0% found this document useful (0 votes)
72 views1 page

RVNL Ans3 Itd Ab 16CB1 1438 - R0

Uploaded by

Manobes Bera
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
72 views1 page

RVNL Ans3 Itd Ab 16CB1 1438 - R0

Uploaded by

Manobes Bera
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3

SCHEDULE OF REINFORCEMENT - BEAM - B124 SCHEDULE OF REINFORCEMENT - BEAM - B113

1 2

DETAIL X

(TYPICAL DETAIL OF HOOK)


VARYING DEPTH (900 TO 2000) VARYING DEPTH (900 TO 2000)

PLATFORM BEAM B124 (900xAS PER SEC.)-ALONG GRID - N

2 3 4

3 4 5

SPECIAL NOTES

PLATFORM BEAM B113 (1200xAS PER SEC.)-ALONG GRID - B


REASONS FOR REVISION IN DETAIL WITH REFERENCES

REFERENCE DRAWINGS

GENERAL NOTES

LEGEND & GRAPHIC SCALE


SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 Legend :
0 0.25 0.5 1.0m 0 0.5 1.0 2.0m

SCALE 1:25 SCALE 1:50

PROJECT MANAGERS: DETAILED DESIGN CONSULTANT RAIL VIKAS NIGAM LIMITED


TANDON CONSULTANTS PVT. LTD. - FOUNTAINHEAD - JV ITD Cementation India Limited METRO RAILWAY, KOLKATA (A Government of India Enterprise)

Cem
1ST FLOOR, AUGUST KRANTI BHAWAN, PLOT NO. 25, BHIKAJI CAMA PLACE, R.K. PURAM, NEW DELHI - 110066
THIS DRAWING IS THE PROPERTY

TCPL-FH JV'S SCOPE OF WORKS DOES NOT INCLUDE SUPERVISION OF CONSTRUCTION FOR THIS PROJECT. THESE
"Godrej Waterside", Tower No. 1, Office #803, 8th Floor, Plot No. 5,
OF RAIL VIKAS NIGAM LTD.

DRAWING REPRESENT THE "AS-BUILT"STATUS OF CONSTRUCTION ON SITE AS CONFIRMED BY THE


CONTRACTOR/SUPERVISION AGENCY.ALL THE SKETCHES, FCR, OTHER CHANGES INFORMED VIDE EMAIL'S SITE Block -DP, Sector - V, Salt Lake City, Kolkata -700091 METRO CORRIDOR - NEW GARIA TO BIMAN BANDAR, KOLKATA
INSTRUCTION REGISTER ETC.PREPARED AND ISSUED DURING CONSTRUCTION STAGES OF THE PROJECT AND AS
PH. +033-23412400 FAX: +033-23412410
Rail Vikas Nigam Limited SUPPLIED BY CONTRACTOR HAVE BEEN INCORPORATED IN "AS BUILT"DRAWING.
Commitment , Reliability & Quality

21TTM
METRO RAILWAY STAMP CONTRACT:AND S2 - DETAILED DESIGN CONSULTANCY SERVICES FOR EIGHT

20SC2
(A Government of India Enterprise) TANDON CONSULTANTS PVT. LTD. IT IS CERTIFIED THAT WORK HAS BEEN EXECUTED AS PER APPROVED WITHOUT FIELD CHANGE REQUEST
23VPR
22RBT
19CVC
ELEVATED METRO STATIONS FROM BELIAGHATA (CH: km 9.500) TO
17, LINK ROAD, JANGPURA EXTN. NEW DELHI-110014. PH. +91-11-24317684, 24319288, 24310509 FAX:
CBD-1 (CH: km 18.630) STATIONS - BOTH STATIONS INCLUSIVE.

14BDN
18NTN

13TNP
+91-11-24316057 EMAIL: [email protected], [email protected] DRAWING INCORPORATING ALL FCR, SKETCHES,E-MAILS,SITE 17CB2
1ST FLOOR, AUGUST KRANTI BHAWAN, PLOT NO. 25, BHIKAJI CAMA PLACE, R.K. PURAM, NEW DELHI - 110066 WITH FCR BUT NO CHANGE IN DESIGN 12SLV
ARCHITECT & SERVICE CONSULTANTS 16CB1

15SC1
11NCO
INSTRUCTION REGISTER ETC. AND AS PER THE MODIFICATIONS LISTED
FOUNTAINHEAD WITH FCR AND CHANGE IN DESIGN 10GKG
STATION: CBD - 1

STRUCTURAL
RVNL'S SCOPE OF WORKS INCLUDE DESIGN COORDINATION AND CONSTRUCTION SUPERVISION FOR THIS PROJECT.THESE DRAWING 09BLG
REPRESENT THE "AS BUILT"STATUS OF CONSTRUCTION ON SITE. FAX: C-9/9148, VASANT KUNJ, NEW DELHI - 110070. TEL: +91 11 26891534 +91-11-26898459 HERE BY 08BSG
EMAIL: [email protected] 07RWG
TITLE: REINFORCEMENT DETAILS OF PLATFORM
B
06VBZ
NAME & DESIGNATION SIGN & DATE NAME & DESIGNATION SIGN & DATE 05HMJ

METRO RAILWAY DRAWING NO:


04KSK
03JNN
BEAM B113 AND B124
MR. N.K.SINGH MRS.S.KASHYAP MR. H.SINGH MR.KAMALESH CHAKRABORTY MR. S.K.MUKHOPADHYAY MR.R.KRISHNA DATE:
MR.PRAVEEN KUMAR MR.RAJAT MATHUR
MR.MANOBES BERA MOUSUMI CHAUDHURI MR.ANIRUDDHA GHOSAL MR.SUKHAMOY MAHADANI
02SRY REV. SCALE STATUS
GM / METRO-CIVIL / CO. SR / DGM / ARCHITECTURE CPM / KOL-II AGM / CIVIL / EXPERT / KOL-II AGM / ELECTRICAL / KOL. GM/S&T/KOL. (VICE PRESIDENT) (CHIEF ARCHITECT) 01KSU DRG. NO: RVNL-ANS3-ITD-AB - 16CB1-1438 R-0 AS SHOWN 06.06.2024 AS BUILT
PREPARED BY (JR.CAD OPERATOR) CHECKED BY (DY.PROJECT MANAGER) PEER CHECKED BY (CHIEF SURVEYOR) APPROVED BY (PROJECT MANAGER) STATION LOCATION