Strong Hold Cost Calculator Guide

Uploaded by

thelightbringer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views5 pages

Strong Hold Cost Calculator Guide

Uploaded by

thelightbringer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 5

Ye Olde Construction Workscroll

Thanks
Thanks for
for your
your interest
interest in
in these
these Building
Building guidelines.
guidelines.

You're
You're welcome
welcome to to make
make thisthis spreadsheet
spreadsheet available
available on on your
your webweb site,
site, but
but II need
need you
you to
to mention
mention
aa couple
couple things
things about
about it.it. First,
First, there
there needs
needs to to be
be aa line
line explaining
explaining that that this
this is/was
is/was part
part of
of aa
discussion
discussion on on thethe MMB
MMB (the(the Mystara
Mystara Message
Message BoardBoard on on the
the TSR
TSR web
web site).
site). Please
Please include
include the
the
date
date you
you posted
posted this this file
file since
since there
there may
may bebe future
future updates,
updates, and and naturally
naturally thethe author's
author's name.
name.
The reason I offer this is to entertain Mystara fans, but also to receive
The reason I offer this is to entertain Mystara fans, but also to receive comments and comments and
suggestions
suggestions from from playtesters.
playtesters. ThisThis sort
sort of
of help
help isis always
always welcome.
welcome. Comments
Comments can can be
be e-mailed
e-mailed
to
to me
me directly,
directly, but
but II would
would prefer
prefer they
they be
be posted
posted on on the
the MMB
MMB just just to
to keep
keep everyone
everyone therethere
involved
involved with
with thethe ongoing
ongoing discussion.
discussion. The The TSR
TSR webweb site
site is
is located
located at at www.TSR.com.
www.TSR.com. This This
message
message board
board can can bebe accessed
accessed directly
directly with
with aa web
web browser
browser
(http://tsronline.wizards.com/mb/index.html),
(http://tsronline.wizards.com/mb/index.html), or or with
with aa newsgroup
newsgroup readerreader (the
(the newsgroup
newsgroup
server
server address
address is is TSROnline.com
TSROnline.com and and the
the MMB's
MMB's location
location is is TSR.OOP.Mystara).
TSR.OOP.Mystara). II mention
mention thethe
latter
latter since
since itit is
is the
the fastest
fastest andand allows
allows offline
offline reading.
reading.

Thanks
Thanks again!
again!

Bruce
Bruce Heard
Heard
[email protected]
[email protected]

Cost Changes due to Productivity Factors


Workers
1-10 11-20 21-50 51-100 101-500 501-1000 1001+
A. Wilderness +100% +120% +140% +160% +180% +200% +250%
B. Borderland +50% +60% +70% +80% +90% +100% +120%
C. Settled Lands N/C +10% +15% +20% +25% +40% +60%
D. Urban Center -20% -15% -10% -5% N/C +10% +30%
E. Extreme Climate +40% regardless of crew size
F. Fair Admin. Skills +15% regardless of crew size
G. Average Admin. Skills No modifier
H. Good Admin.Skills -15% regardless of crew size
I. Outstanding Admin. Skills -30% regardless of crew size
K. Fair Workforce Skill +25% regardless of crew size
L. Good Workforce Skills No modifier
M. Motivated Workforce No Modifier
N. Unmotivated/Hostile Wkf. +25% regardless of crew size
O. Missing Supplies +50% regardless of crew size
P. Lack of Tools +50% regardless of crew size

Enter values manually into shaded cells below: XXXX

Enter Actual Number of Workers Here: 4


Enter Work Pace Here (A, B, or C) A
Work Pace:
A. Working Full Time 10+ hours/day (slaves, full-time professionals)
B. Working Part Time 4-6 hours/day (corvee labor, off-season farmers)
C. Marginal Work Pace 1-3 hours/day (working in addition to a full-time activity)
Resulting Crew Size: 4
Total Cost Modifier: -

1 Clearing & Leveling


Basic Cost (BC) 1 cp per 100 sq. ft. Surface: 10,000 Sq.ft.
1.1 Flat & Level Surface: N/C (Enter Y or N below)
1.2 Wooded Surface 5 cp y 5
1.3 Uneven Surface 5 cp y 5
1.4 Sloped Surface 10 cp y 10
1.5 Soft or wet terrain 15 cp 0
1.6 Hard and rocky terrain 20 cp 0
1.7 Urban lot w/rubble or debris 2 cp 0
Total Modifiers + BC: 21
Total Cost: 2,100 cp
Actual Duration: 6 days 5
Initial Duration: 5.25 days

2 Foundations*
Basic Cost (BC) 2 cp per ft. (outside walls) Perimeter: 320 ft.
2.1 Preexisting foundations: Enter "0" Perimeter & skip step 2

Page 1
Ye Olde Construction Workscroll

2.2 Small Building N/C (Enter Y or N below)


2.3 Large Building 6 cp y 6
2.4 Fortification 18 cp 0
2.5 Soft or wet terrain 6 cp 0
2.6 Hard or rocky terrain 12 cp 0
Total Modifiers + BC: 8 Subtotal:
(*) Treat castle moats as foundations, Total Cost: 2,560 cp 4,660 cp
where depth is equal to width. Actual Duration: 7 days 6 13 days
Initial Duration: 6.40 days

3 Underground Levels
Basic Cost (BC) 1 cp per cu.ft.

3.1 Underground Chambers Total Volume Excavated: 3,200 cu.ft.


3.11 Basic Cellar N/C (Enter Y or N below)
3.12 Multiple Underground Levels* 3 cp 0
3.13 Hard or rocky terrain 2 cp 0
3.14 Soft or wet terrain 6 cp 0
Total Modifiers + BC: 1 Subtotal:
(*) Includes natural ceiling & supports Total Cost: 3,200 cp 7,860 cp
Actual Duration: 8 days 8 21 days
Initial Duration: 8.00 days

3.2 Tunnels, Galleries Total Volume Excavated: - cu.ft.


3.21 Tunneling (crude)* N/C (Enter Y or N below)
3.22 Tunneling (solid)** 3 cp 0
3.23 Hard or rocky terrain 2 cp 0
3.24 Soft or wet terrain 6 cp 0
Total Modifiers + BC: 1 Subtotal:
(*) Includes wooden supports Total Cost: - cp 7,860 cp
(**) Includes permanent stonework Actual Duration: 0 day 0 21 days
Initial Duration: 0.00 days

3.3 Wells, Shafts (BC = 2cp) Total Volume Excavated: 300 cu.ft.
3.31 Simple water well NC (Enter Y or N below)
3.32 Reinforced well w/masonry 6 cp y 6
3.33 Hard or rocky terrain 4 cp 0
3.34 Soft or wet terrain 12 cp 0
Total Modifiers + BC: 8 Subtotal:
Total Cost: 2,400 cp 10,260 cp
Actual Duration: 6 days 6 27 days
Initial Duration: 6.00 days
4 Walls
Basic Cost (BC) 3 cp per ft.

Notes: Figure a wooden wall is at least 1/10 thick as it is high, a stone


wall is 1/5 as thick as it is high, heavy battlements are 1/3 as thick
for the sake of simplicity. So, therefore a 7ft high wooden wall is
about 8 inches thick, a 7ft stone wall would be 1.5 ft thick, and 30ft
high battlements 10ft thick.

4.1 Small Building (7ft. high approx.), or Inside Walls Total Length 320 ft.
4.11 Sticks & mud (6" thick) N/C (Enter Y or N below)
4.12 Wood frame & paper* 1 cp 0
4.13 Wood planks (6" thick) 2 cp y 2
4.14 Wood logs (1ft thick) 7 cp 0
4.15 Adobe bricks (6" thick) 7 cp 0
4.16 Stone (1ft thick) 20 cp 0
Total Modifiers + BC: 5 Subtotal:
(*) Oriental settings only Total Cost: 1,600 cp 11,860 cp
Actual Duration: 4 days 4 31 days
Initial Duration: 4.00 days
4.2 Large Building (9ft. high approx.) Total Length 640 ft.
4.21 Wood (9" thick) 15 cp y 15
4.22 Adobe (1ft thick) 22 cp 0
4.23 Stone (2ft thick) 60 cp 0

Page 2
Ye Olde Construction Workscroll

Total Modifiers + BC: 18 Subtotal:


Total Cost: 11,520 cp 23,380 cp
Actual Duration: 29 days 29 60 days
Initial Duration: 28.80 days
4.3 Fortified Building (12ft high, includes buttresses) Total Length 0 ft.
4.31 Wood (2ft thick) 50 cp 0
4.32 Adobe (3ft thick) 75 cp 0
4.33 Stone (4ft thick) 240 cp 0
Total Modifiers + BC: 3 Subtotal:
Total Cost: - cp 23,380 cp
Actual Duration: 0 day 0 60 days
Initial Duration: 0.00 days
4.4 Battlements (includes buttresses, catwalks, stairs) Total Length 0 ft.
4.41 Wood (18ft h. x 4ft th.) 150 cp 0
4.42 Adobe (18ft h. x 6ft th.) 200 cp 0
4.43 Stone (18ft hi. x 6ft th.) 480 cp 0
4.44 Adobe (24ft hi. x 8ft th.) 500 cp 0
4.45 Stone (24ft hi. x 8ft th.) 960 cp 0
4.46 Adobe (30ft hi. x 10ft th.) 1,250 cp 0
4.47 Stone (30ft hi. x 10ft th.) 1,920 cp 0
Total Modifiers + BC: 3 Subtotal:
Total Cost: - cp 23,380 cp
Actual Duration: 0 day 0 60 days
Initial Duration: 0.00 days
4.5 Wall Finish (inside walls*) Total Length 320 ft.
4.51 Humble (whitewash, plaster) 1 cp 0
4.52 Common (plaster, simple woo 3 cp y 3
4.53 Rich (wood paneling, marble, m 25 cp 0
Total Modifiers: 3 Subtotal:
(*) Count the length of each inner wall only once Total Cost: 960 cp 24,340 cp
regardless of whether it is finished on both sides Actual Duration: 3 days 2 63 days
Initial Duration: 2.40 days
4.6 Wall Finish (outside walls*) Total Length 640 ft.
4.61 Humble (mud, paint) 1 cp 0
4.62 Common (wood slats, paint, pla 3 cp y 3
4.63 Rich (marble, statues, tiles) 20 cp 0
4.64 Gargoyles (one every 10ft) 12 cp 0
4.65 Machicolation 8 cp 0
4.66 Crenellations 4 cp 0
Total Modifiers: 3 Subtotal:
(*) Count the length of each outer wall only once Total Cost: 1,920 cp 26,260 cp
regardless of whether it is finished on both sides Actual Duration: 5 days 5 68 days
Initial Duration: 4.80 days
4.7 Shifting Walls, Secret Doors
Basic Cost (BC) 100 cp per sq.ft. Moving Surface - sq.ft.
4.71 Building's Inside Wall N/C (Enter Y or N below)
4.72 Building's Outside Wall 100 cp 0
4.73 Battlement 200 cp 0
Total Modifiers + BC: 100 Subtotal:
Total Cost: - cp 26,260 cp
Actual Duration: 0 day 0 68 days
Initial Duration: 0.00 days

5 Floors & Terraces


Basic Cost (BC) 1 cp per 10 sq.ft. Total Surface: 19,200 sq.ft.
5.1 Packed Dirt or Gravel N/C (Enter Y or N below)
5.2 Wood, Common 2 cp y 2
5.3 Wood, Rich or Fortified 4 cp 0
5.4 Stone, Common 8 cp 0
5.5 Stone, Rich or Fortified 16 cp 0
Total Modifiers + BC: 3 Subtotal:
(*) Includes supporting pillars, stairs. Total Cost: 5,760 cp 32,020 cp
Wood floors are either rough wood, or wood covered Actual Duration: 15 days 14 83 days
with varnished parquet slats. Stone floors usually include Initial Duration: 14.40 days
flagstone (fortresses), cheap tiles (common construction),
or marble, or ceramic tiles for the more expensive abodes.

Page 3
Ye Olde Construction Workscroll

6 Roofing
Basic Cost (BC) 2 cp per 10 sq.ft. * Original, Flat Surface: 6,400 sq.ft.
OR -- Radius if Circular: ft.
6.11 Flat Terrace ** (Enter Y or N below)
6.12 Peaked Roof y Resulting Surface: 12,800 sq.ft.
6.13 Pagoda Style Resulting Surface: - sq.ft.
6.14 Spherical Dome Resulting Surface: - sq.ft.
6.15 Onion-Shaped Resulting Surface: - sq.ft.

(*) Original, flat surface to cover


(**) See Floors & Terraces, earlier

6.21 Thatch N/C (Enter Y or N below)


6.22 Wood Tiles 3 cp 0
6.23 Slate Tiles 5 cp 0
6.24 Baked-Earth Tiles 6 cp 0
6.25 Stonework 14 cp 0
6.26 Ceramic Tiles 21 cp 0
6.27 Metal Covering (copper) 25 cp 0
6.28 Unusually Fancy Style Special 0
6.29 Stone Gargoyles, Statues* 12 cp 0
Total Modifiers + BC: 2 Subtotal:
(*) Located at peaks and edges Total Cost: 2,560 cp 34,580 cp
Actual Duration: 7 days 6 90 days
Initial Duration: 6.40 days

7 Doors & Gates


Basic Cost (BC) Special

7.1 Outside, Human-Sized* (Enter Number of Doors below)


7.11 Humble, wood 8 cp -
7.12 Common, wood 100 cp -
7.13 Rich, wood 500 cp -
7.14 Rich, metal 2,000 cp -
7.15 Heavy reinforced, wood 500 cp 2 1,000
7.16 Fortress postern, metal 800 cp -

7.2 Inside, Human-Sized* (Enter Number of Doors below)


7.21 Humble, wood 4 cp -
7.22 Common, wood 50 cp 5 250
7.23 Rich, wood 350 cp -
7.24 Rich, glass 700 cp -
7.25 Rich, metal 1,400 cp -
7.26 Heavy reinforced, wood 350 cp -

7.3 Oversized Openings*


Basic Cost (BC) 10 cp per sq.ft. Opening's Surface - sq.ft.
7.31 Large Wooden Doors NC (Enter Y or N below)
7.32 Large Metal Doors 100 cp 0
7.33 Gate, Portcullis 80 cp 0
7.34 Drawbridge & Mechanism 200 cp 0
Total Modifiers + BC: 10 Subtotal:
(*) Includes basic lock & bar if needed Total Cost: 1,250 cp 35,830 cp
For secret doors, see Shifting Walls (4.7) Actual Duration: 4 days 3 94 days
Initial Duration: 3.13 days

8 Windows
Basic Cost (BC) Special

8.1 Average 8-10 sq.ft. Opening* (Enter Number of Items below)


8.11 Plain shutters 4 cp -
8.12 Plain glass window & shutters 200 cp 8 1,600
8.13 Fancy shape, clear glass, shut 1,000 cp -
8.14 Arrow slits w/reinforced shutter 150 cp -
8.15 Sturdy metal bars +150 cp 4 600

Page 4
Ye Olde Construction Workscroll

8.16 Fancy ironwork +450 cp -

8.2 Oversized Openings*


Basic Cost (BC) 10 cp per sq.ft. Opening's Surface sq.ft.
8.21 Large, reinforced shutters NC (Enter Y or N below)
8.22 Fancy, stained glass 90 cp 0
8.23 Sturdy metal bars 5 cp 0
8.24 Fancy ironworks 35 cp 0
Total Modifiers + BC: 10 Subtotal:
(*) Includes basic lock & bar if needed Total Cost: 2,200 cp 38,030 cp
Actual Duration: 6 days 6 100 days
Initial Duration: 5.50 days

9 Other Items
Basic Cost (BC) Special

9.1 Plumbing Total Surface of Area


Basic Cost (BC) 1 cp per sq.ft. to receive Plumbing 400 sq.ft.
9.11 Rudimentary NC (Enter Y or N below)
9.12 Functional 10 cp 0
9.13 Advanced* 50 cp 0
Total Modifiers + BC: 1 Subtotal:
(*) Requires the presence of sewers & water cistern Total Cost: 400 cp 38,430 cp
Actual Duration: 1 day 1.00 101 days
Initial Duration: 1.00 days
9.2 Fireplaces & Chimneys (Enter Number of Items below)
9.21 Humble, w/bricks, plaster (4'x4' 50 cp -
9.22 Common, w/stonework (4'x4') 200 cp 1 200
9.23 Common, w/stonework (8'x5') 500 cp 1 500
9.24 Fancy, w/marble decorations (6 1,000 cp -
Total Modifiers: 700 Subtotal:
Total Cost: 700 cp 39,130 cp
Actual Duration: 2 days 2 103 days
Initial Duration: 1.75 days
9.3 Furniture, Floor & Window Dressing Total Surface of Area
Basic Cost (BC) 2 cp per 100 sq.ft. to receive Furniture 12,800 sq.ft.
9.31 Humble and rudimentary NC (Enter Y or N below)
9.32 Common, cheap & sturdy 125 cp y 125
9.33 Common, comfortable 250 cp 0
9.34 Fancy, expensive trappings 1,000 cp 0
Total Modifiers + BC: 127 Subtotal:
Total Cost: 16,381 cp 55,511 cp
Actual Duration: 41 days 41.00 144 days
Initial Duration: 40.95 days
9.4 Well, Water Cistern
9.41 Common Well (see Underground Levels 3) (Enter Number of Items below)
9.42 Water Cistern*, small wooden 500 cp -
9.43 Water Cistern*, large wooden 2,000 cp -
9.44 Water Cistern*, small stone 1,000 cp -
9.45 Water Cistern*, large stone 4,000 cp - Subtotal:
Total Cost: - cp 55,511 cp
(*) Requires functional plumbing (9.12) or better Actual Duration: 0 day 0 144 days
Initial Duration: 0.00 days
Total Cost of the Construction: 55,511 cp
Cost in Gold (Statistical): 555.11 gp
Cost in Gold for an Adventuring PC: 5,551.10 gp

Total Duration of the Construction: 144 work days


Calendar Duration (Mystara)*: 24 weeks

(*) Assuming 6 work days per week

Note: add the cost of the land, if purchased, after all construction costs have been calculated.