09/20
PTB-Sinai-Insp-Pai-NCR - Page 4 of 5
COATING NON-CONFORMANCE REPORT
Sinai Field – Inspection Division
Rejected painting of Filters 3C
Ref. №: 2020-083-Pai-NCR Subject: Date: 30/09/2020
& 4A at Water Injection Plant
Photographic Record – Filter № 4A Exterior
Improper surface preparation Even debris did not remove before painting
Paints were only to hide previous coating defects such as
Very poor application techniques
undercutting corrosion
defects due to poor application techniques, lack of QC Internal paint was sticky & prevented entry
Inspector: Rina Coating Inspector Petrobel: INSP. DIV. MGR.
Signed: Mu Abdessalam Date: 30/09/20 Signed: Ettokhy Alasswad Date: 30/09/20
PTB-Sinai-Insp-Pai-NCR - Page 5 of 5