Strong Hold Cost Calculator Guide
Strong Hold Cost Calculator Guide
Thanks
Thanks for
for your
your interest
interest in
in these
these Building
Building guidelines.
guidelines.
You're
You're welcome
welcome to to make
make thisthis spreadsheet
spreadsheet available
available on on your
your webweb site,
site, but
but II need
need you
you to
to mention
mention
aa couple
couple things
things about
about it.it. First,
First, there
there needs
needs to to be
be aa line
line explaining
explaining that that this
this is/was
is/was part
part of
of aa
discussion
discussion on on thethe MMB
MMB (the(the Mystara
Mystara Message
Message BoardBoard on on the
the TSR
TSR web
web site).
site). Please
Please include
include the
the
date
date you
you posted
posted this this file
file since
since there
there may
may bebe future
future updates,
updates, and and naturally
naturally thethe author's
author's name.
name.
The reason I offer this is to entertain Mystara fans, but also to receive
The reason I offer this is to entertain Mystara fans, but also to receive comments and comments and
suggestions
suggestions from from playtesters.
playtesters. ThisThis sort
sort of
of help
help isis always
always welcome.
welcome. Comments
Comments can can be
be e-mailed
e-mailed
to
to me
me directly,
directly, but
but II would
would prefer
prefer they
they be
be posted
posted on on the
the MMB
MMB just just to
to keep
keep everyone
everyone therethere
involved
involved with
with thethe ongoing
ongoing discussion.
discussion. The The TSR
TSR webweb site
site is
is located
located at at www.TSR.com.
www.TSR.com. This This
message
message board
board can can bebe accessed
accessed directly
directly with
with aa web
web browser
browser
(http://tsronline.wizards.com/mb/index.html),
(http://tsronline.wizards.com/mb/index.html), or or with
with aa newsgroup
newsgroup readerreader (the
(the newsgroup
newsgroup
server
server address
address is is TSROnline.com
TSROnline.com and and the
the MMB's
MMB's location
location is is TSR.OOP.Mystara).
TSR.OOP.Mystara). II mention
mention thethe
latter
latter since
since itit is
is the
the fastest
fastest andand allows
allows offline
offline reading.
reading.
Thanks
Thanks again!
again!
Bruce
Bruce Heard
Heard
[email protected]
[email protected]
2 Foundations*
Basic Cost (BC) 2 cp per ft. (outside walls) Perimeter: 320 ft.
2.1 Preexisting foundations: Enter "0" Perimeter & skip step 2
Page 1
Ye Olde Construction Workscroll
3 Underground Levels
Basic Cost (BC) 1 cp per cu.ft.
3.3 Wells, Shafts (BC = 2cp) Total Volume Excavated: 300 cu.ft.
3.31 Simple water well NC (Enter Y or N below)
3.32 Reinforced well w/masonry 6 cp y 6
3.33 Hard or rocky terrain 4 cp 0
3.34 Soft or wet terrain 12 cp 0
Total Modifiers + BC: 8 Subtotal:
Total Cost: 2,400 cp 10,260 cp
Actual Duration: 6 days 6 27 days
Initial Duration: 6.00 days
4 Walls
Basic Cost (BC) 3 cp per ft.
4.1 Small Building (7ft. high approx.), or Inside Walls Total Length 320 ft.
4.11 Sticks & mud (6" thick) N/C (Enter Y or N below)
4.12 Wood frame & paper* 1 cp 0
4.13 Wood planks (6" thick) 2 cp y 2
4.14 Wood logs (1ft thick) 7 cp 0
4.15 Adobe bricks (6" thick) 7 cp 0
4.16 Stone (1ft thick) 20 cp 0
Total Modifiers + BC: 5 Subtotal:
(*) Oriental settings only Total Cost: 1,600 cp 11,860 cp
Actual Duration: 4 days 4 31 days
Initial Duration: 4.00 days
4.2 Large Building (9ft. high approx.) Total Length 640 ft.
4.21 Wood (9" thick) 15 cp y 15
4.22 Adobe (1ft thick) 22 cp 0
4.23 Stone (2ft thick) 60 cp 0
Page 2
Ye Olde Construction Workscroll
Page 3
Ye Olde Construction Workscroll
6 Roofing
Basic Cost (BC) 2 cp per 10 sq.ft. * Original, Flat Surface: 6,400 sq.ft.
OR -- Radius if Circular: ft.
6.11 Flat Terrace ** (Enter Y or N below)
6.12 Peaked Roof y Resulting Surface: 12,800 sq.ft.
6.13 Pagoda Style Resulting Surface: - sq.ft.
6.14 Spherical Dome Resulting Surface: - sq.ft.
6.15 Onion-Shaped Resulting Surface: - sq.ft.
8 Windows
Basic Cost (BC) Special
Page 4
Ye Olde Construction Workscroll
9 Other Items
Basic Cost (BC) Special
Note: add the cost of the land, if purchased, after all construction costs have been calculated.
Page 5