0% found this document useful (0 votes)
16 views185 pages

Njfkdyhgvbxcbngfhs Dfvegw EFCDSAFVGRWGEFDC

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views185 pages

Njfkdyhgvbxcbngfhs Dfvegw EFCDSAFVGRWGEFDC

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 185

Open navigation menu

Search

Upload

User Settings

0 ratings0% found this document useful (0 votes)

60 views5 pages

Configuration Management Plan: Version

Uploaded by

Imran MK

This document provides a configuration management plan for managing


changes and releases of software artifacts for a project. It outlines the roles
and responsibilities for configuration man…

Full description

<Company Name><Project Name>Configuration Management Plan

Version <1.0>

[Note: The following template is provided for use with the Rational Unified
Process. Text enclosed in square brackets and displayed in blue italics
(style=InfoBlue) is included to provide guidance to the author and should be
deleted before publishing the document. A paragraph entered following this
style will automatically be set to normal (style=Body Text).] [To customize
automatic fields in Microsoft Word (which display a gray background when
selected), select File>Properties and replace the Title, Subject and Company
fields with the appropriate information for this document. After closing the
dialog, automatic fields may be updated throughout the document by
selecting Edit>Select All (or Ctrl-A) and pressing F9, or simply click on the
field and press F9. This must be done separately for Headers and Footers.
Alt-F9 will toggle between displaying the field names and the field contents.
See Word help for more information on working with fields.]
<Project Name> Version: <1.0>Configuration Management Plan Date:
<dd/mmm/yy><document identifier>

Revision History

Date Version Description Author

<dd/mmm/yy><x.x><details><name>Confidential

<Company Name>, 2021Page 2 of 5

Open navigation menu

Search

Upload

User Settings

0 ratings0% found this document useful (0 votes)

60 views5 pages

Configuration Management Plan: Version

Uploaded by

Imran MK

This document provides a configuration management plan for managing


changes and releases of software artifacts for a project. It outlines the roles
and responsibilities for configuration man…

Full description

<Company Name><Project Name>Configuration Management Plan


Version <1.0>

[Note: The following template is provided for use with the Rational Unified
Process. Text enclosed in square brackets and displayed in blue italics
(style=InfoBlue) is included to provide guidance to the author and should be
deleted before publishing the document. A paragraph entered following this
style will automatically be set to normal (style=Body Text).] [To customize
automatic fields in Microsoft Word (which display a gray background when
selected), select File>Properties and replace the Title, Subject and Company
fields with the appropriate information for this document. After closing the
dialog, automatic fields may be updated throughout the document by
selecting Edit>Select All (or Ctrl-A) and pressing F9, or simply click on the
field and press F9. This must be done separately for Headers and Footers.
Alt-F9 will toggle between displaying the field names and the field contents.
See Word help for more information on working with fields.]

<Project Name> Version: <1.0>Configuration Management Plan Date:


<dd/mmm/yy><document identifier>

Revision History

Date Version Description Author

<dd/mmm/yy><x.x><details><name>Confidential

<Company Name>, 2021Page 2 of 5

<Project Name> Version: <1.0>Configuration Management Plan Date:


<dd/mmm/yy><document identifier>

Table of Contents

1.Introduction31.1Purpose31.2Scope31.3Definitions, Acronyms, and


Abbreviations31.4References31.5Overview32.Software Configuration
Management32.1Organization, Responsibilities, and Interfaces32.2Tools,
Environment, and Infrastructure33.The Configuration Management
Program33.1Configuration Identification33.1.1Identification
Methods33.1.2Project Baselines33.2Configuration and Change
Control33.2.1Change Request Processing and Approval33.2.2Change Control
Board (CCB)33.3Configuration Status Accounting33.3.1Project Media Storage
and Release Process33.3.2Reports and Audits34.Milestones35.Training and
Resources36.Subcontractor and Vendor Software Control3

Configuration Management Plan

1.Introduction

[The introduction of the

Configuration Management Plan

provides an overview of the entire document. It includes the purpose, scope,


definitions, acronyms, abbreviations, references, and overview of this

Configuration Management Plan

.]

1.1Purpose

[Specify the purpose of this

Configuration Management Plan.

1.2Scope

[A brief description of the scope of this

Configuration Management Plan

; what model it is associated with and anything else that is affected or


influenced by this document.]

1.3Definitions, Acronyms, and Abbreviations

[This subsection provides the definitions of all terms, acronyms, and


abbreviations required to properly interpret the

Configuration Management Plan

. This information may be provided by reference to the project’s Glossary.]

1.4References
[This subsection provides a complete list of all documents referenced
elsewhere in the

Configuration Management Plan

. Identify each document by title, report number (if applicable), date, and
publishing organization. Specify the sources from which the references can
be obtained. This information may be provided by reference to an appendix

Confidential

<Company Name>, 2021Page 3 of 5

<Project Name> Version: <1.0>Configuration Management Plan Date:


<dd/mmm/yy><document identifier>

or to another document.]

1.5Overview

[This subsection describes what the rest of the

Configuration Management Plan

contains and explains how the document is organized.]

2.Software Configuration Management

2.1Organization, Responsibilities, and Interfaces

[Describe who is going to be responsible for performing the various


Configuration Management (CM) activities described in the CM Process
Discipline.]

2.2Tools, Environment, and Infrastructure

[Describe the computing environment and software tools to be used in


fulfilling the CM functions throughout the project or product lifecycle.
Describe the tools and procedures required used to version control
configuration items generated throughout the project or product
lifecycle. Issues involved in setting up the CM environment include:


anticipated size of product data

distribution of the product team

physical location of servers and client machines]

3.The Configuration Management Program

3.1Configuration Identification

3.1.1Identification Methods

[Describe how project or product artifacts are to be named, marked, and


numbered. The identification scheme needs to cover hardware, system
software, Commercial-Off-The-Shelf (COTS) products, and all application
development artifacts listed in the product directory structure; for example,
plans, models, components, test software, results and data, executables,
and so on.]

3.1.2Project Baselines

[Baselines provide an official standard on which subsequent work is based


and to which only authorized changes are made. Describe at what points
during the project or product lifecycle the baselines are to be established.
The most common baselines would be at the end of each of the Inception,
Elaboration, Construction, and Transition phases. Baselines could also be
generated at the end of iterations within the various phases or even more
frequently. Describe who authorizes a baseline and what goes into it.]

3.2Configuration and Change Control

3.2.1Change Request Processing and Approval

[Describe the process by which problems and changes are submitted,


reviewed, and dispositioned.]

3.2.2Change Control Board (CCB)

[Describe the CCB membership and the procedures for processing change
requests and approvals to be followed bythe CCB.]

Confidential


<Company Name>, 2021Page 4 of 5

Reward Your Curiosity

Everything you want to read.

Anytime. Anywhere. Any device.

No Commitment. Cancel anytime.

Share this document

Share or Embed Document

Sharing Options

 Share on Facebook, opens a new window

 Share on Twitter, opens a new window

 Share on LinkedIn, opens a new window

 Share with Email, opens mail client

 Copy link

You might also like


 Team Members: Chetnaba Bhalgaria 02 Piyush Jagwani 11 Shivani
Pandita 21 Shruti Patil 30

No ratings yet

Team Members: Chetnaba Bhalgaria 02 Piyush Jagwani 11 Shivani Pandita 21


Shruti Patil 30

59 pages

 ITIL Quizlet

No ratings yet

ITIL Quizlet

23 pages

 Configuration Management Plan


 100% (5)

Configuration Management Plan

27 pages

 Functional Specification Document Template

 100% (2)

Functional Specification Document Template

11 pages

 Event Management: Software Requirements Specification Document


 100% (6)

Event Management: Software Requirements Specification Document

19 pages

 ITIL Heroes Handbook

No ratings yet

ITIL Heroes Handbook

42 pages

 Software Configuration Management Plan Template 2013

No ratings yet

Software Configuration Management Plan Template 2013

7 pages

 Requirements Management: Based On Material From

 100% (1)

Requirements Management: Based On Material From

72 pages

 Process Configuring Method in Bpm Project

 From Everand

Process Configuring Method in Bpm Project

Seyed Ahmad Daliri

No ratings yet
 Configuration Management SOP Sample

 20% (5)

Configuration Management SOP Sample

5 pages

 DD

No ratings yet

DD

149 pages

 Amit Kumar Sahu: Professional Preface

No ratings yet

Amit Kumar Sahu: Professional Preface

4 pages

 Requirements Document Template (UPEDU)

 100% (3)

Requirements Document Template (UPEDU)

6 pages

 Project Manufacturing For Dummies DELTEK 2016

 100% (2)

Project Manufacturing For Dummies DELTEK 2016

76 pages

 Software Quality Assurance Plan PDF

No ratings yet

Software Quality Assurance Plan PDF

35 pages

 Software Requirements Specifications Template 2018

No ratings yet

Software Requirements Specifications Template 2018


14 pages

 Software Configuration Management Plan Template

No ratings yet

Software Configuration Management Plan Template

8 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

20 pages

 PMP Chapter 4 Test Project Integration Management

No ratings yet

PMP Chapter 4 Test Project Integration Management

3 pages

 Thank-You For Downloading The Project Management Plan Template!

No ratings yet

Thank-You For Downloading The Project Management Plan Template!

7 pages

 Thank-You For Downloading The SW Tool IQ-OQ-PQ Template!

No ratings yet

Thank-You For Downloading The SW Tool IQ-OQ-PQ Template!

14 pages

 Qm020 Quality Management Checklist

No ratings yet

Qm020 Quality Management Checklist

9 pages

 IEC62304 Template Software Development Plan V1 0

No ratings yet
IEC62304 Template Software Development Plan V1 0

11 pages

 V Modell XT - V1.3 PDF

No ratings yet

V Modell XT - V1.3 PDF

825 pages

 QA Plan Template Blank

 100% (4)

QA Plan Template Blank

31 pages

 Quality Assurance Plan Template

No ratings yet

Quality Assurance Plan Template

8 pages

 PRINCE2-Exams Test-Inside PRINCE2-Foundation Examcollction v2016-06-


23 by Floyd 149q Vce

No ratings yet

PRINCE2-Exams Test-Inside PRINCE2-Foundation Examcollction v2016-06-23


by Floyd 149q Vce

18 pages

 Project Management Plan Template

No ratings yet

Project Management Plan Template

17 pages

 Navy C4ISR Procedures Interface Standards Opnav-9410-5c

No ratings yet

Navy C4ISR Procedures Interface Standards Opnav-9410-5c


9 pages

 Creating Technical Documentation TTLM Final

No ratings yet

Creating Technical Documentation TTLM Final

121 pages

 Supporting (Implementation (A) (B) : Department of

No ratings yet

Supporting (Implementation (A) (B) : Department of

71 pages

 Isp250 FR - Mytecc E-Commerce System

 100% (1)

Isp250 FR - Mytecc E-Commerce System

18 pages

 Requirements Management Plan: Version

No ratings yet

Requirements Management Plan: Version

8 pages

 Saluran Air Jasmine

No ratings yet

Saluran Air Jasmine

8 pages

 Шаблон-RUP. Product Acceptance Plan

No ratings yet

Шаблон-RUP. Product Acceptance Plan

5 pages

 Supplementary Specification

No ratings yet
Supplementary Specification

7 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

8 pages

 Interface Control Document

No ratings yet

Interface Control Document

4 pages

 College Bus Management System College Bus Management System

No ratings yet

College Bus Management System College Bus Management System

9 pages

 Software Requirements Specification Template

No ratings yet

Software Requirements Specification Template

8 pages

 Software Requirements Specification For

No ratings yet

Software Requirements Specification For

5 pages

 Data Lifecycle MGT Plan

No ratings yet

Data Lifecycle MGT Plan

5 pages

 Quality Assurance Plan


No ratings yet

Quality Assurance Plan

7 pages

 1.requirements Management Plan - RMP

No ratings yet

1.requirements Management Plan - RMP

20 pages

 WH-FORM-XX-1.0 EN - Technical Documentation MDR Software Master


Record Template

No ratings yet

WH-FORM-XX-1.0 EN - Technical Documentation MDR Software Master Record


Template

26 pages

 Measurement Plan: Version

No ratings yet

Measurement Plan: Version

4 pages

 Software Development Plan: Version

No ratings yet

Software Development Plan: Version

9 pages

 ITS332 SDP Template

No ratings yet

ITS332 SDP Template

8 pages

 Error: Reference Source Not Found Error: Reference Source Not Found

No ratings yet
Error: Reference Source Not Found Error: Reference Source Not Found

7 pages

 SRS Ieee

No ratings yet

SRS Ieee

7 pages

 Supplementary Specification

No ratings yet

Supplementary Specification

7 pages

 EPLC Configuration Management Template

No ratings yet

EPLC Configuration Management Template

9 pages

 Problem Resolution Plan: Version

 100% (1)

Problem Resolution Plan: Version

4 pages

 Product Acceptance Plan

No ratings yet

Product Acceptance Plan

5 pages

 Docc 9 F 3

No ratings yet

Docc 9 F 3

21 pages

 SRS MyKokoCenter
No ratings yet

SRS MyKokoCenter

47 pages

 (Product) MTM Program Product Software Project Plan: (Authors Names)

No ratings yet

(Product) MTM Program Product Software Project Plan: (Authors Names)

11 pages

 Vision (Small Project) : Authors

No ratings yet

Vision (Small Project) : Authors

7 pages

 Requirements Management Plan PPM Version 2.0

No ratings yet

Requirements Management Plan PPM Version 2.0

8 pages

 Software Requirements Specification

No ratings yet

Software Requirements Specification

5 pages

 SRS Template of Sample Case Study - 24032018

No ratings yet

SRS Template of Sample Case Study - 24032018

11 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

11 pages
 Its332 Srs Project

No ratings yet

Its332 Srs Project

14 pages

 S R S (S RS) : Takeholder Equirements Pecification T

No ratings yet

S R S (S RS) : Takeholder Equirements Pecification T

13 pages

 Software Requirements Specification

No ratings yet

Software Requirements Specification

9 pages

 CDC UP Requirements Management Plan Template

No ratings yet

CDC UP Requirements Management Plan Template

11 pages

 Pre-Appointment Bep Template

No ratings yet

Pre-Appointment Bep Template

7 pages

 SRS Sample Students

No ratings yet

SRS Sample Students

30 pages

 Configurationmanagementstrategy

No ratings yet

Configurationmanagementstrategy
7 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

7 pages

 Defect Tracking System

 50% (2)

Defect Tracking System

21 pages

 The Islamia University of Bahawalpur: Department of Software Engineering

No ratings yet

The Islamia University of Bahawalpur: Department of Software Engineering

14 pages

 Stmik Multi Data Palembang

No ratings yet

Stmik Multi Data Palembang

8 pages

 d1cs1104d SDP Group2

No ratings yet

d1cs1104d SDP Group2

9 pages

 Successful Service Design for Telecommunications: A comprehensive guide


to design and implementation

 From Everand

Successful Service Design for Telecommunications: A comprehensive guide


to design and implementation

Sauming Pang
No ratings yet

 Transit Quarters

From Everand

Transit Quarters

Shyamala Nemana

 4/5 (8)

 Midterm Exam - II Pao 2021 Software Engineering II

No ratings yet

Midterm Exam - II Pao 2021 Software Engineering II

26 pages

 Network Design and Management

No ratings yet

Network Design and Management

16 pages

 Norte Abierto - Aconex Project Configuration Management Plan

No ratings yet

Norte Abierto - Aconex Project Configuration Management Plan

14 pages

 Question Paper Software Project Management (MB3G2IT) : January 2009

No ratings yet

Question Paper Software Project Management (MB3G2IT) : January 2009

18 pages

 Configuration Management and Version Control

No ratings yet

Configuration Management and Version Control

6 pages

 Software Engineering GTU Syllabus


No ratings yet

Software Engineering GTU Syllabus

3 pages

 Accelerator Safety

No ratings yet

Accelerator Safety

10 pages

 10 SCM

No ratings yet

10 SCM

23 pages

 Project Scheduling and Staffing, Software Configuration Management Plan

No ratings yet

Project Scheduling and Staffing, Software Configuration Management Plan

3 pages

 Software Configuration Management Plan: I. Table of Contents

No ratings yet

Software Configuration Management Plan: I. Table of Contents

14 pages

 Assignment CAED 2012

No ratings yet

Assignment CAED 2012

3 pages

 Design and Optimization of Aircraft Assembling Based On Comprehensive


Simulation of Manufacturing Processes - A. Rozhdestvensky, O. Samsonov

No ratings yet
Design and Optimization of Aircraft Assembling Based On Comprehensive
Simulation of Manufacturing Processes - A. Rozhdestvensky, O. Samsonov

10 pages

 Umbrella Activity

No ratings yet

Umbrella Activity

14 pages

 QPM1

 100% (1)

QPM1

200 pages

Footer menu

Back to top

About

 About Scribd

 Everand: Ebooks & Audiobooks

 SlideShare

 Press

 Join our team!

 Contact us

 Invite friends

Support

 Help / FAQ

 Accessibility

 Purchase help

 AdChoices

Legal
 Terms

 Privacy

 Copyright

 Do not sell or share my personal information

Social

 Instagram Instagram

 Twitter Twitter

 Facebook Facebook

 Pinterest Pinterest

Get our free apps

 Documents

Language:

English
Copyright © 2024 Scribd Inc.

<Project Name> Version: <1.0>Configuration Management Plan Date:


<dd/mmm/yy><document identifier>

Table of Contents

1.Introduction31.1Purpose31.2Scope31.3Definitions, Acronyms, and


Abbreviations31.4References31.5Overview32.Software Configuration
Management32.1Organization, Responsibilities, and Interfaces32.2Tools,
Environment, and Infrastructure33.The Configuration Management
Program33.1Configuration Identification33.1.1Identification
Methods33.1.2Project Baselines33.2Configuration and Change
Control33.2.1Change Request Processing and Approval33.2.2Change Control
Board (CCB)33.3Configuration Status Accounting33.3.1Project Media Storage
and Release Process33.3.2Reports and Audits34.Milestones35.Training and
Resources36.Subcontractor and Vendor Software Control3

Configuration Management Plan

1.Introduction

[The introduction of the

Configuration Management Plan

provides an overview of the entire document. It includes the purpose, scope,


definitions, acronyms, abbreviations, references, and overview of this

Configuration Management Plan

.]

1.1Open navigation menu

Search

Upload

User Settings

0 ratings0% found this document useful (0 votes)


60 views5 pages

Configuration Management Plan: Version

Uploaded by

Imran MK

This document provides a configuration management plan for managing


changes and releases of software artifacts for a project. It outlines the roles
and responsibilities for configuration man…

Full description

<Company Name><Project Name>Configuration Management Plan

Version <1.0>

[Note: The following template is provided for use with the Rational Unified
Process. Text enclosed in square brackets and displayed in blue italics
(style=InfoBlue) is included to provide guidance to the author and should be
deleted before publishing the document. A paragraph entered following this
style will automatically be set to normal (style=Body Text).] [To customize
automatic fields in Microsoft Word (which display a gray background when
selected), select File>Properties and replace the Title, Subject and Company
fields with the appropriate information for this document. After closing the
dialog, automatic fields may be updated throughout the document by
selecting Edit>Select All (or Ctrl-A) and pressing F9, or simply click on the
field and press F9. This must be done separately for Headers and Footers.
Alt-F9 will toggle between displaying the field names and the field contents.
See Word help for more information on working with fields.]

<Project Name> Version: <1.0>Configuration Management Plan Date:


<dd/mmm/yy><document identifier>

Revision History

Date Version Description Author

<dd/mmm/yy><x.x><details><name>Confidential

<Company Name>, 2021Page 2 of 5

Open navigation menu

Search

Upload

User Settings

0 ratings0% found this document useful (0 votes)

60 views5 pages

Configuration Management Plan: Version

Uploaded by

Imran MK

This document provides a configuration management plan for managing


changes and releases of software artifacts for a project. It outlines the roles
and responsibilities for configuration man…

Full description

<Company Name><Project Name>Configuration Management Plan

Version <1.0>

[Note: The following template is provided for use with the Rational Unified
Process. Text enclosed in square brackets and displayed in blue italics
(style=InfoBlue) is included to provide guidance to the author and should be
deleted before publishing the document. A paragraph entered following this
style will automatically be set to normal (style=Body Text).] [To customize
automatic fields in Microsoft Word (which display a gray background when
selected), select File>Properties and replace the Title, Subject and Company
fields with the appropriate information for this document. After closing the
dialog, automatic fields may be updated throughout the document by
selecting Edit>Select All (or Ctrl-A) and pressing F9, or simply click on the
field and press F9. This must be done separately for Headers and Footers.
Alt-F9 will toggle between displaying the field names and the field contents.
See Word help for more information on working with fields.]

<Project Name> Version: <1.0>Configuration Management Plan Date:


<dd/mmm/yy><document identifier>

Revision History

Date Version Description Author

<dd/mmm/yy><x.x><details><name>Confidential

<Company Name>, 2021Page 2 of 5

<Project Name> Version: <1.0>Configuration Management Plan Date:


<dd/mmm/yy><document identifier>

Table of Contents

1.Introduction31.1Purpose31.2Scope31.3Definitions, Acronyms, and


Abbreviations31.4References31.5Overview32.Software Configuration
Management32.1Organization, Responsibilities, and Interfaces32.2Tools,
Environment, and Infrastructure33.The Configuration Management
Program33.1Configuration Identification33.1.1Identification
Methods33.1.2Project Baselines33.2Configuration and Change
Control33.2.1Change Request Processing and Approval33.2.2Change Control
Board (CCB)33.3Configuration Status Accounting33.3.1Project Media Storage
and Release Process33.3.2Reports and Audits34.Milestones35.Training and
Resources36.Subcontractor and Vendor Software Control3

Configuration Management Plan

1.Introduction

[The introduction of the


Configuration Management Plan

provides an overview of the entire document. It includes the purpose, scope,


definitions, acronyms, abbreviations, references, and overview of this

Configuration Management Plan

.]

1.1Purpose

[Specify the purpose of this

Configuration Management Plan.

1.2Scope

[A brief description of the scope of this

Configuration Management Plan

; what model it is associated with and anything else that is affected or


influenced by this document.]

1.3Definitions, Acronyms, and Abbreviations

[This subsection provides the definitions of all terms, acronyms, and


abbreviations required to properly interpret the

Configuration Management Plan

. This information may be provided by reference to the project’s Glossary.]

1.4References

[This subsection provides a complete list of all documents referenced


elsewhere in the

Configuration Management Plan

. Identify each document by title, report number (if applicable), date, and
publishing organization. Specify the sources from which the references can
be obtained. This information may be provided by reference to an appendix

Confidential

<Company Name>, 2021Page 3 of 5


<Project Name> Version: <1.0>Configuration Management Plan Date:
<dd/mmm/yy><document identifier>

or to another document.]

1.5Overview

[This subsection describes what the rest of the

Configuration Management Plan

contains and explains how the document is organized.]

2.Software Configuration Management

2.1Organization, Responsibilities, and Interfaces

[Describe who is going to be responsible for performing the various


Configuration Management (CM) activities described in the CM Process
Discipline.]

2.2Tools, Environment, and Infrastructure

[Describe the computing environment and software tools to be used in


fulfilling the CM functions throughout the project or product lifecycle.
Describe the tools and procedures required used to version control
configuration items generated throughout the project or product
lifecycle. Issues involved in setting up the CM environment include:

anticipated size of product data

distribution of the product team

physical location of servers and client machines]

3.The Configuration Management Program

3.1Configuration Identification

3.1.1Identification Methods
[Describe how project or product artifacts are to be named, marked, and
numbered. The identification scheme needs to cover hardware, system
software, Commercial-Off-The-Shelf (COTS) products, and all application
development artifacts listed in the product directory structure; for example,
plans, models, components, test software, results and data, executables,
and so on.]

3.1.2Project Baselines

[Baselines provide an official standard on which subsequent work is based


and to which only authorized changes are made. Describe at what points
during the project or product lifecycle the baselines are to be established.
The most common baselines would be at the end of each of the Inception,
Elaboration, Construction, and Transition phases. Baselines could also be
generated at the end of iterations within the various phases or even more
frequently. Describe who authorizes a baseline and what goes into it.]

3.2Configuration and Change Control

3.2.1Change Request Processing and Approval

[Describe the process by which problems and changes are submitted,


reviewed, and dispositioned.]

3.2.2Change Control Board (CCB)

[Describe the CCB membership and the procedures for processing change
requests and approvals to be followed bythe CCB.]

Confidential

<Company Name>, 2021Page 4 of 5

Reward Your Curiosity

Everything you want to read.

Anytime. Anywhere. Any device.

No Commitment. Cancel anytime.


Share this document

Share or Embed Document

Sharing Options

 Share on Facebook, opens a new window

 Share on Twitter, opens a new window

 Share on LinkedIn, opens a new window

 Share with Email, opens mail client

 Copy link

You might also like

 Team Members: Chetnaba Bhalgaria 02 Piyush Jagwani 11 Shivani


Pandita 21 Shruti Patil 30
No ratings yet

Team Members: Chetnaba Bhalgaria 02 Piyush Jagwani 11 Shivani Pandita 21


Shruti Patil 30

59 pages

 ITIL Quizlet

No ratings yet

ITIL Quizlet

23 pages

 Configuration Management Plan


 100% (5)

Configuration Management Plan

27 pages

 Functional Specification Document Template

 100% (2)

Functional Specification Document Template

11 pages

 Event Management: Software Requirements Specification Document


 100% (6)

Event Management: Software Requirements Specification Document

19 pages

 ITIL Heroes Handbook

No ratings yet

ITIL Heroes Handbook

42 pages

 Software Configuration Management Plan Template 2013

No ratings yet

Software Configuration Management Plan Template 2013

7 pages

 Requirements Management: Based On Material From

 100% (1)

Requirements Management: Based On Material From

72 pages

 Process Configuring Method in Bpm Project

 From Everand

Process Configuring Method in Bpm Project

Seyed Ahmad Daliri

No ratings yet
 Configuration Management SOP Sample

 20% (5)

Configuration Management SOP Sample

5 pages

 DD

No ratings yet

DD

149 pages

 Amit Kumar Sahu: Professional Preface

No ratings yet

Amit Kumar Sahu: Professional Preface

4 pages

 Requirements Document Template (UPEDU)

 100% (3)

Requirements Document Template (UPEDU)

6 pages

 Project Manufacturing For Dummies DELTEK 2016

 100% (2)

Project Manufacturing For Dummies DELTEK 2016

76 pages

 Software Quality Assurance Plan PDF

No ratings yet

Software Quality Assurance Plan PDF

35 pages

 Software Requirements Specifications Template 2018

No ratings yet

Software Requirements Specifications Template 2018


14 pages

 Software Configuration Management Plan Template

No ratings yet

Software Configuration Management Plan Template

8 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

20 pages

 PMP Chapter 4 Test Project Integration Management

No ratings yet

PMP Chapter 4 Test Project Integration Management

3 pages

 Thank-You For Downloading The Project Management Plan Template!

No ratings yet

Thank-You For Downloading The Project Management Plan Template!

7 pages

 Thank-You For Downloading The SW Tool IQ-OQ-PQ Template!

No ratings yet

Thank-You For Downloading The SW Tool IQ-OQ-PQ Template!

14 pages

 Qm020 Quality Management Checklist

No ratings yet

Qm020 Quality Management Checklist

9 pages

 IEC62304 Template Software Development Plan V1 0

No ratings yet
IEC62304 Template Software Development Plan V1 0

11 pages

 V Modell XT - V1.3 PDF

No ratings yet

V Modell XT - V1.3 PDF

825 pages

 QA Plan Template Blank

 100% (4)

QA Plan Template Blank

31 pages

 Quality Assurance Plan Template

No ratings yet

Quality Assurance Plan Template

8 pages

 PRINCE2-Exams Test-Inside PRINCE2-Foundation Examcollction v2016-06-


23 by Floyd 149q Vce

No ratings yet

PRINCE2-Exams Test-Inside PRINCE2-Foundation Examcollction v2016-06-23


by Floyd 149q Vce

18 pages

 Project Management Plan Template

No ratings yet

Project Management Plan Template

17 pages

 Navy C4ISR Procedures Interface Standards Opnav-9410-5c

No ratings yet

Navy C4ISR Procedures Interface Standards Opnav-9410-5c


9 pages

 Creating Technical Documentation TTLM Final

No ratings yet

Creating Technical Documentation TTLM Final

121 pages

 Supporting (Implementation (A) (B) : Department of

No ratings yet

Supporting (Implementation (A) (B) : Department of

71 pages

 Isp250 FR - Mytecc E-Commerce System

 100% (1)

Isp250 FR - Mytecc E-Commerce System

18 pages

 Requirements Management Plan: Version

No ratings yet

Requirements Management Plan: Version

8 pages

 Saluran Air Jasmine

No ratings yet

Saluran Air Jasmine

8 pages

 Шаблон-RUP. Product Acceptance Plan

No ratings yet

Шаблон-RUP. Product Acceptance Plan

5 pages

 Supplementary Specification

No ratings yet
Supplementary Specification

7 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

8 pages

 Interface Control Document

No ratings yet

Interface Control Document

4 pages

 College Bus Management System College Bus Management System

No ratings yet

College Bus Management System College Bus Management System

9 pages

 Software Requirements Specification Template

No ratings yet

Software Requirements Specification Template

8 pages

 Software Requirements Specification For

No ratings yet

Software Requirements Specification For

5 pages

 Data Lifecycle MGT Plan

No ratings yet

Data Lifecycle MGT Plan

5 pages

 Quality Assurance Plan


No ratings yet

Quality Assurance Plan

7 pages

 1.requirements Management Plan - RMP

No ratings yet

1.requirements Management Plan - RMP

20 pages

 WH-FORM-XX-1.0 EN - Technical Documentation MDR Software Master


Record Template

No ratings yet

WH-FORM-XX-1.0 EN - Technical Documentation MDR Software Master Record


Template

26 pages

 Measurement Plan: Version

No ratings yet

Measurement Plan: Version

4 pages

 Software Development Plan: Version

No ratings yet

Software Development Plan: Version

9 pages

 ITS332 SDP Template

No ratings yet

ITS332 SDP Template

8 pages

 Error: Reference Source Not Found Error: Reference Source Not Found

No ratings yet
Error: Reference Source Not Found Error: Reference Source Not Found

7 pages

 SRS Ieee

No ratings yet

SRS Ieee

7 pages

 Supplementary Specification

No ratings yet

Supplementary Specification

7 pages

 EPLC Configuration Management Template

No ratings yet

EPLC Configuration Management Template

9 pages

 Problem Resolution Plan: Version

 100% (1)

Problem Resolution Plan: Version

4 pages

 Product Acceptance Plan

No ratings yet

Product Acceptance Plan

5 pages

 Docc 9 F 3

No ratings yet

Docc 9 F 3

21 pages

 SRS MyKokoCenter
No ratings yet

SRS MyKokoCenter

47 pages

 (Product) MTM Program Product Software Project Plan: (Authors Names)

No ratings yet

(Product) MTM Program Product Software Project Plan: (Authors Names)

11 pages

 Vision (Small Project) : Authors

No ratings yet

Vision (Small Project) : Authors

7 pages

 Requirements Management Plan PPM Version 2.0

No ratings yet

Requirements Management Plan PPM Version 2.0

8 pages

 Software Requirements Specification

No ratings yet

Software Requirements Specification

5 pages

 SRS Template of Sample Case Study - 24032018

No ratings yet

SRS Template of Sample Case Study - 24032018

11 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

11 pages
 Its332 Srs Project

No ratings yet

Its332 Srs Project

14 pages

 S R S (S RS) : Takeholder Equirements Pecification T

No ratings yet

S R S (S RS) : Takeholder Equirements Pecification T

13 pages

 Software Requirements Specification

No ratings yet

Software Requirements Specification

9 pages

 CDC UP Requirements Management Plan Template

No ratings yet

CDC UP Requirements Management Plan Template

11 pages

 Pre-Appointment Bep Template

No ratings yet

Pre-Appointment Bep Template

7 pages

 SRS Sample Students

No ratings yet

SRS Sample Students

30 pages

 Configurationmanagementstrategy

No ratings yet

Configurationmanagementstrategy
7 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

7 pages

 Defect Tracking System

 50% (2)

Defect Tracking System

21 pages

 The Islamia University of Bahawalpur: Department of Software Engineering

No ratings yet

The Islamia University of Bahawalpur: Department of Software Engineering

14 pages

 Stmik Multi Data Palembang

No ratings yet

Stmik Multi Data Palembang

8 pages

 d1cs1104d SDP Group2

No ratings yet

d1cs1104d SDP Group2

9 pages

 Successful Service Design for Telecommunications: A comprehensive guide


to design and implementation

 From Everand

Successful Service Design for Telecommunications: A comprehensive guide


to design and implementation

Sauming Pang
No ratings yet

 Transit Quarters

From Everand

Transit Quarters

Shyamala Nemana

 4/5 (8)

 Midterm Exam - II Pao 2021 Software Engineering II

No ratings yet

Midterm Exam - II Pao 2021 Software Engineering II

26 pages

 Network Design and Management

No ratings yet

Network Design and Management

16 pages

 Norte Abierto - Aconex Project Configuration Management Plan

No ratings yet

Norte Abierto - Aconex Project Configuration Management Plan

14 pages

 Question Paper Software Project Management (MB3G2IT) : January 2009

No ratings yet

Question Paper Software Project Management (MB3G2IT) : January 2009

18 pages

 Configuration Management and Version Control

No ratings yet

Configuration Management and Version Control

6 pages

 Software Engineering GTU Syllabus


No ratings yet

Software Engineering GTU Syllabus

3 pages

 Accelerator Safety

No ratings yet

Accelerator Safety

10 pages

 10 SCM

No ratings yet

10 SCM

23 pages

 Project Scheduling and Staffing, Software Configuration Management Plan

No ratings yet

Project Scheduling and Staffing, Software Configuration Management Plan

3 pages

 Software Configuration Management Plan: I. Table of Contents

No ratings yet

Software Configuration Management Plan: I. Table of Contents

14 pages

 Assignment CAED 2012

No ratings yet

Assignment CAED 2012

3 pages

 Design and Optimization of Aircraft Assembling Based On Comprehensive


Simulation of Manufacturing Processes - A. Rozhdestvensky, O. Samsonov

No ratings yet
Design and Optimization of Aircraft Assembling Based On Comprehensive
Simulation of Manufacturing Processes - A. Rozhdestvensky, O. Samsonov

10 pages

 Umbrella Activity

No ratings yet

Umbrella Activity

14 pages

 QPM1

 100% (1)

QPM1

200 pages

Footer menu

Back to top

About

 About Scribd

 Everand: Ebooks & Audiobooks

 SlideShare

 Press

 Join our team!

 Contact us

 Invite friends

Support

 Help / FAQ

 Accessibility

 Purchase help

 AdChoices

Legal
 Terms

 Privacy

 Copyright

 Do not sell or share my personal information

Social

 Instagram Instagram

 Twitter Twitter

 Facebook Facebook

 Pinterest Pinterest

Get our free apps

 Documents

Language:

English
Copyright © 2024 Scribd Inc.

<Project Name> Version: <1.0>Configuration Management Plan Date:


<dd/mmm/yy><document identifier>

Table of Contents

1.Introduction31.1Purpose31.2Scope31.3Definitions, Acronyms, and


Abbreviations31.4References31.5Overview32.Software Configuration
Management32.1Organization, Responsibilities, and Interfaces32.2Tools,
Environment, and Infrastructure33.The Configuration Management
Program33.1Configuration Identification33.1.1Identification
Methods33.1.2Project Baselines33.2Configuration and Change
Control33.2.1Change Request Processing and Approval33.2.2Change Control
Board (CCB)33.3Configuration Status Accounting33.3.1Project Media Storage
and Release Process33.3.2Reports and Audits34.Milestones35.Training and
Resources36.Subcontractor and Vendor Software Control3

Configuration Management Plan

1.Introduction

[The introduction of the

Configuration Management Plan

provides an overview of the entire document. It includes the purpose, scope,


definitions, acronyms, abbreviations, references, and overview of this

Configuration Management Plan

.]

1.1Purpose

[Specify the purpose of this

Configuration Management Plan.

1.2Scope

[A brief description of the scope of this


Configuration Management Plan

; what model it is associated with and anything else that is affected or


influenced by this document.]

1.3Definitions, Acronyms, and Abbreviations

[This subsection provides the definitions of all terms, acronyms, and


abbreviations required to properly interpret the

Configuration Management Plan

. This information may be provided by reference to the project’s Glossary.]

1.4References

[This subsection provides a complete list of all documents referenced


elsewhere in the

Configuration Management Plan

. Identify each document by title, report number (if applicable), date, and
publishing organization. Specify the sources from which the references can
be obtained. This information may be provided by reference to an appendix

Confidential

<Company Name>, 2021Page 3 of 5

<Project Name> Version: <1.0>Configuration Management Plan Date:


<dd/mmm/yy><document identifier>

or to another document.]

1.5Overview

[This subsection describes what the rest of the

Configuration Management Plan

contains and explains how the document is organized.]

2.Software Configuration Management


2.1Organization, Responsibilities, and Interfaces

[Describe who is going to be responsible for performing the various


Configuration Management (CM) activities described in the CM Process
Discipline.]

2.2Tools, Environment, and Infrastructure

[Describe the computing environment and software tools to be used in


fulfilling the CM functions throughout the project or product lifecycle.
Describe the tools and procedures required used to version control
configuration items generated throughout the project or product
lifecycle. Issues involved in setting up the CM environment include:

anticipated size of product data

distribution of the product team

physical location of servers and client machines]

3.The Configuration Management Program

3.1Configuration Identification

3.1.1Identification Methods

[Describe how project or product artifacts are to be named, marked, and


numbered. The identification scheme needs to cover hardware, system
software, Commercial-Off-The-Shelf (COTS) products, and all application
development artifacts listed in the product directory structure; for example,
plans, models, components, test software, results and data, executables,
and so on.]

3.1.2Project Baselines

[Baselines provide an official standard on which subsequent work is based


and to which only authorized changes are made. Describe at what points
during the project or product lifecycle the baselines are to be established.
The most common baselines would be at the end of each of the Inception,
Elaboration, Construction, and Transition phases. Baselines could also be
generated at the end of iterations within the various phases or even more
frequently. Describe who authorizes a baseline and what goes into it.]

3.2Configuration and Change Control

3.2.1Change Request Processing and Approval

[Describe the process by which problems and changes are submitted,


reviewed, and dispositioned.]

3.2.2Change Control Board (CCB)

[Describe the CCB membership and the procedures for processing change
requests and approvals to be followed bythe CCB.]

Confidential

<Company Name>, 2021Page 4 of 5

Reward Your Curiosity

Everything you want to read.

Anytime. Anywhere. Any device.

No Commitment. Cancel anytime.


Share this document

Share or Embed Document

Sharing Options

 Share on Facebook, opens a new window

 Share on Twitter, opens a new window

 Share on LinkedIn, opens a new window

 Share with Email, opens mail client

 Copy link

You might also like

 Team Members: Chetnaba Bhalgaria 02 Piyush Jagwani 11 Shivani


Pandita 21 Shruti Patil 30
No ratings yet

Team Members: Chetnaba Bhalgaria 02 Piyush Jagwani 11 Shivani Pandita 21


Shruti Patil 30

59 pages

 ITIL Quizlet

No ratings yet

ITIL Quizlet

23 pages

 Configuration Management Plan


 100% (5)

Configuration Management Plan

27 pages

 Functional Specification Document Template

 100% (2)

Functional Specification Document Template

11 pages

 Event Management: Software Requirements Specification Document


 100% (6)

Event Management: Software Requirements Specification Document

19 pages

 ITIL Heroes Handbook

No ratings yet

ITIL Heroes Handbook

42 pages

 Software Configuration Management Plan Template 2013

No ratings yet

Software Configuration Management Plan Template 2013

7 pages

 Requirements Management: Based On Material From

 100% (1)

Requirements Management: Based On Material From

72 pages

 Process Configuring Method in Bpm Project

 From Everand

Process Configuring Method in Bpm Project

Seyed Ahmad Daliri

No ratings yet
 Configuration Management SOP Sample

 20% (5)

Configuration Management SOP Sample

5 pages

 DD

No ratings yet

DD

149 pages

 Amit Kumar Sahu: Professional Preface

No ratings yet

Amit Kumar Sahu: Professional Preface

4 pages

 Requirements Document Template (UPEDU)

 100% (3)

Requirements Document Template (UPEDU)

6 pages

 Project Manufacturing For Dummies DELTEK 2016

 100% (2)

Project Manufacturing For Dummies DELTEK 2016

76 pages

 Software Quality Assurance Plan PDF

No ratings yet

Software Quality Assurance Plan PDF

35 pages

 Software Requirements Specifications Template 2018

No ratings yet

Software Requirements Specifications Template 2018


14 pages

 Software Configuration Management Plan Template

No ratings yet

Software Configuration Management Plan Template

8 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

20 pages

 PMP Chapter 4 Test Project Integration Management

No ratings yet

PMP Chapter 4 Test Project Integration Management

3 pages

 Thank-You For Downloading The Project Management Plan Template!

No ratings yet

Thank-You For Downloading The Project Management Plan Template!

7 pages

 Thank-You For Downloading The SW Tool IQ-OQ-PQ Template!

No ratings yet

Thank-You For Downloading The SW Tool IQ-OQ-PQ Template!

14 pages

 Qm020 Quality Management Checklist

No ratings yet

Qm020 Quality Management Checklist

9 pages

 IEC62304 Template Software Development Plan V1 0

No ratings yet
IEC62304 Template Software Development Plan V1 0

11 pages

 V Modell XT - V1.3 PDF

No ratings yet

V Modell XT - V1.3 PDF

825 pages

 QA Plan Template Blank

 100% (4)

QA Plan Template Blank

31 pages

 Quality Assurance Plan Template

No ratings yet

Quality Assurance Plan Template

8 pages

 PRINCE2-Exams Test-Inside PRINCE2-Foundation Examcollction v2016-06-


23 by Floyd 149q Vce

No ratings yet

PRINCE2-Exams Test-Inside PRINCE2-Foundation Examcollction v2016-06-23


by Floyd 149q Vce

18 pages

 Project Management Plan Template

No ratings yet

Project Management Plan Template

17 pages

 Navy C4ISR Procedures Interface Standards Opnav-9410-5c

No ratings yet

Navy C4ISR Procedures Interface Standards Opnav-9410-5c


9 pages

 Creating Technical Documentation TTLM Final

No ratings yet

Creating Technical Documentation TTLM Final

121 pages

 Supporting (Implementation (A) (B) : Department of

No ratings yet

Supporting (Implementation (A) (B) : Department of

71 pages

 Isp250 FR - Mytecc E-Commerce System

 100% (1)

Isp250 FR - Mytecc E-Commerce System

18 pages

 Requirements Management Plan: Version

No ratings yet

Requirements Management Plan: Version

8 pages

 Saluran Air Jasmine

No ratings yet

Saluran Air Jasmine

8 pages

 Шаблон-RUP. Product Acceptance Plan

No ratings yet

Шаблон-RUP. Product Acceptance Plan

5 pages

 Supplementary Specification

No ratings yet
Supplementary Specification

7 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

8 pages

 Interface Control Document

No ratings yet

Interface Control Document

4 pages

 College Bus Management System College Bus Management System

No ratings yet

College Bus Management System College Bus Management System

9 pages

 Software Requirements Specification Template

No ratings yet

Software Requirements Specification Template

8 pages

 Software Requirements Specification For

No ratings yet

Software Requirements Specification For

5 pages

 Data Lifecycle MGT Plan

No ratings yet

Data Lifecycle MGT Plan

5 pages

 Quality Assurance Plan


No ratings yet

Quality Assurance Plan

7 pages

 1.requirements Management Plan - RMP

No ratings yet

1.requirements Management Plan - RMP

20 pages

 WH-FORM-XX-1.0 EN - Technical Documentation MDR Software Master


Record Template

No ratings yet

WH-FORM-XX-1.0 EN - Technical Documentation MDR Software Master Record


Template

26 pages

 Measurement Plan: Version

No ratings yet

Measurement Plan: Version

4 pages

 Software Development Plan: Version

No ratings yet

Software Development Plan: Version

9 pages

 ITS332 SDP Template

No ratings yet

ITS332 SDP Template

8 pages

 Error: Reference Source Not Found Error: Reference Source Not Found

No ratings yet
Error: Reference Source Not Found Error: Reference Source Not Found

7 pages

 SRS Ieee

No ratings yet

SRS Ieee

7 pages

 Supplementary Specification

No ratings yet

Supplementary Specification

7 pages

 EPLC Configuration Management Template

No ratings yet

EPLC Configuration Management Template

9 pages

 Problem Resolution Plan: Version

 100% (1)

Problem Resolution Plan: Version

4 pages

 Product Acceptance Plan

No ratings yet

Product Acceptance Plan

5 pages

 Docc 9 F 3

No ratings yet

Docc 9 F 3

21 pages

 SRS MyKokoCenter
No ratings yet

SRS MyKokoCenter

47 pages

 (Product) MTM Program Product Software Project Plan: (Authors Names)

No ratings yet

(Product) MTM Program Product Software Project Plan: (Authors Names)

11 pages

 Vision (Small Project) : Authors

No ratings yet

Vision (Small Project) : Authors

7 pages

 Requirements Management Plan PPM Version 2.0

No ratings yet

Requirements Management Plan PPM Version 2.0

8 pages

 Software Requirements Specification

No ratings yet

Software Requirements Specification

5 pages

 SRS Template of Sample Case Study - 24032018

No ratings yet

SRS Template of Sample Case Study - 24032018

11 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

11 pages
 Its332 Srs Project

No ratings yet

Its332 Srs Project

14 pages

 S R S (S RS) : Takeholder Equirements Pecification T

No ratings yet

S R S (S RS) : Takeholder Equirements Pecification T

13 pages

 Software Requirements Specification

No ratings yet

Software Requirements Specification

9 pages

 CDC UP Requirements Management Plan Template

No ratings yet

CDC UP Requirements Management Plan Template

11 pages

 Pre-Appointment Bep Template

No ratings yet

Pre-Appointment Bep Template

7 pages

 SRS Sample Students

No ratings yet

SRS Sample Students

30 pages

 Configurationmanagementstrategy

No ratings yet

Configurationmanagementstrategy
7 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

7 pages

 Defect Tracking System

 50% (2)

Defect Tracking System

21 pages

 The Islamia University of Bahawalpur: Department of Software Engineering

No ratings yet

The Islamia University of Bahawalpur: Department of Software Engineering

14 pages

 Stmik Multi Data Palembang

No ratings yet

Stmik Multi Data Palembang

8 pages

 d1cs1104d SDP Group2

No ratings yet

d1cs1104d SDP Group2

9 pages

 Successful Service Design for Telecommunications: A comprehensive guide


to design and implementation

 From Everand

Successful Service Design for Telecommunications: A comprehensive guide


to design and implementation

Sauming Pang
No ratings yet

 Transit Quarters

From Everand

Transit Quarters

Shyamala Nemana

 4/5 (8)

 Midterm Exam - II Pao 2021 Software Engineering II

No ratings yet

Midterm Exam - II Pao 2021 Software Engineering II

26 pages

 Network Design and Management

No ratings yet

Network Design and Management

16 pages

 Norte Abierto - Aconex Project Configuration Management Plan

No ratings yet

Norte Abierto - Aconex Project Configuration Management Plan

14 pages

 Question Paper Software Project Management (MB3G2IT) : January 2009

No ratings yet

Question Paper Software Project Management (MB3G2IT) : January 2009

18 pages

 Configuration Management and Version Control

No ratings yet

Configuration Management and Version Control

6 pages

 Software Engineering GTU Syllabus


No ratings yet

Software Engineering GTU Syllabus

3 pages

 Accelerator Safety

No ratings yet

Accelerator Safety

10 pages

 10 SCM

No ratings yet

10 SCM

23 pages

 Project Scheduling and Staffing, Software Configuration Management Plan

No ratings yet

Project Scheduling and Staffing, Software Configuration Management Plan

3 pages

 Software Configuration Management Plan: I. Table of Contents

No ratings yet

Software Configuration Management Plan: I. Table of Contents

14 pages

 Assignment CAED 2012

No ratings yet

Assignment CAED 2012

3 pages

 Design and Optimization of Aircraft Assembling Based On Comprehensive


Simulation of Manufacturing Processes - A. Rozhdestvensky, O. Samsonov

No ratings yet
Design and Optimization of Aircraft Assembling Based On Comprehensive
Simulation of Manufacturing Processes - A. Rozhdestvensky, O. Samsonov

10 pages

 Umbrella Activity

No ratings yet

Umbrella Activity

14 pages

 QPM1

 100% (1)

QPM1

200 pages

Footer menu

Back to top

About

 About Scribd

 Everand: Ebooks & Audiobooks

 SlideShare

 Press

 Join our team!

 Contact us

 Invite friends

Support

 Help / FAQ

 Accessibility

 Purchase help

 AdChoices

Legal
 Terms

 Privacy

 Copyright

 Do not sell or share my personal information

Social

 Instagram Instagram

 Twitter Twitter

 Facebook Facebook

 Pinterest Pinterest

Get our free apps

 Documents

LanguagOpen navigation menu

Search

Upload
User Settings

0 ratings0% found this document useful (0 votes)

60 views5 pages

Configuration Management Plan: Version

Uploaded by

Imran MK

This document provides a configuration management plan for managing


changes and releases of software artifacts for a project. It outlines the roles
and responsibilities for configuration man…

Full description

<Company Name><Project Name>Configuration Management Plan

Version <1.0>

[Note: The following template is provided for use with the Rational Unified
Process. Text enclosed in square brackets and displayed in blue italics
(style=InfoBlue) is included to provide guidance to the author and should be
deleted before publishing the document. A paragraph entered following this
style will automatically be set to normal (style=Body Text).] [To customize
automatic fields in Microsoft Word (which display a gray background when
selected), select File>Properties and replace the Title, Subject and Company
fields with the appropriate information for this document. After closing the
dialog, automatic fields may be updated throughout the document by
selecting Edit>Select All (or Ctrl-A) and pressing F9, or simply click on the
field and press F9. This must be done separately for Headers and Footers.
Alt-F9 will toggle between displaying the field names and the field contents.
See Word help for more information on working with fields.]

<Project Name> Version: <1.0>Configuration Management Plan Date:


<dd/mmm/yy><document identifier>
Revision History

Date Version Description Author

<dd/mmm/yy><x.x><details><name>Confidential

<Company Name>, 2021Page 2 of 5

Open navigation menu

Search

Upload

User Settings

0 ratings0% found this document useful (0 votes)

60 views5 pages

Configuration Management Plan: Version

Uploaded by

Imran MK

This document provides a configuration management plan for managing


changes and releases of software artifacts for a project. It outlines the roles
and responsibilities for configuration man…

Full description

<Company Name><Project Name>Configuration Management Plan

Version <1.0>

[Note: The following template is provided for use with the Rational Unified
Process. Text enclosed in square brackets and displayed in blue italics
(style=InfoBlue) is included to provide guidance to the author and should be
deleted before publishing the document. A paragraph entered following this
style will automatically be set to normal (style=Body Text).] [To customize
automatic fields in Microsoft Word (which display a gray background when
selected), select File>Properties and replace the Title, Subject and Company
fields with the appropriate information for this document. After closing the
dialog, automatic fields may be updated throughout the document by
selecting Edit>Select All (or Ctrl-A) and pressing F9, or simply click on the
field and press F9. This must be done separately for Headers and Footers.
Alt-F9 will toggle between displaying the field names and the field contents.
See Word help for more information on working with fields.]

<Project Name> Version: <1.0>Configuration Management Plan Date:


<dd/mmm/yy><document identifier>

Revision History

Date Version Description Author

<dd/mmm/yy><x.x><details><name>Confidential

<Company Name>, 2021Page 2 of 5

<Project Name> Version: <1.0>Configuration Management Plan Date:


<dd/mmm/yy><document identifier>

Table of Contents

1.Introduction31.1Purpose31.2Scope31.3Definitions, Acronyms, and


Abbreviations31.4References31.5Overview32.Software Configuration
Management32.1Organization, Responsibilities, and Interfaces32.2Tools,
Environment, and Infrastructure33.The Configuration Management
Program33.1Configuration Identification33.1.1Identification
Methods33.1.2Project Baselines33.2Configuration and Change
Control33.2.1Change Request Processing and Approval33.2.2Change Control
Board (CCB)33.3Configuration Status Accounting33.3.1Project Media Storage
and Release Process33.3.2Reports and Audits34.Milestones35.Training and
Resources36.Subcontractor and Vendor Software Control3
Configuration Management Plan

1.Introduction

[The introduction of the

Configuration Management Plan

provides an overview of the entire document. It includes the purpose, scope,


definitions, acronyms, abbreviations, references, and overview of this

Configuration Management Plan

.]

1.1Purpose

[Specify the purpose of this

Configuration Management Plan.

1.2Scope

[A brief description of the scope of this

Configuration Management Plan

; what model it is associated with and anything else that is affected or


influenced by this document.]

1.3Definitions, Acronyms, and Abbreviations

[This subsection provides the definitions of all terms, acronyms, and


abbreviations required to properly interpret the

Configuration Management Plan

. This information may be provided by reference to the project’s Glossary.]

1.4References

[This subsection provides a complete list of all documents referenced


elsewhere in the

Configuration Management Plan

. Identify each document by title, report number (if applicable), date, and
publishing organization. Specify the sources from which the references can
be obtained. This information may be provided by reference to an appendix
Confidential

<Company Name>, 2021Page 3 of 5

<Project Name> Version: <1.0>Configuration Management Plan Date:


<dd/mmm/yy><document identifier>

or to another document.]

1.5Overview

[This subsection describes what the rest of the

Configuration Management Plan

contains and explains how the document is organized.]

2.Software Configuration Management

2.1Organization, Responsibilities, and Interfaces

[Describe who is going to be responsible for performing the various


Configuration Management (CM) activities described in the CM Process
Discipline.]

2.2Tools, Environment, and Infrastructure

[Describe the computing environment and software tools to be used in


fulfilling the CM functions throughout the project or product lifecycle.
Describe the tools and procedures required used to version control
configuration items generated throughout the project or product
lifecycle. Issues involved in setting up the CM environment include:

anticipated size of product data

distribution of the product team

physical location of servers and client machines]


3.The Configuration Management Program

3.1Configuration Identification

3.1.1Identification Methods

[Describe how project or product artifacts are to be named, marked, and


numbered. The identification scheme needs to cover hardware, system
software, Commercial-Off-The-Shelf (COTS) products, and all application
development artifacts listed in the product directory structure; for example,
plans, models, components, test software, results and data, executables,
and so on.]

3.1.2Project Baselines

[Baselines provide an official standard on which subsequent work is based


and to which only authorized changes are made. Describe at what points
during the project or product lifecycle the baselines are to be established.
The most common baselines would be at the end of each of the Inception,
Elaboration, Construction, and Transition phases. Baselines could also be
generated at the end of iterations within the various phases or even more
frequently. Describe who authorizes a baseline and what goes into it.]

3.2Configuration and Change Control

3.2.1Change Request Processing and Approval

[Describe the process by which problems and changes are submitted,


reviewed, and dispositioned.]

3.2.2Change Control Board (CCB)

[Describe the CCB membership and the procedures for processing change
requests and approvals to be followed bythe CCB.]

Confidential

<Company Name>, 2021Page 4 of 5

Reward Your Curiosity

Everything you want to read.

Anytime. Anywhere. Any device.


No Commitment. Cancel anytime.

Share this document

Share or Embed Document

Sharing Options

 Share on Facebook, opens a new window

 Share on Twitter, opens a new window

 Share on LinkedIn, opens a new window

 Share with Email, opens mail client

 Copy link

You might also like

 Team Members: Chetnaba Bhalgaria 02 Piyush Jagwani 11 Shivani


Pandita 21 Shruti Patil 30
No ratings yet

Team Members: Chetnaba Bhalgaria 02 Piyush Jagwani 11 Shivani Pandita 21


Shruti Patil 30

59 pages

 ITIL Quizlet

No ratings yet

ITIL Quizlet

23 pages

 Configuration Management Plan


 100% (5)

Configuration Management Plan

27 pages

 Functional Specification Document Template

 100% (2)

Functional Specification Document Template

11 pages

 Event Management: Software Requirements Specification Document


 100% (6)

Event Management: Software Requirements Specification Document

19 pages

 ITIL Heroes Handbook

No ratings yet

ITIL Heroes Handbook

42 pages

 Software Configuration Management Plan Template 2013

No ratings yet

Software Configuration Management Plan Template 2013

7 pages

 Requirements Management: Based On Material From

 100% (1)

Requirements Management: Based On Material From

72 pages

 Process Configuring Method in Bpm Project

 From Everand

Process Configuring Method in Bpm Project

Seyed Ahmad Daliri

No ratings yet
 Configuration Management SOP Sample

 20% (5)

Configuration Management SOP Sample

5 pages

 DD

No ratings yet

DD

149 pages

 Amit Kumar Sahu: Professional Preface

No ratings yet

Amit Kumar Sahu: Professional Preface

4 pages

 Requirements Document Template (UPEDU)

 100% (3)

Requirements Document Template (UPEDU)

6 pages

 Project Manufacturing For Dummies DELTEK 2016

 100% (2)

Project Manufacturing For Dummies DELTEK 2016

76 pages

 Software Quality Assurance Plan PDF

No ratings yet

Software Quality Assurance Plan PDF

35 pages

 Software Requirements Specifications Template 2018

No ratings yet

Software Requirements Specifications Template 2018


14 pages

 Software Configuration Management Plan Template

No ratings yet

Software Configuration Management Plan Template

8 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

20 pages

 PMP Chapter 4 Test Project Integration Management

No ratings yet

PMP Chapter 4 Test Project Integration Management

3 pages

 Thank-You For Downloading The Project Management Plan Template!

No ratings yet

Thank-You For Downloading The Project Management Plan Template!

7 pages

 Thank-You For Downloading The SW Tool IQ-OQ-PQ Template!

No ratings yet

Thank-You For Downloading The SW Tool IQ-OQ-PQ Template!

14 pages

 Qm020 Quality Management Checklist

No ratings yet

Qm020 Quality Management Checklist

9 pages

 IEC62304 Template Software Development Plan V1 0

No ratings yet
IEC62304 Template Software Development Plan V1 0

11 pages

 V Modell XT - V1.3 PDF

No ratings yet

V Modell XT - V1.3 PDF

825 pages

 QA Plan Template Blank

 100% (4)

QA Plan Template Blank

31 pages

 Quality Assurance Plan Template

No ratings yet

Quality Assurance Plan Template

8 pages

 PRINCE2-Exams Test-Inside PRINCE2-Foundation Examcollction v2016-06-


23 by Floyd 149q Vce

No ratings yet

PRINCE2-Exams Test-Inside PRINCE2-Foundation Examcollction v2016-06-23


by Floyd 149q Vce

18 pages

 Project Management Plan Template

No ratings yet

Project Management Plan Template

17 pages

 Navy C4ISR Procedures Interface Standards Opnav-9410-5c

No ratings yet

Navy C4ISR Procedures Interface Standards Opnav-9410-5c


9 pages

 Creating Technical Documentation TTLM Final

No ratings yet

Creating Technical Documentation TTLM Final

121 pages

 Supporting (Implementation (A) (B) : Department of

No ratings yet

Supporting (Implementation (A) (B) : Department of

71 pages

 Isp250 FR - Mytecc E-Commerce System

 100% (1)

Isp250 FR - Mytecc E-Commerce System

18 pages

 Requirements Management Plan: Version

No ratings yet

Requirements Management Plan: Version

8 pages

 Saluran Air Jasmine

No ratings yet

Saluran Air Jasmine

8 pages

 Шаблон-RUP. Product Acceptance Plan

No ratings yet

Шаблон-RUP. Product Acceptance Plan

5 pages

 Supplementary Specification

No ratings yet
Supplementary Specification

7 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

8 pages

 Interface Control Document

No ratings yet

Interface Control Document

4 pages

 College Bus Management System College Bus Management System

No ratings yet

College Bus Management System College Bus Management System

9 pages

 Software Requirements Specification Template

No ratings yet

Software Requirements Specification Template

8 pages

 Software Requirements Specification For

No ratings yet

Software Requirements Specification For

5 pages

 Data Lifecycle MGT Plan

No ratings yet

Data Lifecycle MGT Plan

5 pages

 Quality Assurance Plan


No ratings yet

Quality Assurance Plan

7 pages

 1.requirements Management Plan - RMP

No ratings yet

1.requirements Management Plan - RMP

20 pages

 WH-FORM-XX-1.0 EN - Technical Documentation MDR Software Master


Record Template

No ratings yet

WH-FORM-XX-1.0 EN - Technical Documentation MDR Software Master Record


Template

26 pages

 Measurement Plan: Version

No ratings yet

Measurement Plan: Version

4 pages

 Software Development Plan: Version

No ratings yet

Software Development Plan: Version

9 pages

 ITS332 SDP Template

No ratings yet

ITS332 SDP Template

8 pages

 Error: Reference Source Not Found Error: Reference Source Not Found

No ratings yet
Error: Reference Source Not Found Error: Reference Source Not Found

7 pages

 SRS Ieee

No ratings yet

SRS Ieee

7 pages

 Supplementary Specification

No ratings yet

Supplementary Specification

7 pages

 EPLC Configuration Management Template

No ratings yet

EPLC Configuration Management Template

9 pages

 Problem Resolution Plan: Version

 100% (1)

Problem Resolution Plan: Version

4 pages

 Product Acceptance Plan

No ratings yet

Product Acceptance Plan

5 pages

 Docc 9 F 3

No ratings yet

Docc 9 F 3

21 pages

 SRS MyKokoCenter
No ratings yet

SRS MyKokoCenter

47 pages

 (Product) MTM Program Product Software Project Plan: (Authors Names)

No ratings yet

(Product) MTM Program Product Software Project Plan: (Authors Names)

11 pages

 Vision (Small Project) : Authors

No ratings yet

Vision (Small Project) : Authors

7 pages

 Requirements Management Plan PPM Version 2.0

No ratings yet

Requirements Management Plan PPM Version 2.0

8 pages

 Software Requirements Specification

No ratings yet

Software Requirements Specification

5 pages

 SRS Template of Sample Case Study - 24032018

No ratings yet

SRS Template of Sample Case Study - 24032018

11 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

11 pages
 Its332 Srs Project

No ratings yet

Its332 Srs Project

14 pages

 S R S (S RS) : Takeholder Equirements Pecification T

No ratings yet

S R S (S RS) : Takeholder Equirements Pecification T

13 pages

 Software Requirements Specification

No ratings yet

Software Requirements Specification

9 pages

 CDC UP Requirements Management Plan Template

No ratings yet

CDC UP Requirements Management Plan Template

11 pages

 Pre-Appointment Bep Template

No ratings yet

Pre-Appointment Bep Template

7 pages

 SRS Sample Students

No ratings yet

SRS Sample Students

30 pages

 Configurationmanagementstrategy

No ratings yet

Configurationmanagementstrategy
7 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

7 pages

 Defect Tracking System

 50% (2)

Defect Tracking System

21 pages

 The Islamia University of Bahawalpur: Department of Software Engineering

No ratings yet

The Islamia University of Bahawalpur: Department of Software Engineering

14 pages

 Stmik Multi Data Palembang

No ratings yet

Stmik Multi Data Palembang

8 pages

 d1cs1104d SDP Group2

No ratings yet

d1cs1104d SDP Group2

9 pages

 Successful Service Design for Telecommunications: A comprehensive guide


to design and implementation

 From Everand

Successful Service Design for Telecommunications: A comprehensive guide


to design and implementation

Sauming Pang
No ratings yet

 Transit Quarters

From Everand

Transit Quarters

Shyamala Nemana

 4/5 (8)

 Midterm Exam - II Pao 2021 Software Engineering II

No ratings yet

Midterm Exam - II Pao 2021 Software Engineering II

26 pages

 Network Design and Management

No ratings yet

Network Design and Management

16 pages

 Norte Abierto - Aconex Project Configuration Management Plan

No ratings yet

Norte Abierto - Aconex Project Configuration Management Plan

14 pages

 Question Paper Software Project Management (MB3G2IT) : January 2009

No ratings yet

Question Paper Software Project Management (MB3G2IT) : January 2009

18 pages

 Configuration Management and Version Control

No ratings yet

Configuration Management and Version Control

6 pages

 Software Engineering GTU Syllabus


No ratings yet

Software Engineering GTU Syllabus

3 pages

 Accelerator Safety

No ratings yet

Accelerator Safety

10 pages

 10 SCM

No ratings yet

10 SCM

23 pages

 Project Scheduling and Staffing, Software Configuration Management Plan

No ratings yet

Project Scheduling and Staffing, Software Configuration Management Plan

3 pages

 Software Configuration Management Plan: I. Table of Contents

No ratings yet

Software Configuration Management Plan: I. Table of Contents

14 pages

 Assignment CAED 2012

No ratings yet

Assignment CAED 2012

3 pages

 Design and Optimization of Aircraft Assembling Based On Comprehensive


Simulation of Manufacturing Processes - A. Rozhdestvensky, O. Samsonov

No ratings yet
Design and Optimization of Aircraft Assembling Based On Comprehensive
Simulation of Manufacturing Processes - A. Rozhdestvensky, O. Samsonov

10 pages

 Umbrella Activity

No ratings yet

Umbrella Activity

14 pages

 QPM1

 100% (1)

QPM1

200 pages

Footer menu

Back to top

About

 About Scribd

 Everand: Ebooks & Audiobooks

 SlideShare

 Press

 Join our team!

 Contact us

 Invite friends

Support

 Help / FAQ

 Accessibility

 Purchase help

 AdChoices

Legal
 Terms

 Privacy

 Copyright

 Do not sell or share my personal information

Social

 Instagram Instagram

 Twitter Twitter

 Facebook Facebook

 Pinterest Pinterest

Get our free apps

 Documents

Language:

English
Copyright © 2024 Scribd Inc.

<Project Name> Version: <1.0>Configuration Management Plan Date:


<dd/mmm/yy><document identifier>

Table of Contents

1.Introduction31.1Purpose31.2Scope31.3Definitions, Acronyms, and


Abbreviations31.4References31.5Overview32.Software Configuration
Management32.1Organization, Responsibilities, and Interfaces32.2Tools,
Environment, and Infrastructure33.The Configuration Management
Program33.1Configuration Identification33.1.1Identification
Methods33.1.2Project Baselines33.2Configuration and Change
Control33.2.1Change Request Processing and Approval33.2.2Change Control
Board (CCB)33.3Configuration Status Accounting33.3.1Project Media Storage
and Release Process33.3.2Reports and Audits34.Milestones35.Training and
Resources36.Subcontractor and Vendor Software Control3

Configuration Management Plan

1.Introduction

[The introduction of the

Configuration Management Plan

provides an overview of the entire document. It includes the purpose, scope,


definitions, acronyms, abbreviations, references, and overview of this

Configuration Management Plan

.]

1.1Open navigation menu

Search

Upload

User Settings

0 ratings0% found this document useful (0 votes)


60 views5 pages

Configuration Management Plan: Version

Uploaded by

Imran MK

This document provides a configuration management plan for managing


changes and releases of software artifacts for a project. It outlines the roles
and responsibilities for configuration man…

Full description

<Company Name><Project Name>Configuration Management Plan

Version <1.0>

[Note: The following template is provided for use with the Rational Unified
Process. Text enclosed in square brackets and displayed in blue italics
(style=InfoBlue) is included to provide guidance to the author and should be
deleted before publishing the document. A paragraph entered following this
style will automatically be set to normal (style=Body Text).] [To customize
automatic fields in Microsoft Word (which display a gray background when
selected), select File>Properties and replace the Title, Subject and Company
fields with the appropriate information for this document. After closing the
dialog, automatic fields may be updated throughout the document by
selecting Edit>Select All (or Ctrl-A) and pressing F9, or simply click on the
field and press F9. This must be done separately for Headers and Footers.
Alt-F9 will toggle between displaying the field names and the field contents.
See Word help for more information on working with fields.]

<Project Name> Version: <1.0>Configuration Management Plan Date:


<dd/mmm/yy><document identifier>

Revision History

Date Version Description Author

<dd/mmm/yy><x.x><details><name>Confidential

<Company Name>, 2021Page 2 of 5

Open navigation menu

Search

Upload

User Settings

0 ratings0% found this document useful (0 votes)

60 views5 pages

Configuration Management Plan: Version

Uploaded by

Imran MK

This document provides a configuration management plan for managing


changes and releases of software artifacts for a project. It outlines the roles
and responsibilities for configuration man…

Full description

<Company Name><Project Name>Configuration Management Plan

Version <1.0>

[Note: The following template is provided for use with the Rational Unified
Process. Text enclosed in square brackets and displayed in blue italics
(style=InfoBlue) is included to provide guidance to the author and should be
deleted before publishing the document. A paragraph entered following this
style will automatically be set to normal (style=Body Text).] [To customize
automatic fields in Microsoft Word (which display a gray background when
selected), select File>Properties and replace the Title, Subject and Company
fields with the appropriate information for this document. After closing the
dialog, automatic fields may be updated throughout the document by
selecting Edit>Select All (or Ctrl-A) and pressing F9, or simply click on the
field and press F9. This must be done separately for Headers and Footers.
Alt-F9 will toggle between displaying the field names and the field contents.
See Word help for more information on working with fields.]

<Project Name> Version: <1.0>Configuration Management Plan Date:


<dd/mmm/yy><document identifier>

Revision History

Date Version Description Author

<dd/mmm/yy><x.x><details><name>Confidential

<Company Name>, 2021Page 2 of 5

<Project Name> Version: <1.0>Configuration Management Plan Date:


<dd/mmm/yy><document identifier>

Table of Contents

1.Introduction31.1Purpose31.2Scope31.3Definitions, Acronyms, and


Abbreviations31.4References31.5Overview32.Software Configuration
Management32.1Organization, Responsibilities, and Interfaces32.2Tools,
Environment, and Infrastructure33.The Configuration Management
Program33.1Configuration Identification33.1.1Identification
Methods33.1.2Project Baselines33.2Configuration and Change
Control33.2.1Change Request Processing and Approval33.2.2Change Control
Board (CCB)33.3Configuration Status Accounting33.3.1Project Media Storage
and Release Process33.3.2Reports and Audits34.Milestones35.Training and
Resources36.Subcontractor and Vendor Software Control3

Configuration Management Plan

1.Introduction

[The introduction of the


Configuration Management Plan

provides an overview of the entire document. It includes the purpose, scope,


definitions, acronyms, abbreviations, references, and overview of this

Configuration Management Plan

.]

1.1Purpose

[Specify the purpose of this

Configuration Management Plan.

1.2Scope

[A brief description of the scope of this

Configuration Management Plan

; what model it is associated with and anything else that is affected or


influenced by this document.]

1.3Definitions, Acronyms, and Abbreviations

[This subsection provides the definitions of all terms, acronyms, and


abbreviations required to properly interpret the

Configuration Management Plan

. This information may be provided by reference to the project’s Glossary.]

1.4References

[This subsection provides a complete list of all documents referenced


elsewhere in the

Configuration Management Plan

. Identify each document by title, report number (if applicable), date, and
publishing organization. Specify the sources from which the references can
be obtained. This information may be provided by reference to an appendix

Confidential

<Company Name>, 2021Page 3 of 5


<Project Name> Version: <1.0>Configuration Management Plan Date:
<dd/mmm/yy><document identifier>

or to another document.]

1.5Overview

[This subsection describes what the rest of the

Configuration Management Plan

contains and explains how the document is organized.]

2.Software Configuration Management

2.1Organization, Responsibilities, and Interfaces

[Describe who is going to be responsible for performing the various


Configuration Management (CM) activities described in the CM Process
Discipline.]

2.2Tools, Environment, and Infrastructure

[Describe the computing environment and software tools to be used in


fulfilling the CM functions throughout the project or product lifecycle.
Describe the tools and procedures required used to version control
configuration items generated throughout the project or product
lifecycle. Issues involved in setting up the CM environment include:

anticipated size of product data

distribution of the product team

physical location of servers and client machines]

3.The Configuration Management Program

3.1Configuration Identification

3.1.1Identification Methods
[Describe how project or product artifacts are to be named, marked, and
numbered. The identification scheme needs to cover hardware, system
software, Commercial-Off-The-Shelf (COTS) products, and all application
development artifacts listed in the product directory structure; for example,
plans, models, components, test software, results and data, executables,
and so on.]

3.1.2Project Baselines

[Baselines provide an official standard on which subsequent work is based


and to which only authorized changes are made. Describe at what points
during the project or product lifecycle the baselines are to be established.
The most common baselines would be at the end of each of the Inception,
Elaboration, Construction, and Transition phases. Baselines could also be
generated at the end of iterations within the various phases or even more
frequently. Describe who authorizes a baseline and what goes into it.]

3.2Configuration and Change Control

3.2.1Change Request Processing and Approval

[Describe the process by which problems and changes are submitted,


reviewed, and dispositioned.]

3.2.2Change Control Board (CCB)

[Describe the CCB membership and the procedures for processing change
requests and approvals to be followed bythe CCB.]

Confidential

<Company Name>, 2021Page 4 of 5

Reward Your Curiosity

Everything you want to read.

Anytime. Anywhere. Any device.

No Commitment. Cancel anytime.


Share this document

Share or Embed Document

Sharing Options

 Share on Facebook, opens a new window

 Share on Twitter, opens a new window

 Share on LinkedIn, opens a new window

 Share with Email, opens mail client

 Copy link

You might also like

 Team Members: Chetnaba Bhalgaria 02 Piyush Jagwani 11 Shivani


Pandita 21 Shruti Patil 30
No ratings yet

Team Members: Chetnaba Bhalgaria 02 Piyush Jagwani 11 Shivani Pandita 21


Shruti Patil 30

59 pages

 ITIL Quizlet

No ratings yet

ITIL Quizlet

23 pages

 Configuration Management Plan


 100% (5)

Configuration Management Plan

27 pages

 Functional Specification Document Template

 100% (2)

Functional Specification Document Template

11 pages

 Event Management: Software Requirements Specification Document


 100% (6)

Event Management: Software Requirements Specification Document

19 pages

 ITIL Heroes Handbook

No ratings yet

ITIL Heroes Handbook

42 pages

 Software Configuration Management Plan Template 2013

No ratings yet

Software Configuration Management Plan Template 2013

7 pages

 Requirements Management: Based On Material From

 100% (1)

Requirements Management: Based On Material From

72 pages

 Process Configuring Method in Bpm Project

 From Everand

Process Configuring Method in Bpm Project

Seyed Ahmad Daliri

No ratings yet
 Configuration Management SOP Sample

 20% (5)

Configuration Management SOP Sample

5 pages

 DD

No ratings yet

DD

149 pages

 Amit Kumar Sahu: Professional Preface

No ratings yet

Amit Kumar Sahu: Professional Preface

4 pages

 Requirements Document Template (UPEDU)

 100% (3)

Requirements Document Template (UPEDU)

6 pages

 Project Manufacturing For Dummies DELTEK 2016

 100% (2)

Project Manufacturing For Dummies DELTEK 2016

76 pages

 Software Quality Assurance Plan PDF

No ratings yet

Software Quality Assurance Plan PDF

35 pages

 Software Requirements Specifications Template 2018

No ratings yet

Software Requirements Specifications Template 2018


14 pages

 Software Configuration Management Plan Template

No ratings yet

Software Configuration Management Plan Template

8 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

20 pages

 PMP Chapter 4 Test Project Integration Management

No ratings yet

PMP Chapter 4 Test Project Integration Management

3 pages

 Thank-You For Downloading The Project Management Plan Template!

No ratings yet

Thank-You For Downloading The Project Management Plan Template!

7 pages

 Thank-You For Downloading The SW Tool IQ-OQ-PQ Template!

No ratings yet

Thank-You For Downloading The SW Tool IQ-OQ-PQ Template!

14 pages

 Qm020 Quality Management Checklist

No ratings yet

Qm020 Quality Management Checklist

9 pages

 IEC62304 Template Software Development Plan V1 0

No ratings yet
IEC62304 Template Software Development Plan V1 0

11 pages

 V Modell XT - V1.3 PDF

No ratings yet

V Modell XT - V1.3 PDF

825 pages

 QA Plan Template Blank

 100% (4)

QA Plan Template Blank

31 pages

 Quality Assurance Plan Template

No ratings yet

Quality Assurance Plan Template

8 pages

 PRINCE2-Exams Test-Inside PRINCE2-Foundation Examcollction v2016-06-


23 by Floyd 149q Vce

No ratings yet

PRINCE2-Exams Test-Inside PRINCE2-Foundation Examcollction v2016-06-23


by Floyd 149q Vce

18 pages

 Project Management Plan Template

No ratings yet

Project Management Plan Template

17 pages

 Navy C4ISR Procedures Interface Standards Opnav-9410-5c

No ratings yet

Navy C4ISR Procedures Interface Standards Opnav-9410-5c


9 pages

 Creating Technical Documentation TTLM Final

No ratings yet

Creating Technical Documentation TTLM Final

121 pages

 Supporting (Implementation (A) (B) : Department of

No ratings yet

Supporting (Implementation (A) (B) : Department of

71 pages

 Isp250 FR - Mytecc E-Commerce System

 100% (1)

Isp250 FR - Mytecc E-Commerce System

18 pages

 Requirements Management Plan: Version

No ratings yet

Requirements Management Plan: Version

8 pages

 Saluran Air Jasmine

No ratings yet

Saluran Air Jasmine

8 pages

 Шаблон-RUP. Product Acceptance Plan

No ratings yet

Шаблон-RUP. Product Acceptance Plan

5 pages

 Supplementary Specification

No ratings yet
Supplementary Specification

7 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

8 pages

 Interface Control Document

No ratings yet

Interface Control Document

4 pages

 College Bus Management System College Bus Management System

No ratings yet

College Bus Management System College Bus Management System

9 pages

 Software Requirements Specification Template

No ratings yet

Software Requirements Specification Template

8 pages

 Software Requirements Specification For

No ratings yet

Software Requirements Specification For

5 pages

 Data Lifecycle MGT Plan

No ratings yet

Data Lifecycle MGT Plan

5 pages

 Quality Assurance Plan


No ratings yet

Quality Assurance Plan

7 pages

 1.requirements Management Plan - RMP

No ratings yet

1.requirements Management Plan - RMP

20 pages

 WH-FORM-XX-1.0 EN - Technical Documentation MDR Software Master


Record Template

No ratings yet

WH-FORM-XX-1.0 EN - Technical Documentation MDR Software Master Record


Template

26 pages

 Measurement Plan: Version

No ratings yet

Measurement Plan: Version

4 pages

 Software Development Plan: Version

No ratings yet

Software Development Plan: Version

9 pages

 ITS332 SDP Template

No ratings yet

ITS332 SDP Template

8 pages

 Error: Reference Source Not Found Error: Reference Source Not Found

No ratings yet
Error: Reference Source Not Found Error: Reference Source Not Found

7 pages

 SRS Ieee

No ratings yet

SRS Ieee

7 pages

 Supplementary Specification

No ratings yet

Supplementary Specification

7 pages

 EPLC Configuration Management Template

No ratings yet

EPLC Configuration Management Template

9 pages

 Problem Resolution Plan: Version

 100% (1)

Problem Resolution Plan: Version

4 pages

 Product Acceptance Plan

No ratings yet

Product Acceptance Plan

5 pages

 Docc 9 F 3

No ratings yet

Docc 9 F 3

21 pages

 SRS MyKokoCenter
No ratings yet

SRS MyKokoCenter

47 pages

 (Product) MTM Program Product Software Project Plan: (Authors Names)

No ratings yet

(Product) MTM Program Product Software Project Plan: (Authors Names)

11 pages

 Vision (Small Project) : Authors

No ratings yet

Vision (Small Project) : Authors

7 pages

 Requirements Management Plan PPM Version 2.0

No ratings yet

Requirements Management Plan PPM Version 2.0

8 pages

 Software Requirements Specification

No ratings yet

Software Requirements Specification

5 pages

 SRS Template of Sample Case Study - 24032018

No ratings yet

SRS Template of Sample Case Study - 24032018

11 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

11 pages
 Its332 Srs Project

No ratings yet

Its332 Srs Project

14 pages

 S R S (S RS) : Takeholder Equirements Pecification T

No ratings yet

S R S (S RS) : Takeholder Equirements Pecification T

13 pages

 Software Requirements Specification

No ratings yet

Software Requirements Specification

9 pages

 CDC UP Requirements Management Plan Template

No ratings yet

CDC UP Requirements Management Plan Template

11 pages

 Pre-Appointment Bep Template

No ratings yet

Pre-Appointment Bep Template

7 pages

 SRS Sample Students

No ratings yet

SRS Sample Students

30 pages

 Configurationmanagementstrategy

No ratings yet

Configurationmanagementstrategy
7 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

7 pages

 Defect Tracking System

 50% (2)

Defect Tracking System

21 pages

 The Islamia University of Bahawalpur: Department of Software Engineering

No ratings yet

The Islamia University of Bahawalpur: Department of Software Engineering

14 pages

 Stmik Multi Data Palembang

No ratings yet

Stmik Multi Data Palembang

8 pages

 d1cs1104d SDP Group2

No ratings yet

d1cs1104d SDP Group2

9 pages

 Successful Service Design for Telecommunications: A comprehensive guide


to design and implementation

 From Everand

Successful Service Design for Telecommunications: A comprehensive guide


to design and implementation

Sauming Pang
No ratings yet

 Transit Quarters

From Everand

Transit Quarters

Shyamala Nemana

 4/5 (8)

 Midterm Exam - II Pao 2021 Software Engineering II

No ratings yet

Midterm Exam - II Pao 2021 Software Engineering II

26 pages

 Network Design and Management

No ratings yet

Network Design and Management

16 pages

 Norte Abierto - Aconex Project Configuration Management Plan

No ratings yet

Norte Abierto - Aconex Project Configuration Management Plan

14 pages

 Question Paper Software Project Management (MB3G2IT) : January 2009

No ratings yet

Question Paper Software Project Management (MB3G2IT) : January 2009

18 pages

 Configuration Management and Version Control

No ratings yet

Configuration Management and Version Control

6 pages

 Software Engineering GTU Syllabus


No ratings yet

Software Engineering GTU Syllabus

3 pages

 Accelerator Safety

No ratings yet

Accelerator Safety

10 pages

 10 SCM

No ratings yet

10 SCM

23 pages

 Project Scheduling and Staffing, Software Configuration Management Plan

No ratings yet

Project Scheduling and Staffing, Software Configuration Management Plan

3 pages

 Software Configuration Management Plan: I. Table of Contents

No ratings yet

Software Configuration Management Plan: I. Table of Contents

14 pages

 Assignment CAED 2012

No ratings yet

Assignment CAED 2012

3 pages

 Design and Optimization of Aircraft Assembling Based On Comprehensive


Simulation of Manufacturing Processes - A. Rozhdestvensky, O. Samsonov

No ratings yet
Design and Optimization of Aircraft Assembling Based On Comprehensive
Simulation of Manufacturing Processes - A. Rozhdestvensky, O. Samsonov

10 pages

 Umbrella Activity

No ratings yet

Umbrella Activity

14 pages

 QPM1

 100% (1)

QPM1

200 pages

Footer menu

Back to top

About

 About Scribd

 Everand: Ebooks & Audiobooks

 SlideShare

 Press

 Join our team!

 Contact us

 Invite friends

Support

 Help / FAQ

 Accessibility

 Purchase help

 AdChoices

Legal
 Terms

 Privacy

 Copyright

 Do not sell or share my personal information

Social

 Instagram Instagram

 Twitter Twitter

 Facebook Facebook

 Pinterest Pinterest

Get our free apps

 Documents

Language:

English
Copyright © 2024 Scribd Inc.

<Project Name> Version: <1.0>Configuration Management Plan Date:


<dd/mmm/yy><document identifier>

Table of Contents

1.Introduction31.1Purpose31.2Scope31.3Definitions, Acronyms, and


Abbreviations31.4References31.5Overview32.Software Configuration
Management32.1Organization, Responsibilities, and Interfaces32.2Tools,
Environment, and Infrastructure33.The Configuration Management
Program33.1Configuration Identification33.1.1Identification
Methods33.1.2Project Baselines33.2Configuration and Change
Control33.2.1Change Request Processing and Approval33.2.2Change Control
Board (CCB)33.3Configuration Status Accounting33.3.1Project Media Storage
and Release Process33.3.2Reports and Audits34.Milestones35.Training and
Resources36.Subcontractor and Vendor Software Control3

Configuration Management Plan

1.Introduction

[The introduction of the

Configuration Management Plan

provides an overview of the entire document. It includes the purpose, scope,


definitions, acronyms, abbreviations, references, and overview of this

Configuration Management Plan

.]

1.1Purpose

[Specify the purpose of this

Configuration Management Plan.

1.2Scope

[A brief description of the scope of this


Configuration Management Plan

; what model it is associated with and anything else that is affected or


influenced by this document.]

1.3Definitions, Acronyms, and Abbreviations

[This subsection provides the definitions of all terms, acronyms, and


abbreviations required to properly interpret the

Configuration Management Plan

. This information may be provided by reference to the project’s Glossary.]

1.4References

[This subsection provides a complete list of all documents referenced


elsewhere in the

Configuration Management Plan

. Identify each document by title, report number (if applicable), date, and
publishing organization. Specify the sources from which the references can
be obtained. This information may be provided by reference to an appendix

Confidential

<Company Name>, 2021Page 3 of 5

<Project Name> Version: <1.0>Configuration Management Plan Date:


<dd/mmm/yy><document identifier>

or to another document.]

1.5Overview

[This subsection describes what the rest of the

Configuration Management Plan

contains and explains how the document is organized.]

2.Software Configuration Management


2.1Organization, Responsibilities, and Interfaces

[Describe who is going to be responsible for performing the various


Configuration Management (CM) activities described in the CM Process
Discipline.]

2.2Tools, Environment, and Infrastructure

[Describe the computing environment and software tools to be used in


fulfilling the CM functions throughout the project or product lifecycle.
Describe the tools and procedures required used to version control
configuration items generated throughout the project or product
lifecycle. Issues involved in setting up the CM environment include:

anticipated size of product data

distribution of the product team

physical location of servers and client machines]

3.The Configuration Management Program

3.1Configuration Identification

3.1.1Identification Methods

[Describe how project or product artifacts are to be named, marked, and


numbered. The identification scheme needs to cover hardware, system
software, Commercial-Off-The-Shelf (COTS) products, and all application
development artifacts listed in the product directory structure; for example,
plans, models, components, test software, results and data, executables,
and so on.]

3.1.2Project Baselines

[Baselines provide an official standard on which subsequent work is based


and to which only authorized changes are made. Describe at what points
during the project or product lifecycle the baselines are to be established.
The most common baselines would be at the end of each of the Inception,
Elaboration, Construction, and Transition phases. Baselines could also be
generated at the end of iterations within the various phases or even more
frequently. Describe who authorizes a baseline and what goes into it.]

3.2Configuration and Change Control

3.2.1Change Request Processing and Approval

[Describe the process by which problems and changes are submitted,


reviewed, and dispositioned.]

3.2.2Change Control Board (CCB)

[Describe the CCB membership and the procedures for processing change
requests and approvals to be followed bythe CCB.]

Confidential

<Company Name>, 2021Page 4 of 5

Reward Your Curiosity

Everything you want to read.

Anytime. Anywhere. Any device.

No Commitment. Cancel anytime.


Share this document

Share or Embed Document

Sharing Options

 Share on Facebook, opens a new window

 Share on Twitter, opens a new window

 Share on LinkedIn, opens a new window

 Share with Email, opens mail client

 Copy link

You might also like

 Team Members: Chetnaba Bhalgaria 02 Piyush Jagwani 11 Shivani


Pandita 21 Shruti Patil 30
No ratings yet

Team Members: Chetnaba Bhalgaria 02 Piyush Jagwani 11 Shivani Pandita 21


Shruti Patil 30

59 pages

 ITIL Quizlet

No ratings yet

ITIL Quizlet

23 pages

 Configuration Management Plan


 100% (5)

Configuration Management Plan

27 pages

 Functional Specification Document Template

 100% (2)

Functional Specification Document Template

11 pages

 Event Management: Software Requirements Specification Document


 100% (6)

Event Management: Software Requirements Specification Document

19 pages

 ITIL Heroes Handbook

No ratings yet

ITIL Heroes Handbook

42 pages

 Software Configuration Management Plan Template 2013

No ratings yet

Software Configuration Management Plan Template 2013

7 pages

 Requirements Management: Based On Material From

 100% (1)

Requirements Management: Based On Material From

72 pages

 Process Configuring Method in Bpm Project

 From Everand

Process Configuring Method in Bpm Project

Seyed Ahmad Daliri

No ratings yet
 Configuration Management SOP Sample

 20% (5)

Configuration Management SOP Sample

5 pages

 DD

No ratings yet

DD

149 pages

 Amit Kumar Sahu: Professional Preface

No ratings yet

Amit Kumar Sahu: Professional Preface

4 pages

 Requirements Document Template (UPEDU)

 100% (3)

Requirements Document Template (UPEDU)

6 pages

 Project Manufacturing For Dummies DELTEK 2016

 100% (2)

Project Manufacturing For Dummies DELTEK 2016

76 pages

 Software Quality Assurance Plan PDF

No ratings yet

Software Quality Assurance Plan PDF

35 pages

 Software Requirements Specifications Template 2018

No ratings yet

Software Requirements Specifications Template 2018


14 pages

 Software Configuration Management Plan Template

No ratings yet

Software Configuration Management Plan Template

8 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

20 pages

 PMP Chapter 4 Test Project Integration Management

No ratings yet

PMP Chapter 4 Test Project Integration Management

3 pages

 Thank-You For Downloading The Project Management Plan Template!

No ratings yet

Thank-You For Downloading The Project Management Plan Template!

7 pages

 Thank-You For Downloading The SW Tool IQ-OQ-PQ Template!

No ratings yet

Thank-You For Downloading The SW Tool IQ-OQ-PQ Template!

14 pages

 Qm020 Quality Management Checklist

No ratings yet

Qm020 Quality Management Checklist

9 pages

 IEC62304 Template Software Development Plan V1 0

No ratings yet
IEC62304 Template Software Development Plan V1 0

11 pages

 V Modell XT - V1.3 PDF

No ratings yet

V Modell XT - V1.3 PDF

825 pages

 QA Plan Template Blank

 100% (4)

QA Plan Template Blank

31 pages

 Quality Assurance Plan Template

No ratings yet

Quality Assurance Plan Template

8 pages

 PRINCE2-Exams Test-Inside PRINCE2-Foundation Examcollction v2016-06-


23 by Floyd 149q Vce

No ratings yet

PRINCE2-Exams Test-Inside PRINCE2-Foundation Examcollction v2016-06-23


by Floyd 149q Vce

18 pages

 Project Management Plan Template

No ratings yet

Project Management Plan Template

17 pages

 Navy C4ISR Procedures Interface Standards Opnav-9410-5c

No ratings yet

Navy C4ISR Procedures Interface Standards Opnav-9410-5c


9 pages

 Creating Technical Documentation TTLM Final

No ratings yet

Creating Technical Documentation TTLM Final

121 pages

 Supporting (Implementation (A) (B) : Department of

No ratings yet

Supporting (Implementation (A) (B) : Department of

71 pages

 Isp250 FR - Mytecc E-Commerce System

 100% (1)

Isp250 FR - Mytecc E-Commerce System

18 pages

 Requirements Management Plan: Version

No ratings yet

Requirements Management Plan: Version

8 pages

 Saluran Air Jasmine

No ratings yet

Saluran Air Jasmine

8 pages

 Шаблон-RUP. Product Acceptance Plan

No ratings yet

Шаблон-RUP. Product Acceptance Plan

5 pages

 Supplementary Specification

No ratings yet
Supplementary Specification

7 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

8 pages

 Interface Control Document

No ratings yet

Interface Control Document

4 pages

 College Bus Management System College Bus Management System

No ratings yet

College Bus Management System College Bus Management System

9 pages

 Software Requirements Specification Template

No ratings yet

Software Requirements Specification Template

8 pages

 Software Requirements Specification For

No ratings yet

Software Requirements Specification For

5 pages

 Data Lifecycle MGT Plan

No ratings yet

Data Lifecycle MGT Plan

5 pages

 Quality Assurance Plan


No ratings yet

Quality Assurance Plan

7 pages

 1.requirements Management Plan - RMP

No ratings yet

1.requirements Management Plan - RMP

20 pages

 WH-FORM-XX-1.0 EN - Technical Documentation MDR Software Master


Record Template

No ratings yet

WH-FORM-XX-1.0 EN - Technical Documentation MDR Software Master Record


Template

26 pages

 Measurement Plan: Version

No ratings yet

Measurement Plan: Version

4 pages

 Software Development Plan: Version

No ratings yet

Software Development Plan: Version

9 pages

 ITS332 SDP Template

No ratings yet

ITS332 SDP Template

8 pages

 Error: Reference Source Not Found Error: Reference Source Not Found

No ratings yet
Error: Reference Source Not Found Error: Reference Source Not Found

7 pages

 SRS Ieee

No ratings yet

SRS Ieee

7 pages

 Supplementary Specification

No ratings yet

Supplementary Specification

7 pages

 EPLC Configuration Management Template

No ratings yet

EPLC Configuration Management Template

9 pages

 Problem Resolution Plan: Version

 100% (1)

Problem Resolution Plan: Version

4 pages

 Product Acceptance Plan

No ratings yet

Product Acceptance Plan

5 pages

 Docc 9 F 3

No ratings yet

Docc 9 F 3

21 pages

 SRS MyKokoCenter
No ratings yet

SRS MyKokoCenter

47 pages

 (Product) MTM Program Product Software Project Plan: (Authors Names)

No ratings yet

(Product) MTM Program Product Software Project Plan: (Authors Names)

11 pages

 Vision (Small Project) : Authors

No ratings yet

Vision (Small Project) : Authors

7 pages

 Requirements Management Plan PPM Version 2.0

No ratings yet

Requirements Management Plan PPM Version 2.0

8 pages

 Software Requirements Specification

No ratings yet

Software Requirements Specification

5 pages

 SRS Template of Sample Case Study - 24032018

No ratings yet

SRS Template of Sample Case Study - 24032018

11 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

11 pages
 Its332 Srs Project

No ratings yet

Its332 Srs Project

14 pages

 S R S (S RS) : Takeholder Equirements Pecification T

No ratings yet

S R S (S RS) : Takeholder Equirements Pecification T

13 pages

 Software Requirements Specification

No ratings yet

Software Requirements Specification

9 pages

 CDC UP Requirements Management Plan Template

No ratings yet

CDC UP Requirements Management Plan Template

11 pages

 Pre-Appointment Bep Template

No ratings yet

Pre-Appointment Bep Template

7 pages

 SRS Sample Students

No ratings yet

SRS Sample Students

30 pages

 Configurationmanagementstrategy

No ratings yet

Configurationmanagementstrategy
7 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

7 pages

 Defect Tracking System

 50% (2)

Defect Tracking System

21 pages

 The Islamia University of Bahawalpur: Department of Software Engineering

No ratings yet

The Islamia University of Bahawalpur: Department of Software Engineering

14 pages

 Stmik Multi Data Palembang

No ratings yet

Stmik Multi Data Palembang

8 pages

 d1cs1104d SDP Group2

No ratings yet

d1cs1104d SDP Group2

9 pages

 Successful Service Design for Telecommunications: A comprehensive guide


to design and implementation

 From Everand

Successful Service Design for Telecommunications: A comprehensive guide


to design and implementation

Sauming Pang
No ratings yet

 Transit Quarters

From Everand

Transit Quarters

Shyamala Nemana

 4/5 (8)

 Midterm Exam - II Pao 2021 Software Engineering II

No ratings yet

Midterm Exam - II Pao 2021 Software Engineering II

26 pages

 Network Design and Management

No ratings yet

Network Design and Management

16 pages

 Norte Abierto - Aconex Project Configuration Management Plan

No ratings yet

Norte Abierto - Aconex Project Configuration Management Plan

14 pages

 Question Paper Software Project Management (MB3G2IT) : January 2009

No ratings yet

Question Paper Software Project Management (MB3G2IT) : January 2009

18 pages

 Configuration Management and Version Control

No ratings yet

Configuration Management and Version Control

6 pages

 Software Engineering GTU Syllabus


No ratings yet

Software Engineering GTU Syllabus

3 pages

 Accelerator Safety

No ratings yet

Accelerator Safety

10 pages

 10 SCM

No ratings yet

10 SCM

23 pages

 Project Scheduling and Staffing, Software Configuration Management Plan

No ratings yet

Project Scheduling and Staffing, Software Configuration Management Plan

3 pages

 Software Configuration Management Plan: I. Table of Contents

No ratings yet

Software Configuration Management Plan: I. Table of Contents

14 pages

 Assignment CAED 2012

No ratings yet

Assignment CAED 2012

3 pages

 Design and Optimization of Aircraft Assembling Based On Comprehensive


Simulation of Manufacturing Processes - A. Rozhdestvensky, O. Samsonov

No ratings yet
Design and Optimization of Aircraft Assembling Based On Comprehensive
Simulation of Manufacturing Processes - A. Rozhdestvensky, O. Samsonov

10 pages

 Umbrella Activity

No ratings yet

Umbrella Activity

14 pages

 QPM1

 100% (1)

QPM1

200 pages

Footer menu

Back to top

About

 About Scribd

 Everand: Ebooks & Audiobooks

 SlideShare

 Press

 Join our team!

 Contact us

 Invite friends

Support

 Help / FAQ

 Accessibility

 Purchase help

 AdChoices

Legal
 Terms

 Privacy

 Copyright

 Do not sell or share my personal information

Social

 Instagram Instagram

 Twitter Twitter

 Facebook Facebook

 Pinterest Pinterest

Get our free apps

 Documents

Language:

English
Copyright © 2024 Scribd Inc.

Purpose

[Specify the purpose of this

Configuration Management Plan.

1.2Scope

[A brief description of the scope of this

Configuration Management Plan

; what model it is associated with and anything else that is affected or


influenced by this document.]

1.3Definitions, Acronyms, and Abbreviations

[This subsection provides the definitions of all terms, acronyms, and


abbreviations required to properly interpret the

Configuration Management Plan

. This information may be provided by reference to the project’s Glossary.]

1.4References

[This subsection provides a complete list of all documents referenced


elsewhere in the

Configuration Management Plan

. Identify each document by title, report number (if applicable), date, and
publishing organization. Specify the sources from which the references can
be obtained. This information may be provided by reference to an appendix

Confidential

<Company Name>, 2021Page 3 of 5


<Project Name> Version: <1.0>Configuration Management Plan Date:
<dd/mmm/yy><document identifier>

or to another document.]

1.5Overview

[This subsection describes what the rest of the

Configuration Management Plan

contains and explains how the document is organized.]

2.Software Configuration Management

2.1Organization, Responsibilities, and Interfaces

[Describe who is going to be responsible for performing the various


Configuration Management (CM) activities described in the CM Process
Discipline.]

2.2Tools, Environment, and Infrastructure

[Describe the computing environment and software tools to be used in


fulfilling the CM functions throughout the project or product lifecycle.
Describe the tools and procedures required used to version control
configuration items generated throughout the project or product
lifecycle. Issues involved in setting up the CM environment include:

anticipated size of product data

distribution of the product team

physical location of servers and client machines]

3.The Configuration Management Program

3.1Configuration Identification

3.1.1Identification Methods

[Describe how project or product artifacts are to be named, marked, and


numbered. The identification scheme needs to cover hardware, system
software, Commercial-Off-The-Shelf (COTS) products, and all application
development artifacts listed in the product directory structure; for example,
plans, models, components, test software, results and data, executables,
and so on.]

3.1.2Project Baselines

[Baselines provide an official standard on which subsequent work is based


and to which only authorized changes are made. Describe at what points
during the project or product lifecycle the baselines are to be established.
The most common baselines would be at the end of each of the Inception,
Elaboration, Construction, and Transition phases. Baselines could also be
generated at the end of iterations within the various phases or even more
frequently. Describe who authorizes a baseline and what goes into it.]

3.2Configuration and Change Control

3.2.1Change Request Processing and Approval

[Describe the process by which problems and changes are submitted,


reviewed, and dispositioned.]

3.2.2Change Control Board (CCB)

[Describe the CCB membership and the procedures for processing change
requests and approvals to be followed bythe CCB.]

Confidential

<Company Name>, 2021Page 4 of 5

Reward Your Curiosity

Everything you want to read.

Anytime. Anywhere. Any device.

No Commitment. Cancel anytime.


Share this document

Share or Embed Document

Sharing Options

 Share on Facebook, opens a new window

 Share on Twitter, opens a new window

 Share on LinkedIn, opens a new window

 Share with Email, opens mail client

 Copy link

You might also like

 Team Members: Chetnaba Bhalgaria 02 Piyush Jagwani 11 Shivani


Pandita 21 Shruti Patil 30
No ratings yet

Team Members: Chetnaba Bhalgaria 02 Piyush Jagwani 11 Shivani Pandita 21


Shruti Patil 30

59 pages

 ITIL Quizlet

No ratings yet

ITIL Quizlet

23 pages

 Configuration Management Plan


 100% (5)

Configuration Management Plan

27 pages

 Functional Specification Document Template

 100% (2)

Functional Specification Document Template

11 pages

 Event Management: Software Requirements Specification Document


 100% (6)

Event Management: Software Requirements Specification Document

19 pages

 ITIL Heroes Handbook

No ratings yet

ITIL Heroes Handbook

42 pages

 Software Configuration Management Plan Template 2013

No ratings yet

Software Configuration Management Plan Template 2013

7 pages

 Requirements Management: Based On Material From

 100% (1)

Requirements Management: Based On Material From

72 pages

 Process Configuring Method in Bpm Project

 From Everand

Process Configuring Method in Bpm Project

Seyed Ahmad Daliri

No ratings yet
 Configuration Management SOP Sample

 20% (5)

Configuration Management SOP Sample

5 pages

 DD

No ratings yet

DD

149 pages

 Amit Kumar Sahu: Professional Preface

No ratings yet

Amit Kumar Sahu: Professional Preface

4 pages

 Requirements Document Template (UPEDU)

 100% (3)

Requirements Document Template (UPEDU)

6 pages

 Project Manufacturing For Dummies DELTEK 2016

 100% (2)

Project Manufacturing For Dummies DELTEK 2016

76 pages

 Software Quality Assurance Plan PDF

No ratings yet

Software Quality Assurance Plan PDF

35 pages

 Software Requirements Specifications Template 2018

No ratings yet

Software Requirements Specifications Template 2018


14 pages

 Software Configuration Management Plan Template

No ratings yet

Software Configuration Management Plan Template

8 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

20 pages

 PMP Chapter 4 Test Project Integration Management

No ratings yet

PMP Chapter 4 Test Project Integration Management

3 pages

 Thank-You For Downloading The Project Management Plan Template!

No ratings yet

Thank-You For Downloading The Project Management Plan Template!

7 pages

 Thank-You For Downloading The SW Tool IQ-OQ-PQ Template!

No ratings yet

Thank-You For Downloading The SW Tool IQ-OQ-PQ Template!

14 pages

 Qm020 Quality Management Checklist

No ratings yet

Qm020 Quality Management Checklist

9 pages

 IEC62304 Template Software Development Plan V1 0

No ratings yet
IEC62304 Template Software Development Plan V1 0

11 pages

 V Modell XT - V1.3 PDF

No ratings yet

V Modell XT - V1.3 PDF

825 pages

 QA Plan Template Blank

 100% (4)

QA Plan Template Blank

31 pages

 Quality Assurance Plan Template

No ratings yet

Quality Assurance Plan Template

8 pages

 PRINCE2-Exams Test-Inside PRINCE2-Foundation Examcollction v2016-06-


23 by Floyd 149q Vce

No ratings yet

PRINCE2-Exams Test-Inside PRINCE2-Foundation Examcollction v2016-06-23


by Floyd 149q Vce

18 pages

 Project Management Plan Template

No ratings yet

Project Management Plan Template

17 pages

 Navy C4ISR Procedures Interface Standards Opnav-9410-5c

No ratings yet

Navy C4ISR Procedures Interface Standards Opnav-9410-5c


9 pages

 Creating Technical Documentation TTLM Final

No ratings yet

Creating Technical Documentation TTLM Final

121 pages

 Supporting (Implementation (A) (B) : Department of

No ratings yet

Supporting (Implementation (A) (B) : Department of

71 pages

 Isp250 FR - Mytecc E-Commerce System

 100% (1)

Isp250 FR - Mytecc E-Commerce System

18 pages

 Requirements Management Plan: Version

No ratings yet

Requirements Management Plan: Version

8 pages

 Saluran Air Jasmine

No ratings yet

Saluran Air Jasmine

8 pages

 Шаблон-RUP. Product Acceptance Plan

No ratings yet

Шаблон-RUP. Product Acceptance Plan

5 pages

 Supplementary Specification

No ratings yet
Supplementary Specification

7 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

8 pages

 Interface Control Document

No ratings yet

Interface Control Document

4 pages

 College Bus Management System College Bus Management System

No ratings yet

College Bus Management System College Bus Management System

9 pages

 Software Requirements Specification Template

No ratings yet

Software Requirements Specification Template

8 pages

 Software Requirements Specification For

No ratings yet

Software Requirements Specification For

5 pages

 Data Lifecycle MGT Plan

No ratings yet

Data Lifecycle MGT Plan

5 pages

 Quality Assurance Plan


No ratings yet

Quality Assurance Plan

7 pages

 1.requirements Management Plan - RMP

No ratings yet

1.requirements Management Plan - RMP

20 pages

 WH-FORM-XX-1.0 EN - Technical Documentation MDR Software Master


Record Template

No ratings yet

WH-FORM-XX-1.0 EN - Technical Documentation MDR Software Master Record


Template

26 pages

 Measurement Plan: Version

No ratings yet

Measurement Plan: Version

4 pages

 Software Development Plan: Version

No ratings yet

Software Development Plan: Version

9 pages

 ITS332 SDP Template

No ratings yet

ITS332 SDP Template

8 pages

 Error: Reference Source Not Found Error: Reference Source Not Found

No ratings yet
Error: Reference Source Not Found Error: Reference Source Not Found

7 pages

 SRS Ieee

No ratings yet

SRS Ieee

7 pages

 Supplementary Specification

No ratings yet

Supplementary Specification

7 pages

 EPLC Configuration Management Template

No ratings yet

EPLC Configuration Management Template

9 pages

 Problem Resolution Plan: Version

 100% (1)

Problem Resolution Plan: Version

4 pages

 Product Acceptance Plan

No ratings yet

Product Acceptance Plan

5 pages

 Docc 9 F 3

No ratings yet

Docc 9 F 3

21 pages

 SRS MyKokoCenter
No ratings yet

SRS MyKokoCenter

47 pages

 (Product) MTM Program Product Software Project Plan: (Authors Names)

No ratings yet

(Product) MTM Program Product Software Project Plan: (Authors Names)

11 pages

 Vision (Small Project) : Authors

No ratings yet

Vision (Small Project) : Authors

7 pages

 Requirements Management Plan PPM Version 2.0

No ratings yet

Requirements Management Plan PPM Version 2.0

8 pages

 Software Requirements Specification

No ratings yet

Software Requirements Specification

5 pages

 SRS Template of Sample Case Study - 24032018

No ratings yet

SRS Template of Sample Case Study - 24032018

11 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

11 pages
 Its332 Srs Project

No ratings yet

Its332 Srs Project

14 pages

 S R S (S RS) : Takeholder Equirements Pecification T

No ratings yet

S R S (S RS) : Takeholder Equirements Pecification T

13 pages

 Software Requirements Specification

No ratings yet

Software Requirements Specification

9 pages

 CDC UP Requirements Management Plan Template

No ratings yet

CDC UP Requirements Management Plan Template

11 pages

 Pre-Appointment Bep Template

No ratings yet

Pre-Appointment Bep Template

7 pages

 SRS Sample Students

No ratings yet

SRS Sample Students

30 pages

 Configurationmanagementstrategy

No ratings yet

Configurationmanagementstrategy
7 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

7 pages

 Defect Tracking System

 50% (2)

Defect Tracking System

21 pages

 The Islamia University of Bahawalpur: Department of Software Engineering

No ratings yet

The Islamia University of Bahawalpur: Department of Software Engineering

14 pages

 Stmik Multi Data Palembang

No ratings yet

Stmik Multi Data Palembang

8 pages

 d1cs1104d SDP Group2

No ratings yet

d1cs1104d SDP Group2

9 pages

 Successful Service Design for Telecommunications: A comprehensive guide


to design and implementation

 From Everand

Successful Service Design for Telecommunications: A comprehensive guide


to design and implementation

Sauming Pang
No ratings yet

 Transit Quarters

From Everand

Transit Quarters

Shyamala Nemana

 4/5 (8)

 Midterm Exam - II Pao 2021 Software Engineering II

No ratings yet

Midterm Exam - II Pao 2021 Software Engineering II

26 pages

 Network Design and Management

No ratings yet

Network Design and Management

16 pages

 Norte Abierto - Aconex Project Configuration Management Plan

No ratings yet

Norte Abierto - Aconex Project Configuration Management Plan

14 pages

 Question Paper Software Project Management (MB3G2IT) : January 2009

No ratings yet

Question Paper Software Project Management (MB3G2IT) : January 2009

18 pages

 Configuration Management and Version Control

No ratings yet

Configuration Management and Version Control

6 pages

 Software Engineering GTU Syllabus


No ratings yet

Software Engineering GTU Syllabus

3 pages

 Accelerator Safety

No ratings yet

Accelerator Safety

10 pages

 10 SCM

No ratings yet

10 SCM

23 pages

 Project Scheduling and Staffing, Software Configuration Management Plan

No ratings yet

Project Scheduling and Staffing, Software Configuration Management Plan

3 pages

 Software Configuration Management Plan: I. Table of Contents

No ratings yet

Software Configuration Management Plan: I. Table of Contents

14 pages

 Assignment CAED 2012

No ratings yet

Assignment CAED 2012

3 pages

 Design and Optimization of Aircraft Assembling Based On Comprehensive


Simulation of Manufacturing Processes - A. Rozhdestvensky, O. Samsonov

No ratings yet
Design and Optimization of Aircraft Assembling Based On Comprehensive
Simulation of Manufacturing Processes - A. Rozhdestvensky, O. Samsonov

10 pages

 Umbrella Activity

No ratings yet

Umbrella Activity

14 pages

 QPM1

 100% (1)

QPM1

200 pages

Footer menu

Back to top

About

 About Scribd

 Everand: Ebooks & Audiobooks

 SlideShare

 Press

 Join our team!

 Contact us

 Invite friends

Support

 Help / FAQ

 Accessibility

 Purchase help

 AdChoices

Legal
 Terms

 Privacy

 Copyright

 Do not sell or share my personal information

Social

 Instagram Instagram

 Twitter Twitter

 Facebook Facebook

 Pinterest Pinterest

Get our free apps

 Documents

Language:

English
Copyright © 2024 Scribd Inc.

e:

English

Copyright © 2024 Scribd Inc.

Purpose

[Specify the purpose of this

Configuration Management Plan.

1.2Scope

[A brief description of the scope of this

Configuration Management Plan

; what model it is associated with and anything else that is affected or


influenced by this document.]

1.3Definitions, Acronyms, and Abbreviations

[This subsection provides the definitions of all terms, acronyms, and


abbreviations required to properly interpret the

Configuration Management Plan

. This information may be provided by reference to the project’s Glossary.]

1.4References

[This subsection provides a complete list of all documents referenced


elsewhere in the

Configuration Management Plan


. Identify each document by title, report number (if applicable), date, and
publishing organization. Specify the sources from which the references can
be obtained. This information may be provided by reference to an appendix

Confidential

<Company Name>, 2021Page 3 of 5

<Project Name> Version: <1.0>Configuration Management Plan Date:


<dd/mmm/yy><document identifier>

or to another document.]

1.5Overview

[This subsection describes what the rest of the

Configuration Management Plan

contains and explains how the document is organized.]

2.Software Configuration Management

2.1Organization, Responsibilities, and Interfaces

[Describe who is going to be responsible for performing the various


Configuration Management (CM) activities described in the CM Process
Discipline.]

2.2Tools, Environment, and Infrastructure

[Describe the computing environment and software tools to be used in


fulfilling the CM functions throughout the project or product lifecycle.
Describe the tools and procedures required used to version control
configuration items generated throughout the project or product
lifecycle. Issues involved in setting up the CM environment include:

anticipated size of product data


distribution of the product team

physical location of servers and client machines]

3.The Configuration Management Program

3.1Configuration Identification

3.1.1Identification Methods

[Describe how project or product artifacts are to be named, marked, and


numbered. The identification scheme needs to cover hardware, system
software, Commercial-Off-The-Shelf (COTS) products, and all application
development artifacts listed in the product directory structure; for example,
plans, models, components, test software, results and data, executables,
and so on.]

3.1.2Project Baselines

[Baselines provide an official standard on which subsequent work is based


and to which only authorized changes are made. Describe at what points
during the project or product lifecycle the baselines are to be established.
The most common baselines would be at the end of each of the Inception,
Elaboration, Construction, and Transition phases. Baselines could also be
generated at the end of iterations within the various phases or even more
frequently. Describe who authorizes a baseline and what goes into it.]

3.2Configuration and Change Control

3.2.1Change Request Processing and Approval

[Describe the process by which problems and changes are submitted,


reviewed, and dispositioned.]

3.2.2Change Control Board (CCB)

[Describe the CCB membership and the procedures for processing change
requests and approvals to be followed bythe CCB.]

Confidential

<Company Name>, 2021Page 4 of 5


Reward Your Curiosity

Everything you want to read.

Anytime. Anywhere. Any device.

No Commitment. Cancel anytime.

Share this document

Share or Embed Document

Sharing Options

 Share on Facebook, opens a new window

 Share on Twitter, opens a new window

 Share on LinkedIn, opens a new window

 Share with Email, opens mail client

 Copy link

You might also like

 Team Members: Chetnaba Bhalgaria 02 Piyush Jagwani 11 Shivani


Pandita 21 Shruti Patil 30
No ratings yet

Team Members: Chetnaba Bhalgaria 02 Piyush Jagwani 11 Shivani Pandita 21


Shruti Patil 30

59 pages

 ITIL Quizlet

No ratings yet

ITIL Quizlet

23 pages

 Configuration Management Plan


 100% (5)

Configuration Management Plan

27 pages

 Functional Specification Document Template

 100% (2)

Functional Specification Document Template

11 pages

 Event Management: Software Requirements Specification Document


 100% (6)

Event Management: Software Requirements Specification Document

19 pages

 ITIL Heroes Handbook

No ratings yet

ITIL Heroes Handbook

42 pages

 Software Configuration Management Plan Template 2013

No ratings yet

Software Configuration Management Plan Template 2013

7 pages

 Requirements Management: Based On Material From

 100% (1)

Requirements Management: Based On Material From

72 pages

 Process Configuring Method in Bpm Project

 From Everand

Process Configuring Method in Bpm Project

Seyed Ahmad Daliri

No ratings yet
 Configuration Management SOP Sample

 20% (5)

Configuration Management SOP Sample

5 pages

 DD

No ratings yet

DD

149 pages

 Amit Kumar Sahu: Professional Preface

No ratings yet

Amit Kumar Sahu: Professional Preface

4 pages

 Requirements Document Template (UPEDU)

 100% (3)

Requirements Document Template (UPEDU)

6 pages

 Project Manufacturing For Dummies DELTEK 2016

 100% (2)

Project Manufacturing For Dummies DELTEK 2016

76 pages

 Software Quality Assurance Plan PDF

No ratings yet

Software Quality Assurance Plan PDF

35 pages

 Software Requirements Specifications Template 2018

No ratings yet

Software Requirements Specifications Template 2018


14 pages

 Software Configuration Management Plan Template

No ratings yet

Software Configuration Management Plan Template

8 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

20 pages

 PMP Chapter 4 Test Project Integration Management

No ratings yet

PMP Chapter 4 Test Project Integration Management

3 pages

 Thank-You For Downloading The Project Management Plan Template!

No ratings yet

Thank-You For Downloading The Project Management Plan Template!

7 pages

 Thank-You For Downloading The SW Tool IQ-OQ-PQ Template!

No ratings yet

Thank-You For Downloading The SW Tool IQ-OQ-PQ Template!

14 pages

 Qm020 Quality Management Checklist

No ratings yet

Qm020 Quality Management Checklist

9 pages

 IEC62304 Template Software Development Plan V1 0

No ratings yet
IEC62304 Template Software Development Plan V1 0

11 pages

 V Modell XT - V1.3 PDF

No ratings yet

V Modell XT - V1.3 PDF

825 pages

 QA Plan Template Blank

 100% (4)

QA Plan Template Blank

31 pages

 Quality Assurance Plan Template

No ratings yet

Quality Assurance Plan Template

8 pages

 PRINCE2-Exams Test-Inside PRINCE2-Foundation Examcollction v2016-06-


23 by Floyd 149q Vce

No ratings yet

PRINCE2-Exams Test-Inside PRINCE2-Foundation Examcollction v2016-06-23


by Floyd 149q Vce

18 pages

 Project Management Plan Template

No ratings yet

Project Management Plan Template

17 pages

 Navy C4ISR Procedures Interface Standards Opnav-9410-5c

No ratings yet

Navy C4ISR Procedures Interface Standards Opnav-9410-5c


9 pages

 Creating Technical Documentation TTLM Final

No ratings yet

Creating Technical Documentation TTLM Final

121 pages

 Supporting (Implementation (A) (B) : Department of

No ratings yet

Supporting (Implementation (A) (B) : Department of

71 pages

 Isp250 FR - Mytecc E-Commerce System

 100% (1)

Isp250 FR - Mytecc E-Commerce System

18 pages

 Requirements Management Plan: Version

No ratings yet

Requirements Management Plan: Version

8 pages

 Saluran Air Jasmine

No ratings yet

Saluran Air Jasmine

8 pages

 Шаблон-RUP. Product Acceptance Plan

No ratings yet

Шаблон-RUP. Product Acceptance Plan

5 pages

 Supplementary Specification

No ratings yet
Supplementary Specification

7 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

8 pages

 Interface Control Document

No ratings yet

Interface Control Document

4 pages

 College Bus Management System College Bus Management System

No ratings yet

College Bus Management System College Bus Management System

9 pages

 Software Requirements Specification Template

No ratings yet

Software Requirements Specification Template

8 pages

 Software Requirements Specification For

No ratings yet

Software Requirements Specification For

5 pages

 Data Lifecycle MGT Plan

No ratings yet

Data Lifecycle MGT Plan

5 pages

 Quality Assurance Plan


No ratings yet

Quality Assurance Plan

7 pages

 1.requirements Management Plan - RMP

No ratings yet

1.requirements Management Plan - RMP

20 pages

 WH-FORM-XX-1.0 EN - Technical Documentation MDR Software Master


Record Template

No ratings yet

WH-FORM-XX-1.0 EN - Technical Documentation MDR Software Master Record


Template

26 pages

 Measurement Plan: Version

No ratings yet

Measurement Plan: Version

4 pages

 Software Development Plan: Version

No ratings yet

Software Development Plan: Version

9 pages

 ITS332 SDP Template

No ratings yet

ITS332 SDP Template

8 pages

 Error: Reference Source Not Found Error: Reference Source Not Found

No ratings yet
Error: Reference Source Not Found Error: Reference Source Not Found

7 pages

 SRS Ieee

No ratings yet

SRS Ieee

7 pages

 Supplementary Specification

No ratings yet

Supplementary Specification

7 pages

 EPLC Configuration Management Template

No ratings yet

EPLC Configuration Management Template

9 pages

 Problem Resolution Plan: Version

 100% (1)

Problem Resolution Plan: Version

4 pages

 Product Acceptance Plan

No ratings yet

Product Acceptance Plan

5 pages

 Docc 9 F 3

No ratings yet

Docc 9 F 3

21 pages

 SRS MyKokoCenter
No ratings yet

SRS MyKokoCenter

47 pages

 (Product) MTM Program Product Software Project Plan: (Authors Names)

No ratings yet

(Product) MTM Program Product Software Project Plan: (Authors Names)

11 pages

 Vision (Small Project) : Authors

No ratings yet

Vision (Small Project) : Authors

7 pages

 Requirements Management Plan PPM Version 2.0

No ratings yet

Requirements Management Plan PPM Version 2.0

8 pages

 Software Requirements Specification

No ratings yet

Software Requirements Specification

5 pages

 SRS Template of Sample Case Study - 24032018

No ratings yet

SRS Template of Sample Case Study - 24032018

11 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

11 pages
 Its332 Srs Project

No ratings yet

Its332 Srs Project

14 pages

 S R S (S RS) : Takeholder Equirements Pecification T

No ratings yet

S R S (S RS) : Takeholder Equirements Pecification T

13 pages

 Software Requirements Specification

No ratings yet

Software Requirements Specification

9 pages

 CDC UP Requirements Management Plan Template

No ratings yet

CDC UP Requirements Management Plan Template

11 pages

 Pre-Appointment Bep Template

No ratings yet

Pre-Appointment Bep Template

7 pages

 SRS Sample Students

No ratings yet

SRS Sample Students

30 pages

 Configurationmanagementstrategy

No ratings yet

Configurationmanagementstrategy
7 pages

 Requirements Management Plan

No ratings yet

Requirements Management Plan

7 pages

 Defect Tracking System

 50% (2)

Defect Tracking System

21 pages

 The Islamia University of Bahawalpur: Department of Software Engineering

No ratings yet

The Islamia University of Bahawalpur: Department of Software Engineering

14 pages

 Stmik Multi Data Palembang

No ratings yet

Stmik Multi Data Palembang

8 pages

 d1cs1104d SDP Group2

No ratings yet

d1cs1104d SDP Group2

9 pages

 Successful Service Design for Telecommunications: A comprehensive guide


to design and implementation

 From Everand

Successful Service Design for Telecommunications: A comprehensive guide


to design and implementation

Sauming Pang
No ratings yet

 Transit Quarters

From Everand

Transit Quarters

Shyamala Nemana

 4/5 (8)

 Midterm Exam - II Pao 2021 Software Engineering II

No ratings yet

Midterm Exam - II Pao 2021 Software Engineering II

26 pages

 Network Design and Management

No ratings yet

Network Design and Management

16 pages

 Norte Abierto - Aconex Project Configuration Management Plan

No ratings yet

Norte Abierto - Aconex Project Configuration Management Plan

14 pages

 Question Paper Software Project Management (MB3G2IT) : January 2009

No ratings yet

Question Paper Software Project Management (MB3G2IT) : January 2009

18 pages

 Configuration Management and Version Control

No ratings yet

Configuration Management and Version Control

6 pages

 Software Engineering GTU Syllabus


No ratings yet

Software Engineering GTU Syllabus

3 pages

 Accelerator Safety

No ratings yet

Accelerator Safety

10 pages

 10 SCM

No ratings yet

10 SCM

23 pages

 Project Scheduling and Staffing, Software Configuration Management Plan

No ratings yet

Project Scheduling and Staffing, Software Configuration Management Plan

3 pages

 Software Configuration Management Plan: I. Table of Contents

No ratings yet

Software Configuration Management Plan: I. Table of Contents

14 pages

 Assignment CAED 2012

No ratings yet

Assignment CAED 2012

3 pages

 Design and Optimization of Aircraft Assembling Based On Comprehensive


Simulation of Manufacturing Processes - A. Rozhdestvensky, O. Samsonov

No ratings yet
Design and Optimization of Aircraft Assembling Based On Comprehensive
Simulation of Manufacturing Processes - A. Rozhdestvensky, O. Samsonov

10 pages

 Umbrella Activity

No ratings yet

Umbrella Activity

14 pages

 QPM1

 100% (1)

QPM1

200 pages

Footer menu

Back to top

About

 About Scribd

 Everand: Ebooks & Audiobooks

 SlideShare

 Press

 Join our team!

 Contact us

 Invite friends

Support

 Help / FAQ

 Accessibility

 Purchase help

 AdChoices

Legal
 Terms

 Privacy

 Copyright

 Do not sell or share my personal information

Social

 Instagram Instagram

 Twitter Twitter

 Facebook Facebook

 Pinterest Pinterest

Get our free apps

 Documents

Language:

English
Copyright © 2024 Scribd Inc.

You might also like